MONTHYEARML24023A6242024-01-23023 January 2024 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (PSAR) Section 4.3 Audit Question (4.3-25 on Material Degradation) ML24022A2122024-01-22022 January 2024 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (PSAR) Section 4.3 Audit Questions (4.3-23 and 4.3-24 on Material Degradation) ML24017A3032024-01-17017 January 2024 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (PSAR) Section 4.3 Audit Questions (Related to Material Degradation) ML24015A0102024-01-11011 January 2024 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (PSAR) Section 4.3 Audit Question (Related to Material Degradation) ML24008A0922024-01-0808 January 2024 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (PSAR) Section 4.3 Audit Questions (Related to Material Degradation) ML23354A2852023-12-20020 December 2023 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (Psar), Section 4.3 and 9.2 Audit Questions (Related to Material Degradation) ML23348A3732023-12-14014 December 2023 Acu Msrr - Environmental Review Requests for Confirmatory Information - Closure Confirmation for CA- 2, 5 and 6 ML23346A2352023-12-12012 December 2023 Acu Msrr - Environmental Review Requests for Confirmatory Information - Closure Confirmation for NO-2 and 3 ML23345A1702023-12-11011 December 2023 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) PSAR Chapter 3 Audit Question ML23335A1172023-12-0101 December 2023 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr), Preliminary Safety Analysis Report (PSAR) Chapter 3 Audit Question ML23271A0202023-09-27027 September 2023 Acu Msrr - Environmental Review Requests for Confirmatory Information - Closure Confirmation ML23237B1492023-08-21021 August 2023 Abilene Christian University, Request for Non-Public Documents ML23241A7842023-08-16016 August 2023 Discussion with Texas Historical Commission ML23241A7932023-08-14014 August 2023 Chitimacha Tribe Response 8_14_2023 ML23241A8192023-08-11011 August 2023 Texas Historical Commission Final Response 8_11_2023 ML23241A8312023-08-11011 August 2023 THC Correspondence with Caitlin Brashear as of 8_29 ML23219A2132023-08-0202 August 2023 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Section 2.3 Audit Questions (Batch 2) ML23194A1592023-07-13013 July 2023 NRR E-mail Capture - Abilene Christian University (Acu), Molten Salt Research Reactor (Msrr) Chapter 16 Audit Questions ML23194A0642023-07-13013 July 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for Pre-Submittal Audit Related to Physical Security for the Molten Salt Research Reactor ML23192A4542023-07-11011 July 2023 NRR E-mail Capture - Abilene Christian University (Acu), Molten Salt Research Reactor (Msrr) Chapter 11 Audit Question ML23184A1462023-07-0303 July 2023 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Chapter 10 Audit Questions ML23241A8262023-06-12012 June 2023 Texas Historical Commission Response 6_12_2023 ML23241A8142023-06-12012 June 2023 Delaware Nation Response 6_12_2023 ML23241A7862023-05-23023 May 2023 Caddo Nation Response 5_16_23 ML23241A8172023-05-23023 May 2023 Kickapoo Tribe Response 5_23_2023 ML23129A7802023-05-0909 May 2023 NRR E-mail Capture - Abilene Christian University (Acu) Msrr Section 1.7 and 9.5 Audit Questions ML23123A0462023-05-0202 May 2023 NRR E-mail Capture - Abilene Christian University (Acu) Msrr Chapter 13 and Section 9.2 Audit Question ML23123A0442023-05-0202 May 2023 NRR E-mail Capture - Abilene Christian University (Acu) Msrr Chapter 4, Chapter 6, and Section 9.6 Audit Question ML23116A1712023-04-26026 April 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu CP Chapters 1, 5, 8, 9 (Except 9.2 and 9.6), 10, 11, 12, 14-18, and General Topics (Batch 2) ML23095A0812023-04-0505 April 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu Construction Permit (CP) Preliminary Safety Analysis Report (PSAR) Chapters 2 and 3 (Batch 2) ML23086A0142023-03-24024 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu CP Chapters 4, 6, and 9.6 ML23086A0172023-03-24024 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu CP PSAR Chapters 2 and 3 (Batch 1) ML23080A1912023-03-21021 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu CP Chapters 1, 5, 8, 9 (Except 9.2 and 9.6), 10, 11, 12, 14-18, and General Topics (Batch 1) ML23076A0152023-03-16016 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu CP Chapters 9.2 and 13 ML23073A3022023-03-14014 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu CP Chapter 7 ML23065A0552023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 4, 6, and 9.6 ML23065A0482023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 2 & 3 ML23065A0512023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapter 7 ML23065A0522023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 1, 5, 8, 9 (Except 9.2 and 9.6), 10, 11, 12, 14-18, and General Topics ML23065A0562023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 9.2 and 13 ML23052A0672023-02-21021 February 2023 NRR E-mail Capture - Abilene Christian University - Audit Question Regarding the Acu CP Technical Topics Audit ML23038A0092023-02-0606 February 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding the Acu CP Technical Topics Audit 2024-01-08
[Table view] |
Text
From: Edward Helvenston Sent: Wednesday, April 5, 2023 9:03 AM To: Rusty Towell; Lester Towell; Jordan Robison; Tim Head; Alexander Adams Cc: Richard Rivera; Zackary Stone; Michael Wentzel; Stephen Philpott; Greg Oberson (He/Him); Boyce Travis; Kyle Song; Andrew Prinaris
Subject:
Abilene Christian University - Audit Questions Regarding ACU CP PSAR Chapters 2 and 3 (Batch 2)
Attachments: ACU MSRR Chapter 2 and 3 Audit Questions (Batch 2).pdf
Dear Dr. Towell,
Attached is a list of questions the NRC staff has prepared for Abilene Christian University (ACU) related to the ACU Preliminary Safety Analysis Report, Chapter 3, Design of Structures, Systems, and Components, specifically, Section 3.1, Design Criteria. The NRC staff would like to discuss these questions within the scope of the ACU construction permit (CP) application review Audit Plan for Chapters 2 and 3 (see audit plan dated 3/2/2023, ML23065A048), and I am providing these in advance to facilitate discussion during an audit meeting. Once ACU is ready to discuss, please let us know and we can set up an audit meeting. We will add this e-mail, with questions, to public ADAMS. If you have any questions, please let Richard, Zackary, or I know.
