EPID:L-2022-LRO-0073, Post-Shutdown Decommissioning Activities Report Public Meeting Slides - September 22, 2022 (Open) |
|
|
|
---|
Category:Letter type:PNP
MONTHYEARPNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-025, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 182022-09-12012 September 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 18 PNP 2022-032, 2022 Evacuation Time Estimate Report2022-09-0707 September 2022 2022 Evacuation Time Estimate Report PNP 2022-023, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 172022-08-15015 August 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 17 PNP 2022-014, Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 342022-07-13013 July 2022 Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 34 PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-017, Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E2022-07-11011 July 2022 Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals PNP 2022-011, Termination of the Emergency Response Data System (Eros) Link2022-06-13013 June 2022 Termination of the Emergency Response Data System (Eros) Link PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2022-06-13013 June 2022 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel PNP 2022-004, 2021 Radiological Environmental Operating Report2022-05-12012 May 2022 2021 Radiological Environmental Operating Report PNP 2022-003, and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report2022-04-25025 April 2022 and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2022-007, 2021 Annual Non-Radiological Environmental Operating Report2022-04-21021 April 2022 2021 Annual Non-Radiological Environmental Operating Report PNP 2022-012, Response to Request for Additional Information Regarding License Amendment Request to Revise Facility Operating License and Technical Specifications for a Permanently Defueled Condition2022-04-21021 April 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Facility Operating License and Technical Specifications for a Permanently Defueled Condition PNP 2022-002, Annual Report of Changes in Emergency Core Cooling System Models2022-03-24024 March 2022 Annual Report of Changes in Emergency Core Cooling System Models PNP 2021-012, Report of Changes, Tests and Experiments, and Summary of Commitment Changes2021-10-0707 October 2021 Report of Changes, Tests and Experiments, and Summary of Commitment Changes PNP 2021-029, Pre-Notice of Disbursement from Decommissioning Trust2021-09-0202 September 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-013, Request for Rescission of Interim Compensatory Measure from Order EA-02-0262021-07-21021 July 2021 Request for Rescission of Interim Compensatory Measure from Order EA-02-026 PNP 2021-020, Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.122021-06-15015 June 2021 Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12 PNP 2021-005, License Amendment Request to Revise Renewed Facility Operating License and Technical Specifications for Permanently Defueled Condition2021-06-0101 June 2021 License Amendment Request to Revise Renewed Facility Operating License and Technical Specifications for Permanently Defueled Condition PNP 2021-026, Pre-Notice of Disbursement from Decommissioning Trust2021-05-27027 May 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-016, 2020 Radiological Environmental Operating Report2021-05-12012 May 2021 2020 Radiological Environmental Operating Report PNP 2021-022, 2020 Annual Non-Radiological Environmental Operating Report2021-04-27027 April 2021 2020 Annual Non-Radiological Environmental Operating Report PNP 2021-015, and Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report2021-04-21021 April 2021 and Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2021-017, Schedule Change to Open Phase Condition Detection Implementation2021-04-0101 April 2021 Schedule Change to Open Phase Condition Detection Implementation PNP 2021-003, 2020 Steam Generator Tube Inspection Report2021-03-25025 March 2021 2020 Steam Generator Tube Inspection Report PNP 2021-010, Annual Report of Changes in Emergency Core Cooling System Models2021-03-19019 March 2021 Annual Report of Changes in Emergency Core Cooling System Models PNP 2021-004, Report - Changes to Palisades Nuclear Plant Technical Specifications Bases2021-03-10010 March 2021 Report - Changes to Palisades Nuclear Plant Technical Specifications Bases PNP 2021-006, Pre-Notice of Disbursement from Decommissioning Trust2021-03-0808 March 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-001, ASME Section XI 90-Day Owner'S Activity Report2021-01-12012 January 2021 ASME Section XI 90-Day Owner'S Activity Report 2023-09-28
