Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20205N9871999-04-14014 April 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990308-11 ML20203G0081999-02-12012 February 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 981102-06 ML20211M5671997-10-0303 October 1997 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed Rulemaking Entitled Financial Assurance Requirements for Decommissioning Nuclear Power Reactors, Which Amended 10CFR50,published in Fr on 970910 ML20149D7851997-07-14014 July 1997 Notification of Significant Licensee Meeting W/Util on 970731 in Arlington,Tx to Discuss Case Studies (Response Time & Reactor Feedwater Pump Trip Test) & Common Themes ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134P5931997-02-21021 February 1997 Forwards Order Imposing Civil Monetary Penalty for Transmittal to Ofc of Fr for Publication.W/O Encl ML20132F5421996-12-19019 December 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961007-11 ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20203B9891995-11-20020 November 1995 Discusses OI Rept 4-95-032 Re Alleged False Statements by Fire Watches to NRC Inspectors.Oe Will Consider Matter Closed from Enforcement Perspective Unless Different View Received within 3 Wks of Date of This Memo ML20211M6231994-11-30030 November 1994 Provides Info to Commission on Status of Rulemaking Activities Re Power Reactor Decommissioning Cost Issues,Per 930714 SRM ML20236L5631994-08-10010 August 1994 Responds to Former Region V 930422 Request for NRR Evaluation of WPPSS Practices Associated W/Testing RHR Sys While Aligned in SPC Mode ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20247G1561989-05-15015 May 1989 Forwards Director'S Decision 89-03 in Response to 2.206 Petition Re BWR Stability.Petition Filed by Hiatt on Behalf of Ocre Expressing Concerns Re 890309 Power Oscillattion Event & Requested Action W/Respect to All BWRs ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20147E3621988-02-28028 February 1988 Summary of 880223 Operating Reactors Events Meeting 88-008. List of Attendees,Tabulation of long-term Followup Assignments to Be Completed & Summary of Reactor Scrams Encl ML20195G7981987-07-31031 July 1987 Partially Deleted Memo Forwarding SALP Rept & Recommendations Re NRC Actions for Plant.W/O Encl IR 05000397/19870061987-07-0101 July 1987 Forwards Draft SALP Rept 50-397/87-06 for Feb-May 1987 for Review.Comments Requested at SALP Board Meeting Schedule for 870707 in Region V.Update of Tables 1-4 Included in Draft. W/O Rept ML20236B1451987-06-18018 June 1987 Forwards Response to DF Kirsch 870507 Memo Requesting Performance Analysis Info for Input to Facility SALP Rept. Review Results Provided in Encl.Encl Withheld ML20214M1381987-05-26026 May 1987 Provides Enforcement Guidance to Regions for Issues Re Control Room Habitability/Control Room Emergency Ventilation Sys Deficiencies.Summary of Plants Reviewed & Documents Describing Findings Encl ML20195G7931987-05-12012 May 1987 Forwards Insp & LER Data Tables for Use in Preparing Performance Analyses for Salp,Per DF Kirsch 870507 Memo. Tables Subj to Review & Comment Until SALP Process Complete. W/O Encls ML20214A0311987-05-12012 May 1987 Notifies of 870514 Briefing on Licensing & Operational Status of Plants Assigned to Project Directorate V,Including Diablo Canyon,Palo Verde,Rancho Seco,San Onfore,Trojan & WPPSS 2 ML20212M8601987-03-0909 March 1987 Forwards SER Re Concerns Identified in Plant Fire Protection Program,As Described in FSAR Through Amend 33.Concerns Resolved Except for Listed Items,Including Adequacy of Safe Shutdown Procedures.Review Excluded Amend 37 Items ML20154A2831986-12-13013 December 1986 Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985 ML20215G1361986-10-14014 October 1986 Summary