ML22145A141

From kanterella
Jump to navigation Jump to search
Technical Specification Bases, Manual
ML22145A141
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 05/16/2022
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML22145A141 (24)


Text

J.YJ.c:ty * .Lo, L..VL..L..

Page 1 of 2

  • MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2022-6501 USER INFORMATION:

GERLACH*ROSEY M EMPL#: 028401 CA#: 0363 Address: NUCSA2 Phone#: 542-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSEY M 05/16/2022 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS AR.oM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF

'4111fRRORS .

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TSBl - TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 04/28/2022 ADD MANUAL TABLE OF CONTENTS DATE: 05/13/2022 CATEGORY: DOCUMENTS TYPE: TSBl

!let. y *, .L O I L. V L. L.

Page 2 of 2

  • ID:* TEXT 3.4.l ADD: REV: 7 REMOVE: REV:6 CATEGORY: DOCUMENTS TYPE: TSBl ID: TEXT 3.4.2 ADD: REV: 5 REMOVE : REV: 4 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX .

SSES MANUAL Manual Name: TSBl

  • Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL Table Of Contents Issue Date: 05/13/2022 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 134 01/03/2019

Title:

LIST OF EFFECTIVE SECTIONS TEXT TOC 25 03/05/2019 *

Title:

TABLE OF CONTENTS TEXT 2.1.1 7 03/29/2022

Title:

SAFETY LIMITS (SLS) REACTOR CORE SLS TEXT 2 .1.2 1 TEXT 3.0 TEXT 3 .1.1 TEXT 3.1.2

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES TEXT 3 .1.5 2 11/16/2016

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3.1.6 5 03/29/2022

Title:

REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL

  • Page 1 of 8 Report Date: 05/16/22

SSES MANUAL J Manual Name: TSBl Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1-MANUAL TEXT 3 .1. 7 4 ll/16/20lq

Title:

REACTIVITY CONTROL SYSTEMS STANDBY LIQU_ID CONTROL (SLC) SYSTEM TEXT 3 .1.8 4 11/16/2016

Title:

REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 4 03/29/2022

Title:

POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)

TEXT 3.2.2 5 03/29/2022

Title:

POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)

TEXT 3.2.3 4 03/29/2022

Title:

POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE (LHGR)

TEXT 3.3.1.1 TEXT 3.3.1.2 7

4 11/16/2016

Title:

INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) 01/23/2018

Title:

INSTRUMENTATION SOURCE RANGE MONITOR (SRM)

INSTRUMENTATION INSTRUMENTATION TEXT 3.3.2.1 5 li/16/2016

Title:

INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 3 11/16/2016

Title:

INSTRUMENTATION FEEDWATER MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION TEXT 3.3.3.1 10 11/16/2016

Title:

INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT 3.3.3.2 2 11/16/2016

Title:

INSTRUMENTATION .REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 3 11/16/2016

Title:

INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION Page 2 of 8 Report Date: 05/16/22

SSES MANIJAL

  • Manual Name: TSBl Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.3.4.2 1 11/16/2016

Title:

INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1 5 03/05/2019

Title:

INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2 3 03/18/2021

Title:

REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL INSTRUMENTATION TEXT 3.3.5.3 0 03/05/2019

Title:

INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM INSTRUMENTATION

    • PREVIOUSLY TEXT 3.3.5.2 REV 1**-

TEXT 3.3.6.1 9 03 Jos/2 019

Title:

INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION

  • TEXT 3.3.6.2 6 03/05/2019

Title:

INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 4 03/05/2019

Title:

INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION TEXT 3.3.8.1 4 03/18/2021

Title:

INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION TEXT 3.3.8.2 1 11/16/2016

Title:

INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 7 05/13/2022

Title:

REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING TEXT 3 .4_.2 5 05/13/2022

Title:

REACTOR ~OOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3 3 01/13/2012

Title:

REACTOR COOLANT SYSrEM RCS SAFETY RELIEF VALVES S/RVS Page 3 of 8 Report Date: 05/16/22

