Transmittal Letter for the Federal Energy Regulatory Commission (FERC) Dam Inspection Report (CAC No. 001370/05000395/L-2017-LNS-0015; EPID L-2019-LRO-0063) (Redacted Version)
ML19232A040
Person / Time
Site: Summer 
Issue date: 08/23/2019
From: Shawn Williams
Plant Licensing Branch II
To: Lippard G
South Carolina Electric & Gas Co
Williams S
Shared Package
ML19218A253 List:
References
CAC 001370, EPID L-2017-LNS-0015, EPID L-2019-LRO-0063
Download: ML19232A040 (4)


Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION CEII - DO NOT RELEASE OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION CEII - DO NOT RELEASE August 23, 2019 Mr. George A. Lippard, III Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88, Mail Code 800 Jenkinsville, SC 29065

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - TRANSMITTAL OF FERC DAM INSPECTION REPORT (CAC NO. 001370/05000395/L-2017-LNS-0015; EPID L-2019-LRO-0063)

Dear Mr. Lippard:

Enclosed is a copy of the Dam Safety Inspection Report prepared by the Federal Energy Regulatory Commission (FERC) for the U.S. Nuclear Regulatory Commission (NRC). This report contains the results of an inspection conducted on May 17, 2019, of the Service Water Pond (SWP) Dam at the Virgil C. Summer Nuclear Station, Unit 1. Based on observations made during the field inspection, review of data submitted by the owner, and discussions with the NRC staff and licensee representatives, FERC found that the SWP Dam embankment and appurtenances were in satisfactory condition and adequately maintained for service, stability, and longevity.

The enclosure is considered Critical Energy Infrastructure Information (CEII) by FERC and sensitive security-related information by the NRC, and thus is being withheld from public disclosure.

The enclosure transmitted herewith contains Critical Energy Infrastructure Information (CEII) as designated by the FERC and Security-Related Information as designated by the NRC. When separated from the enclosure, this transmittal document is decontrolled.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION CEII - DO NOT RELEASE OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION CEII - DO NOT RELEASE If you have any questions, please contact the Project Manager, Shawn Williams, at 301-415-1009 or by e-mail at Shawn.Williams@nrc.gov.

Sincerely,

/RA/

Shawn A. Williams, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-395

Enclosure:

FERC Dam Safety Inspection Report cc w/o encl: Listserv

ADAMS Package No. ML19218A253 (Non-Public)

Transmittal Letter - ML19218A298 (Non-Public)

Enclosure - FERC Report ML19218A297 (Non-Public)

Redacted Transmittal Letter - ML19232A040 (Public)

OFFICE DORL/LPL2-1/PM DORL/LPL2-1/LA NRO/DLSE/BC NAME SWilliams KGoldstein CMunson DATE 08/20/19 08/21/19 08/08/19 OFFICE DORL/LPL2-1/BC DORL/LPL2-1/PM NAME MMarkley SWilliams DATE 08/23/19 08/23/19