ML23006A011
| ML23006A011 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 01/06/2023 |
| From: | NRC/RGN-II |
| To: | |
| References | |
| Download: ML23006A011 (1) | |
Text
2022 NRC Exam ML23006A011
2022 NRC Exam
- 1.
Which one of the following completes both statements below regarding the LOCA Recirc Pump Discharge Valve, B32-F031A(B) auto-closure feature?
The auto-closure setpoint is ___(1)____ psig.
After the auto-closure occurs, with LOCA conditions no longer existing and the LPCI Initiation Logic NOT reset, the B32-F031A(B) ___(2)___ be opened manually.
A. (1) 310 psig (2) can B. (1) 310 psig (2) can NOT C. (1) 410 psig (2) can D. (1) 410 psig (2) can NOT
2022 NRC Exam
- 2.
Which of the following completes both statements below?
The normal power supply to 1-E11-F009, RHR SDC Suction Isolation-Inboard is
____(1)___.
The normal power supply to 1-E11-F008, RHR SDC Suction Isolation-Outboard is
____(2)___.
A. (1) 1XA (2) 1XDA B. (1) 1XA (2) 1XDB C. (1) 1XB (2) 1XDA D. (1) 1XB (2) 1XDB
2022 NRC Exam
- 3.
Unit One has experienced a small break LOCA. HPCI auto-started on low level and is the ONLY high-pressure source of injection available.
Reactor Water Level is currently +180 inches and rising Drywell pressure is 1.4 psig and rising.
If reactor water level reaches 206 inches while drywell pressure is 1.5 psig, how will reactor water level subsequently respond?
Reactor water level will lower ____?____.
A. to +166 inches and then stabilize B. to +105 inches, then begin to rise C. until drywell pressure reaches 1.7 psig and then rise D. to +45 inches and then rise
2022 NRC Exam
- 4.
Reactor pressure is 300 psig.
Which one of the following completes both statements about the Core Spray Inboard (E21-F005B) and Outboard (E21-F004B) Injection Valve interlock feature?
With the current reactor pressure, to manually open BOTH valves, ___(1)___.
The purpose of the interlock feature is to ___(2)___.
A. (1) either valve can be opened first (2) prevent overpressurizing the discharge piping B. (1) either valve can be opened first (2) maintain the discharge piping full of water C. (1) E21-F004B must be opened first (2) prevent overpressurizing the discharge piping D. (1) E21-F004B must be opened first (2) maintain the discharge piping full of water
2022 NRC Exam
- 5.
Which of the following completes the statement below pertaining to the Core Spray Line Break Detection differential pressure (DP) instrument E21-PDS-N004A/B?
The ____(1)____ leg of this DP instrument senses pressure just ____(2)____ core plate pressure via the SLC/Core Differential Pressure penetration.
A. (1) low pressure (2) below B. (1) low pressure (2) above C. (1) high pressure (2) below D. (1) high pressure (2) above
2022 NRC Exam
- 6.
Unit One is in an ATWS condition with reactor pressure at 1060 psig when both SLC pumps are started.
Which one of the following completes both statements below?
If both squib valves fail to fire, the SLC pump relief valves will discharge to the
____(1)____.
With the current reactor pressure, if one squib valve fails to fire, then ____(2)____ SLC pump(s) is/are allowed to remain in operation per 1OP-05, SLC System.
A. (1) suction of the pump(s)
(2) ONLY one B. (1) suction of the pump(s)
(2) both C. (1) SLC tank (2) ONLY one D. (1) SLC tank (2) both
2022 NRC Exam
- 7.
Unit Two is in Mode 1 operating at 15% when all Turbine bypass valves fail open due to an EHC pressure regulator failure.
Which one of the following completes both statements below?
A reactor SCRAM ____(1)____ occur.
The MSIVs ____(2)____ isolate.
A. (1) will (2) will NOT B. (1) will (2) will C. (1) will NOT (2) will NOT D. (1) will NOT (2) will
2022 NRC Exam
- 8.
Unit One is performing a reactor startup in accordance with 0GP-02, Approach to Criticality and Pressurization of The Reactor.
All IRM detectors are on Range 6 with power level rising Which one of the following completes the statements below?
In accordance with 0GP-02, as reactor power rises, reposition the IRM range switches to maintain IRM indication on recorders between 15 and ____(1)____ on the 125 scale.
If one IRM range switch is at the high limit of the band stated above and the operator inadvertently ranged it down, a half scram ____(2)____ occur.
A. (1) 40 (2) will B. (1) 40 (2) will NOT C. (1) 50 (2) will D. (1) 50 (2) will NOT
2022 NRC Exam
- 9.
A plant startup is in progress with the following nuclear instrument indications when SRM A fails downscale:
SRM Counts Position IRM Counts Range A
0 Partially Inserted A
25/125 2
B 5x104 Partially Inserted B
35/125 2
C 6x104 Partially Inserted C
30/125 2
D 0
Bypassed D
15/125 2
E 30/125 2
F 35/125 2
G 30/125 2
H 25/125 2
Which one of the following completes the statements below?
The failed SRM ____(1)____ cause a control rod withdrawal block.
If an additional SRM subsequently becomes inoperable, TS 3.3.1.2, Source Range Monitor (SRM) Instrumentation requires the crew to ____(2)____ immediately.