SSES MANUAL Manual Name: TSBl Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.4.4 1 11/16/2016 Titl,e: REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE TEXT 3.4.5 2 04/13/2016

Title:

REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6 5 11/16/2016

Title:

REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 3 il/16/2016

Title:

REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.4.8 3 11/16/2016

Title:

REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM

- HOT SHUTDOWN TEXT 3 .4. 9 2 11/16/2016 . *

Title:

REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM

- COLD SHUTDOWN TEXT 3.4.10 6 05/1,4/2019

Title:

REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS TEXT 3.4.11 1 11/16/2016

Title:

REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3.5.1 7 03/29/2022

Title:

EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE,VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.2 4 03/18/2021

Title:

EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.3 6 03/05/2019

Title:

EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING Page 4 of 8 Report Date: 05/16/22

SSES MANUAL Manual Name: TSBl Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL I

TEXT 3.6.1.1 6 11/16/2016

Title:

PRIMARY CONTAINMENT TEXT 3.6.1.2 2 11/16/2016

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK TEXT 3.6.1.3 18 04/28/2022

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)

TEXT 3.6.1.4 2 11/16/2016

Title:

CONTAINMENT SYSTEMS CONTAINMENT PRESSURE TEXT 3 .6.1.5 2 11/16/2016

Title:

CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE

  • TEXT 3.6.1.6 1 11/16/2016

Title:

CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 3 11/16/2016

Title:

CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 2 03/05/2019

Title:

CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 2 11/16/2016

Title:

CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4 1 11/16/2016

Title:

CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POQL SPRAY TEXT 3.6.3.1 2 06/13/2006

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT HYDROGEN RECOMBINERS TEXT 3.6.3.2 4 04/22/2020

Title:

CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM Page 5 of 8 I Report Date: 05/16/22 I

SSES MANUAL Manual Name: . TSBl Manual

Title:

TECHNICAL SPECIFICA,TION BASES UNIT 1 MANUAL TEXT 3.6.3.3 3 09/29/2017

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3 . 6 . 4*. 1 16 12/16/2020

Title:

CONTAINMENT SYSTEMS SECONDARY CONTAINMENT TEXT 3.6.4.2 14. 03/05/2019

Title:

CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)

TEXT 3.6.4.3 7 03/05/2019

Title:

CONTAINMENT SYSTEMS STANDBY GAS TREATMENT (SGT) SYSTEM TEXT 3.7.1 6 03/03/2020

Title:

PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS)

TEXT 3.7.2 4 03/03/2020

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3 4 03/05/2019

Title:

PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM TEXT 3.7.4 2 03/05/2019

Title:

PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5 2 11/16/2016

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS TEXT 3.7.6 3 11/16/2016

Title:

PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7 2 11/16/2016

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL TEXT 3.7.8 1 11/16/2016

Title:

PLANT SYSTEMS Page 6 of 8 Report Date: 05/1~/22

SSES MANUAL Manual Name: TSBl Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3. 8.. 1 14 05/26/2021

Title:

ELECTRICAL POWER SYSTEMS AC SOURCES - OPERATING TEXT 3.8.2* 2 03/18/2021

Title:

ELECTRICAL POWER SYSTEMS AC SOURCES - SHUTDOWN TEXT 3.8.3 7 08/07/20i9

Title:

ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL, LUBE OIL, AND STARTING AIR TEXT 3.8.4 4 11/16/2016

Title:

ELECTRICAL POWER SYSTEMS DC SOURCES - OPERATING TEXT 3.8.5 2 03/05/2019

Title:

ELECTRICAL POWER SYSTEMS DC SOURCES - SHUTDOWN

  • TEXT 3.8.6 2 11/16/2016

Title:

ELECTRICAL POWER SYSTEMS BATTERY CELL PARAMETERS TEXT 3.8.7 3 09/04/2019

Title:

ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - OPERATING TEXT 3.8.8 2 03/05/2019

Title:

ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - SHUTDOWN TEXT 3.9.1 1 11/16/2016

Title:

REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2 2 11/16/2016

Title:

REFUELING OPERATIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK TEXT 3.9.3 1 11/16/2016

Title:

