Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 ML24289A0152024-10-21021 October 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report 05000423/LER-2024-001, Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary2024-10-14014 October 2024 Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) ML24281A1102024-10-0707 October 2024 Requalification Program Inspection 05000423/LER-2023-006-02, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-09-26026 September 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24176A1782024-06-20020 June 2024 Update to the Final Safety Analysis Report ML24176A2622024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 ML24281A2072024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) 05000336/LER-2024-001, Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications2024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML24110A0562024-05-21021 May 2024 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2023-LLE-0013) (Letter) ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report 05000423/LER-2023-006-01, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-20020 May 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24141A2432024-05-20020 May 2024 Response to Request for Additional Information Regarding Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment No. 15 IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation 05000423/LER-2023-006, Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-0202 May 2024 Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24123A2042024-05-0202 May 2024 Pre-Decisional Replay to EA-23-144 IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) ML24123A1222024-04-30030 April 2024 Inservice Inspection Program - Owners Activity Report, Refueling Outage 22 ML24116A0452024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) ML24116A1742024-04-24024 April 2024 Annual Radiological Environmental Operating Report ML24114A2662024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report ML24103A0202024-04-22022 April 2024 Summary of Regulatory Audit in Support of License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24106A2032024-04-15015 April 2024 2023 Annual Environmental Operating Report ML24088A3302024-04-0404 April 2024 Regulatory Audit Plan in Support of License Amendment Request to Implement Framatome Gaia Fuel IR 05000336/20240112024-04-0101 April 2024 Comprehensive Engineering Team Inspection - Inspection Report 05000336/2024011 and 05000423/2024011 2024-09-04
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML24281A2072024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) ML23193A8842023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML23193A9072023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML23193A8962023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML23193A8902023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Frontmatter ML23193A8852023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 7, Instruments and Controls ML23193A9002023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML23193A9062023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML23193A8732023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23193A8912023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary System ML23193A8832023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML23193A8682023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 3, Reactor ML23193A8692023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems ML23193A9012023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML23193A8742023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System ML23193A8822023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Frontmatter ML23193A8582023-06-28028 June 2023 8 to Defueled Safety Analysis Report, Drawings Incorporated by Reference ML23193A8722023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 2, Site and Environment ML23193A8702023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features Systems ML23193A8942023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML23193A8562023-06-28028 June 2023 Submittal of Updates to the Final Safety Analysis Reports ML23193A8872023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML23193A8652023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary ML23193A8982023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Drawing Incorporated by Reference ML23193A8812023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations ML23193A9022023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML23193A8782023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operation ML23193A8882023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML23193A8952023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23193A8992023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML23193A8892023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML23193A8772023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 15, License Renewal ML23193A8752023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Processing and Radiation Protection Systems ML23193A9032023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML23193A9052023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 19, License Renewal ML23193A9042023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 2, Tables 2.3-15 & Appendices, Monthly and Annual Wind Direction and Speed Distributions for 33-Foot Winds at Millstone ML23193A8592023-06-28028 June 2023 8 to Defueled Safety Analysis Report, Technical Requirements Manual ML23193A8672023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control ML23193A8862023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 18, Human Factors Engineering ML23193A8572023-06-28028 June 2023 8 to Defueled Safety Analysis Report, Redacted ML23193A8762023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23193A8712023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 5, Structures ML23193A8662023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference - Redacted ML23193A8802023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis ML23193A8972023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Fire Protection Evaluation Report ML22193A0232022-06-23023 June 2022 7 to Defueled Safety Analysis Report ML22193A1352022-06-23023 June 2022 5 to Updated Final Safety Analysis Report ML22193A1362022-06-23023 June 2022 5 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22193A1332022-06-23023 June 2022 5 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance 2024-06-20
[Table view] |
Text
SECURITY-RELATED INFORMATION-WITHHOLD UNDER 10 CFR 2.390 Dominion Energy Nuclear Connecticut, Inc.
5000 Dominion Boulevard, Glen Allen, VA 23060 DominionEnergy.com June 23, 2022 U.S. Nuclear Regulatory Commission Serial No.22-195 Attention: Document Control Desk NRNSS RO Washington, DC 20555 Docket Nos. 50-245 50-336 50-423 License Nos. DPR-21 DPR-65 NPF-49 DOMINION ENERGY NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNITS 1, 2, AND 3 UPDATES TO THE FINAL SAFETY ANALYSIS REPORTS In accordance with 10 CFR 50.71 (e), Dominion Energy Nuclear Connecticut, Inc.
(DENC) hereby submits revisions to the Defueled Safety Analysis Report (DSAR) for Millstone Power Station Unit 1 (MPS1 ), and the Updated Final Safety Analysis Reports (UFSARs) for Units 2 (MPS2) and 3 (MPS3). Six CD-ROMs are enclosed in this submittal.
