IR 05000324/2023006

From kanterella
(Redirected from ML24053A088)
Jump to navigation Jump to search
Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2023006 and 05000325/2023006
ML24053A088
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 02/28/2024
From: Matthew Fannon
NRC/RGN-II/DRP/RPB4
To: Krakuszeski J
Duke Energy Progress
References
IR 2023006
Download: ML24053A088 (7)


Text

February 28, 2024

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORTS 05000324/2023006 AND 05000325/2023006

Dear John Krakuszeski:

The NRC has completed its end-of-cycle performance assessment of Brunswick Steam Electric Plant, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023, through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at Brunswick Steam Electric Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2025.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4547 with any questions you have regarding this letter.

Sincerely, Matthew S. Fannon, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 05000324, 05000325 License Nos.: DPR-62, DPR-71 Enclosure:

Brunswick Inspection Plan (3/1/2024 - 12/31/2025)

cc:

Distribution via ListServ Signed by Fannon, Matthew on 02/28/24 SUBJECT: ANNUAL ASSESSMENT LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORTS 05000324/2023006 AND 05000325/2023006 - DATED FEBRUARY 28, 2024 DISTRIBUTION:

A. Wilson, RII G. Smith, RII M. Fannon, RII R2EICS RidsNRRDROResource ROPAssessmentResource RidsNRRPMBrunswickResource ADAMS ACCESSION NUMBER: ML24053A088 X

SUNSI Review X

Non-Sensitive

Sensitive X

Publicly Available

Non-Publicly Available OFFICE RII/DRP RII/DRP NAME A. Wilson M. Fannon DATE 2/23/2024 2/28/2024 OFFICIAL AGENCY RECORD

Site Inspection Activity Plan Prepared on 2/21/2024 11:13:19 AM

07200006 - Brunswick (ISFSI)

03/01/2024 - 12/31/2025 OPERATION OF AN ISFSI

Unit Start End Activity CAC Title Staff Count 7/8/2024 7/12/2024 IP 60855 001001 Operation Of An ISFSI

Site Inspection Activity Plan Prepared on 2/21/2024 11:13:19 AM

Brunswick 03/01/2024 - 12/31/2025 RP OCCUPATIONAL RAD SAFETY AND TRANSPORTATION BASELINE INSPECTION

1,2 3/4/2024 3/8/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 3/4/2024 3/8/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1,2 3/4/2024 3/8/2024 IP 71151 000746 Performance Indicator Verification MATERIAL CONTROL AND ACCOUNTING

CYBER SECURITY INSPECTION

1,2 5/6/2024 5/10/2024 IP 71130.10 000741 Cybersecurity FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - BRU

1,2 5/13/2024 5/17/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 6/3/2024 6/7/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing RP PUBLIC RAD SAFETY BASELINE INSPECTION

1,2 5/20/2024 5/24/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1,2 5/20/2024 5/24/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program 1,2 5/20/2024 5/24/2024 IP 71151 000746 Performance Indicator Verification OPERATION OF AN ISFSI

1,2 7/8/2024 7/12/2024 IP 60855 001001 Operation Of An ISFSI EMERGENCY PREPAREDNESS EXERCISE INSPECTION

1,2 7/29/2024 8/2/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 7/29/2024 8/2/2024 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 1,2 7/29/2024 8/2/2024 IP 71151 001397 Performance Indicator Verification FOCUSED ENGINEERING INSPECTIONS (CGD)

1,2 8/5/2024 8/9/2024 IP 71111.21N.03 001808 Commercial Grade Dedication 1,2 8/19/2024 8 /23/2024 IP 71111.21N.03 001808 Commercial Grade Dedication BRUNSWICK REQUAL INSPECTION

1,2 9/9/2024 9/13/2024 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance SECURITY BASELINE INSPECTION

1,2 10/14/2024 10/17/2024 IP 71130.02 000734 Access Control 1,2 10/14/2024 10/17/2024 IP 71130.09 001656 Security Plan Changes 1,2 10/14/2024 10/17/2024 IP 71151 001338 Performance Indicator Verification DUKE CORPORATE SECURITY INSPECTION AA/FFD

1,2 4/22/2024 4 /26/2024 IP 71130.11 000742 Material Control and Accounting (MC&A)

Unit Start End Activity CAC Title Staff Count 1,2 1/13/2025 1 /16/2025 IP 71130.01 000733 Access Authorization

Site Inspection Activity Plan Prepared on 2/21/2024 11:13:19 AM

1,2 1/13/2025 1 /16/2025 IP 71130.08 000740 Fitness-For-Duty Program SECURITY BASELINE INSPECTION

UNIT 2 IN-SERVICE INSPECTION

RP OCCUPATIONAL RADIATION SAFETY BASELINE INSPECTION

1,2 3/10/2025 3/14/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 3/10/2025 3/14/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 3/10/2025 3/14/2025 IP 71124.04 000728 Occupational Dose Assessment 1,2 3/10/2025 3/14/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 3/10/2025 3/14/2025 IP 71151 000746 Performance Indicator Verification 1,2 3/24/2025 3/28/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 3/24/2025 3/28/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 3/24/2025 3/28/2025 IP 71124.04 000728 Occupational Dose Assessment 1,2 3/24/2025 3/28/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 3/24/2025 3/28/2025 IP 71151 000746 Performance Indicator Verification BRUNSWICK INITIAL LICENSE EXAM

1,2 4/6/2025 4/12/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1,2 5/11/2025 5 /24/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

FOCUSED ENGINEERING INSPECTION (AGE-RELATED)

1,2 9/8/2025 9/12/2025 IP 71111.21N.04 001832 Age-Related Degradation 1,2 9/22/2025 9 /26/2025 IP 71111.21N.04 001832 Age-Related Degradation EMERGENCY PREPAREDNESS PROGRAM INSPECTION

1,2 10/6/2025 10/10/2025 IP 71114.02 000717 Alert and Notification System Testing 1,2 10/6/2025 10/10/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 10/6/2025 10/10/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 10/6/2025 10/10/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 10/6/2025 10/10/2025 IP 71151 001397 Performance Indicator Verification PROBLEM IDENTIFICATION & RESOLUTION

1,2 10/6/2025 1 0 /10/2025 IP 71152B 000747 Problem Identification and Resolution 1,2 10/20/2025 10/24/2025 IP 71152B 000747 Problem Identification and Resolution SECURITY BASELINE INSPECTION

1,2 10/20/2025 10/23/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 10/20/2025 10/23/2025 IP 71130.07 000739 Security Training SECURITY BASELINE INSPECTION

2 3/10/2025 3 /14/2025 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

1,2 1/27/2025 1 /30/2025 IP 71130.01 000733 Access Authorization 1,2 1/27/2025 1 /30/2025 IP 71130.08 000740 Fitness-For-Duty Program 1,2 11/17/2025 11/20/2025 IP 71130.02 000734 Access Control

Site Inspection Activity Plan Prepared on 2/21/2024 11:13:19 AM

1,2 11/17/2025 11/20/2025 IP 71130.05 000737 Protective Strategy Evaluation 1,2 11/17/2025 11/20/2025 IP 71130.09 001656 Security Plan Changes 1,2 11/17/2025 11/20/2025 IP 71151 001338 Performance Indicator Verification