REFUELING OPERATIONS CONTROL ROD POSITION TEXT 3.9.4 0 11/15/2002

Title:

REFUELING OPERATIONS CONTROL ROD POSITION INDICATION Page 7 of 8 Report Date: 05/16/22

SSES MANUAL Manual Name: TSBl Manual

Title:

TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.9.5 1 11/16/2016

Title:

REFUELING OPERATIONS CONTROL ROD OPERABILITY - REFUELING TEXT 3.9.6 2 11/16/2016

Title:

REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL TEXT 3.9.7 1 11/16/2016

Title:

REFOELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - HIGH WATER LEVEL TEXT 3.9.8 1 11/16/2016

Title:

REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - LOW WATER LEVEL TEXT 3.10.1 2 03/05/2019

Title:

SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3.10.2 1 11/16/2016

Title:

SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3 1 11/16/2016

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - HOT SHUTDOWN TEXT 3.10.4 1 11/16/2016

Title:

-SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - COLD SHUTDOWN TEXT 3.10.5 1 11/16/2016

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL - REFUELING TEXT 3.10.6 1 11/16/2016

Title:

SPECIAL OPERATIONS MULTIPLE CONTROL ROD ~ITHDRAWAL - REFUELING TEXT 3.10.7 2 03/29/2022

Title:

SPECIAL OPERATIONS CONTROL ROD TESTING - OPERATING TEXT 3.10.8 3 03/29/2022

Title:

SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST - REFUELING

.i Page 8 of 8 Report Date: 05/16/22

Rev. 7 Recirculation Loops Operating B 3.4.1 B 3.4 REACTOR COOLANT SYSTEM (RCS)

B 3.4.1 Recirculation Loops Operating BASES BACKGROUND The Reactor Coolant Recirculation System is designed to provide a forced

.coolant flow through the core to remove heat from the fuel. The forced coolant flow removes more heat from the fuel than would be possible with just natural circulation. The forced flow, therefore, allows operation at significantly higher power than would otherwise be possible. The recirculation system also controls reactivity over a wide span of reactor power by varying the recirculation flow rate to control the void content of the moderator. The Reactor Coolant Recirculation System consists of two recirculation pump loops external to the reactor vessel. These loops provide the piping path for the driving flow of water to the reactor vessel jet pumps. Each external loop contains one variable speed motor driven recirculation pump, a motor generator (MG) set to control pump speed and associated piping, jet pumps, valves, and instrumentation. The recirculation pump, piping, and valves are part of the reactor coolant pressure boundary and are located inside the drywell structure. The jet pumps are reactor vessel internals.

The recirculated coolant consists of saturated water from the steam separators and dryers that has been subcooled by incoming feedwater.

This water passes down the annulus between the reactor vessel wall and the core shroud. A portion of the coolant flows from the vessel, through the two external recirculation loops, and becomes the driving flow for the jet pumps. Each of the two external recirculation loops discharges high pressure flow into an external manifold, from which individual recirculation inlet lines are routed to the jet pump risers within the reactor vessel. The remaining portion of the coolant mixture in the annulus becomes the suction flow for the jet pumps. This flow enters the jet pump at suction inlets and is accelerated by the driving flow. The drive flow and suction flow are mixed in the jet pump throat section. The total flow then. passes through the jet pump diffuser section into the area below the core (lower plenum), gaining sufficient head in the process to drive the required flow upward through the core. The subcooled water enters the bottom of the fuel channels and contacts the fuel cladding, where heat is transferred to the coolant. As it rises, the coolant begins to boil, creating steam voids within the fuel channel that continue until the coolant exits the core.

Because of reduced moderation, the steam voiding introduces negative reactivity that must be compensated for to maintain or to increase reactor power. The recirculation flow control allows operators to increase recirculation flow and sweep some of the voids from the fuel channel, SUSQUEHANNA - UNIT 1 3.4-1

Rev. 7 Recirculation Loops Operating B 3.4.1 BASES BACKGROUND overcoming the negative reactivity void effect. Thus, the reason for having (continued) variable recirculation flow is to compensate for reactivity effects of boiling over a wide range of power generation without having to move control rods and disturb desirable flux patterns.

