ML22278A817

From kanterella
Jump to navigation Jump to search
Rev. 21 to Updated Final Safety Analysis Report, Drawing M-56, Sheet 1, Rev. 43, P&ID High HPCI Pump/Turbine
ML22278A817
Person / Time
Site: Limerick  
Issue date: 09/19/2022
From:
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation
Shared Package
ML22278A223 List: ... further results
References
Download: ML22278A817 (1)


Text

.

1-

c

~

H G

F E

D c

B A

8 8031-M-56 8

SH. 1 OF TURBll'<IE SPEED

~-

<SH.3 H, ll 7

I I

I I

LOW PUMP SUCTION PRESSURE

_j r

HIGH TURBIN~HAUST PRESSURE -- --

r - - - - - - - -,

r- - -----) REF I t..- -


) REF 2 7

REACTOR VESSEL HIGH WATER LEVEL I

AUTO ISOLATION SIGNAL I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I 6

2' HBB-115 1',D-1561 Y'

DAW Ji* HBB-110 I Yi HBB-110 Y'

ORW Y'

ORW 6

5

~

4 VENT TO HPCI COMPARTMENT 3

2 TURBll'<IE HYDRAULIC COl'<ITROL SYSTEt.t EGM OUTPUT

~----

~

~~RAMP I,----- - - - - -

GENERATOR I

OUTPUT t

I C201 C201 HS HS I

C847 t STEAM SUPPLY C647 0*

~

H2

[;] I I __ _

I L_

&______.L___;fo\

w--~

L TURBINE CONTROL LOGIC REFERENCE 2 & REFERENCE 1 I 10" EBB-lOB M-55

<SH.I D,31 I

I I

I C618 L

W IS*

COl-4 IO" 900* ANSI SG FLANGE z

"' a:

0 6....

~~

u a:

Y' ORW BOOSTER PUt.tP N - z dJ 4

"' 0:

<.> 0 Y'

DAW HPCJ PUt.tP IOP204*

1C001

!NOTE Bl DRIVE SHAFT 12*

  • Y' ORW Ji,* SBD-156 I SUCTION t VENT ~

DAW 14' EBB-129 20' HBB-108 1

INGSSS L-~

~

C014 PT INOSIF r-~---;

1 ~

r--w DRIVE SHAFT PSE 10003 IFD99 1F06i_

~ z

<(iJE!>~ ~

Y' ORW Y' Y' ORW DRW 1" HBB-113 Ji,* SBD-156 Y'

DRW

~~.

~

o~

ORAll'<I POT~~

r.i=

I' HBB-108 CASING DRAIN Ji* HBS-108 HPCI TURBINE

""iOS2ii

  • iCo'02""

<NOTE 8 & 151

(,)

(,)

SEAT &

CHEST DRAINS f.:l CB47

~


1---1--

HV IF059 C647

~

~

-L.-SREF 2 1

CGl8 PIS

  • INGIGF
?

Y2'

~

RVL-113 f--] DRAIN BAROt.tETRIC CONOEl'<ISER

~

I PCV N'-..~----..... ~~~-IF_Q_35~--f)l()-:.*~~~.._..,._...-.....-.._--jL8~~~"-~~...l~~~~~-"'-*N..&.~-~

..... ~-;,.,-N..&.~-~.... ~{)

2' HBB-IOB r-CB47

~

~

2" HBB-108 i

Y' ORW 2'

1F048

~

J DRAIN

~

Dh LUBE OIL COOLER

~

I0E213*

DRAIN ~--tI..----1 1043 r---

1 C647 I

I

~

_J I

I I

I I r-1 2*

I IFOS2

_L __ _

IF058 1065 LOCKED THROTTLED

-1 I

DC

_J C647 C647 1--fili HPCI VACUUM TANK CONDENSATE PUt.tP IOP215

  • TEST ~--lllt----1 HV-IF026<ASJ

<SH~~~\8, ~ I ac I

1F043


:-1

~~-f)--.,p--,~~~-tl(]---<M-M-T515('. I I

~..

HV-1F02S<ASI ISH.J4 B,Bl 1 !

~z

~l l

V1 Q

REF 2 DRW VACUUt.I TANK Ji* SBD-156 a;~

O LU

~....

-o z

Y' ORW TO REACTOR ENCLOSURE EQUIPMENT COMPARTMENT EXHAUST 5

4 3

/

HPCI BAROMfiRIC CONDENSER VACuut.t

""""Pijijji"""

IOP216*

1' HBB-108 1' HBB-108 1" HBB-108 I

_J Cb47

~

~

L Y'

ORW


SREF 2 2

REF No.

REFERENCE DRAWINGS BECHTEL No.

GE No.

