Letter Sequence Request |
|---|
EPID:L-2024-LRM-0009, Constellations Pre-Submittal Meeting Presentation About Peach Bottom ECCS Compensated Level System Replacement Project - July 22, 2024 (Open) |
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML24134A2032024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment - Rev 0 Project stage: Other ML24131A1282024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment Project stage: Other ML24121A1862024-05-14014 May 2024 Attachment 3: Peach Bottom ECCS Compensated Level System Replacement Project Presentation Material (Non-Proprietary Information) Project stage: Request PMNS20240898, Meeting with Constellation Energy Generation, LLC to Discuss a Planned License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 32024-07-0808 July 2024 Meeting with Constellation Energy Generation, LLC to Discuss a Planned License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Meeting ML24200A2312024-07-22022 July 2024 Constellations Pre-Submittal Meeting Presentation About Peach Bottom ECCS Compensated Level System Replacement Project - July 22, 2024 Project stage: Request ML24206A1782024-07-29029 July 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Concerning Peach Bottom Units Nos. 2 and 3 Digital Upgrade of the ECCS Compensated Level System Project stage: Meeting ML24270A2612024-10-17017 October 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Concerning Peach Bottom, Units Nos. 2 and 3 Digital Upgrade of the ECCS Compensated Level System Project stage: Meeting PMNS20241330, Meeting with Constellation Energy Generation, LLC to Discuss a Planned Licenseamendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 32024-10-18018 October 2024 Meeting with Constellation Energy Generation, LLC to Discuss a Planned Licenseamendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Meeting ML24302A2422024-10-29029 October 2024 ECCS Compensated Level System Replacement Project Pre-Submittal Meeting Slides Project stage: Meeting ML24305A0952024-10-29029 October 2024 Constellation Slides - ECCS Compensated Level System Replacement Project NRC Pre-submittal Meeting on October 29, 2024 Project stage: Request ML24325A5532024-11-21021 November 2024 Summary of October 29, 2024, Public Observation Meeting with Constellation Energy Generation, LLC Regarding Peach Bottom Atomic Power Station, Units 2 & 3 Digital Upgrade of the Emergency Core Cooling System Compensated Level System EPID L- Project stage: Meeting ML24325A5702024-11-22022 November 2024 ECCS Compensated Level System Replacement Project, Constellation Pre-submittal Meeting Slides November 22, 2024 (EPID L-2024-LRM-0009) Public Project stage: Meeting PMNS20241466, Meeting with Constellation Energy Generation, LLC to Discuss a Planned License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 32024-12-11011 December 2024 Meeting with Constellation Energy Generation, LLC to Discuss a Planned License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Meeting ML24366A0502024-12-12012 December 2024 Non-Proprietary Slides for 12/12/24 Meeting with Constellation - ECCS Compensated Level System Replacement Project Project stage: Meeting ML24344A2272024-12-12012 December 2024 Summary of Partially Closed Observation Meeting with Constellation Energy Generation, LLC Regarding Peach Bottom Atomic Power Station, Units 2 and 3 Digital Upgrade of the Emergency Core Cooling System Compensated Level System Project stage: Meeting ML25014A0552025-01-13013 January 2025 December 12, 2024, Summary of Closed Meeting with Constellation Energy Generation, LLC Regarding Peach Bottom, Units 2 & 3 Digital Upgrade of the Emergency Core Cooling System Compensated Level System (EPID L-2024-LRM-0009) Non-Proprietary Project stage: Meeting PMNS20250143, Meeting with Constellation Energy Generation, LLC to Discuss a Planned License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 32025-01-31031 January 2025 Meeting with Constellation Energy Generation, LLC to Discuss a Planned License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Meeting ML25051A2332025-02-16016 February 2025 Constellations Affidavit for Proprietary 2-21-25 Presubmittal Meeting Materials Project stage: Meeting ML25051A2292025-02-21021 February 2025 Constellations Non-Proprietary Slides for 2-21-25 Presubmittal Meeting Project stage: Meeting ML25083A0722025-04-0808 April 2025 Summary of February 21, 2025, Partially Closed Observation Meeting with Constellation Energy Generation, LLC Peach Bottom, Units 2 & 3 Digital Upgrade of the Emergency Core Cooling System Compensated Level System EPID L-2024-LRM-0009 Non-Pr Project stage: Meeting PMNS20250476, Meeting with Constellation Energy Generation, LLC to Discuss a Planned License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 32025-04-28028 April 2025 Meeting with Constellation Energy Generation, LLC to Discuss a Planned License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Meeting ML25118A0372025-05-0101 May 2025 NRC Public Meeting - Peach Bottom Atomic Power Station ECCS Compensated Level System Replacement Project Project stage: Meeting ML25118A0362025-05-0101 May 2025 NRC Slides Peach Bottom Pre-Application 5.1.25 Meeting - Radics Topical Report Safety Evaluation Conclusions on Internal Diversity Project stage: Approval ML25122A1722025-05-0505 May 2025 Summary of Public Observation Meeting with Constellation Energy Generation, LLC Regarding Peach Bottom Atomic Power Station, Units 2 and 3 Digital Upgrade of the Emergency Core Cooling System Compensated Level System Project stage: Meeting 2024-07-29
[Table View] |
Text
Peach Bottom Atomic Power Station ECCS Compensated Level System Replacement Project NRC Pre-submittal Meeting October 29, 2024
Meeting Purpose
- Gain alignment on the basis of the additional NRC requested documents from DI&C-ISG-06 Rev 2 Enclosure B.
Agenda
- Introductions - Project Team
- Requested DI&C-ISG-06 Rev 2 Enclosure B documents
- NRC to provide regulatory basis for the requested documents Purpose and Agenda l
1
Constellation Energy
- Pablo Guardado, Principal PM, PEA Project Management
- Steve Flickinger, Prin. Reg. Specialist, Corporate Licensing Sargent & Lundy
- Pareez Golub - Project Director, Digital Licensing SME Introductions - Project Team l
2
Items submitted as part of the ARP
- 1.3 Approved Topical Report Safety Evaluation
- 1.6 (Summary of) Hardware Equipment Qualification
- 1.7 (Unified Compliance/Conformance Matrix for) IEEE
[Institute of Electrical and Electronics Engineers] Stds 603-1991 and 7-4.3.2-2003
- 1.8 (Changes to) Technical Specifications
- 1.9 Setpoint Methodology and Calculations
- 1.10 Secure Development and Operational Environment NRC Requested ISG-06 Enclosure B documents l
3 Additional documents requested by the NRC
- 1.11 Software Requirements Specification
- 1.12 Software Design Specification
- 1.13 Design Analysis Reports for Platform Changes
- 1.14 System Response Time Analysis Report
- 1.17 Quality Assurance Plan for Hardware
- 1.18 (Summary of) Hardware Development Process
- 2.2 As-Manufactured, System Configuration Documentation
- 2.6 System-Level Failure Modes and Effects Analysis
- 2.9 (Summary of) Electromagnetic Interface, Temperature, Humidity, and Seismic Testing Results
- The project team needs to understand the basis of the additional NRC requests to ensure that what we provide in the submittal meets the necessary basis.
Basis for the requested additional documents l
4