Enclosure 1 contains a, CD-HOM for the electronic version of the Unredacted MPS1 DSAR, Revision 17, consisting of the following files:
001 MPS1 DSAR 2,906,112 bytes 002 MPS1 DWGS 4,554,752 bytes 003 MPS1 TRM 161,792 bytes
- Enclosure 1 contains Security-Related Information that DENG requests be withheld from public disclosure in accordance with 10 CFR 2.390.
Enclosure 2 contains a CD-ROM for the electronic version of the Redacted MPS1 DSAR, Revision 17, consisting of the following files:
001 MPS1 DSAR 2,117,632 bytes 002 MPS1 DWGS 9,555,968 bytes 003 MPS1 TRM 161,792 bytes ENCLOSURES 1, 3 & 5 TO THIS LETTER CONTAIN SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.
UPON REMOVAL OF ENCLOSURES 1, 3 & 5 THIS LETTER IS DECONTROLLED.
Serial No.22-195 Docket Nos. 50-245/336/423 Page 2 of 6 Enclosure 3 contains a CD-ROM for the electronic version of the Unredacted MPS2 UFSAR, Revision 40, consisting of the following files:
000 MPS2 UFSAR Frontmatter.pdf 2,709,504 bytes 001 MPS2 UFSAR Chapter 1.pdf 1,853,440 bytes 002 MPS2 UFSAR Chapter 2.pdf 12,873,728 bytes 003 MPS2 UFSAR Chapter 3.pdf 16,807,936 bytes 004 MPS2 UFSAR Chapter 4.pdf 16,984,064 bytes 005 MPS2 UFSAR Chapter 5.pdf 49,444,864 bytes 006 MPS2 UFSAR Chapter 6.pdf 8,753,152 bytes 007 MPS2 UFSAR Chapter 7.pdf 11,098,112 bytes 008 MPS2 UFSAR Chapter 8.pdf 3,252,224 bvtes 009 MPS2 UFSAR Chapter 9.pdf 18,419,712 bytes 010 MPS2 UFSAR Chapter 10.pdf 477,184 bytes 011 MPS2 UFSAR Chapter 11.pdf 5,722,112 bytes 012 MPS2 UFSAR Chapter 12.pdf 241,664 bytes 013 MPS2 UFSAR Chapter 13.pdf 1,382,400 bvtes 014 MPS2 UFSAR Chapter 14.odf 37,355,520 bytes 015 MPS2 UFSAR Chapter 15.pdf 622,592 bytes MPS2 UFSAR DWGS 65,601,536 bytes MPS2 UFSAR TRM 7,342,080 bytes contains Security-Related Information that DENC requests be withheld from public disclosure in accordance with 10 CFR 2.390. contains a CD-ROM for the electronic version of the Redacted MPS2 UFSAR, Revision 40, consisting of the following files:
000 MPS2 UFSAR Frontmatter.pdf 2,709,504 bytes 001 MPS2 UFSAR Chapter 1.pdf 784,384 bytes 002 MPS2 UFSAR Chapter 2.pdf 11,300,864 bytes 003 MPS2 UFSAR Chapter 3.pdf 16,807,936 bytes 004 MPS2 UFSAR Chapter 4.pdf 16,984,064 bytes 005 MPS2 UFSAR Chapter 5.pdf 45,807,616 bvtes 006 MPS2 UFSAR Chapter 6.pdf 8,753,152 bvtes 007 MPS2 UFSAR Chapter 7.pdf 9,148,416 bytes 008 MPS2 UFSAR Chapter 8.pdf 1,243,136 bytes 009 MPS2 UFSAR Chapter 9.pdf 18,419,712 bytes 010 MPS2 UFSAR Chapter 1O.pdf 477,184 bvtes 011 MPS2 UFSAR Chapter 11.pdf 3,233,792 bytes 012 MPS2 UFSAR Chapter 12.pdf 241,664 bytes 013 MPS2 UFSAR Chapter 13.pdf 1,382,400 bytes 014 MPS2 UFSAR Chapter 14.pdf 37,355,520 bytes 015 MPS2 UFSAR Chapter 15.pdf 622,592 bytes MPS2 UFSAR DWGS 47,314,944 bytes MPS2 UFSAR TRM 5,822,464 bytes
Serial No.22-195 Docket Nos. 50-245/336/423 Page 3 of 6 Enclosure 5 contains a CD-ROM for the electronic version of the Unredacted MPS3 UFSAR, Revision 35, consisting of the following files:
