| | | Reporting criterion |
|---|
| 05000529/LER-1987-001-01, :on 870208,control Room Ventilation Intake Noble Gas Monitors RU-29 & RU-30 Discovered Inoperable W/O Appropriate Action Statement Being Entered within Required Time Frame.Caused by Personnel Error |
- on 870208,control Room Ventilation Intake Noble Gas Monitors RU-29 & RU-30 Discovered Inoperable W/O Appropriate Action Statement Being Entered within Required Time Frame.Caused by Personnel Error
| |
| 05000530/LER-1987-001-02, :on 870328,while Preparing to Enter Mode 6, Control Room Essential Filtration Actuation Signals & Containment Purge Isolation Actuation Signals Received.Cause Under Investigation |
- on 870328,while Preparing to Enter Mode 6, Control Room Essential Filtration Actuation Signals & Containment Purge Isolation Actuation Signals Received.Cause Under Investigation
| 10 CFR 50.73(e)(2) |
| 05000528/LER-1987-001, :on 870203,control Room Essential Filtration Actuation Signal Actuated on Channels a & B.Caused by Voltage Spike.Setpoints Readjusted to Be Consistent W/Tech Specs |
- on 870203,control Room Essential Filtration Actuation Signal Actuated on Channels a & B.Caused by Voltage Spike.Setpoints Readjusted to Be Consistent W/Tech Specs
| |
| 05000530/LER-1987-002-02, :on 870615,control Room Essential Filtration Actuation Signals & Containment Purge Isolation Actuation Signals Received on Both Channels of balance-of-plant Esfas. Cause Under Investigation |
- on 870615,control Room Essential Filtration Actuation Signals & Containment Purge Isolation Actuation Signals Received on Both Channels of balance-of-plant Esfas. Cause Under Investigation
| |
| 05000529/LER-1987-002-01, :on 870320,Class 1E Train B Bank of Pressurizer Backup Heaters Could Not Be Energized from Control Room,Per Tech Spec Requirement.Caused by Malfunction of Heater Breaker & Personnel Error.Breaker Replaced |
- on 870320,Class 1E Train B Bank of Pressurizer Backup Heaters Could Not Be Energized from Control Room,Per Tech Spec Requirement.Caused by Malfunction of Heater Breaker & Personnel Error.Breaker Replaced
| 10 CFR 50.73(e)(2) |
| 05000528/LER-1987-002, :on 870317,continuous Fire Watch Not Established within Required Time,Per Tech Spec 3.7.11.2 Action A.Caused by Personnel Error.Fire Protection Personnel Counseled on Importance of Proper Performance |
- on 870317,continuous Fire Watch Not Established within Required Time,Per Tech Spec 3.7.11.2 Action A.Caused by Personnel Error.Fire Protection Personnel Counseled on Importance of Proper Performance
| |
| 05000530/LER-1987-002, :on 870615,control Room Essential Filtration & Containment Purge Isolation Actuation Signals Received on Both Channels of Balance of Plant Esfas.Caused by Calibr of Static Transfer Switch.Switch Recalibr |
- on 870615,control Room Essential Filtration & Containment Purge Isolation Actuation Signals Received on Both Channels of Balance of Plant Esfas.Caused by Calibr of Static Transfer Switch.Switch Recalibr
| 10 CFR 50.73(e)(2) |
| 05000528/LER-1987-003, :on 870110,reactor Power Cutback Occurred Due to Load Rejection Resulting in Reactor Trip.Caused by Cognitive Personnel Error.Night Order Issued to Discuss Desirable Strategy During Feedwater Transient |
- on 870110,reactor Power Cutback Occurred Due to Load Rejection Resulting in Reactor Trip.Caused by Cognitive Personnel Error.Night Order Issued to Discuss Desirable Strategy During Feedwater Transient
| |
| 05000530/LER-1987-003-02, :on 870929,condition Identified That,If Not Corrected,Could Have Resulted in Improper Operation of Two Shutdown Cooling Isolation Valves in Redundant Trains.Caused by Vendor Error.Bolting Replaced |