A. (1) will (2) suspend control rod withdrawal B. (1) will (2) place the Reactor Mode switch in SHUTDOWN C. (1) will NOT (2) suspend control rod withdrawal D. (1) will NOT (2) place the Reactor Mode switch in SHUTDOWN
2022 NRC Exam 10.
Which one of the following completes the statements below? (Evaluate each statement separately)
A FLOW COMPARE alarm will be displayed on the Rod Block Monitor Operator Display Assembly if any two Recirculation Flow inputs differ by an amount greater than a MINIMUM amount of ____(1)____.
With the Mode Switch in Run, if reactor power is 114% a scram ____(2)____
automatically occur due to the Neutron Flux High-Fixed limit.
A. (1) 10%
(2) will B. (1) 10%
(2) will NOT C. (1) 14%
(2) will D. (1) 14%
(2) will NOT
2022 NRC Exam 11.
The RCIC turbine has been manually tripped at the RTGB.
Which one of the following completes the statement below in accordance with 1OP-16, Reactor Core Isolation Cooling Operating Procedure?
In order to reset the trip and throttle valve, the control switch is placed in the CLOSE position and held in that position for a MINIMUM of ___(1)___ after closed indication is received on the ___(2)___ position indication.
A. (1) 5 seconds (2) actuator B. (1) 5 seconds (2) valve C. (1) 13 seconds (2) actuator D. (1) 13 seconds (2) valve
2022 NRC Exam 12.
Which one of the following completes both statements below regarding how the RCIC steam line is drained of condensate?
Condensate inside the steam supply line is drained through a steam/orifice pot arrangement located ___(1)___.
The orifice and its air-operated bypass valve drain to the ___(2)___.
A. (1) downstream of the E51-V8, RCIC Turbine Trip and Throttle Valve (2) barometric condenser B. (1) downstream of the E51-V8, RCIC Turbine Trip and Throttle Valve (2) main condenser C. (1) upstream of the E51-F045, RCIC Turbine Steam Supply Valve (2) barometric condenser D. (1) upstream of the E51-F045, RCIC Turbine Steam Supply Valve (2) main condenser
2022 NRC Exam 13.
The crew is implementing the following step in PCCP:
Which one of the following identifies the reason why Emergency Depressurization is required?
To prevent ___(?)___.
A. Containment vent valve integrity being lost B. SRV solenoid temperature limit being exceeded C. ECCS MOV temperature limits being exceeded D. Suppression Chamber to Drywell Vacuum Breakers integrity being lost.
2022 NRC Exam 14.
Reactor Recirc pumps have automatically tripped due to low Reactor water level. The following indications are available:
G31-F001, RWCU Inboard Isol Vlv, is Closed G31-F004, RWCU Outboard Isol Vlv, is Open Which one of the following identifies what the GROUP 3 ISOL CMND status box on ERFIS will display in five minutes?
A. A green GROUP ISOL B. A red NO GROUP ISOL C. A yellow GROUP ISOL CMND D. A green NO GROUP ISOL CMND
2022 NRC Exam 15.
Unit One was at 100% power when the Main Turbine tripped and the Turbine Bypass valves failed to open resulting in RPV pressure peaking at 1134 psig.
Which of the following completes both statements below?
____(1)____ Safety Relief Valves opened.
SRV position indication on Panel P601 is provided by ____(2)____.
A. (1) Eight (2) acoustic monitors B. (1) Eight (2) thermocouples C. (1) Four (2) acoustic monitors D. (1) Four (2) thermocouples
2022 NRC Exam
- 16.
Unit One is at 20% power.
Which one of the following completes both statements below?
The current pneumatic supply for Safety Relief Valves is from ____(1)____.
The Safety Relief Valve accumulators are designed to ensure each valve can be cycled a MINIMUM of ____(2)____ time(s).
A. (1) Backup Nitrogen (2) one B. (1) Backup Nitrogen (2) five C. (1) Pneumatic Nitrogen System (2) one D. (1) Pneumatic Nitrogen System (2) five
2022 NRC Exam
- 17.
Unit Two is operating at 100% power when RFP B trips on low suction pressure.
Which one of the following completes both statements below?
The FWLCS will ____(1)____.
If an automatic runback subsequently failed to occur, 0AOP-23, Condensate /
Feedwater System Failure, requires manually reducing recirc pump speed to
____(2)____.
A. (1) remain in 3-element (2) 45%
B. (1) remain in 3-element (2) 48%
C. (1) auto-shift to 1-element (2) 45%
D. (1) auto-shift to 1-element (2) 48%
2022 NRC Exam
- 18.
Unit One primary containment venting is being performed IAW 1OP-10, Standby Gas Treatment System Operating System, with the following system status:
1-VA-1F-BFV-RB, SBGT DW Suct Damper is open 1-VA-1D-BFV-RB, Reactor Building SBGT Train 1A Inlet Valve is closed 1-VA-1H-BFV-RB, Reactor Building SBGT Train 1B Inlet Valve is closed Which one of the following completes both statements below if drywell pressure rises to 1.9 psig?
1-VA-1F-BFV-RB ____(1)____.
Both 1-VA-1D-BFV-RB and 1-VA-1H-BFV-RB ____(2)____.
A. (1) auto closes (2) auto open B. (1) auto closes (2) remain closed C. (1) remains open (2) auto open D. (1) remains open (2) remain closed
2022 NRC Exam 19.
Unit Two is operating at 100% power with all busses being powered from their normal source when a Main Generator lockout occurs.