of 861006 Operating Reactor Events Meeting 86-35 Re Events Since Last Meeting on 860929.Assignees Should Review Identified Responsibilities & Completion Dates & Advise If Dates Cannot Be Met.Attendance List & Viewgraphs Encl ML20215F2751986-10-0606 October 1986 Forwards Action Timetable Re Coordinated Approach to Resolution of Fire Protection Issues at Facility ML20209A8611986-09-0202 September 1986 Forwards Matls Needed to Complete Assignment During Emergency Preparedness Exercise on 860916-19.W/o Encl IR 05000397/19860121986-08-25025 August 1986 Notification of 860828 Meeting W/Util in Walnut Creek,Ca to Discuss Apparent Violations Involving Equipment Qualification (50-397/86-12),Region V Team Insp 50-397/86-11 & Control of Combustible Matls ML20204G4051986-08-0404 August 1986 Notification of 860909 Meeting W/Utils in Bethesda,Md to Discuss Nrc/Util Living Schedules,Util Performance,Legal Considerations,Tech Spec Improvements & Severe Accident Policy/Degraded Core Programs.Proposed Agenda Encl ML20207J2451986-07-16016 July 1986 Forwards Request for Addl Info Re Util Application to Amend Tech Spec 4.6.4.1 Concerning Drywell Vacuum Breakers,For Transmittal to Licensee.Receipt of Info After 860731 Will Require Rev to 860831 Anticipated Review Completion Date ML20058K6041986-07-0303 July 1986 Informs of Telcon on Status of EA-86-110 Re Health Physics/ Emergency Planning & EA-86-070 Re Fire Protection ML20203B0881986-07-0202 July 1986 Forwards SALP Rept for Feb 1985 - Jan 1986,for Review.Salp Board Rated Licensee Performance Category 1 in Area of Outages & Category 2 in All Other Areas Except Fire Protection.W/O Encls ML20236Y1311986-04-25025 April 1986 Forwards List of Primary Containment Isolation Valves & Valve P&ID Locations as Referenced in Util 860117 & 0218 Request for Amend to License NPF-21 ML20198D7151986-04-24024 April 1986 Forwards Insp Rept 50-397/86-05,notice of Violation & Enforcement History,For Consideration & Action.Civil Penalty Unwarranted Since Fire Watches Immediately Posted & Safety Significance of Fire Loadings Limited ML17278A7091986-04-16016 April 1986 Advises That Deletion of Technical Memo 1227 Overlooked During Issuance of Amend 31 to Fsar.Memo Deleted as Result of Incorporation of Scn 83-135 Into Amend ML20195G7731986-03-14014 March 1986 Forwards Draft SALP Rept for Feb 1985 - Jan 1986,for Review & Comment at 860319 Meeting at Region V.Updated Tables 1 & 4 Also Encl.W/O Encl ML20154K1511986-03-0303 March 1986 Notifies That SALP Board 860312 Meeting Rescheduled for 860319 at Region V.Deviation from Instruction 0701 to Permit a Toth Attendance at B&W Training Course on 860303-15 in Best Interest of SALP Process ML20199D1311986-02-19019 February 1986 Informs That Proposed Recirculation Pump Vibration Testing Plan Acceptable,Based on Licensee Testing Procedure & Supporting Stress Analysis ML20203B1101986-02-13013 February 1986 Forwards Assessment of Lers,Including Results for Input Into SALP Rept for Feb 1985 - Jan 1986.LERs of Above Average Quality ML20195G7801986-02-0909 February 1986 Forwards Data Tables for Use in Preparing Performance Analysis for Salp.Insp Results & LERs Occurring During Last Month of SALP May Not Be Included in Tables.Tables Subject to Review & Comment Until SALP Process Completed.W/O Encl ML20215N3041986-01-30030 January 1986 Provides Summary of Review of Past Experience as Related to Handling of Nonradiological Issues.State of Wa Notified by NRC of Industrial Safety Concerns at Facility.Dm Kunihiro 851213 Memo to State of Wa Encl ML20151Q9751986-01-29029 January 1986 Requests Identification of Div Contact for Regional Insp Team Leaders to Arrange NRR Alternative Shutdown & Fire Protection Reviewer Technical Assistance on region-based post-fire Safe Shutdown Insps.Schedule of