Millstone Power Station Unit 3 Safety Analysis Report Chapter 18: Human Factors Engineering

Table of Contents tion Title Page HUMAN FACTORS CONTROL ROOM DESIGN REVIEW ............... 18.1-1 SAFETY PARAMETER DISPLAY SYSTEM (SPDS) .......................... 18.2-1

HUMAN FACTORS CONTROL ROOM DESIGN REVIEW Licensee is cognizant of the criteria promulgated by the Nuclear Regulatory Commission C) concerning the Human Factors aspects of nuclear power plant design and operation. As h, a Control Room Design Review (CRDR) utilizing the guidance contained in NUREG-0737, plement 1 and NUREG-0700, Guidelines for Control Room Design Reviews, has been ormed.

objective of performing the CRDR is to ensure that the Millstone Nuclear Power Station Unit ntrol room provides an effective safe control center such that operators can satisfactorily orm the necessary functions required during normal operating, transient and emergency ditions.

scope of the review included all controls, displays and other components on the control rds, peripheral consoles, back panels, communication equipment ancillary devices and cedures that the control room operators would be expected to interface with. For purposes of review, the remote shutdown panels were also included in the CRDR.

ecommended in NUREG-0801, NRC Evaluation Criteria for Detailed Control Room Design iews, the Licensee provided the NRC with a detailed program plan for the CRDR. This lementation plan was submitted to the NRC on November 10, 1983.

owing completion of the CRDR a summary report was transmitted to the NRC on ember 1, 1984. Addendum 1 to the summary report was submitted to the NRC on tember 12, 1985, and Addendum 2 was submitted on November 14, 1985. The NRC Staff lved all issues related to the CRDR in Supplement 4 to the Millstone Unit No. 3 SER.

er to Section 7.5 for description of SPDS.