UA-13 1-2, GENERATOR DIFF L/O UNIT TRIP, is in alarm.
Which one of the following completes the statements below?
Bus ____(1)____ is normally powered from the UAT.
After the Generator lockout occurs, the bus stated above will be ____(2)____.
A. (1) 2B (2) de-energized B. (1) 2B (2) powered by the SAT C. (1) 2C (2) de-energized D. (1) 2C (2) powered by the SAT
2022 NRC Exam 20.
The Standby UPS Manual Bypass Switch is in its normally aligned position.
Which one of the following completes the statements below?
The normal AC power source for Primary UPS 1A is ____(1)____.
In the event the inverter for Primary UPS 1A fails, the static transfer switch will automatically align ____(2)____ to provide power to the associated loads.
A. (1) MCC 1CA (2) DC SWBD 1A B. (1) MCC 1CA (2) MCC 1CB C. (1) MCC 1CB (2) DC SWBD 1B D. (1) MCC 1CB (2) MCC 1CA
2022 NRC Exam
- 21.
4160 VAC SWGR 1B normal control power is lost.
Which one of the following completes both statements below?
DC Control power to SWGR 1B ____(1)____ to alternate.
The alternate power is fed from DC Distribution Panel ____(2)____.
A. (1) automatically transfers (2) 9A (UNIT 1)
B. (1) automatically transfers (2) 10A (UNIT 2)
C. (1) has to be manually transferred (2) 9A (UNIT 1)
D. (1) has to be manually transferred (2) 10A (UNIT 2)
2022 NRC Exam 22.
Emergency Diesel Generators are supplying their respective E Busses on Unit One after a scram with a LOOP.
Which one of the following completes both statements below?
A loss of ____(1)____ pressure will cause DG 1 to trip.
The de-energized bus can be cross-tied to bus ____(2)____ to provide power.
A. (1) lube oil (2) E3 B. (1) lube oil (2) E2 C. (1) jacket water (2) E3 D. (1) jacket water (2) E2
2022 NRC Exam 23.
Unit Two is operating at 35% power.
Which one of the following choices completes both statements below concerning the 2-CO-FV-49, SJAE Condensate Recirculation Valve?
On a loss of the pneumatic supply to 2-CO-FV-49, condensate system flow will
___(1)___.
On a loss of control power to the 2-CO-FIC-49, SJAE COND RECIRC FCV, condensate system flow will ___(2)___.
A. (1) increase (2) increase B. (1) decrease (2) decrease C. (1) remain the same (2) remain the same D. (1) remain the same (2) increase
2022 NRC Exam 24.
A loss of cooling to RBCCW has occurred. Which ONE of the following loads is cooled by RBCCW AND has an automatic trip feature based on high cooling water temperature?
A. Fuel Pool Cooling Pumps B. Drywell Coolers C. Control Rod Drive Pumps D. Reactor Water Cleanup Pumps
2022 NRC Exam 25.
Which one of the following completes both statements below concerning RBCCW Heat Exchangers?
RBCCW flows in the ___(1)___ direction as service water flows through the heat exchanger.
Proper venting of the RBCCW Heat Exchangers is important because air trapped in the heat exchanger ___(2)___.
A. (1) same (2) reduces the heat transfer surface area B. (1) same (2) will cause thermal shock C. (1) opposite (2) reduces the heat transfer surface area D. (1) opposite (2) will cause thermal shock
2022 NRC Exam 26.
Which one of the following completes the following statement?
The power supply for Conventional - Nuclear Header Division Isolation Valve 1-SW-V106 is ________.
A. 1XA B. 1XB C. 1PA D. 1PB
2022 NRC Exam 27.
Unit One is operating at 100% power when the following annunciator alarms:
A-07 6-1 CRD ACCUM LO PRESS/HI LEVEL An AO dispatched to the HCU panel observed that the red light for the associated HCU remained on (lit) when its pushbutton was depressed.
Which one of the following completes the statements below?
The HCU panel is located on the ____(1)____ elevation of the Reactor Building.
The red light for the associated HCU remaining on (lit) indicates the associated CRD accumulator has a ____(2)____ condition.
A. (1) -17 foot (2) low pressure B. (1) -17 foot (2) high water level C. (1) +20 foot (2) low pressure D. (1) +20 foot (2) high water level
2022 NRC Exam 28.
Which of the following completes both statements below as it pertains to the ATWS-RPT?
___(1)___ is the MINIMUM reactor vessel pressure that will result in an ATWS-RPT actuation.
If this pressure is exceeded, the ___(2)___.
A. (1) 1077.0 psig (2) VFD Input Circuit Breaker will trip, resulting in a VFD trip B. (1) 1077.0 psig (2) VFD will trip with the VFD Input Circuit Breaker remaining closed C. (1) 1137.8 psig (2) VFD Input Circuit Breaker will trip, resulting in a VFD trip D. (1) 1137.8 psig (2) VFD will trip with the VFD Input Circuit Breaker remaining closed
2022 NRC Exam 29.
Concerning RWCU Filter Inlet Temperature, which of the following completes the statement below?
If RWCU nonregenerative heat exchanger outlet temperature exceeds a MINIMUM of (1) the (2) will close.
