05000528/LER-2021-001, Emergency Diesel Generator Actuation on Loss of Offsite Power to Class 4.16 Kv Bus
| ML21349B373 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 12/15/2021 |
| From: | Bruce R Arizona Public Service Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 102-08369-BJR/MDD LER 2021-001-00 | |
| Download: ML21349B373 (5) | |
| Event date: | |
|---|---|
| Report date: | |
| Reporting criterion: | 10 CFR 50.73(a)(2)(iv)(A), System Actuation 10 CFR 50.73(a)(2)(v), Loss of Safety Function |
| 5282021001R00 - NRC Website | |
text
10 CFR 50.73 A member of the STARS Alliance LLC Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek BRUCE J. RASH Vice President Nuclear Engineering/Regulatory Palo Verde Nuclear Generating Station 5801 S Wintersburg Road Tonopah, AZ 85354 Mail Station 7602 Tel 623 393 7362 102-08369-BJR/MDD December 1, 2021 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS) Units 1 and 3 Docket No. STN 50-528 and 50-530 License No. NPF-41 and NPF-74 Licensee Event Report 2021-001-00 Enclosed, please find Licensee Event Report (LER) 50-528/2021-001-00, that has been prepared and submitted pursuant to 10 CFR 50.73. This LER reports specified system actuations that occurred in Units 1 and 3 on October 20, 2021.
In accordance with 10 CFR 50.4, copies of this LER are being forwarded to the Nuclear Regulatory Commission (NRC) Regional Office, NRC Region IV, and the Senior Resident Inspector.
Arizona Public Service Company makes no commitments in this letter. If you have questions regarding this submittal, please contact Michael DiLorenzo, Department Leader, Regulatory Affairs, at (623) 393-3495.
Sincerely, BJR/MDD Enclosure cc:
S. A. Morris NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS L. N. Merker NRC Senior Resident Inspector for PVNGS Rash, Bruce (Z77439)
Digitally signed by Rash, Bruce (Z77439)
DN: cn=Rash, Bruce (Z77439)
Date: 2021.12.15 13:57:52 -07'00'
Abstract
On October 20, 2021, at approximately 1446 Mountain Standard Time, a valid actuation of the circuitry that starts the emergency diesel generators (EDGs) for Palo Verde Nuclear Generating Station Unit 1 train B and Unit 3 train A occurred due to an undervoltage condition on their respective 4.16 kV safety buses. Both EDGs started and loaded as designed, including associated train essential spray pond pumps and the Unit 1 B-train auxiliary feedwater pump.
The loss of power to the Unit 1 and Unit 3 safety buses and resulting component actuations were the result of an unintended personnel contact with an energized portion of the Unit 2 S06 intermediate bus during maintenance. The fault isolated the startup transformer from offsite power which de-energized the 13.8 kV power provided to the affected intermediate buses providing power to the Unit 1 B-train safety bus and the Unit 3 A-train safety buses. Unit 1 and Unit 3 entered Technical Specification (TS) Limiting Condition for Operation (LCO) 3.8.1, Condition A, for one required offsite circuit inoperable, which was exited after off-site power was restored to the units respective safety buses.
The results of the investigation are pending. The cause and corrective actions will be reported in a supplement to this LER. No similar events have been reported by PVNGS in the last three years.
All times are Mountain Standard Time and approximate unless otherwise indicated.
- 1.
REPORTING REQUIREMENT(S)
This Licensee Event Report (LER) is being submitted pursuant to 10 CFR 50.73 (a)(2)(iv)(A) to report a valid automatic actuation of the circuitry that starts the emergency diesel generator (EDG) (EIIS: EK) for Unit 1 and Unit 3 following an undervoltage condition on the affected safety bus for each unit on October 20, 2021. The event included actuations of the associated essential spray pond (SP) pumps (EIIS: BS) and the Unit 1 B auxiliary feedwater (AF) pump (EIIS: BA). This event was reported to the NRC on October 20, 2021, via the event notification system (ENS 55534) and was updated on December 3, 2021.
- 2. DESCRIPTION OF STRUCTURE(S), SYSTEM(S) AND COMPONENT(S):
The safety related equipment for each Palo Verde Nuclear Generating Station (PVNGS) unit is powered by one of two load groups (A-train and B-train). Either of the associated trains is capable of providing power for safe plant shutdown. Each alternating current (AC) train includes one Class 1E 4.16 kilovolt (kV) bus (EIIS: EB).
The preferred and alternate power sources for each load group is offsite 525 kV AC power (EIIS: EK) and is supplied via the 13.8 kV secondary windings of two of the three startup transformers (EIIS: EA) to six 13.8 kV intermediate buses; Each unit receives 13.8 kV power from two of the intermediate buses. Class 1E 4.16 kV safety load group power is provided from the associated intermediate bus engineered safety feature (ESF) transformers. The standby power supply for each safety load group consists of one EDG, including its auxiliary and fuel systems. The standby power supply functions as a source of AC power for safe plant shutdown in the event of loss of preferred power and for post-accident operation of ESF loads.
