Letter Sequence Other |
---|
|
|
MONTHYEARML18233A4752018-08-24024 August 2018 Summary of Safety Inspection of the Service Water Reservoir Dam (CAC Nos. 001370/05000338 and 001370/05000339; EPID L-2017-LNS-0015) Project stage: Other ML19225B0702019-08-16016 August 2019 Redacted, Transmittal Letter for Dam Inspection Report (CAC Nos. 001370/05000348/L-2017-LNS-0015 and 001370/05000364/L-2017-LNS-0015) Project stage: Other ML19232A0402019-08-23023 August 2019 Transmittal Letter for the Federal Energy Regulatory Commission (FERC) Dam Inspection Report (CAC No. 001370/05000395/L-2017-LNS-0015; EPID L-2019-LRO-0063) (Redacted Version) Project stage: Other ML19246A1532019-09-12012 September 2019 Redacted, Transmittal of Dam Inspection Report (CAC No. 001370/05000400/L-2017-LNS-0015) Project stage: Other ML20006D5902020-01-0202 January 2020 Redacted - Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 - Transmittal of Dam Inspection Report Project stage: Other ML21272A3022021-12-0606 December 2021 Summary of Safety Inspection of the Service Water Reservoir Dam (CAC Nos. 001370/05000338 and 001370/05000339; EPID L-2017-LNS-0015)(Public Version) Project stage: Other ML22006A0122022-01-19019 January 2022 Redacted Cover Letter McGuire Dam Safety Inspection 2021, Public Project stage: Other ML22041A0052022-02-11011 February 2022 Transmittal of Dam Inspection Report (EPID L-2017-LNS-0015) (Public) Project stage: Other ML22047A2272022-02-18018 February 2022 Dam Inspection Cover Letter (Public - Redacted) Project stage: Other ML22077A8022022-03-22022 March 2022 Summary of the Dam Safety Inspection for Catawba'S Standby Nuclear Service Water Pond Dam (CAC Nos. 001370/05000413 and 001370/05000414; EPID L-2017-LNS-0015) (Redacted Letter) Project stage: Other ML22059A0972022-03-24024 March 2022 Summary of Safety Inspection of the Service Water Reservoir Dam (CAC Nos. 001370/05000395; EPID L-2017-LNS-0015) (Public) Project stage: Other ML23333A0872023-12-13013 December 2023 Transmittal of Dam Safety Inspection Report - Public Project stage: Other 2021-12-06
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] |
Text
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION December 6, 2021 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, VA 23060-6711
SUBJECT:
NORTH ANNA POWER STATION, UNIT NOS. 1 & 2 -
SUMMARY
OF SAFETY INSPECTION OF THE SERVICE WATER RESERVOIR DAM (CAC NOS. 001370/05000338 AND 001370/05000339; EPID L-2017-LNS-0015)
Dear Mr. Stoddard:
Enclosed is a copy of the Dam Safety Inspection Report prepared by the Federal Energy Regulatory Commission (FERC) for the U.S. Nuclear Regulatory Commission (NRC). This report contains the results of an inspection conducted on May 26, 2021, of the Service Water Reservoir (SWR) Dam at the North Anna Power Station, Unit Nos. 1 and 2. Based on observations made during the field inspection, review of data submitted by the owner, and discussions with the NRC staff and licensee representatives, FERC found that the SWR dam embankment and appurtenances were in satisfactory condition and maintained adequately for service, stability, and longevity.
The information in the report is considered Critical Energy Infrastructure Information (CEII). The Enclosure is considered sensitive security-related information, official use only, and is being withheld from public disclosure.
The enclosure transmitted herewith contains security-related information. When separated from the enclosure, this document is decontrolled.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION D. Stoddard If you have any questions regarding this matter, I may be reached at (301) 415-2481, or by e-mail at ed.miller@nrc.gov.
Sincerely,
/RA/
G. Edward Miller, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339
Enclosure:
FERC Inspection Report cc w/ encl: Mr. Daniel McGinnis Station Licensing North Anna Power Station 1022 Haley Drive Mineral, VA 23117 OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Package: ML21235A003 (Non-Public)
OUO Cover LTR: ML21272A301 (Non-Public)
Public Cover LTR: ML21272A302 (Public)
Enclosure:
ML21272A300 (Non-Public)
OFFICE NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NRR/DEX/EXHB/DSO NRR/DORL/LPL2-1/PM NAME GEMiller KGoldstein KSee MMarkley DATE 12/1/2021 10/21/2021 12/1/2021 12/6/2021