A. (1) 135oF (2) 1-G31-F001, RWCU Inlet Inboard Isolation Valve B. (1) 135oF (2) 1-G31-F004, RWCU Inlet Outboard Isolation Valve C. (1) 115oF (2) 1-G31-F001, RWCU Inlet Inboard Isolation Valve D. (1) 115oF (2) 1-G31-F004, RWCU Inlet Outboard Isolation Valve
2022 NRC Exam 30.
Unit One is at 25% power during a plant startup. A control rod is notched out from position 12.
The operator observes the 12 indication on the four rod display goes out, comes back on, and then goes out again.
The operator then observes the 13 indication come on and then go out. No additional rod position is displayed on the four rod display.
Which one of the following completes both statements below?
The rod position that will be displayed on the RWM will be ____(1)____.
In accordance with 0AOP-02.0, Control Rod Malfunction/Misposition, in order to position the control rod at an operable indication, the control rod ___(2)___ be withdrawn.
A. (1) position 12 in inverse video (2) can B. (1) position 12 in inverse video (2) can NOT C. (1) FF with an inferred position of 14 (2) can D. (1) FF with an inferred position of 14 (2) can NOT
2022 NRC Exam
- 31.
Unit One is at rated power. Reactor Engineering has completed performance of 0PT-01.9, LPRM Calibration. The TIPs are currently located at the indexer.
Which one of the following choices completes the statements below?
The TIPS Indexer is located in the ___(1)___.
If reactor water level lowered below the LL1 setpoint, the ball valve would auto close
___(2)___.
A. (1) TIP Room (2) as soon as the LL1 condition occurs B. (1) TIP Room (2) only after the in-shield limit switch is activated C. (1) Drywell (2) as soon as the LL1 condition occurs D. (1) Drywell (2) only after the in-shield limit switch is activated
2022 NRC Exam
- 32.
Unit Two plant cooldown is being performed with the following conditions:
Reactor water level 175 inches, steady Reactor pressure is 800 psig Drywell ref leg temp 175°F 0GP-05, Attachment 2, Reference Leg Monitoring, is in progress due to reference leg backfill being out-of-service.
Which one of the following completes both statements below?
Lowering reactor pressure to 600 psig causes the Narrow Range (N004A/B/C) reactor water level instrument error to ____(1)____.
At 600 psig, the Reactor Water Level Uncompensated (2-B21-LI-R611) indication that would correspond to Low level 4 (LL4) is ____(2)____.
(REFERENCE PROVIDED)
A. (1) increase (2) -60 inches B. (1) increase (2) -65 inches C. (1) decrease (2) -60 inches D. (1) decrease (2) -65 inches
2022 NRC Exam
- 33.
Unit One is at 45% power when the Turbine trips. All Control Rods fail to insert (ATWS).
Which one of the following completes the statement below?
A maximum of ____(1)____Turbine Bypass valves will be fully open.
A. two B. three C. four D. six
2022 NRC Exam
- 34.
Unit 1 is at 100% power with six CDDs in service. Which one of the following states the LOWEST DP across the demineralizers which will cause the 1(2)-CD-PV-401, CDD Bypass Valve to open?
A. 40 psid B. 50 psid C. 55 psid D. 75 psid
2022 NRC Exam
- 35.
Unit One HPCI is injecting into the reactor vessel with 1-E41-FIC-R600, HPCI Flow Controller, in manual. Subsequently, Feedwater line A ruptures downstream of the 1-B21-F032A, Feedwater Isolation valve.
Which one of the following completes the statements below?
The HPCI line taps into the feedwater system ____(1)____ of 1-B21-F032A.
When the break occurs, HPCI flow, as read on 1-E41-FIC-R600, HPCI Flow Controller, will ____(2)____.
A. (1) upstream (2) remain the same B. (1) upstream (2) increase C. (1) downstream (2) remain the same D. (1) downstream (2) increase
2022 NRC Exam
- 36.
Which one of the following is the Power supply to 1A-PS-EF-RB (Purge Exhaust Fan) ?
A. 1XC B. 1XD C. 1XG D. 1XH
2022 NRC Exam
- 37.
Unit Two is in the process of shutting down.
Which one of the following completes the statements below?
In accordance with 0GP-05, Unit Shutdown, Shutdown Cooling will be placed in service when reactor pressure is below a MAXIMUM of ____(1)____ psig.
During Shutdown Cooling operation with no recirc pumps running, flow ____(2)____ be observed on jet pump loop flow indicators B21-R611A/B on control room panel H12-P603.
A. (1) 125 (2) can B. (1) 125 (2) can NOT C. (1) 300 (2) can D. (1) 300 (2) can NOT
2022 NRC Exam
- 38.
Unit One was operating at 25% power when recirculation flow lowers.
Which one of the following completes both statements in accordance with 1AOP-04.0?
In accordance with 1AOP-04.0, Low Core Flow, if the maximum differential temperature between bottom head and dome exceeds a MINIMUM of 145 oF, ___(1)____.
The above action is required due to the concern that ____(2)____.
A. (1) insert a manual scram (2) the recirc piping stress analyses is no longer bounded B. (1) insert a manual scram (2) significant thermal stratification can exist C. (1) commence a reactor shutdown (2) the recirc piping stress analyses is no longer bounded D. (1) commence a reactor shutdown (2) significant thermal stratification can exist
2022 NRC Exam
- 39.
Unit Two is in cold shutdown when a lockout of E3 bus occurs resulting in a loss of shutdown cooling.
Which one of the following completes both statements in accordance with 0AOP-15.0, Loss of Shutdown Cooling?
The CRS will direct starting RHR pump ____(1)____.