1 NUCLEAR BOILER P&ID M-4 I HPCI FUNTIONAL CONTROL DIAGRAM 603HAl-E41-1030-F 729E627AD HPCI PUMP/TURBINE P&ID M-56 1--+-----------+---------t-------1 P&ID LEGEND M-00 CORE SPRAY PidO M-52 RCIC P&ID M-49 AUXILIARY STEAM P&ID M-21 MAIN STEAM P&IO M-01 CONDENSATE P&ID M-05 11 TURBINE CONTROLS DIAGRAM B031-Ml-E41-C002-K VPF 2763-92-1 12 HPCI SYSTEM P&ID B03H<l-E41-IOIO-D 761E230AO 22Al732 14 HPCI SYSTEM DESIGN SPEC BOlHAl-E<l-4010-L 22Al021 8031-M-B30 NA I.

HPCI IS A SEISMIC CATEGORY I SYSTEM EXCEPT AS NOTED.

2.

AC POWER FOR HPCI INSTRUMENTS SHALL 8£ DERIVED FROM THE PLANT DC POWER SYSTEM, VIA AN INVERTER. THE DC SOURCE IS TO BE SEPARATE FROM THAT WHICH SUPPLIES THE RCIC SYSTEM.

3.

THE GE MPL NUMBER FOR THIS SYSTEM IS E-41.

4.

THE BAROMETRIC CONDENSER AND VACUUM TANK SHALL BE LOCATED SO THAT ITS WATER LEVEL IS BELOW THE BOTTOM OF THE TURBINE EXHAUST.

5.

ALL INSTRUMENT PIPING ANO TUBING SHALL BE INSTALLED IN ACCORDANCE WITH REFERENCE 13. FOR DEVIATIONS TO SLOPE CRITERIA SEE REF. 15.

6.

All STEAM L!NES SHALL BE SLOPED WHERE PRACTICAL.

7.

NON-0 DRAIN ANO VENT LINES AND CAPPED ENDS EXTENDING FROM SEISMIC CATEGORY I PIPING ARE SEISMIC CATEGORY IIA DOWNSTREAM OF THE LAST ISOLATION VALVE.

8.

THIS EQUIPMENT IF,3-51 IS BEING MONITORED BY THE VIBRATION MONITORING SYTEM IVMSI. FOR THE TYPE OF SENSORS BEING USED, SEE VMS 1/0

SUMMARY

, VP DWG 8031-M-247-108,

9.

PORTION OF THE HBB-110 SUCTION LINE FROM THE PUMP TO TH[ FLANGE MAY BE TESTED AT THE SAME PRESSURE AS GBB-125. IF,61 IO.

DELETED.

11.

FOR ALL NON-SEISMIC CATEGORY I CAPPED VENTS. DRAINS, ANO TEST CONNECTIONS, DESIGN, FABRICATION, MATERIAL PROCUREMENT, ERECTION AND TESTING FOR ALL PIPING DOWNSTREAM OF THE LAST ISOLATION VALVE MAY BE IN ACCORDANCE WITH DESIGN CODE "O'.

12.

DELETED.

13.

FOR ALL SEISMIC CATEGORY !IA HBB-113 PIPING DOWNSTREAM OF FO-IDOll ANO PSE-10004: DESIGN, FABRICATION, MATERIAL PROCUREMENT, ERECTION AND TESTING MAY BE IN ACCORDANCE W!TH PIPING CLASS DESIGNATION, DESIGN CODE 'D' IH,41.

14.

REMOVE VALVE INTERNALS FROM BAROMETRIC CONDENSER VACUUM PUMP DISCHARGE LINE CHECK VALVE 1F081 IA,3J, PER MOCP-614.

IS.

PERMANENT REMOVAL OF ONE "ACTIVE' CARBON RING PER HPCI TURBINE GLAND IS ACCEPTABLE PER LG ECR 05-00126.

16.
DELETED,
17.

POINT CONNECTIONS SHOWN ON DRAWING H12-P614-E-002 SHT,I, II INCORP. ECR LG 13-00310 REV.3 PER W/O C025B360.

w D >-

Z"'

0 ADDED NOTE < 6.

AT iE-ll.

INCORP. ECR LG 05-00126 R/D PER W/O C02130B6.

15 AND A REFERENCE TO IT DESCRIPTION TABLE OF AODITIONS & CHANGES USE ONLY PRINTS SHOWING LATEST DATE MECHANICAL P&ID HPCI PUMP/TURBINE J

JC NT H

G F

E D

c (UNIT 1>

1--~~~~L-lt.t_E_R-IC_K_G_E_NE_R_A_T_ING~S-T_A_Tl_O_N~~~--tA EXELON NUCLEAR CORP.

SCALE DRAWN

!GOS CHECKED INSPECTED APPROVED DATE NONE BECHTEL BECHTEL BECHTEL BECHTEL BECH BECH 01/:31/'Jl APPROVED BECHTEL APPROVED SHEET OF 8031-M-56 E 43 I CA TE GORY A 1