Each recirculation loop is manually started from the control room. The MG set provides regulation of individual recirculation loop drive flows. The flow in each loop is manually controlled.

APPLICABLE The operation of the Reactor Coolant Recirculation System is an initial SAFETY condition assumed in the design basis loss of coolant accident (LOCA)

ANALYSES (Ref. 1). During a LOCA caused by a recirculation loop pipe break, the intact loop is assumed to provide coolant flow during the first few seconds of the accident. The initial core flow decrease is rapid because the recirculation pump in the broken loop ceases to pump reactor coolant to the vessel almost immediately. The pump in the intact loop coasts down relatively slowly. This pump coastdown governs the core flow response for the next several seconds until the jet pump suction is uncovered (Ref. 1).

The analyses assume that both loops are operating at the same flow prior to the accident. However, the LOCA analysis was reviewed for the case with a flow mismatch between the two loops, with the pipe break assumed to be in the loop with the higher flow. While the flow coastdown and core respon_se are potentially more severe in this assumed case (since the intact loop starts at a lovver flow rate and the core response is the same as if both loops were operating at a lower flow rate), a small mismatch has been determined to be acceptable based on engineering judgment. The recirculation system is also assumed to have sufficient flow coastdown characteristics to maintain fuel thermal margins during abnormal operational transients (Ref. 2), which are analyzed in Chapter 15 of the FSAR.

Plant specific LOCA analyses have been performed assuming only one operating recirculation loop. These analyses have demonstrated that, in the event of a LOCA caused by a pipe break in the operating recirculation loop, the Emergency Core Cooling System response will provide adequate core cooling, provided that the APLHGR limits for ATRIUM 10 and ATRIUM 11 fuel are modified .

  • SUSQUEHANNA - UNIT 1 3.4-2

Rev. 7 Recirculation Loops Operating

  • *sASES APPLICABLE SAFETY The transient analyses of Chapter 15 of the FSAR have also been B 3.4.1 performed for single recirculation loop operation and demonstrate sufficient ANALYSES flow coastdown characteristics to maintain fuel thermal margins during the (continued) abnormal operational transients analyzed provided the MCPR
  • requirements are modified. During single recirculation loop operation, modification to the Reactor Protection System (RPS) average power range monitor (APRM) instrument setpoints is also required to account for the

-different relationships between recirculation drive flow and reactor core flow. The APLHGR, LHGR, and MCPR limits for single loop operation are specified in the COLR. The APRM Simulated Thermal Power-High setpoint is in LCO 3.3.1.1, "Reactor Protection System (RPS)

Instrumentation." In addition, a restriction on recirculation pump speed is incorporated to address reactor vessel internals vibration concerns and -

assumptions in the event analysis.

Recirculation loops operating satisfies Criterion 2 of the NRC Policy Statement (Ref. 5).

LCO Two recirculation loops are required to be in operation with their flows

  • matched within the limits specified in SR 3.4.1.1 to ensure that during a LOCA caused by a break of the piping of one recirculation loop the assumptions of the LOCA analysis are satisfied. With the limits specified in SR 3.4.1.1 not met, the recirculation loop with the lower flow must be considered not in operation. With only one recirculation loop in operation, modifications to the required APLGHR limits (LCO 3.2.1, "AVERAGE PLANAR LINEAR HEAT GENERATION RATE"), LHGR limits (LCO 32.3, "LINEAR HEAT GENERATION RATE (LHGR)"), MCPR limits (LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)"), and APRM Simulated Thermal Power-High setpoint (LCO 3.3.1.1) may be applied to allow continued operation consistent with the safety analysis assumptions.

Furthermore, restrictions are placed on recirculation pump speed to ensure the initial assumption of the event analysis are maintained.

The LCO is modified by a Note thatallows up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to establish the required limits and setpoints after a change from two recirculation loops operation to single recirculation loop operation. If the limits and setpoints are not in compliance with the applicable requirements at the end of this period, the ACTIONS required by the applicable specifications must be implemented. This time is provided to stabilize operation with one recirculation loop by: limiting flow in the operating loop, limiting total THERMAL POWER, monitor APRM and local power range monitor (LPRM) neutron flux noise levels; and, fully implementing and confirming

  • the required limit and setpoint modifications .