3. INITIAL PLANT CONDITIONS
On October 20, 2021, Palo Verde Unit 1 and Unit 3 were in Mode 1 (Power Operation) at 100 percent power, normal operating temperature and normal operating pressure. There were no inoperable structures, systems, or components at the time that contributed to this event. Unit 2 was defueled for a refueling outage. Page 3 of 4 (08-2020)
U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 08/31/2023 LICENSEE EVENT REPORT (LER)
CONTINUATION SHEET (See NUREG-1022, R.3 for instruction and guidance for completing this form https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1022/r3/)
- 3. LER NUMBER Palo Verde Nuclear Generating Station 05000-528 YEAR SEQUENTIAL NUMBER REV NO.
2021 001 00
4. EVENT DESCRIPTION
On October 20, 2021, at 1446, a valid loss of power (LOP) actuation occurred due to an undervoltage condition on the Unit 1 train B and Unit 3 train A safety buses which resulted in an automatic actuation of the circuitry that starts the Unit 1 B-train EDG and Unit 3 A-train EDG. Both EDGs started and loaded as designed. The EDG actuations were accompanied by the associated train essential spray pond pumps in both units. The Unit 1 B-train EDG actuation was also accompanied by the start of the Unit 1 B-train essential auxiliary feedwater pump, as required for the undervoltage condition. By design, actuation of the Unit 3 A-train steam-driven auxiliary feedwater pump was not required in response to the EDG actuation.
The undervoltage condition on the Unit 1 and Unit 3 Class 1E 4.16 kV buses resulted from an electrical fault that occurred when a worker (utility, non-licensed) contacted an energized 13.8 kV element inside the Unit 2 S06 switchgear, which opened 525 kV breakers supplying the startup transformer AE-NAN-X02. This de-energized the startup transformer which was powering the Unit 1 13.8 kV intermediate bus S06 and the Unit 3 13.8 kV intermediate bus S05, which fed the respective Unit 1 B-train and Unit 3 A-train 4.16 kV Class 1E kV buses.
Both Units 1 and 3 entered Technical Specification (TS) Limiting Condition for Operation (LCO) 3.8.1, Condition A, for one required offsite circuit inoperable. At 2032, on October 20, 2021, Unit 1 restored offsite power to B-train safety bus from the alternate supply and exited the LCO condition. On October 21, 2021, at 1545, Unit 3 restored offsite power to A-train safety bus from the alternate supply and exited the LCO condition.
Unit 2 safety buses and required offsite circuits were unaffected by the AE-NAN-X02 startup transformer trip. Unit 1 A-train and Unit 3 B-train safety buses were supplied by startup transformers AE-NAN-X01 and AE-NAN-X03 and remained energized.
Unit 2 was in a refueling outage and the unintended contact with the energized 13.8 kV element of the Unit 2 S06 switchgear occurred during scheduled inspection and cleaning of the de-energized portions of the switchgear during the outage.
5. ASSESSMENT OF SAFETY CONSEQUENCES
There were no inoperable structures, systems, or components at the time that contributed to this event. The EDGs responded as designed to the undervoltage condition on their respective safety buses. Essential SP and AF pumps actuated as required for the LOP. Page 4 of 4 (08-2020)
U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 08/31/2023 LICENSEE EVENT REPORT (LER)
CONTINUATION SHEET (See NUREG-1022, R.3 for instruction and guidance for completing this form https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1022/r3/)
- 3. LER NUMBER Palo Verde Nuclear Generating Station 05000-528 YEAR SEQUENTIAL NUMBER REV NO.
2021 001 00 The individual who made contact with the energized 13.8 kV component was hospitalized and is recovering from the injuries. The injury did not involve radioactive contamination.
This event did not result in any challenges to the fission product barriers or result in the release of radioactive materials.
This event did not prevent the fulfillment of a safety function nor did it result in a safety system functional failure as described by 10 CFR 50.73 (a)(2)(v).
6.
CAUSE OF THE EVENT
The direct cause of the undervoltage and the EDG and pump actuations was unintended personnel contact with an energized portion of the Unit 2 S06 switchgear when the electrician working in one of the switchgear cubicles reached into an area outside the clearance boundary to perform a task.
The results of the investigation are pending. The cause of the event will be provided in a supplement to this report.
7.
CORRECTIVE ACTIONS
Immediate corrective actions were taken to restore offsite power to Unit 1 safety bus 1E-PBB-S04 and Unit 3 safety bus 3E-PBA-S03. Alternate supply power was provided from startup transformers AE-NAN-X01 and AE-NAN-X03 respectively, through their associated intermediate buses to the safety buses.
Corrective actions to address the cause of the event will be provided in a supplement to this report.
8.
PREVIOUS SIMILAR EVENTS
No EDG or ESF actuations resulting from personnel contact with energized circuits have been reported by Palo Verde.