Insps Submitted ML20149M8611986-01-24024 January 1986 Discusses 851202-06 Observation of Seven INPO Members & Two Industry Peer Evaluators During Conduct of Site Visit to Evaluate Three Training Programs at Plant.Significant Milestones Toward Accreditation of Training Programs Listed ML20198H2291986-01-22022 January 1986 Requests Date & Subj of Application for OL Issued on 840413.Info Needed to Complete Review of 850318 Transmittal of License Fee Data & Assessment of Fees & Contractual Costs Through 841222 ML20198G8771986-01-16016 January 1986 Forwards Brief Description & Evaluation of Util 850911 Proposed Tech Spec Change to Revise Composition of Corporate Nuclear Safety Review Board.Proposed Change Acceptable ML20198G8291986-01-0606 January 1986 Forwards Draft Response to 850718 Memo Re Inspector Feedback /Request for Technical Assistance on NUREG-0737,Item II.F.1.Response Based on Review of Util Position on Iodine plate-out ML20141E9281985-12-26026 December 1985 Recommends Survey of Plants Re Licensee Review of Preservice Insp Rept & Submittal of Relief Requests.Relief Requests from Preservice Insp Should Be Submitted Before Issuance of OL & Plant Startup to Permit NRC Review 1999-04-14
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20205N9871999-04-14014 April 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990308-11 ML20203G0081999-02-12012 February 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 981102-06 ML20211M5671997-10-0303 October 1997 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed Rulemaking Entitled Financial Assurance Requirements for Decommissioning Nuclear Power Reactors, Which Amended 10CFR50,published in Fr on 970910 ML20149D7851997-07-14014 July 1997 Notification of Significant Licensee Meeting W/Util on 970731 in Arlington,Tx to Discuss Case Studies (Response Time & Reactor Feedwater Pump Trip Test) & Common Themes ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134P5931997-02-21021 February 1997 Forwards Order Imposing Civil Monetary Penalty for Transmittal to Ofc of Fr for Publication.W/O Encl ML20132F5421996-12-19019 December 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961007-11 ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20203B9891995-11-20020 November 1995 Discusses OI Rept 4-95-032 Re Alleged False Statements by Fire Watches to NRC Inspectors.Oe Will Consider Matter Closed from Enforcement Perspective Unless Different View Received within 3 Wks of Date of This Memo ML20211M6231994-11-30030 November 1994 Provides Info to Commission on Status of Rulemaking Activities Re Power Reactor Decommissioning Cost Issues,Per 930714 SRM ML20236L5631994-08-10010 August 1994 Responds to Former Region V 930422 Request for NRR Evaluation of WPPSS Practices Associated W/Testing RHR Sys While Aligned in SPC Mode ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20247G1561989-05-15015 May 1989 Forwards Director'S Decision 89-03 in Response to 2.206 Petition Re BWR Stability.Petition Filed by Hiatt on Behalf of Ocre Expressing Concerns Re 890309 Power Oscillattion Event & Requested Action W/Respect to All BWRs ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20147E3621988-02-28028 February 1988 Summary of 880223 Operating Reactors Events Meeting 88-008. List of Attendees,Tabulation of long-term Followup Assignments to Be Completed & Summary of Reactor Scrams Encl ML20195G7981987-07-31031 July 1987 Partially Deleted Memo Forwarding SALP Rept & Recommendations Re NRC Actions for Plant.W/O Encl IR 05000397/19870061987-07-0101 July 1987 Forwards Draft SALP Rept 50-397/87-06 for Feb-May 1987 for Review.Comments Requested at SALP Board Meeting Schedule for 870707 in Region V.Update of Tables 1-4 Included in Draft. W/O Rept ML20236B1451987-06-18018 June 1987 Forwards Response