ML22278A288

From kanterella
Jump to navigation Jump to search
Rev. 21 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Reload Evaluations
ML22278A288
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/19/2022
From:
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation
Shared Package
ML22278A223 List: ... further results
References
Download: ML22278A288 (4)


Text

LGS UFSAR APPENDIX 15B - RELOAD EVALUATIONS TABLE OF CONTENTS 15B.0 INTRODUCTION 15B.1 MAXIMUM EXTENDED OPERATING DOMAIN AND PARTIAL FEEDWATER HEATING ANALYSIS 15B.1.1 MAXIMUM EXTENDED LOAD LINE LIMIT REGION 15B.1.2 INCREASED CORE FLOW/FINAL FEEDWATER TEMPERATURE REDUCTION REGION 15B.1.3 PARTIAL FEEDWATER HEATING OR FEEDWATER HEATING OUT-OF-SERVICE 15B.2 ARTS PROGRAM 15B.3 SINGLE LOOP OPERATION 15B.4 OTHER EQUIPMENT OUT-OF-SERVICE 15B.4.1 TURBINE BYPASS VALVE OUT-OF-SERVICE 15B.4.2 END OF CYCLE RPT OUT-OF-SERVICE 15B.4.3 POWER LOAD UNBALANCE OUT-OF-SERVICE 15B.4.4 PRESSURE REGULATOR OUT-OF-SERVICE 15B.5

SUMMARY

AND CONCLUSIONS 15B.6 REFERENCES APPENDIX 15B 15B.i REV. 18, SEPTEMBER 2016

LGS UFSAR APPENDIX 15B 15B.ii REV. 18, SEPTEMBER 2016

LGS UFSAR APPENDIX 15B - RELOAD EVALUATIONS LIST OF TABLES Table Title 15B-1 Deleted 15B-2 Deleted 15B-3 Deleted APPENDIX 15B 15B.iii REV. 18, SEPTEMBER 2016

LGS UFSAR APPENDIX 15B - RELOAD EVALUATIONS LIST OF FIGURES Figure Title 15B-1 Deleted 15B-2 Deleted 15B-3 Deleted 15B-4 Deleted 15B-5 Deleted 15B-6 Deleted APPENDIX 15B 15B.iv REV. 18, SEPTEMBER 2016