Text

V.C. Summer Power Station Safety Analysis Report Chapter 16: Technical Specifications Revision 22--Updated Online 05/27/22

Revision 22--Updated Online 05/27/22 VC SUMMER UFSAR 1 of 1 The Revision summary replaces the List of Effective pages of the VC Summer FSAR, effective June 30, 2021. It will appear in Chapter 00 of the VC Summer FSAR and is the best history available of all the changes made to the original VC Summer FSAR. As changes are made now, only a REV bar will appear in the right margin next to a change. All other REV bars from previous NRC updates will eventually be removed. These changes were made to accommodate VC Summer fleet integration efforts.

LIST OF EFFECTIVE PAGES (LEP)

The following list delineates pages to Chapter 16 of the Virgil C. Summer Nuclear Station Final Safety Analysis Report which are currently in effect. The latest changes to pages and figures are indicated below by Amendment 97-01 in the Amendment column along with the amendment number and date for each page and figure included in the Final Safety Analysis Report.

Page/Fig No. Amend No. Date Page 16.1-1 97-01 August 1997 16-i AMENDMENT 97-01 AUGUST 1997

16.0 TECHNICAL SPECIFICATIONS Chapter 16, Technical Specifications, has been deleted. The Virgil C. Summer Nuclear Station Technical Specifications, as approved by the NRC, has been issued as Appendix A to the Facility Operating License.

16.1-1 AMENDMENT 97-01 JUNE 1997