to DF Kirsch 870507 Memo Requesting Performance Analysis Info for Input to Facility SALP Rept. Review Results Provided in Encl.Encl Withheld ML20214M1381987-05-26026 May 1987 Provides Enforcement Guidance to Regions for Issues Re Control Room Habitability/Control Room Emergency Ventilation Sys Deficiencies.Summary of Plants Reviewed & Documents Describing Findings Encl ML20195G7931987-05-12012 May 1987 Forwards Insp & LER Data Tables for Use in Preparing Performance Analyses for Salp,Per DF Kirsch 870507 Memo. Tables Subj to Review & Comment Until SALP Process Complete. W/O Encls ML20214A0311987-05-12012 May 1987 Notifies of 870514 Briefing on Licensing & Operational Status of Plants Assigned to Project Directorate V,Including Diablo Canyon,Palo Verde,Rancho Seco,San Onfore,Trojan & WPPSS 2 ML20212M8601987-03-0909 March 1987 Forwards SER Re Concerns Identified in Plant Fire Protection Program,As Described in FSAR Through Amend 33.Concerns Resolved Except for Listed Items,Including Adequacy of Safe Shutdown Procedures.Review Excluded Amend 37 Items ML20154A2831986-12-13013 December 1986 Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985 ML20215G1361986-10-14014 October 1986 Summary of 861006 Operating Reactor Events Meeting 86-35 Re Events Since Last Meeting on 860929.Assignees Should Review Identified Responsibilities & Completion Dates & Advise If Dates Cannot Be Met.Attendance List & Viewgraphs Encl ML20215F2751986-10-0606 October 1986 Forwards Action Timetable Re Coordinated Approach to Resolution of Fire Protection Issues at Facility ML20209A8611986-09-0202 September 1986 Forwards Matls Needed to Complete Assignment During Emergency Preparedness Exercise on 860916-19.W/o Encl IR 05000397/19860121986-08-25025 August 1986 Notification of 860828 Meeting W/Util in Walnut Creek,Ca to Discuss Apparent Violations Involving Equipment Qualification (50-397/86-12),Region V Team Insp 50-397/86-11 & Control of Combustible Matls ML20204G4051986-08-0404 August 1986 Notification of 860909 Meeting W/Utils in Bethesda,Md to Discuss Nrc/Util Living Schedules,Util Performance,Legal Considerations,Tech Spec Improvements & Severe Accident Policy/Degraded Core Programs.Proposed Agenda Encl ML20207J2451986-07-16016 July 1986 Forwards Request for Addl Info Re Util Application to Amend Tech Spec 4.6.4.1 Concerning Drywell Vacuum Breakers,For Transmittal to Licensee.Receipt of Info After 860731 Will Require Rev to 860831 Anticipated Review Completion Date ML20058K6041986-07-0303 July 1986 Informs of Telcon on Status of EA-86-110 Re Health Physics/ Emergency Planning & EA-86-070 Re Fire Protection ML20203B0881986-07-0202 July 1986 Forwards SALP Rept for Feb 1985 - Jan 1986,for Review.Salp Board Rated Licensee Performance Category 1 in Area of Outages & Category 2 in All Other Areas Except Fire Protection.W/O Encls ML20236Y1311986-04-25025 April 1986 Forwards List of Primary Containment Isolation Valves & Valve P&ID Locations as Referenced in Util 860117 & 0218 Request for Amend to License NPF-21 ML20198D7151986-04-24024 April 1986 Forwards Insp Rept 50-397/86-05,notice of Violation & Enforcement History,For Consideration & Action.Civil Penalty Unwarranted Since Fire Watches Immediately Posted & Safety Significance of Fire Loadings Limited ML17278A7091986-04-16016 April 1986 Advises That Deletion of Technical Memo 1227 Overlooked During Issuance of Amend 31 to Fsar.Memo Deleted as Result of Incorporation of Scn 83-135 Into Amend ML20195G7731986-03-14014 March 1986 Forwards Draft SALP Rept for Feb 1985 - Jan 1986,for Review & Comment at 860319 Meeting at Region V.Updated Tables 1 & 4 Also Encl.W/O Encl ML20154K1511986-03-0303 March 1986 Notifies That SALP Board 860312 Meeting Rescheduled for 860319 at Region V.Deviation from Instruction 0701 