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARPNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-012, Response to Request for Additional Information Regarding License Amendment Request to Revise Facility Operating License and Technical Specifications for a Permanently Defueled Condition2022-04-21021 April 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Facility Operating License and Technical Specifications for a Permanently Defueled Condition CNRO-2021-00002, Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-01-28028 January 2021 Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L ML20272A1662020-09-30030 September 2020 Attachment 3 - Framatome Document No. ANP-3876, Revision 1Q1NP, Response to NRC Request for Additional Information of Palisades Relief Request Number RR 5-8, Repair of Reactor Pressure Vessel Head Penetration, Inservice Inspection Program, CNRO-2019-00030, Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary2019-12-30030 December 2019 Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary PNP 2019-034, Response to Request for Additional Information Regarding License Amendment Request Resubmittal to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- Risk Informed Technical Specification...2019-08-23023 August 2019 Response to Request for Additional Information Regarding License Amendment Request Resubmittal to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- Risk Informed Technical Specification... ML19149A3042019-05-28028 May 2019 Enclosure Attachment 1 (Continued) to Pnp 2019-028: Operating License Page Change Instructions and Retyped Renewed Facility Operating License Pages ML19149A3022019-05-28028 May 2019 Enclosure to Pnp 2019-028: Response to Request for Additional Information - License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications ML19149A3032019-05-28028 May 2019 Enclosure Attachment 1 to Pnp 2019-028: Renewed Facility Operating License Page Markups PNP 2019-003, Response to Request for Additional Information for License Amendment Request to Revise Emergency Diesel Generator Degraded Voltage Surveillance Requirement2019-02-0707 February 2019 Response to Request for Additional Information for License Amendment Request to Revise Emergency Diesel Generator Degraded Voltage Surveillance Requirement PNP 2018-059, Response to Request for Additional Information for Relief Request No. RR-5-7, Proposed Alternative to ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations2018-12-0303 December 2018 Response to Request for Additional Information for Relief Request No. RR-5-7, Proposed Alternative to ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations PNP 2018-023, Response to Second Request for Additional Information - Alternative to the Reexamination Frequency for a Relevant Condition Foreign Material Lodged in the Reactor Pressure Vessel2018-04-30030 April 2018 Response to Second Request for Additional Information - Alternative to the Reexamination Frequency for a Relevant Condition Foreign Material Lodged in the Reactor Pressure Vessel PNP 2018-018, Response to Request for Additional Information - Proposed Changes to the Emergency Plan to Reflect a Permanently Shut Down and Defueled Reactor Vessel2018-04-16016 April 2018 Response to Request for Additional Information - Proposed Changes to the Emergency Plan to Reflect a Permanently Shut Down and Defueled Reactor Vessel PNP 2018-014, Response to Request for Additional Information - Alternative to the Reexamination Frequency for a Relevant Condition Foreign Material Lodged in the Reactor Pressure Vessel2018-03-27027 March 2018 Response to Request for Additional Information - Alternative to the Reexamination Frequency for a Relevant Condition Foreign Material Lodged in the Reactor Pressure Vessel PNP 2017-075, Response to Request for Additional Information - Proposed Changes to Administrative Controls Section of the Technical Specifications for Permanently Defueled Condition2017-12-19019 December 2017 Response to Request for Additional Information - Proposed Changes to Administrative Controls Section of the Technical Specifications for Permanently Defueled Condition PNP 2017-020, Response to Request for Additional Information - Relief Request Number RR 4-25 Impracticality - Limited Coverage Examinations During the Fourth 10-year Inservice Inspection Interval2017-04-0505 April 2017 Response to Request for Additional Information - Relief Request Number RR 4-25 Impracticality - Limited Coverage Examinations During the Fourth 10-year Inservice Inspection Interval PNP 2016-055, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools.2016-10-25025 October 2016 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools. PNP 2016-053, Supplement to License Amendment Request: Control Rod Drive Exercise Surveillance2016-09-0808 September 2016 Supplement to License Amendment Request: Control Rod Drive Exercise Surveillance PNP 2016-047, Voluntary Response to NRC Regulatory Issue Summary 2016-09: Preparation and Scheduling of Operator Licensing Examinations2016-07-26026 July 2016 Voluntary Response to NRC Regulatory Issue Summary 2016-09: Preparation and Scheduling of Operator Licensing Examinations PNP 2016-037, Response to Request for Additional Information Regarding the License Amendment Request for Implementation of an Alternate Repair Criterion on the Steam Generator Tubes (CAC No. MF74352016-06-0707 June 2016 Response to Request for Additional Information Regarding the License Amendment Request for Implementation of an Alternate Repair Criterion on the Steam Generator Tubes (CAC No. MF7435 ML16071A4412016-03-0707 March 2016 Entergy Fleet Relief Request No. RR-EN-15-1-Proposed Alternative to