OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION December 23, 2024 Eric S. Carr Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, VA 23060-6711
SUBJECT:
VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO. 1 -
SUMMARY
OF SAFETY INSPECTION OF THE SERVICE WATER RESERVOIR DAM (CAC NOS. 001370/05000395; EPID L-2017-LNS-0015)
Dear Eric Carr:
Enclosed is a copy of the Dam Safety Inspection Report prepared by the Federal Energy Regulatory Commission (FERC) for the U.S. Nuclear Regulatory Commission (NRC). This report contains the results of an inspection completed on June 26, 2024, of the Service Water Pond (SWP) Dams (North, South, and East) and West Embankment at the Virgil C. Summer Nuclear Station, Unit No. 1. Based on observations made during the field inspection, review of data submitted by the owner, and discussions with the NRC staff and licensee representatives, FERC found that the SWP dam embankment and appurtenances were in satisfactory condition and adequately maintained and did not observe any conditions which would adversely affect the safety, permanence, and operational reliability of the SWP Dam.
The information in the report is considered Critical Energy Infrastructure Information (CEII). The Enclosure is considered sensitive security-related information, official use only, and is being withheld from public disclosure.
The enclosure transmitted herewith contains security-related information. When separated from the enclosure, this document is decontrolled.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION If you have any questions regarding this matter, I may be reached at (301) 415-2481, or by e-mail at Ed.Miller@nrc.gov.
Sincerely,
/RA/
G. Edward Miller, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-395
Enclosure:
FERC Inspection Report
Package: ML24344A193 (Non-Public)
OUO Cover LTR: ML24344A189 (Non-Public)
Public Cover LTR: ML24344A190 (Public)
Enclosure:
ML24344A191 (Non-Public)
OFFICE NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NRR/DEX/EXHB/DSO NRR/DORL/LPL2-1/PM NAME GEMiller KGoldstein KSee MMarkley (JKlos for)
DATE 12/5/2024 12/10/2024 12/12/2024 12/23/2024