- on 870929,condition Identified That,If Not Corrected,Could Have Resulted in Improper Operation of Two Shutdown Cooling Isolation Valves in Redundant Trains.Caused by Vendor Error.Bolting Replaced
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(c)(2) 10 CFR 21.21(b)(3) |
| 05000529/LER-1987-004-01, :on 870416,reactor & Turbine Trip Occurred. Caused by High Local Power Density Trip Signals Generated by Core Protection Calculators.Effects of Cycling Each Breaker Will Be Incorporated Into Guidelines |
- on 870416,reactor & Turbine Trip Occurred. Caused by High Local Power Density Trip Signals Generated by Core Protection Calculators.Effects of Cycling Each Breaker Will Be Incorporated Into Guidelines
| 10 CFR 50.73(e)(2) |
| 05000528/LER-1987-004, :on 870323,discovered That Spectrum Analysis Not Done for Three Grab Samples Taken on 870320 from Turbine Bldg Sump & Condenser Area Sump.Caused by Personnel Error. Event Discussed W/Chemistry Personnel |
- on 870323,discovered That Spectrum Analysis Not Done for Three Grab Samples Taken on 870320 from Turbine Bldg Sump & Condenser Area Sump.Caused by Personnel Error. Event Discussed W/Chemistry Personnel
| 10 CFR 50.73(e)(2) |
| 05000530/LER-1987-004-02, :on 871217,w/reactor at 50% Test Plateau During Power Ascension Testing,Reactor Trip Occurred.Caused by Malfunctioning Logic Sequencer Card in Control Element Drive Mechanism Control Sys.Card Replaced |
- on 871217,w/reactor at 50% Test Plateau During Power Ascension Testing,Reactor Trip Occurred.Caused by Malfunctioning Logic Sequencer Card in Control Element Drive Mechanism Control Sys.Card Replaced
| |
| 05000530/LER-1987-005-02, :on 871030,while Unit in Mode 3,main Steam Isolation Sys Automatically Actuated.Caused by Faulty Logic Card for MSIV-170.Faulty Logic Card Replaced |
- on 871030,while Unit in Mode 3,main Steam Isolation Sys Automatically Actuated.Caused by Faulty Logic Card for MSIV-170.Faulty Logic Card Replaced
| 10 CFR 50.73(r)(2) |
| 05000528/LER-1987-005-01, :on 870302,while Unit in Mode 4,hourly Fire Watch Patrol Not Performed in Accordance W/Tech Spec 3.7.12. Caused by Cognitive Personnel Error.Foreman Disciplined & Instructed on Importance of Fire Watches |
- on 870302,while Unit in Mode 4,hourly Fire Watch Patrol Not Performed in Accordance W/Tech Spec 3.7.12. Caused by Cognitive Personnel Error.Foreman Disciplined & Instructed on Importance of Fire Watches
| |
| 05000529/LER-1987-005, :on 870305,fire Patrol for Control Diesel Generator & Main Steam Support Structure Performed Late. Caused by Malfunctioning Access Door to Main Steam Support Structure.Door Returned to Svc |
- on 870305,fire Patrol for Control Diesel Generator & Main Steam Support Structure Performed Late. Caused by Malfunctioning Access Door to Main Steam Support Structure.Door Returned to Svc
| |
| 05000528/LER-1987-006, :on 870304,Limiting Condition for Operation 3.0.3 Entered Five Times Due to Inoperable Msivs.Caused by Fact That Sys Design Does Not Allow Tech Spec Action Statement to Be Met.Tech Spec Change Issued |
- on 870304,Limiting Condition for Operation 3.0.3 Entered Five Times Due to Inoperable Msivs.Caused by Fact That Sys Design Does Not Allow Tech Spec Action Statement to Be Met.Tech Spec Change Issued
| |
| 05000529/LER-1987-006-01, :on 870307,during Surveillance Test,Limiting Condition for Operation 3.0.3 Entered When Tech Spec 3/4.6.3 Action Statements Could Not Be Met.Caused by Inoperability of Msivs.Tech Spec Change Request Submitted |