000 MPS3 UFSAR Frontmatter.pdf 2,373,632 bytes 001 MPS3 UFSAR Chapter 1.pdf 2,696,216 bytes 002 MPS3 UFSAR Chapter 2.pdf 152,385,536 bytes 002 MPS3 UFSAR Chapter 2 (Tables & Appendices) 98,959,360 bytes 003 MPS3 UFSAR Chapter 3.pdf 96,233,472 bytes 004 MPS3 UFSAR Chapter 4.pdf 6,811,648 bytes 005 MPS3 UFSAR Chapter 5.pdf 4,317,184 bytes 006 MPS3 UFSAR Chapter 6.odf 18,063,360 bytes 007 MPS3 UFSAR Chapter 7.pdf 6,795,264 bytes 008 MPS3 UFSAR Chapter 8.pdf 9,193,472 bytes 009 MPS3 UFSAR Chapter 9.pdf 23,492,608 bytes 010 MPS3 UFSAR Chapter 10.pdf 4,833,280 bytes 011 MPS3 UFSAR Chapter 11.pdf 4,067,328 bytes 012 MPS3 UFSAR Chapter 12.pdf 32,157,696 bytes 013 MPS3 UFSAR Chapter 13.pdf 1,105,920 bytes 014 MPS3 UFSAR Chapter 14.pdf 2,418,688 bytes 015 MPS3 UFSAR Chapter 15.pdf 26,445,824 bytes 016 MPS3 UFSAR Chapter 16.pdf 83,968 bytes 017 MPS3 UFSAR Chapter 17.pdf 90,112 bytes 018 MPS3 UFSAR Chapter 18.odf 96,256 bytes 019 MPS3 UFSAR Chapter 19.pdf 540,672 bytes MPS3 UFSAR FPER 4,034,560 bytes MPS3 UFSAR DWGS 67,127,296 bvtes MPS3 TRM 4,243,456 bytes contains Security-Related Information that DENC requests be withheld from public disclosure in accordance with 10 CFR 2.390.
Serial No.22-195 Docket Nos. 50-245/336/423 Page 4 of 6 contains a CD-ROM for the electronic version of the Redacted MPS3 UFSAR, Revision 35, consisting of the following files:
000 MPS3 UFSAR Frontmatter.pdf 2,373,632 bytes 001 MPS3 UFSAR Chapter 1.pdf 1,275,904 bytes 002 MPS3 UFSAR Chapter 2.pdf 105,560,064 bytes 002 MPS3 UFSAR Chapter 2 (Tables & Appendices) 98,959,360 bytes 003 MPS3 UFSAR Chapter 3.pdf 43,841,536 bytes 004 MPS3 UFSAR Chapter 4.pdf 6,811,648 bytes 005 MPS3 UFSAR Chapter 5.pdf 4,317,184 bytes 006 MPS3 UFSAR Chapter 6.pdf 14,694,400 bytes 007 MPS3 UFSAR Chapter 7.pdf 6,795,264 bytes 008 MPS3 UFSAR Chapter 8.pdf 8,427,520 bytes 009 MPS3 UFSAR Chapter 9.pdf 23,492,608 bytes 010 MPS3 UFSAR Chapter 10.pdf 4,833,280 bytes 011 MPS3 UFSAR Chapter 11.pdf 4,067,328 bytes 012 MPS3 UFSAR Chapter 12.pdf 2,732,032 bvtes 013 MPS3 UFSAR Chapter 13.pdf 1,032,192 bvtes 014 MPS3 UFSAR Chapter 14.pdf 2,418,688 bytes 015 MPS3 UFSAR Chapter 15.pdf 26,445,824 bytes 016 MPS3 UFSAR Chapter 16.pdf 83,968 bytes 017 MPS3 UFSAR Chapter 17.pdf 90,112 bytes 018 MPS3 UFSAR Chapter 18.pdf 96,256 bytes 019 MPS3 UFSAR Chapter 19.pdf 540,672 bytes MPS3 UFSAR FPER 1,710,080 bytes MPS3 UFSAR DWGS 60,704,678 bytes MPS3 UFSAR 4,243,456 bytes
Serial No.22-195 Docket Nos. 50-245/336/423 Page 5 of 6 Should you have any questions, please contact Mr. Shayan Sinha at (804) 273-4687.
Sincerely, fevfd7£-'6 Gerald T. Bischof Senior Vice President - Nuclear Operations and Fleet Performance COMMONWEALTH OF VIRGINIA )
)
COUNTY OF HENRICO )
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Gerald T. Bischof, who is Senior Vice President - Nuclear Operations and Fleet Performance of Dominion Energy Nuclear Connecticut, Inc. He has affirmed before me that he is duly authorized to execute and file the foregoing document on behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this 2.i1ay of ~ I 2022, My Commission Expires: ti.\ Bl ,},t.f CRAIG D SLY Notary Public Commonwealth of Virginia Reg.# 7518653 1..~
My Commission Expires December 31, 20-
Enclosures:
- 1. CD ROM labeled "Millstone Power Station Unit 1 Defueled Safety Analysis Report Revision 17 - Docket No. 050-00245 - Security-Related Information - Withhold Under 10 CFR 2.390." [Security-Related Information]
- 2. CD ROM labeled "Millstone Power Station Unit 1 Defueled Safety Analysis Report Revision 17 - Redacted~ Docket No. 050-00245."