Use ASME Code Case N-789-1 - E-mail from G.Davant to R.Guzman - Response to Second RAI (MF6340 - MF6349) PNP 2016-016, Reply to Request for Information EA-16-0112016-03-0303 March 2016 Reply to Request for Information EA-16-011 CNRO-2016-00005, Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)2016-02-25025 February 2016 Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2016-00002, Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Secti2016-01-29029 January 2016 Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Section Xl, CNRO-2015-00002, Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 12015-12-0404 December 2015 Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 1 PNP 2015-069, Response to Request for Additional Information Regarding Relief Request No. RR 5-22015-09-0909 September 2015 Response to Request for Additional Information Regarding Relief Request No. RR 5-2 PNP 2015-063, Supplemental Information for the Response to the First Request for Additional Information Regarding the License Amendment Request to Implement 10 CFR 50.61a2015-08-14014 August 2015 Supplemental Information for the Response to the First Request for Additional Information Regarding the License Amendment Request to Implement 10 CFR 50.61a PNP 2015-059, Response to Request for Supplemental Information for Relief Request Number RR 4-2 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination2015-07-31031 July 2015 Response to Request for Supplemental Information for Relief Request Number RR 4-2 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination ML18344A4421993-11-30030 November 1993 Reply to NRC Request for Information Regarding the Pressurizer Safe End Crack Critical Flaw Size and Margin to Failure Analysis. Response to Items 10 and 11 of the Nrc'S October 8, 1993 Information Request ML18346A2931993-09-22022 September 1993 CPC Letter of 7/6/1993, Responding to Inspection Report 93010 & Subsequent Conference Call of 7/22/1993, Letter Submit Supplemental Information to Inspection Report within 60 Days ML18344A2651993-08-16016 August 1993 Response to Request for Additional Information Recent Fuel Failure Event ML18354A6531990-05-30030 May 1990 Information Required by the November 9, 1989 Technical Evaluation Report - NUREG 0737, Item Ii.D.L, Performance Testing of Relief and Safety Valves, Palisades Plant to Close Items Not Fully Resolved ML18354A6151988-01-15015 January 1988 Updated Response to IE Bulletin 87-03 Dated 11/15/1985, Entitled, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings ML18348A8881979-05-15015 May 1979 Rapid Response to Additional Information Request on Three Mile Island ML18348A3721978-07-0707 July 1978 Provide Additional Information Related to Diesel Generators Control Circulatory, as Requested ML18348A3741978-07-0606 July 1978 Provide Requested Information of Additional Analysis Specific to Determine Consequences of Potential Boron Dilution Incidents ML18348A7441978-05-23023 May 1978 Response to Request for Additional Information Reactor Vessel Material Surveillance ML18346A1121978-01-24024 January 1978 Response to Request for Additional Information Relating to Water Hammer in Feed-Water Lines and Feed-Water Spargers ML18353B1571977-12-22022 December 1977 Response to Request for Specific Information Re Potential Problem of Post-LOCA Ph Control of Containment Sump Water of IE Bulletin 77-04 ML18347A1711977-09-26026 September 1977 Additional Information Relating to Power Increase Request ML18348A3961977-07-29029 July 1977 Response to Request for Specific Information Concerning Reactor Vessel Materials & Associated Surveillance Programs ML18348A4151977-07-12012 July 1977 Response to Request for Additional Information Re IE Bulletin 77-01, Relating to Use of Pneumatic Time Delay Relays in Safety-Related Systems ML18348A6911977-05-16016 May 1977 Response to Request for Additional Information Alarm and Diesel Generator Control Circuitry ML18348A6921977-05-12012 May 1977 Response to Request for Additional Information Proposed Emergency Dose Assessment System ML18348A8521977-05-0404 May 1977 Advising Exxon Concluded Three of Six Documents Do Not Contain Proprietary Information, Which Was Identified by AEC Letter of 3/1/1977, & Forwarding Affidavit as Additional Information Re Proprietary Documents ML18348A7051977-03-23023 March 1977 Response to Request for Additional Information Environmental Qualification of Electrical Equipment and the Effects of Its Submergence ML18348A8681977-03-0808 March 1977 Letter Reactor Vessel Overpressurization ML18348A8631977-03-0808 March 1977 Response to Request for Additional Information Reactor Vessel Overpressurization ML18348A7121977-02-15015 February 1977 Response to Request for Additional Information Power Defect Value Stated in Report No. XN-76-52 2023-03-01
[Table view] |
Text
Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 HOLTEC Telephone (856) 797-0900 DECOMMISSIONING Fax (856) 797-0909 INTERNATIONAL HDI PNP 2023-005 10 CFR 50.82(a)(4) 0DUFK, 2023 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket No. 50-255 and 72-007 Renewed Facility Operating License No. DPR-20
Subject:
Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report (EPID No.