Under natural circulation conditions, ____(2)____ must be monitored to determine if a mode change has taken place.
A. (1) 2A (2) recirc loop suction/bottom head temperatures B. (1) 2A (2) reactor vessel pressure C. (1) 2C (2) recirc loop suction/bottom head temperatures D. (1) 2C (2) reactor vessel pressure
2022 NRC Exam
- 40.
Unit One is at 100% power and the CRS has directed entry into 0AOP-39.0, Loss of DC Power, due to DC Switchboard 1B Breaker GL6, Feeder for 125 VDC Panel 1B, tripping open.
Which one of the following completes both statements in accordance with 0AOP-39.0, Loss of DC Power?
Swapping DC control power for the EDG is required to be performed within
____(1)____ minutes.
The control power transfer for the EDG is performed at ____(2)____.
A. (1) 60 (2) Panel 2B B. (1) 60 (2) the EDG Excitation Panel C. (1) 53 (2) Panel 2B D. (1) 53 (2) the EDG Excitation Panel
2022 NRC Exam
- 41.
Unit One is at 104 MWe performing 0GP-05, Unit Shutdown. The crew is preparing to trip the turbine per 1OP-26, Turbine System Operating Procedure, Section 6.2.1, Normal Shutdown Which one of the following completes both statements below in accordance with 1OP-26?
A-05 6-7, TURB CV FAST CLOS/SV TRIP BYPASS ____(1)____ required to be in alarm.
To trip the main turbine, OP-26 requires ___(2)___ Main Turbine RTGB Trip switch/switches to be taken to the PULL TO TRIP position.
A. (1) is (2) only one B. (1) is NOT (2) only one C. (1) is (2) both D. (1) is NOT (2) both
2022 NRC Exam
- 42.
Unit One tripped from 100% power and 0EOP-01-SCRAM is being implemented.
Which one of the following completes both statements in accordance with 0EOP SCRAM?
At step RSP-10, Reactor pressure is required to be stabilized ____(1)____.
If this step cannot be met, then ____(2)____ is required to be entered.
A. (1) at 900 psig (2) 0EOP-01-RVCH B. (1) at 900 psig (2) 0EOP-01-ATWS C. (1) below 1060 psig (2) 0EOP-01-RVCH D. (1) below 1060 psig (2) 0EOP-01-ATWS
2022 NRC Exam
- 43.
The control room has been evacuated and suppression pool cooling is required on Unit One.
Which one of the following completes both statements below?
In accordance with 0AOP-32.0, Plant Shutdown From Outside Control Room RHR Loop ____(1)____ will be placed in Suppression Pool Cooling.
Suppression Pool cooling will be secured when temperature can be maintained below a MAXIMUM of ____(2)____.
A. (1) A (2) 95 oF B. (1) A (2) 105 oF C. (1) B (2) 95 oF D. (1) B (2) 105 oF
2022 NRC Exam
- 44.
Which one of the following completes the statements below in accordance with 0AOP-16.0, RBCCW System Failure?
For a complete loss of RBCCW, the MAXIMUM time the CRD Pumps are allowed to be operated is ____(1)____ minutes, except as directed by the CRS.
If RBCCW is lost to the recirculation pump seal heat exchanger, the affected Recirculation Pumps need to be secured within ___(2)___ minutes.
A. (1) 10 (2) 10 B. (1) 10 (2) 20 C. (1) 20 (2) 10 D. (1) 20 (2) 20
2022 NRC Exam 45.
Unit TWO is operating at 100% power when PNS Sys Div I Hdr Press and Div II Hdr Pressure start lowering.
RNA-SV-5482/1, Div I/II Backup N2 Rack Isol Vlvs auto open and pressure stabilizes at 88 psig.
Which one of the following completes the statements below?
When the Nitrogen Backup System aligns to supply drywell loads, it is prevented from supplying non drywell loads by____(1)____.
In accordance with 0AOP-20.0, Pneumatic (Air/Nitrogen) System Failures, a reactor scram ____(2)____ required.
A. (1) check valves V350/351 in the supply line (2) is B. (1) check valves V350/351 in the supply line (2) is NOT C. (1) PNS/RNA isolation valves SV-5262/5261 closing (2) is D. (1) PNS/RNA isolation valves SV-5262/5261 closing (2) is NOT
2022 NRC Exam
- 46.
Unit Two is in Cold Shutdown with both Reactor Recirculation pumps shutdown.
SDC has been lost. The crew has determined that Alternate SDC using the SRVs is required.
Which one of the following completes the statement below for establishing alternate shutdown cooling with the SRVs IAW 0EOP-01-SEP-23, ALTERNATE SHUTDOWN COOLING USING SRV'S?
RPV Level must be raised and maintained (1), which can be verified on the (2) Level instrument.
A. (1) 200 to 220 inches (2) N026, Wide Range B. (1) 200 to 220 inches (2) N027, Shutdown Range C. (1) greater than 254 inches (2) N026, Wide Range D. (1) greater than 254 inches (2) N027, Shutdown Range
2022 NRC Exam 47 Unit Two is in a refueling outage.
A fuel bundle is inadvertently dropped in the "cattle chute".
Reactor Building Vent Exhaust Rad is 1 mr/hr The following indication is observed for ARM Channel 2-28, U-2 RX Bldg Between RX and Fuel Storage Pool Elev 117 Ft:
[Reference Provided]
Which one of the following completes both statements below for this condition?
