ML20006D590

From kanterella
Jump to navigation Jump to search

Redacted - Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 - Transmittal of Dam Inspection Report
ML20006D590
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/02/2020
From: Dennis Galvin
Plant Licensing Branch IV
To: Peters K
Vistra Operations Company
Galvin D, 415-6256
Shared Package
ML19218A245 List:
References
EPID L-2017-LNS-0015
Download: ML20006D590 (3)


Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION CEII - DO NOT RELEASE OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION CEII - DO NOT RELEASE January 2, 2020 Mr. Ken J. Peters Senior Vice President and Chief Nuclear Officer Attention: Regulatory Affairs Vistra Operations Company LLC Comanche Peak Nuclear Power Plant 6322 N FM 56 P.O. Box 1002 Glen Rose, TX 76043

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 -

TRANSMITTAL OF DAM INSPECTION REPORT (EPID L-2017-LNS-0015)

Dear Mr. Peters:

Enclosed is a copy of the Dam Safety Inspection Report prepared by the Federal Energy Regulatory Commission (FERC) for the U.S. Nuclear Regulatory Commission (NRC). This report contains the results of an inspection conducted on April 25, 2018, of the Safe Shutdown Impoundment (SSI) dam at the Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2.

Based on observations made during the field inspection, review of data submitted by the owner, and discussions with the NRC staff and licensee representatives, FERC found that the SSI dam embankment and appurtenances were in satisfactory condition and adequately maintained for service, stability, and longevity.

The information in the report is considered critical energy infrastructure information (CEII). Thus, the enclosure is considered sensitive security-related information, official use only, and is being withheld from public disclosure.

The enclosure transmitted herewith contains security-related Information. When separated from the enclosure, this transmittal document is DECONTROLLED.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION CEII - DO NOT RELEASE OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION CEII - DO NOT RELEASE If you have any questions, please contact me at 301-415-6256 or by e-mail to Dennis.Galvin@nrc.gov.

Sincerely,

/RA Margaret M. OBanion for/

Dennis J. Galvin, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446

Enclosure:

FERC Inspection Report (Non-Public) cc w/o encl: Listserv

ML19218A258 Package: ML19218A245 (non-public)

FERC Security-Related Report ML19218A257; Redacted Letter ML20006D590 OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NRR/DEX/DD(A)

NAME MOBanion PBlechman (LRonewicz for) ACampbell DATE 12/31/2019 12/31/2019 08/08/2019 OFFICE NRR/DORL/LPL4/BC NRR/DORL/LPL4/PM NAME JDixon-Herrity (BSingal for)

DGalvin (MOBanion for)

DATE 1/2/2020 1/2/2020