to Permit a Toth Attendance at B&W Training Course on 860303-15 in Best Interest of SALP Process ML20199D1311986-02-19019 February 1986 Informs That Proposed Recirculation Pump Vibration Testing Plan Acceptable,Based on Licensee Testing Procedure & Supporting Stress Analysis ML20203B1101986-02-13013 February 1986 Forwards Assessment of Lers,Including Results for Input Into SALP Rept for Feb 1985 - Jan 1986.LERs of Above Average Quality ML20195G7801986-02-0909 February 1986 Forwards Data Tables for Use in Preparing Performance Analysis for Salp.Insp Results & LERs Occurring During Last Month of SALP May Not Be Included in Tables.Tables Subject to Review & Comment Until SALP Process Completed.W/O Encl ML20215N3041986-01-30030 January 1986 Provides Summary of Review of Past Experience as Related to Handling of Nonradiological Issues.State of Wa Notified by NRC of Industrial Safety Concerns at Facility.Dm Kunihiro 851213 Memo to State of Wa Encl ML20151Q9751986-01-29029 January 1986 Requests Identification of Div Contact for Regional Insp Team Leaders to Arrange NRR Alternative Shutdown & Fire Protection Reviewer Technical Assistance on region-based post-fire Safe Shutdown Insps.Schedule of Insps Submitted ML20149M8611986-01-24024 January 1986 Discusses 851202-06 Observation of Seven INPO Members & Two Industry Peer Evaluators During Conduct of Site Visit to Evaluate Three Training Programs at Plant.Significant Milestones Toward Accreditation of Training Programs Listed ML20198H2291986-01-22022 January 1986 Requests Date & Subj of Application for OL Issued on 840413.Info Needed to Complete Review of 850318 Transmittal of License Fee Data & Assessment of Fees & Contractual Costs Through 841222 ML20198G8771986-01-16016 January 1986 Forwards Brief Description & Evaluation of Util 850911 Proposed Tech Spec Change to Revise Composition of Corporate Nuclear Safety Review Board.Proposed Change Acceptable ML20198G8291986-01-0606 January 1986 Forwards Draft Response to 850718 Memo Re Inspector Feedback /Request for Technical Assistance on NUREG-0737,Item II.F.1.Response Based on Review of Util Position on Iodine plate-out ML20141E9281985-12-26026 December 1985 Recommends Survey of Plants Re Licensee Review of Preservice Insp Rept & Submittal of Relief Requests.Relief Requests from Preservice Insp Should Be Submitted Before Issuance of OL & Plant Startup to Permit NRC Review 1999-04-14
[Table view] |
Text
.
7 W^ m s,_ (* y yy $_) ;) ) -) -
MAY 3 1934 DISTRIBUTI0ft DHFS R/F Q )
Nflembers l!EMORN10011 FOP,: Thomas ii. Ilovak, Assistant Directnr for Licensing Division of Licensing FR0it: William T. Russell, Deputy Director Division of Huuan Factors Safaty
SUBJECT:
REVIEW C0;'.hEtiTS Otl WASilliiGT0li PUBLIC PO'JER SUPPLY SYSTEtt UETAILED C0iiTROL ROOli DESIGil REVIEll PROGPld PLNI FCR liUCLEAR PROJECT NO. 2 Enclosed for transnittal to the 'Jashington Puolic Pcwer Supply Syst n (Supply Systen) are tne stati comments on their Prcgran Plan fur the hiiP-2 Detailed Control Hocm Design Review (DCRDR). Staff approval of the Prcgram Plen is not required.
The staff review was based on the requireuents of Supplement 1 to liUREG-073/
and the guidence coni.cined in i;UREG-0700 and drart huREG-0C01. Je fino that the Supply Systen's Program Plan hos adcressed all or the requiruc elecents of a OChDR, and have only ninor concerns as to tneir planned approach. ;le do nut plan to conduct an in-prograss audit at i. iip-2.
un "~ - . ..a oy
-r
.a;Q
'Jillian T. Russell, Ocputy Director Division of Huaan Factors Safety
Enclosure:
gg As stated cc: A. Schwencer R. Auluck
Contact:
- a. h. 'Froelich x24 W8405170444 ADOCK 05000g7 840503 N
~~ ..H.Fe .. . . . .er ER. . .. . . . . ..l. .,55I. e;B
..HFE f
dGW
.{. . .'. . .
(.Di1FS : D D , , , , , , ,
"'"'> .W.GVJhE7.0LD.T.