SUSQUEHANNA - UNIT 1 3.4-3

Rev. 7 Recirculation Loops Operating B 3.4.1 BASES APPL! GABI LITY In MODES 1 and 2, requirements for operation of the Reactor Coolant Recirculation System are necessary since there is considerable energy in the reactor core and the limiting design basis transients and accidents are assumed to occur.

In MODES 3, 4, and 5, the consequences of an accident are reduced and the coastdown characteristics of the recirculation loops are not important.

ACTIONS A.1 When operating with no recirculation loops operating in MODE 1, the potential for thermal-hydraulic oscillations is greatly increased. Although this transient is protected for expected modes of oscillation by the OPRM system, when OPERABLE per LCO 3.3.1.1, Function 2.f (Reference 3, 4),

the prudent response to the natural circulation condition is to preclude potential thermal-hydraulic oscillations by immediately placing the mode switch in the shutdown position.

8.1 Recirculation loop flow must match within required limits when both recirculation loops are in operation. If flow mismatch is not within required limits, matched flow must be restored within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. If matched flows are not restored, the recirculation loop with lower flow must be declared "not in operation." Should a LOCA occur with recirculation loop flow not matched, the core flow coastdown and resultant core response may not be bounded by the LOCA analyses. Therefore, only a limited time is allowed prior to imposing restrictions associated with single loop operation. Operation with only one recirculation loop satisfies the requirements of the LCO and the initial conditions of. the accident sequence.

The 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Completion Time is based on the low probability of an accident occurring during this time period, providing a reasonable time to complete the Required Action, and considering that frequent core monitoring by operators allows abrupt changes in core.flow conditions to be quickly detected.

These Required Actions do not require tripping the recirculation pump in the lowest flow loop when the mismatch between total jet pump flows of the two loops is greater than the required limits. However, in cases where large flow mismatches occur, low flow or reverse flow can occur in the low flow loop jet pumps, causing vibration of the jet pumps. If zero or reverse flow is detected, the condition should be alleviated by changing SUSQUEHANNA - UNIT 1 3.4-4

Rev. 7 Recirculation Loops Operating

    • BASES ACTIONS B.1 (continued)

B 3.4.1 (continued) recirculation pump speed to re-establish forward flow or by tripping the pump.

C.1 With no recirculation loops in operation while in MODE 2 or if after going to single loop operations the required limits and setpoints cannot be established, the plant must be brought to MODE 3, where the LCO does not apply within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. In this condition, the recirculation loops are not required to be operating because of the reduced severity of DBAs and minimal dependence on the recirculation loop coastdown characteristics.

The allowed Completion Time of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is reasonable to reach MODE 3 from full power conditions in an orderly manner without challenging plant systems.

SURVEILLANCE SR 3.4.1.1 REQUIREMENTS

  • This SR ensures the recirculation loops are within the allowable limits for mismatch. At low core flow (i.e.,< 75 million lbm/hr), the MCPR requirements provide larger margins to the fuel cladding integrity Safety Limit such that the potential adverse effect of early boiling transition during a LOCA is reduced. A larger flow mismatch can therefore be allowed when core flow is < 75 million lbm/hr. The recirculation loop jet pump flow, as used in this Surveillance, is the summation of the flows from all of the jet pumps associated with a single recirculation loop.

The mismatch is measured in terms of core flow. If the flow mismatch exceeds the specified limits, the loop with the lower flow is considered inoperable. The SR is not required when both loops are not in operation since the mismatch limits are meaningless during single loop or natural circulation operation. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.4.1.2 As noted, this SR is only applicable when in single loop operation. This SR ensures the recirculation pump limit is maintained. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program .

  • SUSQUEHANNA - UNIT 1 3.4-5

Rev. 7 Recirculation Loops Operating 8 3.4.1 BASES

REFERENCE:

S 1. FSAR, Section 6.3.3.7.

2. FSAR, Section 5.4.1.4.
3. GE NEDO-31960-A "BWROG Long Term Stability Solutions Licensing Methodology," November 1995.

4, GE NEDO-31960-A "BWROG Long Term Stability Solutions Licensing Methodology, Supplement 1," November 1995.

5. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132) .
  • SUSQUEHANNA - UNIT 1 3.4-6

Rev. 7 Recirculation Loops Operating B 3.4.1 THIS PAGE INTENTIONALLY LEFT BLANK

    • SUSQUEHANNA - UNIT 1 3.4-7

Rev. 7 Recirculation Loops Operating B 3.4.1

    • THIS PAGE INTENTIONALLY LEFT BLANK
  • SUSQUEHANNA - UNIT 1
  • 3.4-8

Rev. 7 Recirculation Loops Operating 8 3.4.1 THIS PAGE INTENTIONALLY LEFT BLANK

    • SUSQUEHANNA-. UNIT 1 3.4-9

Rev. 5 Jet Pumps B 3.4.2 B 3.4 REACTOR COOLANT SYSTEM (RCS)

B 3.4.2 Jet Pumps BASES BACKGROUND The Reactor Coolant Recirculation System is described in the Background section of the Bases for LCO 3.4.1, "Recirculation Loops Operating," which discusses the operating characteristics of the system and how these characteristics affect the Design Basis Accident (OBA) analyses.

The jet pumps are part of the Reactor Coolant Recirculation System and are designed to provide forced circulation through the core to remove heat from the fuel. The jet pumps are located in the annular region between the core shroud and the vessel inner wall. Because the jet pump suction elevation is at two-thirds core height, the vessel can be reflooded and coolant level maintained at two-thirds core height even with the complete break of the recirculation loop pipe that is located below the jet pump suction elevation .

  • Each reactor coolant recirculation loop contains ten jet pumps.

Recirculated coolant passes down the annulus between the reactor vessel wall and the core shroud. A portion of the coolant flows from the vessel, through the two external recirculation loops, and becomes the driving flow for the jet pumps. Each of the two external recirculation loops discharges high pressure flow into an external manifold from which individual

  • recirculation inlet lines are routed to the jet pump risers within the reactor vessel. The remaining portion of the coolant mixture in the annulus becomes the suction flow for the jet pumps. This flow enters the jet pump at suction inlets and is accelerated by the drive flow. The drive flow and suction flow are mixed in the jet pump throat section. The total flow then passes through the jet pump diffuser section into the area below the core (lower plenum), gaining sufficient head in the process to drive the required flow upward through the core.

APPLICABLE Jet pump OPERABILITY is an explicit assumption in the design basis loss SAFETY of coolant accident (LOCA) analysis evaluated in Reference 1.

ANALYSES

  • SUSQUEHANNA - UNIT 1 3.4-10

Rev.5 Jet Pumps B 3.4.2 BASES APPLICABLE The capability of reflooding the core to two-thirds core height is dependent SAFETY upon the structural integrity of the jet pumps. If the structural system, ANALYSES including the beam holding a jet pump in place, fails, jet pump (continued) displacement and performance degradation could occur, resulting in an increased flow area through the jet pump and a lower core flooding elevation. This could adversely affect the water level in the core during the reflood phase of a LOCA as well as the assumed blowdown flow during a LOCA. .

Jet pumps satisfy Criterion 2 of the NRC Policy Statement (Ref. 4).

LCO The structural failure of any of the jet pumps could cause significant degradation in the ability of the jet pumps to allow reflooding to two-thirds core height during a LOCA. OPERABILITY of all jet pumps is required to ensure that operation of the Reactor Coolant Recirculation System will be consistent with the assumptions used in the licensing basis analysis (Ref. 1).

    • APPLICABILITY In MODES 1 and 2, the jet pumps are required to be OPERABLE since
  • there is a large amount of energy in the reactor core and since the limiting DBAs are assumed to occur in these MODES. This is consistent with the requirements for operation of the Reactor Coolant Recirculation System (LCO 3.4.1 ).

In MODES 3, 4, and 5, the Reactor Coolant Recirculation System is not required to be in operation, and when not in operation, sufficient flow is not available to evaluate jet pump OPERABILITY.