Thank you, Ed Helvenston, U.S. NRC Non-Power Production and Utilization Facility Licensing Branch (UNPL)
Division of Advanced Reactors and Non-Power Production and Utilization Facilities (DANU)
Office of Nuclear Reactor Regulation (NRR)
O-6B22 (301) 415-4067
Hearing Identifier: NRR_DRMA Email Number: 2027 Mail Envelope Properties (BY5PR09MB595636152B7726270AAB9AD7E0909)
Subject:
Abilene Christian University - Audit Questions Regarding ACU CP PSAR Chapters 2 and 3 (Batch 2)
Sent Date: 4/5/2023 9:02:44 AM Received Date: 4/5/2023 9:02:00 AM From: Edward Helvenston Created By: Edward.Helvenston@nrc.gov Recipients:
"Richard Rivera" <richard.rivera@nrc.gov>
Tracking Status: None "Zackary Stone" <Zackary.Stone@nrc.gov>
Tracking Status: None "Michael Wentzel" <Michael.Wentzel@nrc.gov>
Tracking Status: None "Stephen Philpott" <Stephen.Philpott@nrc.gov>
Tracking Status: None "Greg Oberson (He/Him)" <Greg.Oberson@nrc.gov>
Tracking Status: None "Boyce Travis" <Boyce.Travis@nrc.gov>
Tracking Status: None "Kyle Song" <Kyle.Song@nrc.gov>
Tracking Status: None "Andrew Prinaris" <Andrew.Prinaris@nrc.gov>
Tracking Status: None "Rusty Towell" <rxt01a@acu.edu>
Tracking Status: None "Lester Towell" <ldt20a@acu.edu>
Tracking Status: None "Jordan Robison" <jcr20b@acu.edu>
Tracking Status: None "Tim Head" <tlh07b@acu.edu>
Tracking Status: None "Alexander Adams" <axa20j@acu.edu>
Tracking Status: None Post Office: BY5PR09MB5956.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1058 4/5/2023 9:02:00 AM ACU MSRR Chapter 2 and 3 Audit Questions (Batch 2).pdf 87480 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
PSAR Review Audit Questions for Chapter 3, Design of Structures, Systems, and Components, Section 3.1, Design Criteria Item # Question 3.1-1 Principal design criterion (PDC) 32 uses the term important areas and features to describe the scope of functions covered by inspection.
Please provide additional context regarding what important means as applied here (e.g., important to safety or something else).
3.1-2 PSAR Section 3.1 does not appear to provide any PDC for fuel inventory maintenance. This function appears to be relevant to the design and fuel inventory and distributions throughout the reactor system are assumed quantities in Section 4.2.1.1 of the PSAR (though the PSAR states that values will be provided in further detail in an OL application). Please discuss whether an additional appropriate PDC should be implemented.
If such a PDC is not necessary (whether not needed at all or captured under a different PDC), provide a justification why a PDC is not implemented.
3.1-3 The staff notes that PSAR Section 3.1 does not appear to provide any PDC related to the MSRR graphite. It is not clear to the staff based on the content of the PSAR whether the graphite has functions important to safety in the design. Please provide context regarding the function(s) of the graphite and discuss why a PDC is not required or whether additional PDC(s) may be appropriate to cover any functions important to safety.
3.1-4 PDCs 71 and 73 use the language ability of the fuel salt to perform its safety functions and could prevent accomplishing a safety function.
Because these PDCs are novel, it is not entirely clear to the staff from the PSAR which safety functions are covered by these PDCs. The NRC staff requests that ACU provide additional context regarding what functions are expected to be covered by these PDCs. Additionally, PDC 73 lists a number of possible causes of cover gas line plugging; is this list meant to be exclusive?