- 3. CD ROM labeled "Millstone Power Station Unit 2 Updated Final Safety Analysis Report Revision 40 - Docket No. 050-00336 - Security-Related Information - Withhold Under 10 CFR 2.390." [Security-Related Information]
- 4. CD ROM labeled "Millstone Power Station Unit 2 Updated Final Safety Analysis Report Revision 40 - Redacted - Docket No. 050-00336."
- 5. CD ROM labeled "Millstone Power Station Unit 3 Updated Final Safety Analysis Report Revision 35 - Docket No. 050-00423 - Security-Related Information - Withhold Under 10 CFR 2.390." [Security-Related Information]
- 6. CD ROM labeled "Millstone Power Station Unit 3 Updated Final Safety Analysis Report Revision 35 - Redacted - Docket No. 050-00423."
Commitments made in this letter: None
Serial No.22-195 Docket Nos. 50-245/336/423 Page 6 of 6 cc: (w/ enclosures)
U.S. Nuclear Regulatory Commission Region I 475 Allendale Rd, Suite 102 King of Prussia, PA 19406-1415 NRC Senior Resident Inspector Millstone Power Station cc: (w/o enclosures)
Elizabeth Andrews Health Physicist - Division of Nuclear Materials Safety U.S. Nuclear Regulatory Commission, Region I 475 Allendale Rd, Suite 102 King of Prussia, PA 19406-1415 Karl Sturzebecher Decommissioning Project Manager- Millstone Unit 1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Richard. V. Guzman NRC Senior Project Manager Millstone Units 2 and 3 U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C2 11555 Rockville Pike Rockville, MD 20852-2738
Serial No.22-195 Docket No. 50-245 ENCLOSURE 1 CD-ROM labeled:
Millstone Power Station Unit 1 Defueled Safety Analysis Report Revision 17 Docket No. 050-00245 Security-Related Information - Withhold Under 10 CFR 2.390 Dominion Energy Nuclear Connecticut, Inc.
Millstone Power Station Unit 1 ENCLOSURE 1 TO THIS LETTER CONTAINS SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.
UPON SEPARATION FROM ENCLOSURE 1, THIS PAGE IS DECONTROLLED.
Serial No.22-195 Docket No. 50-245 ENCLOSURE 2 CD-ROM labeled:
Millstone Power Station Unit 1 Defueled Safety Analysis Report Revision 17 - Redacted Docket No. 050-00245 Dominion Energy Nuclear Connecticut, Inc.
Millstone Power Station Unit 1
Serial No.22-195 Docket No. 50-336 ENCLOSURE 3 CD-ROM labeled:
Millstone Power Station Unit 2 Updated Final Safety Analysis Report Revision 40 Docket No. 050-00336 Security-Related Information - Withhold Under 10 CFR 2.390 Dominion Energy Nuclear Connecticut, Inc.
Millstone Power Station Unit 2 ENCLOSURE 3 TO THIS LETTER CONTAINS SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.
UPON SEPARATION FROM ENCLOSURE 3, THIS PAGE IS DECONTROLLED.
Serial No.22-195 Docket No. 50-336 ENCLOSURE4 CD-ROM labeled:
Millstone Power Station Unit 2 Updated Final Safety Analysis Report Revision 40 - Redacted Docket No. 050-00336 Dominion Energy Nuclear Connecticut, Inc.
Millstone Power Station Unit 2
Serial No.22-195 Docket No. 50-423 ENCLOSURE 5 CD-ROM labeled:
Millstone Power Station Unit 3 Updated Final Safety Analysis Report Revision 35 Docket No. 050-00423 Security-Related Information - Withhold Under 10 CFR 2.390 Dominion Energy Nuclear Connecticut, Inc.
Millstone Power Station Unit 3 ENCLOSURE 5 TO THIS LETTER CONTAINS SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.
UPON SEPARATION FROM ENCLOSURE 5, THIS PAGE IS DECONTROLLED.
Serial No.22-195 Docket No. 50-423 ENCLOSURE 6 CD-ROM labeled:
Millstone Power Station Unit 3 Updated Final Safety Analysis Report Revision 35 - Redacted Docket No. 050-00423 Dominion Energy Nuclear Connecticut, Inc.
Millstone Power Station Unit 3