- on 870307,during Surveillance Test,Limiting Condition for Operation 3.0.3 Entered When Tech Spec 3/4.6.3 Action Statements Could Not Be Met.Caused by Inoperability of Msivs.Tech Spec Change Request Submitted
| |
| 05000528/LER-1987-007, :on 870120,Tech Spec 3.3.2,Table 3.3-3 Requirement Not Met.Caused by Entry Into Limiting Condition for Operation 3.0.3 to Avoid ESF Actuation.Tech Spec Change Request to Allow Trip in Mode 4 Initiated |
- on 870120,Tech Spec 3.3.2,Table 3.3-3 Requirement Not Met.Caused by Entry Into Limiting Condition for Operation 3.0.3 to Avoid ESF Actuation.Tech Spec Change Request to Allow Trip in Mode 4 Initiated
| |
| 05000529/LER-1987-007-01, :on 870423,time Interval for Sampling Concentration of Hydrogen & Oxygen in Gaseous Radwaste Sys Exceeded,Contrary to Tech Spec 3.3.3.9.Caused by Cognitive Personnel Error.New Form Used to Aid Personnel |
- on 870423,time Interval for Sampling Concentration of Hydrogen & Oxygen in Gaseous Radwaste Sys Exceeded,Contrary to Tech Spec 3.3.3.9.Caused by Cognitive Personnel Error.New Form Used to Aid Personnel
| |
| 05000528/LER-1987-008, :on 870314,fire Patrol Performed Six Hours Late Due to Log Omission.Caused by Cognitive Personnel Error.Fire Protection Technician Counseled on Area of Responsibility |
- on 870314,fire Patrol Performed Six Hours Late Due to Log Omission.Caused by Cognitive Personnel Error.Fire Protection Technician Counseled on Area of Responsibility
| |
| 05000528/LER-1987-009-01, :on 870604,inadvertent Control Room Essential Filtration Actuation Occurred Due to Radiation Monitor Pump Cycling.Caused by Motor Drawing Too Much Current.Ground to Motor & Radiation Monitor Separated |
- on 870604,inadvertent Control Room Essential Filtration Actuation Occurred Due to Radiation Monitor Pump Cycling.Caused by Motor Drawing Too Much Current.Ground to Motor & Radiation Monitor Separated
| |
| 05000528/LER-1987-010, :on 870325,while in Mode 1,discovered That Daily Chemistry Samples Not Taken on 870323 for Turbine Bldg & Condenser Area Sumps.Caused by Personnel Error.Briefing Sessions Held W/Workers.Sample Form Developed |
- on 870325,while in Mode 1,discovered That Daily Chemistry Samples Not Taken on 870323 for Turbine Bldg & Condenser Area Sumps.Caused by Personnel Error.Briefing Sessions Held W/Workers.Sample Form Developed
| |
| 05000528/LER-1987-011, :on 870331,while in Mode 1,fire Watch Round Not Performed Per Tech Spec 3.7.12.Caused by Cognitive Personnel Error.Fire Watch Patrolman Counseled on Safety Warnings & Scheduled for Addl Training |
- on 870331,while in Mode 1,fire Watch Round Not Performed Per Tech Spec 3.7.12.Caused by Cognitive Personnel Error.Fire Watch Patrolman Counseled on Safety Warnings & Scheduled for Addl Training
| |
| 05000529/LER-1987-012-01, :on 870716,discovered That Time Interval for Performance of Tech Spec Surveillance Requirement 4.6.1.3.b.1 Exceeded on 870102.Caused by Error in Approved Procedure.Procedure to Be Revised |
- on 870716,discovered That Time Interval for Performance of Tech Spec Surveillance Requirement 4.6.1.3.b.1 Exceeded on 870102.Caused by Error in Approved Procedure.Procedure to Be Revised
| 10 CFR 50.73(e)(2) |
| 05000528/LER-1987-013, :on 870408,Tech Spec 3.0.3 Entered Due to Inoperability of ESF Pump Room Air Exhaust Sys.Caused by Cognitive Personnel Error.Memo Sent to Onsite Managers Reminding Personnel of Responsibilities |
- on 870408,Tech Spec 3.0.3 Entered Due to Inoperability of ESF Pump Room Air Exhaust Sys.Caused by Cognitive Personnel Error.Memo Sent to Onsite Managers Reminding Personnel of Responsibilities