An entry condition for SCCP (1).
0AOP-5.0, Radioactive Spills, High Radiation, and Airborne Activity, requires Control Room Emergency Ventilation to be placed in service within (2).
A. (1) exists (2) 15 minutes B. (1) exists (2) 20 minutes C. (1) does NOT exist (2) 15 minutes D. (1) does NOT exist (2) 20 minutes
2022 NRC Exam 48 Unit Two has experienced a LOCA. Containment water level indicated on CAC-PI-4176 is 18 feet.
Which one of the following identifies the space (drywell or torus) with the limiting pressure that would FIRST require 0EOP-01-SEP-01, Primary Containment Venting, AND whether the torus can be used to vent at this time?
[REFERENCE PROVIDED]
A. Drywell; torus can be vented B. Drywell; torus CANNOT be vented C. Torus; torus can be vented D. Torus; torus CANNOT be vented
2022 NRC Exam 49 Unit Two was raising power in accordance with 0GP-04, Increasing Turbine Load to Rated Power.
When 100% power was reached, A-05 3-5, REACTOR VESS HI PRESS, alarmed due to the EHC pressure setpoint being set too high.
Which one of the following completes both statements below?
In accordance with A-05 3-5, the annunciator setpoint is ___(1)___ psig At 100% power, EHC pressure setpoint is adjusted to maintain RPV pressure at
___(2)____ psig.
A.
(1) 1050 (2) 1015 B.
(1) 1050 (2) 1030 C.
(1) 1060 (2) 1015 D.
(1) 1060 (2) 1030
2022 NRC Exam 50 Which one of the following completes the definition of Heat Capacity Temperature Limit (HCTL) in accordance with 0EOP-01-UG, Users Guide?
HCTL is the highest torus temperature at which initiation of RPV depressurization will not result in exceeding EITHER the torus design temperature of ___(1)___ OR the
___(2)___, before the rate of energy transfer from the RPV to the containment is within the capacity of the containment vent.
A. 1. 190oF
- 2. Primary Containment Pressure Limit B. 1. 220oF
- 2. Primary Containment Pressure Limit C. 1. 190oF
- 2. SRV Tailpipe Level Limit D. 1. 220oF
- 2. SRV Tailpipe Level Limit
2022 NRC Exam 51 Unit Two is currently in 0AOP-14, Abnormal Primary Containment Conditions due to rising drywell temperature.
Which one of the following completes both statements in accordance with 0AOP-14?
IF desired, remove ____(1)___ from service to reduce RBCCW heat load.
Reduce power to maintain drywell temperature below a MAXIMUM of ___(2)___.
A. (1) one RWCU F/D (2) 150 oF B. (1) one RWCU F/D (2) 170 oF C. (1) RWCU (2) 150 oF D. (1) RWCU (2) 170 oF
2022 NRC Exam 52 A LOCA has occurred on Unit One and you have been directed to determine the Core Spray NPSH limit per 0EOP-01-NL, Figure 48, Core Spray NPSH Limit. Current parameters are as follows:
Core Spray A flowrate is 2500 gpm Core Spray B flowrate is 2500 gpm Torus Level is -43 inches stable Torus pressure is 5.5 psig Which one of the following completes the statement below?
[Reference Provided]
In order to maintain the operating point below the NPSH limit for the Core Spray pumps, the MAXIMUM Torus temperature is ________.
A. 198 oF B. 200 oF C. 206 oF D. 210 oF
2022 NRC Exam 53 Unit One had a LOCA with RPV level currently at 63 inches and lowering at 10 inches per minute.
Which one of the following completes the statement below?
In accordance with Reactor Vessel Control (RVCH RC/L), ED will be required within a MAXIMUM of ________ minutes. (Assuming the rate of level decrease remains constant)
A. two B. seven C. nine D. fourteen
2022 NRC Exam 54 An ATWS occurred on Unit 1 and RPV level was deliberately lowered in accordance with 0EOP-01-ATWS, C5/L.
The crew is evaluating the amount of boron injection required at Step C5/L-21 to proceed with restoring and maintaining RPV level between +166 and +206 inches.
Which one of the following completes both statements below?
In order to establish the new level band, you must have injected ____(1)____.
This amount is based on adding ____(2)____ shutdown boron weight.
A. (1) 36% of the SLC tank or 1800 gallons from the SLC tank (2) Cold B. (1) 36% of the SLC tank or 1800 gallons from the SLC tank (2) Hot C. (1) until the SLC tank has 36% or 1800 gallons remaining (2) Cold D. (1) until the SLC tank has 36% or 1800 gallons remaining (2) Hot
2022 NRC Exam 55 Unit Two has entered RRCP due to fuel failure which has resulted in a high offsite release.
Which one of the following completes both statements below?
CREV will automatically start in the recirculation mode when Control Room Area Radiation Monitor (Channel 1) FIRST exceeds ____(1)____.
CREV operation in the recirculation mode is required to maintain habitability of the ____(2)____.
A. (1) 1 mR/hr (2) Control Room ONLY B. (1) 1 mR/hr (2) Control Room and Cable Spread C. (1) 7 mR/hr (2) Control Room ONLY D. (1) 7 mR/hr (2) Control Room and Cable Spread
2022 NRC Exam 56 A fire has been reported and confirmed in the turbine building breezeway.
A fire hose is being used to control/suppress the fire.
Which one of the following completes both statements below IAW 0PFP-013, General Fire Plan?
