NL-22-0325, Withdrawal of Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable

From kanterella
(Redirected from ML22123A159)
Jump to navigation Jump to search

Withdrawal of Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable
ML22123A159
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/03/2022
From: Gayheart C
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-22-0325
Download: ML22123A159 (2)


Text

Cheryl Gayheart Regulatory Affairs 3535 Colonnade Parkway Birmingham, AL 35243 205 992 5000 tel 205 992 7795 fax May 3, 2022 Docket No.:

50-321 NL-22-0325 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Unit 1 Withdrawal of Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (PSW) Pump Inoperable Ladies and Gentlemen:

In letter NL-22-0316, dated April 30, 2022, Southern Nuclear Operating Company (SNC) submitted a request for a proposed emergency license amendment to the Technical Specifications (TS) for Hatch Nuclear Plant (HNP) Unit 1 renewed facility operating license DPR-57. The proposed amendment would have revised TS 3.7.2, Plant Service Water (PSW)

System and Ultimate Heat Sink (UHS), Required Actions for Condition A, One PSW pump inoperable, to allow a one-time increase in the Completion Time from 30 days to 45 days.

Subsequent to the submittal, HNP personnel were able to complete the necessary repairs of the Unit 1 1A PSW Pump and return it to Operable condition within the original Completion Time and thus there is no longer a need for an extension of the Completion Time. Therefore, SNC hereby withdraws the subject request for an emergency license amendment for HNP Unit 1 TS 3.7.2.

In accordance with 10 CFR 50.91, SNC is notifying the State of Georgia of the withdrawal of this license amendment request by transmitting a copy of this letter to the designated State Official.

This letter contains no regulatory commitments. If you have any questions, please contact Ryan Joyce at 205-992-6468.

U.S. Nuclear Regulatory Commission NL-22-0325 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct.

Executed on May 3, 2022.

Cheryl A. Gayheart Regulatory Affairs Director CAG/was/cbg cc:

NRC Regional Administrator, Region II NRC NRR Project Manager - Hatch NRC Senior Resident Inspector - Hatch Director, Environmental Protection Division - State of Georgia RType: CHA02.004