. .R,WER,0,E L I C,f,1,:
5644Er$3 .- . .VN RE- -
W RUSSELL- - - - - -
'*>;4MRS4......... . 4l.N/S4. . . . .. .8/.. ./ . /h.4. . . . . . .. . . /. .)/f.4. . . .. .'.3 . 8,4 acro w aisno o.ucyo:4o OFFICIAL RECORD COPY *"5" 282- "
~
STAFF REVIEW, WASHINGTON PUBLIC POWER SUPPLY SYSTEM DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN NUCLEAR PLANT NO.'2 The Washington Public Power Supply System (Supply System) submitted a detailed control room design review (DCRDR) Program Plan for Nuclear Plant No. 2 (WNP-2) on February 17, 1984. The submittal complied with the requirements of Supple-ment 1 of NUREG-0737 and the condition specified in Attachment 2, Item 1 of Operating License NPF-21. The Supply System has had an ongoing human factors design review of the WNP-2 control room since 1980 which has included a control icom human factors review by the BWROG, a Preliminary Design Assessment and report, and a subsequent NRC on-site audit. With the exception of those items ,
identified in the staff's Preliminary Design Assessment audit report as requiring attention during the DCRDR, the WNP-2 control room has had a reasonably thorough survey for potential human factors , problems. This survey has included the remote shutdown panel.
In general, the staff has found..the WNP-2 human factors review program to be well organized, adequately supported by Supply Syste[n management, and designed to iden-tify and implement control room design changes needed to improve man-machine ,
interfaces and ensure safe and reliable plant operation. Our review of the WNP-2 Program Plan has taken into account the Supply System's past performance in the area of human factors, and we have not provided comments on those portions of the l Program Plan that address completed items. Our comments that follow are primarily on those DCRDR tasks yet to be conducted, and involve what the Supply System is planning to do, who will perform the tasks, and how they are to be accomplished.
- 1. Qualifications and Structure of the DCRDR Team Review team management, organization, qualifications and structure as de-scribed for the DCRDR program and outlined in Figure 3-2 is very good. However,
- _ _~
we cannot determine that this organization will carry over into the post-licensing DCRDR activity. For example, Figure 6-3, which illustrates the plant operation (post-licensing) phase review process, suggests that this will be a Supply System activity. Oe cannot determine who will make up the " Task Force Team" referred to in this figure, nor if they will constitute an appropriate multi-disciplined
) organization. The magnitude and importance of the human factors activities still to be conducted for the WNP-2 DCRDR requires the continued efforts of a multi-disciplinary review team such as is described in Figure 3-2 of the Program Plan.
- 2. System Function and Task Analysis The Program Plan describes a planned function and task analysis that should satisfy the requirements of Supplement 1 to NUREG-0737. We concur in the approach
~
adopted by the Supply System.
- 3. Comparison of Control and Display Recuirements with a Control Room Inventory The Supply System reports thatman inventory of control room instruments and controls has been conducted. We agree that an inventory is available that can be _
used with results of the function and task analysis to identify missing or im- .
properly located instruments and controls.
- 4. Control Room Survey The Program Plan notes that "BWRCS Survey checklist items not completed, due to the plant construction status, and the BWROG Supplemental Survey checklists will be completed during the plant operating phase by the WNP-2 Task Force and reported in the WNP-2 Summary Report." Based on our comments on the makeup and qualifications of the plant operation phase DCRDR review team, we are concerned that an appropriate multi-disciplirary team may not be available for this task.
, We also point out that the NRC Preliminary Design Assessment audit identified
a number of survey-type items that must be completed during the DCRDR. Some of these items are conditions of License NPF-21.
- 5. HED Assessment The Program Plan outlines an adequate and effective process for HED assess-ment. However, the Program Plan does not identify the makeup of the task force team that will be analyzing and categorizing HEDs. We also note that priority 1 (Prompt / Prior to Fuel Load) no longer appears to have significance -- i.e.,
that " prompt" appears to refer only to prior-to-fuel-load corrections. This needs to be clarified, since " prompt" should still have significance for an operating plant.