ACTIONS A.1 An inoperable jet pump can increase the blowdown area and reduce the capability of reflooding during a design basis LOCA. If one or more of the jet pumps are inoperable, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The Completion Time of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is reasonable, based on operating experience, to reach MODE 3 from full power conditions in an orderly manner and without challenging plant systems. *

  • SUSQUEHANNA - UNIT 1 3.4-11

Rev. 5 Jet Pumps B 3.4.2 BASES SURVEILLANCE SR 3.4.2.1 REQUIREMENTS This SR is designed to detect significant degradation in jet pump performance that precedes jet pump failure (Ref. 2). This SR is required to be performed only when the loop has forced recirculation flow since surveillance checks and measurements can only be performed during jet pump operation. With no forced recirculation flow, stresses on jet pump assemblies are significantly reduced. The jet pump failure of concern is a complete mixer displacement due to jet pump beam failure. Jet pump plugging is also of concern since it adds flow resistance to the recirculation loop. Significant degradation is indicated if the specified criteria confirm unacceptable deviations from established patterns or relationships. The allowable deviations from the established patterns have been developed based on the variations experienced at plants during normal operation and with jet pump assembly failures (Refs. 2 and 3). Each recirculation loop must satisfy two of the performance criteria provided .. Since refueling activities (fuel assembly replacement or shuffle, as well as any modifications to fuel support orifice size or core plate bypass flow) can affect the relationship between core flow, jet pump flow, and recirculation loop flow, these relationships may need to be re-established each cycle .

Similarly, initial entry into extended single loop operation may also require establishment of these relationships. During the initial weeks of operation under such conditions, while base-lining new "established patterns,"

engineering judgment of the daily surveillance results is used to detect significant abnormalities, which could indicate a jet pump failure.

The recirculation pump speed operating characteristics (loop drive flow versus pump speed) are determined by the flow resistance from the loop suction through the jet pump nozzles. A change in the relationship indicates a plug, flow restriction, loss in pump hydraulic performance, leakage, or new flow path between the recirculation pump discharge and jet pump nozzle. For this criterion, loop drive flow versus pump speed relationship must be verified. Note that recirculation pump speed is directly proportional to recirculation motor generator speed (Reference 5).

Therefore, recirculation motor generator speed can be used for the purposes of this surveillance.

Individual jet pumps in a recirculation loop normally do not have the same flow. The unequal flow is due to the drive flow manifold, which does not distribute flo\/1( equally to all risers. The flow (or jet pump diffuser to low~r plenum differential pressure) pattern or relationship of one jet pump to the loop average is repeatable. An appreciable change in this relationship is an indication that increased (or reduced) resistance has occurred in one of the jet pumps. This may be indicated by an increase in the relative flow for a jet pump that has experienced beam cracks.

SUSQUEHANNA - UNIT 1 3.4-12

Rev. 5 Jet Pumps B 3.4.2 BASES SURVEILLANCE SR 3.4.2.1 (continued)

REQUIREMENTS (continued) The deviations from normal are considered indicative of a potential problem in the recirculation drive flow or jet pump system (Ref. 2). Normal flow ranges and established jet pump flow and differenti?I pressure patterns are established by plotting historical data as discussed in Reference 2.

The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

This SR is modified by two Notes. If this SR has not been performed in the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at the time an idle recirculation loop is restored to service, Note 1 allows 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after the idle recirculation loop is in operation before the SR must be completed because these checks can only be performed during jet pump operation. The 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is an acceptable time to establish conditions and complete data collection and evaluation.

Note 2 allows deferring completion of this SR until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after THERMAL POWER is greater than 23% of RTP. During low flow conditions, jet pump rioise approaches the threshold response of the associated flow instrumentation and precludes the collection of repeatable and meaningful data.

REFERENCES 1. FSAR, Section 6.3.

2. GE Service Information Letter No. 330, June 9, 1990.
3. NUREG/CR-3052, November 1984.
4. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132).
5. FSAR, Section 7.7 .
  • SUSQUEHANNA - UNIT 1 3.4-13.

Rev.5 Jet Pumps B 3.4.2

    • THIS PAGE INTENTIONALLY LEFT BLANK
  • -* SUSQUEHANNA - UNIT 1 3.4-14