| |
| 05000529/LER-1987-013-01, :on 870510,shutdown Commenced Per Tech Spec 3.8.3.1 Due to Inoperable Inverter.Caused by Loose Silicon Controlled Rectifier (Scr).Loose SCR Replaced & Other SCRs Retorqued |
- on 870510,shutdown Commenced Per Tech Spec 3.8.3.1 Due to Inoperable Inverter.Caused by Loose Silicon Controlled Rectifier (Scr).Loose SCR Replaced & Other SCRs Retorqued
| |
| 05000529/LER-1987-014-01, :on 870605,discovered That Auxiliary Sample Cart in Svc as Backup to Fuel Bldg Ventilation Radiation Monitor Turned Off & Inoperable.Caused by Personnel Error. Radiation Protection Technician Terminated |
- on 870605,discovered That Auxiliary Sample Cart in Svc as Backup to Fuel Bldg Ventilation Radiation Monitor Turned Off & Inoperable.Caused by Personnel Error. Radiation Protection Technician Terminated
| |
| 05000529/LER-1987-015, :on 870816,control Room Essential Filtration Actuation Initiated on ESFAS Channels a & B.Caused by Voltage Spike on RU-30.Monitor Reset,Train B Returned to Svc & Procedural Change Initiated |
- on 870816,control Room Essential Filtration Actuation Initiated on ESFAS Channels a & B.Caused by Voltage Spike on RU-30.Monitor Reset,Train B Returned to Svc & Procedural Change Initiated
| 10 CFR 50.73(c)(2) 10 CFR 50.73(r)(2) |
| 05000529/LER-1987-016-01, :on 870718,contents of Chemical Waste Neutralization Tank Released to Onsite Evaporation Pond Exceeding Tech Spec 3.11.1.1 Limit for Mo-99.Caused by Personnel Error.Briefing Session Planned |
- on 870718,contents of Chemical Waste Neutralization Tank Released to Onsite Evaporation Pond Exceeding Tech Spec 3.11.1.1 Limit for Mo-99.Caused by Personnel Error.Briefing Session Planned
| 10 CFR 50.73(e)(2) |
| 05000528/LER-1987-016, :on 870609,both Trains of ESF Pump Room Air Exhaust Cleanup Sys Inoperable.Caused by Personnel Error. Operations Dept Experience Rept & Night Orders Developed & Issued & Warning Tags Placed on Equipment |
- on 870609,both Trains of ESF Pump Room Air Exhaust Cleanup Sys Inoperable.Caused by Personnel Error. Operations Dept Experience Rept & Night Orders Developed & Issued & Warning Tags Placed on Equipment
| 10 CFR 50.73(c)(2) 10 CFR 50.73(e)(2) |
| 05000528/LER-1987-017-01, :on 870630,auxiliary Operator Entered High Radiation Area W/O Radiation Monitoring Devices Required by Tech Specs.Caused by Personnel Error.Exposure within 10CFR20 Limits.Disciplinary Action Taken |
- on 870630,auxiliary Operator Entered High Radiation Area W/O Radiation Monitoring Devices Required by Tech Specs.Caused by Personnel Error.Exposure within 10CFR20 Limits.Disciplinary Action Taken
| |
| 05000529/LER-1987-017, :on 870608,discovered That 4-h Samples of Gaseous Radwaste Sys Had Not Been Taken as Required.Caused by Improper Communication Between Chemist & Control Room Operator.Night Order Initiated |
- on 870608,discovered That 4-h Samples of Gaseous Radwaste Sys Had Not Been Taken as Required.Caused by Improper Communication Between Chemist & Control Room Operator.Night Order Initiated
| 10 CFR 50.73(e)(2) |
| 05000528/LER-1987-018, :on 870827,reactor Trip Occurred Due to Axial Shape Index of Reactor Core.Caused by Deficient Procedure. Procedural Enhancements Implemented |
- on 870827,reactor Trip Occurred Due to Axial Shape Index of Reactor Core.Caused by Deficient Procedure. Procedural Enhancements Implemented
| |
| 05000529/LER-1987-018-01, :on 871004,ESF Signal Initiated on Train B & cross-tripped Train a as Designed.Caused by Spurious Signal Due to Voltage Spike Caused by Electronic Noise.Plant Change Package Initiated |