L-2022-LRO-0073)
References:
- 1) Holtec Decommissioning International LLC, to U.S. Nuclear Regulatory Commission, Post Shutdown Decommissioning Activities Report including Site-Specific Decommissioning Cost Estimate for Palisades Nuclear Plant, (NRC ADAMS Accession Number ML20358A232), dated December 23, 2020
- 2) U.S. Nuclear Regulatory Commission, Letter to Holtec International, LLC, Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report (EPID No.
L-2022-LRO-0073), (NRC ADAMS Accession Package Number ML23055A152), dated February 14, 2023 In accordance with Title 10 of the Code of Federal Regulations (CFR) Part 50, Section 82, Termination of License, paragraph (a)(4), 10 CFR 50.82(a)(4), Holtec Decommissioning International, LLC (HDI), on behalf of Holtec Palisades, LLC (Holtec Palisades), submitted a Post-Shutdown Decommissioning Activities Report (PSDAR), including the Site-Specific Decommissioning Cost Estimate (DCE) to the U.S. Nuclear Regulatory Commission (NRC)
(Reference 1).
In Reference 2, HDI received a request for additional information (RAI) from the NRC on the subject PSDAR (Reference 2). The HDI response to the RAI is provided in the enclosure to this letter.
This letter contains no new commitments and no revised regulatory commitments.
Should you have any questions or require additional information, please contact Jim Miksa, Regulatory Assurance Engineer at (269) 764-2945.
HDI PNP 2023-005 Page 2 of 2 Respectfully, Jean A. Fleming Digitally y
signed by Jean A. Fleming Date: 2023.03.01 08:06:26 -05'00' Jean A. Fleming Vice President, of Licensing, Regulatory Affairs & PSA Holtec International
Enclosure:
Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report cc: NRC Region Ill Regional Administrator NRC Decommissioning Inspector - Palisades Nuclear Plant NRC NMSS Project Manager - Palisades Nuclear Plant Designated Michigan State Official American Nuclear Insurers - Principal Account Engineer
HDI PNP 2023-005 Enclosure Page 1 of 4 Enclosure to HDI PNP 2023-005 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report
HDI PNP 2023-005 Enclosure Page 2 of 4 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report NRC RAI On December 23, 2020, Holtec Decommissioning International, LLC (HDI) submitted to the U.S. Nuclear Regulatory Commission (NRC) a letter enclosing the Post-Shutdown Decommissioning Activities Report (PSDAR) and the Site-Specific Decommissioning Cost Estimate (DCE) for the Palisades Nuclear Plant (Palisades), contingent upon the transfer of the Palisades operating licenses to HDI. The PSDAR and DCE have been made publicly available in the NRCs Agencywide Documents Access and Management System (ADAMS) at Accession No. ML20358A232. The Palisades license transfer transaction closed on June 28, 2022 (ML22179A075), allowing the NRC staff to begin the review of the HDI PSDAR for Palisades.
Paragraph 50.82(a)(4)(I) of title 10 of the Code of Federal Regulations (10 CFR) states that a PSDAR must contain a description of the planned decommissioning activities along with a schedule for their accomplishment, a discussion that provides the reasons for concluding that the environmental impacts associated with site-specific decommissioning activities will be bounded by appropriate previously issued environmental impact statements, and a site-specific DCE, including the projected cost of managing irradiated fuel. In addition, the regulation at 10 CFR 50.82(a)(6) states, in part, that [l]icensees shall not perform any decommissioning activities that [r]esult in significant environmental impacts not previously reviewed .