The ____(1)____ is required to direct radwaste to lock out floor drains in the affected area of the breezeway.
A call for offsite assistance to the Brunswick County 911 Center ____(2)____ required.
A. (1) control room operator (2) is B. (1) control room operator (2) is NOT C. (1) fire brigade leader (2) is D. (1) fire brigade leader (2) is NOT
2022 NRC Exam 57 Unit One is operating at full power when the following conditions occur:
Generator frequency 59.6 Hz Emergency Bus E1 voltage 4050 volts Emergency Bus E2 voltage 4040 volts Which one of the following completes both statements below in accordance with 0AOP-22, Grid Instability?
A manual scram ____(1)____ required.
Off-frequency operation can ____(2)____.
A. (1) is (2) damage emergency bus loads B. (1) is NOT (2) damage emergency bus loads C. (1) is (2) stimulate resonance vibration in low pressure blades D. (1) is NOT (2) stimulate resonance vibration in low pressure blades
2022 NRC Exam 58 Unit Two is operating at 19% power with the turbine on the turning gear when the following indications are observed:
SJAE Trains Both in half load AOG System Outlet Flow 80 scfm and slowly rising Condenser Vacuum Slowly lowering Steam Seal header pressure 0 psig Steam Packing Exhauster Vacuum 14.5 inches of water Which one of the following identifies the required operator action in accordance with 0AOP-37.0, Low Condenser Vacuum?
A. Place B SJAE in full load B. Start the mechanical vacuum pump C. Throttle open MVD-S2, Steam Seal Bypass Valve D. Throttle open the SJAE Condensate Recirculation Valve, CO-FV-49
2022 NRC Exam 59 Which one of the following completes both statements below in accordance with 0AOP23.0, Condensate/Feedwater System Failures?
A recirculation pump runback to Speed Limiter 2 is based on ____(1)____.
The flow value necessary for the runback to occur is less than a MAXIMUM of
____(2)____ rated suction flow on either reactor feed pump.
A. (1) low feedwater flow ONLY (2) 14.9%
B. (1) low feedwater flow ONLY (2) 16.4%
C. (1) low RPV level AND low feedwater flow (2) 14.9%
D. (1) low RPV level AND low feedwater flow (2) 16.4%
2022 NRC Exam 60 Unit One is operating at 100% when an inadvertent PCIS Group One occurs due to a fault in the MSIV Pit Temperature logic.
Assuming no operator action, which one of the following completes both statements below?
The FIRST RPS scram signal generated will be from ____(1)____.
In accordance with RVCH and 0EOP-01-UG, Users Guide, 1-B32-F019, Recirc Sample Inboard Isolation Valve, and 1-B32-F020, Recirc Sample Outboard Isolation Valve, will be verified ____(2)____.
A. (1) MSIV closure (2) open B. (1) MSIV closure (2) shut C. (1) Steam dome high pressure (2) open D. (1) Steam dome high pressure (2) shut
2022 NRC Exam 61 Unit One is operating at 100% power and a loss of Recirc Seal Injection flow occurs.
Which one of the following completes both statements below?
If the number one (inner) seal failed, the number two (outer) seal cavity pressure indication will be ____(1)____.
In accordance with 1OP-02, Reactor Recirc System Operating Procedure, if seal injection flow AND seal cooling water flow are both lost to an operating recirc pump, continued operation of the pump is limited to ____(2)____ seconds.
A. (1) lower (2) 30 B. (1) lower (2) 90 C. (1) higher (2) 30 D. (1) higher (2) 90
2022 NRC Exam 62 Unit One is operating at 100% power when the following annunciators alarm:
UA-3 (6-2), RX BLDG VENT TEMP HIGH A-2 (5-7) STM LEAK DET AMBIENT HIGH A-1 (3-5) HPCI ISOL TRIP SIG A INITIATED A-1 (4-5) HPCI ISOL TRIP SIG B INITIATED HPCI auto-isolation occurred and steam leak stopped.
Which one of the following completes both statements below?
Standby Gas Treatment trains ____(1)____ automatically start.
Entry into 0EOP-03-SCCP, Secondary Containment Control Procedure ____(2)____
required.
(Reference Provided)
A. (1) will (2) is B. (1) will (2) is NOT C. (1) will NOT (2) is D. (1) will NOT (2) is NOT
2022 NRC Exam 63 Which one of the following completes both statements below?
In accordance with 0EOP-03-SCCP, SC/L, the areas listed in Table SC-4, Area Water level Limits, ___(1)___ all on the -17 ft Rx Building elevation.
As defined in 0EOP-01-UG, EOP Users Guide, Maximum Safe Operating Water Level is the highest water level above which ___(2)___.
A. (1) are (2) it is indicative that support and control systems are not functioning properly B. (1) are (2) equipment necessary for the shutdown of the plant may fail C. (1) are NOT (2) it is indicative that support and control systems are not functioning properly D. (1) are NOT (2) equipment necessary for the shutdown of the plant may fail
2022 NRC Exam 64 Which one of the following completes both statements below regarding motor operated valves (MOVs) in accordance with AD-OP-ALL-0110, General Equipment Operating Standards?
The preferred method for verifying MOV position is ___(1)___.
Control switches for throttle MOVs shall be held for ___(2)___ seconds past full CLOSED indication.
