MONTHYEARML24023A6242024-01-23023 January 2024 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (PSAR) Section 4.3 Audit Question (4.3-25 on Material Degradation) ML24022A2122024-01-22022 January 2024 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (PSAR) Section 4.3 Audit Questions (4.3-23 and 4.3-24 on Material Degradation) ML24017A3032024-01-17017 January 2024 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (PSAR) Section 4.3 Audit Questions (Related to Material Degradation) ML24015A0102024-01-11011 January 2024 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (PSAR) Section 4.3 Audit Question (Related to Material Degradation) ML24008A0922024-01-0808 January 2024 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (PSAR) Section 4.3 Audit Questions (Related to Material Degradation) ML23354A2852023-12-20020 December 2023 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (Psar), Section 4.3 and 9.2 Audit Questions (Related to Material Degradation) ML23348A3732023-12-14014 December 2023 Acu Msrr - Environmental Review Requests for Confirmatory Information - Closure Confirmation for CA- 2, 5 and 6 ML23346A2352023-12-12012 December 2023 Acu Msrr - Environmental Review Requests for Confirmatory Information - Closure Confirmation for NO-2 and 3 ML23345A1702023-12-11011 December 2023 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) PSAR Chapter 3 Audit Question ML23335A1172023-12-0101 December 2023 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr), Preliminary Safety Analysis Report (PSAR) Chapter 3 Audit Question ML23271A0202023-09-27027 September 2023 Acu Msrr - Environmental Review Requests for Confirmatory Information - Closure Confirmation ML23237B1492023-08-21021 August 2023 Abilene Christian University, Request for Non-Public Documents ML23241A7842023-08-16016 August 2023 Discussion with Texas Historical Commission ML23241A7932023-08-14014 August 2023 Chitimacha Tribe Response 8_14_2023 ML23241A8192023-08-11011 August 2023 Texas Historical Commission Final Response 8_11_2023 ML23241A8312023-08-11011 August 2023 THC Correspondence with Caitlin Brashear as of 8_29 ML23219A2132023-08-0202 August 2023 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Section 2.3 Audit Questions (Batch 2) ML23194A1592023-07-13013 July 2023 NRR E-mail Capture - Abilene Christian University (Acu), Molten Salt Research Reactor (Msrr) Chapter 16 Audit Questions ML23194A0642023-07-13013 July 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for Pre-Submittal Audit Related to Physical Security for the Molten Salt Research Reactor ML23192A4542023-07-11011 July 2023 NRR E-mail Capture - Abilene Christian University (Acu), Molten Salt Research Reactor (Msrr) Chapter 11 Audit Question ML23184A1462023-07-0303 July 2023 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Chapter 10 Audit Questions ML23241A8262023-06-12012 June 2023 Texas Historical Commission Response 6_12_2023 ML23241A8142023-06-12012 June 2023 Delaware Nation Response 6_12_2023 ML23241A7862023-05-23023 May 2023 Caddo Nation Response 5_16_23 ML23241A8172023-05-23023 May 2023 Kickapoo Tribe Response 5_23_2023 ML23129A7802023-05-0909 May 2023 NRR E-mail Capture - Abilene Christian University (Acu) Msrr Section 1.7 and 9.5 Audit Questions ML23123A0462023-05-0202 May 2023 NRR E-mail Capture - Abilene Christian University (Acu) Msrr Chapter 13 and Section 9.2 Audit Question ML23123A0442023-05-0202 May 2023 NRR E-mail Capture - Abilene Christian University (Acu) Msrr Chapter 4, Chapter 6, and Section 9.6 Audit Question ML23116A1712023-04-26026 April 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu CP Chapters 1, 5, 8, 9 (Except 9.2 and 9.6), 10, 11, 12, 14-18, and General Topics (Batch 2) ML23095A0812023-04-0505 April 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu Construction Permit (CP) Preliminary Safety Analysis Report (PSAR) Chapters 2 and 3 (Batch 2) ML23086A0142023-03-24024 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu CP Chapters 4, 6, and 9.6 ML23086A0172023-03-24024 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu CP PSAR Chapters 2 and 3 (Batch 1) ML23080A1912023-03-21021 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu CP Chapters 1, 5, 8, 9 (Except 9.2 and 9.6), 10, 11, 12, 14-18, and General Topics (Batch 1) ML23076A0152023-03-16016 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu CP Chapters 9.2 and 13 ML23073A3022023-03-14014 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu CP Chapter 7 ML23065A0552023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 4, 6, and 9.6 ML23065A0482023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 2 & 3 ML23065A0512023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapter 7 ML23065A0522023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 1, 5, 8, 9 (Except 9.2 and 9.6), 10, 11, 12, 14-18, and General Topics ML23065A0562023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 9.2 and 13 ML23052A0672023-02-21021 February 2023 NRR E-mail Capture - Abilene Christian University - Audit Question Regarding the Acu CP Technical Topics Audit ML23038A0092023-02-0606 February 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding the Acu CP Technical Topics Audit 2024-01-08
[Table view] |
Text
From: Edward Helvenston Sent: Tuesday, February 21, 2023 8:16 AM To: Rusty Towell; Lester Towell; Jordan Robison; Tim Head; Alexander Adams Cc: Richard Rivera; Zackary Stone; Michael Wentzel; Michelle Hayes
Subject:
Abilene Christian University - Audit Question Regarding the ACU CP Technical Topics Audit
Dear Dr. Towell,
Please see below for an additional question the NRC staff has prepared for Abilene Christian University (ACU) for the current CP Technical Topics Audit. The NRC staff would like to discuss this question within the scope of the Audit (see audit plan dated 1/13/2023, ML23013A089), and I am providing this in advance to facilitate discussion during an audit meeting. Once ACU is ready to discuss, please let us know and we can set up a meeting. We will add this e-mail, with the question, to public ADAMS. If you have any questions, please let Richie, Zack, or I know.