In NUREG-0586, Generic Environmental Impact Statement [GEIS] on Decommissioning of Nuclear Facilities: Supplement 1, Regarding the Decommissioning of Nuclear Power Reactors, the NRC evaluated the environmental impacts during the decommissioning of nuclear power reactors. The decommissioning GEIS concludes that:
For those issues that have been determined to be generic, licensees may proceed with the decommissioning activity without further analysis provided that the impacts resulting from those activities fall within the range of impacts as described in Chapter 4. However, if the impacts of an activity fall outside the range predicted in Chapter 4, or if the activity results in impacts to environmental issues not considered in this Supplement, or if the impact involves an environmental issue determined to be conditionally site-specific as defined above, then the activity cannot be performed until a further site-specific analysis is completed along with a license-amendment request and NRC has approved the license amendment (the license amendment request will provide an opportunity for a public hearing).
The following is a request for additional information (RAI) to facilitate the ongoing review of the NRC staff. A timely and accurate response to this RAI is requested in order to continue the staffs review of the Palisades PSDAR.
HDI PNP 2023-005 Enclosure Page 3 of 4
RAI 1
The decommissioning GEIS evaluates the environmental impacts from three decommissioning methods or a combination of these methods: DECON, SAFSTOR, and ENTOMB. The decommissioning GEIS states that the selection of a decommissioning method(s) is left entirely to the licensee and is communicated to the NRC and the public in the PSDAR.
However, the Palisades PSDAR does not explicitly identify the decommissioning method, or combination of methods, that will be used at the facility. Please identify the decommissioning method or a combination of methods that will be used for the decommissioning of Palisades.
HDI Response to RAI 1 The NUREG-0586, Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities, Supplement 1 method of decommissioning for Palisades is incremental DECON.
RAI 2
Section 5.3 of the Palisades PSDAR states that for radiation dose, waste management, air quality, water quality, ecological resources, and socioeconomics,
[t]he NRC staff did not identify any new and significant information during their independent review of the Palisades license renewal environmental report at that time, the site audit, or the scoping process for license renewalthe NRC concluded that there are no impacts related to these issues beyond those discussed in the SEIS
([PSDAR] Reference 9), or the GEIS ([PSDAR] Reference 2) for decommissioning.
The NRC found no site-specific issues related to decommissioning and there are no decommissioning activities contemplated for Palisades that would alter that conclusion. Section 5.5 of the Palisades PSDAR further states that based on the discussions presented in the Palisades PSDAR, including Section 5.3, HDI concludes that the environmental impacts associated with planned Palisades site-specific decommissioning activities will be bounded by the appropriate, previously issued environmental impact statements.
However, NUREG-1437, Supplement 27, Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Palisades Nuclear Plant - Final Report, did not reach conclusions related to Category 1 decommissioning issues with respect to the 2002 decommissioning GEIS (NUREG-0586, Supplement 1), but rather with respect to the 1996 license renewal GEIS (see Section 7.1 of NUREG-1437, Supplement 27).
Given that NUREG-1437, Supplement 27 reached conclusions related to applicable Category 1 decommissioning issues for Palisades with respect to the 1996 license renewal GEIS (i.e., the impacts associated with decommissioning following the license renewal term), rather than the decommissioning GEIS, please provide a basis for
HDI PNP 2023-005 Enclosure Page 4 of 4 concluding that the environmental impacts associated with site-specific decommissioning activities for Palisades will be bounded by appropriate previously issued environmental impact statements for radiation doses, waste management, air quality, water quality, ecological resources, and socioeconomic impacts.
HDI Response to RAI 2 Per NUREG-0856, Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities, (Decommissioning GEIS) Supplement 1 (Reference 1), the environmental impacts of radiation dose, waste management, air quality, water quality and socioeconomic impacts have been determined to be VPDOO. Holtec Decommissioning International (HDI) has not identified any planned decommissioning activities for Palisades that are outside those considered in the Decommissioning GEIS. Therefore, HDI concludes that the impacts for the issues of radiation doses, waste management, air quality, water quality, ecological resources, and socioeconomic associated with decommissioning of Palisades are bounded by the Decommissioning GEIS impacts. This conclusion is further supported by the site-specific analyses of the impacts for these issues documented in NUREG 1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 27, Regarding Palisades Nuclear Plant, (SEIS)
(Reference 2). If site-specific activities were to be performed that are not within the bounds covered by the Decommissioning GEIS, a site- specific analysis of the activities would be conducted prior to these activities being performed.
References
- 1. NUREG-0856, Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities, Supplement 1, ADAMS Accession No. ML023470304, dated November 2002.
- 2. NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 27, Regarding Palisades Nuclear Plant, ADAMS Accession No. ML062710300, dated October 2006