A. (1) control indicating lights or computer position information (2) 1-5 seconds B. (1) control indicating lights or computer position information (2) 10-15 seconds C. (1) local visual inspection (2) 1-5 seconds D. (1) local visual inspection (2) 10-15 seconds
2022 NRC Exam 65 A Reactor Operator has an active license and has been performing licensed activities for the past six months.
Which one of the following completes both statements in accordance with AD-OP-ALL-0107, Maintenance of RO and SRO Licenses?
The MINIMUM watchstanding this operator must perform in order to maintain an active license is____(1)____.
The above watchstanding requirements must be completed ____(2)____.
A. (1) 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> at an active license level (2) during ANY consecutive three month period B. (1) 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> at an active license level (2) in a calendar quarter C. (1) five 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts at an active license level (2) during ANY consecutive three month period D. (1) five 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts at an active license level (2) in a calendar quarter
2022 NRC Exam 66 The reactor is at rated power with a surveillance is in progress that is adding heat into the Suppression Pool.
Which one of the following is the HIGHEST Suppression Pool Temperature that if reached, would still allow the continuance of the surveillance in accordance with Technical Specifications?
A.
94 oF B.
101 oF C.
107 oF D.
111oF
2022 NRC Exam 67 Which one of the following completes the following statement in accordance with 0EOP-01-SEP-15, Anticipate Emergency Depressurization?
While depressurizing to the main condenser, steam flow ____(1)____ is required to be limited to a maximum ____(2)____?
A. (1) on both units (2) 3x106 lbm/hr B. (1) ONLY on Unit 2 (2) 3x106 lbm/hr C. (1) on both units (2) 17.5x106 lbm/hr (137%)
D. (1) ONLY on Unit 2 (2) 17.5x106 lbm/hr (137%)
2022 NRC Exam 68 Which one of the following completes both statements below?
The Drywell High Range Radiation Monitors measure (1)___ radiation.
These radiation monitors (2).
A. (1) gamma (2) are used for a RRCP entry condition B. (1) gamma (2) can be used for estimates of core damage C. (1) neutron (2) are used for a RRCP entry condition D. (1) neutron (2) can be used for estimates of core damage
2022 NRC Exam 69 Which one of the following completes the statement below in accordance with AD-EP-ALL-0111, Control Room Activation of the ERO?
Activation of the ___(1)___ is required within ___(2)___ minutes of an Alert, Site Area Emergency, or General Emergency declaration.
A. (1) ERONS (Emergency Response Organization Notification System)
(2) 5 B. (1) ERONS (Emergency Response Organization Notification System)
(2) 30 C. (1) ETS (Emergency Telecommunications System)
(2) 5 D. (1) ETS (Emergency Telecommunications System)
(2) 30
2022 NRC Exam 70 Unit One is operating at 45 percent power.
For which one of the following events will the Doppler coefficient act FIRST to change reactivity in the core?
A. A control rod drop B. Loss of a high pressure feedwater heater C. Tripping the main turbine D. SRV opening
2022 NRC Exam 71 A reactor startup is in progress with an initial SRM count rate of 10 cps.
Which one of the following completes both statements below in accordance with 0GP-02, APPROACH TO CRITICALITY AND PRESSURIZATION OF THE REACTOR?
As a rule of thumb, criticality will be expected when the SRM count rate reaches
____(1)____CPS.
If criticality is not achieved prior to the upper range of the Estimated Critical Position (ECP), control rods are required to be ____(2)____.
A. (1) 160 (2) completely inserted B. (1) 160 (2) inserted to less than 3 doublings of the initial source range counts (80 CPS)
C. (1) 320 (2) completely inserted D. (1) 320 (2) inserted to less than 3 doublings of the initial source range counts (80 CPS)
2022 NRC Exam 72 A reactor startup is being performed.
Which one of the following completes the statement below?
If a control rod is withdrawn from position 24 to position 48, it has been withdrawn
____(1)____ notches which is equivalent to ____(2)____ inches.
A. (1) 12 (2) 36 B. (1) 12 (2) 72 C. (1) 24 (2) 36 D. (1) 24 (2) 72
2022 NRC Exam 73 Unit One is executing the ATWS procedure, step C5-L-4, with the following plant conditions:
Reactor power 12%
Reactor pressure 940 psig, controlled by EHC Reactor water level 170 inches, controlled by feedwater In accordance with 0OI-37.5, ATWS Procedure Basis Document, which one of the following identifies the reason the ATWS procedure directs deliberately lowering RPV water level to 90 inches?
A. Reduce power below APRM downscale setpoint.
B. Reduce core inlet subcooling.
C. Minimize containment heatup.
D. Reduce steam production.
2022 NRC Exam 74 Unit One is operating at 35% power.
Which one of the following completes both statements below?
If the Maximum Fraction of Limiting Power Density (MFLPD) is maintained ____(1)____
one, we are assured that the LHGR limit is not exceeded.
The TS 3.2.3, Linear Heat Generation Rate LCO ____(2)____ currently applicable.
A. (1) less than (2) is B. (1) less than (2) is NOT C. (1) greater than (2) is D. (1) greater than (2) is NOT
2022 NRC Exam 75 Unit Two has scrammed with RPV pressure stabilizing at 1035 psig.
If the decision is made to cool down the plant at a maximum rate of 100 oF in one hour, which one of the following is the LOWEST pressure the RPV can be in one hour without violating the cooldown rate limit?
A. 411 psig B. 423 psig C. 437 psig D. 450 psig