- on 871004,ESF Signal Initiated on Train B & cross-tripped Train a as Designed.Caused by Spurious Signal Due to Voltage Spike Caused by Electronic Noise.Plant Change Package Initiated
| 10 CFR 50.73(e)(2) |
| 05000529/LER-1987-019, :on 871122,reactor Trip Occurred Due to Core Axial Shape Index Out of Bounds.Caused by Deficient Procedure & Faulty Contact.Procedural Enhancements Initiated & Faulty Contact Replaced |
- on 871122,reactor Trip Occurred Due to Core Axial Shape Index Out of Bounds.Caused by Deficient Procedure & Faulty Contact.Procedural Enhancements Initiated & Faulty Contact Replaced
| 10 CFR 50.73(c)(2) |
| 05000528/LER-1987-020, :on 870416,inadvertent ESF Actuation Occurred. Caused by Parity Error on Byte of Data Between Microprocessor & Remote Indication Controller.Mod to Install Time Delay Relays Developed |
- on 870416,inadvertent ESF Actuation Occurred. Caused by Parity Error on Byte of Data Between Microprocessor & Remote Indication Controller.Mod to Install Time Delay Relays Developed
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2) |
| 05000528/LER-1987-021, :on 870729,control Room Essential Filtration Actuation Initiated on Channels a & B of Esfas.Caused by Voltage Spike.Monitor Reset,Returning Setpoint to Specified Value |
- on 870729,control Room Essential Filtration Actuation Initiated on Channels a & B of Esfas.Caused by Voltage Spike.Monitor Reset,Returning Setpoint to Specified Value
| |
| 05000529/LER-1987-021, :on 871202,post-accident Sampling Sys Declared Inoperable.Caused by Personnel Error.Appropriate Functional & Surveillance Tests Completed & Sys Decalred Operable.W/ |
- on 871202,post-accident Sampling Sys Declared Inoperable.Caused by Personnel Error.Appropriate Functional & Surveillance Tests Completed & Sys Decalred Operable.W/
| 10 CFR 50.73(c)(2) 10 CFR 50.73(e)(2) |
| 05000528/LER-1987-024, :on 870902,two Dma Interface Cards Providing Input to Core Operating Limit Supervisory Sys Found Incorrectly Installed.Caused by Cognitive Personnel Error. Computer Technician Counseled |
- on 870902,two Dma Interface Cards Providing Input to Core Operating Limit Supervisory Sys Found Incorrectly Installed.Caused by Cognitive Personnel Error. Computer Technician Counseled
| 10 CFR 50.73(e)(2)(i) |
| 05000528/LER-1987-026, :on 871027,automatic Actuation of Balance of Plant ESF Occurred Due to Inadvertent Containment Purge Isolated Actuation Signal.Caused by Personnel Error. Responsible Individual Will Be Reinstructed |
- on 871027,automatic Actuation of Balance of Plant ESF Occurred Due to Inadvertent Containment Purge Isolated Actuation Signal.Caused by Personnel Error. Responsible Individual Will Be Reinstructed
| 10 CFR 50.73(e)(2) |
| 05000528/LER-1987-027, :on 870728,unit Entered Mode 4 (Hot Shutdown) W/O Meeting Surveillance Requirements for Containment Spray Sys Train B Pump.Caused by Personnel Error.Train a Pump Tests Verified & Procedure Revised |
- on 870728,unit Entered Mode 4 (Hot Shutdown) W/O Meeting Surveillance Requirements for Containment Spray Sys Train B Pump.Caused by Personnel Error.Train a Pump Tests Verified & Procedure Revised
| |
| 05000528/LER-1987-028, :on 871217,inability to Meet Tech Spec Requirements Encountered Due to Failure to Retain Monitor Samples.Caused by Personnel Error.Technician Disciplined & Chemistry Dept Will Receive Training |
- on 871217,inability to Meet Tech Spec Requirements Encountered Due to Failure to Retain Monitor Samples.Caused by Personnel Error.Technician Disciplined & Chemistry Dept Will Receive Training
| |