- 6. Selection of Design Improvements e The ' Program Plan suggests thatsthe recomended solution to each HED is prepared by the " reviewer" who identified that problem. We are concerned that this process will not provide for theyamination of alternative design solutions.
The Supply System should ansure that " review reports" prepared by individual task force members do consider alternative design solutions, and that the subse-l ,
quent task force meetings address ~this point. We are also concerned that the Supply System ensure that the task force team include all of the disciplines needed to arrive at appropriately human-factored design solutions. We are also unable to determine how the Plant Operating Comittee will function in reviewing the task force design improvement recommendations. For example, what is the procedure for handling a design change recomendation that might be rejected by the Plant Operating Comittee?
I
- 7. and.8. Verification That Improvements Will Provide Corrections And That Control Room Modifications Do Not Introduce New HEDs The' Program Plan outlines a process for verifying that selected design improvements, both individually and collectively, adquately correct discrepancies and do not create other safety problems. We believe that this procedure will be 4
adequate. However, it should be applied to all design improvements, including those improvements accomplished through enhancement techniques.
- 9. Coordination with Other Improvement Programs The Program Plan notes that " Improvements that are introduced are coordi-nated with changes resulting from other improvement programs, such as new in- ,'
strumentation (RG-1.97), upgraded emergency procedures, and new Graphic Display Systems;" and/ " Human Factor affecting activities within the control room are reviewed by the Task Force to ensur,e configuration control and integration between related activities. Specific design and layout reviews include such areas as RG-1.97, RG-1.47, Safety Parameter Display System, new BWR Emergency Procedure
. .. +
Guidelines and Procedures, TMI-related tasks, and other engineering changes."
l We' believe that this approach should be adequate to ensure proper coordination.
l However, the task force will need procedures for identifying changes associated with other improvement programs and for bringing these changes to the attention of the task force for their review.
Conclusions We find the WNP-2 DCRDR Program Plan adequate to satisfy the requirements of Supplement 1 to NUREG-0737. Our main concern is with ensuring that an adequately qualified review team remains actively involved in the DCRDR through preparation of the Summary Report and final resolution of proposed design improvements. The following additional comments, applying to soecific items in the WNP-2 Program
.:-~
Plan, are provided as additional guidance / input to the Supply System DCRDR review team: ,
Figure 3-2. Since some HEDs may be resolved through training, and since the DCRDR needs to be coordinated with training programs, we recommend that a Supply System training engineer be made a part of the task force.
Paragraph 5.1.1. The DCRDR Summary Report is scheduled to be transmitted to the NRC 6 months before the first refueling outage. Prior to that time, there should be sufficient operating experience to permit some input of this nature to the DCRDR.
Paragraph 5.1.2. The comment for 5.1.1 applies. Time will be available to develop some operator input to Ihe DCRDR that can be based on actual WNP-2 operating experience.
.m The staff-Supply System meeting of Novemberh2,1983 resulted in the deferral _
of a number of HEDs identified during the Preliminary Design Assessment to the .
DCRDR. A list of those HEDs which are to be reevaluated and reassessed during the DCRDR is attached to this review report.
. . , . , s HEDs TO BE ADDRESSED IN THE WNP-2 DCRDR HEDs are identtfied by the Part and Finding number as given in the staff's Human Factors Engineering Preltminary Design Assessment Audit Report.
Finding Finding Part A Part'E (Cont'd) 1.3 5.51 5.52 Part 0 5.53 1.27 5.54 2.2 5.55 3.55 5.56 ;
3.57 5.58 3.59 5'59 -
5.32 5.62 5.38 5.63 .
5.39 ,
5.66 5.47 5.70 6.91 6.97 Part F .->^*
3.76 '
5.72
- 7.6 5.73 5.75 6.114 8.50 Part E 8.51 1.33 8.52 1.34 A complete review of annunciator control system design, 3.66 location and operation is also required as a part of the 3.71 DCRDR. HEDs that currently address the annunciator control 4.29 system are as follows:
5.11 0 3.60 0 3.70 F 3.79
- 0. 3.61 F 3.18 F 3.80 0 3.63 F 3.77 l
--. ---- - - _ . _ _ , _ _ __. __ _ _ _ _ _ .