Question Question Number Gen-7 The PSAR uses the terms safety-related, non-safety-related, and important to safety to describe various MSRR structures, systems, and components (SSCs). The principal design criteria (PDCs) listed in PSAR Section 3.1 refer to SSCs as well as design conditions and functions that are important to safety. Other portions of the PSAR commonly refer to safety-related SSCs, including in discussing meteorological, hydrological, and seismic loading in PSAR Sections 3.2, 3.3, and 3.4. With respect to design of SSCs for seismic loading, PSAR Section 3.4 states that SSCs designated Seismic Category I are safety-related SSCs and those SSCs required to support shutdown and maintain the MSRR in a safe shutdown condition.
PSAR Section 3.5 states that MSRR systems and components are important to safety if they perform safety functions during normal operations or are required to prevent or mitigate the consequences of operational transients or accidents.
PSAR Section 3.5.2.1 states that:
Safety-related is a classification applied to items relied on to remain functional during and following a postulated accident to ensure the
- integrity of the MSRR facility safety-related infrastructure.
- capability to shut down the MSRR and maintain it in a safe shutdown condition.
However, it is not clear to the staff if the PSAR provides a consistent definition of the terms safety-related, non-safety-related, or important to safety, or if these terms are used consistently throughout the PSAR.
The NRC staff also notes that some codes and standards cited in the PSAR may use and/or contain definitions for these terms. It is not clear whether definitions in these codes and standards are intended to apply to the MSRR.
The NRC staff notes that an understanding of these concepts will be important in classifying and understanding the importance of various SSCs at a more detailed level. The staff requests clarification on the definitions of each of these terms and how ACU is applying them to categorize the SSCs in the MSRR design.
- Thanks, Ed Ed Helvenston, U.S. NRC Non-Power Production and Utilization Facility Licensing Branch (UNPL)
Division of Advanced Reactors and Non-Power Production and Utilization Facilities (DANU)
Office of Nuclear Reactor Regulation (NRR)
O-6B22 (301) 415-4067
Hearing Identifier: NRR_DRMA Email Number: 1951 Mail Envelope Properties (BY5PR09MB595616B4FEB015EAA9398583E0A59)
Subject:
Abilene Christian University - Audit Question Regarding the ACU CP Technical Topics Audit Sent Date: 2/21/2023 8:16:06 AM Received Date: 2/21/2023 8:16:00 AM From: Edward Helvenston Created By: Edward.Helvenston@nrc.gov Recipients:
"Richard Rivera" <richard.rivera@nrc.gov>
Tracking Status: None "Zackary Stone" <Zackary.Stone@nrc.gov>
Tracking Status: None "Michael Wentzel" <Michael.Wentzel@nrc.gov>
Tracking Status: None "Michelle Hayes" <Michelle.Hayes@nrc.gov>
Tracking Status: None "Rusty Towell" <rxt01a@acu.edu>
Tracking Status: None "Lester Towell" <ldt20a@acu.edu>
Tracking Status: None "Jordan Robison" <jcr20b@acu.edu>
Tracking Status: None "Tim Head" <tlh07b@acu.edu>
Tracking Status: None "Alexander Adams" <axa20j@acu.edu>
Tracking Status: None Post Office: BY5PR09MB5956.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2990 2/21/2023 8:16:00 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: