MONTHYEARML23291A4242023-10-24024 October 2023 1 to Updated Final Safety Analysis Report, Chapter 7, Section 7.6, All Other Instrumentation Systems Required for Safety ML23292A2122023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 222.1 Through 222.2 PLA-8081, 1 to Updated Final Safety Analysis Report, Questions and Responses 121.1 Through 121.212023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 121.1 Through 121.21 ML23292A2252023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Chapter 17, Section 17.1, This Section N/A to FSAR ML23292A2242023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 032.1 Through 032.103 ML23292A2232023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 331.1 Through 331.19 ML23292A2222023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions 321.1 Through 321.7 ML23292A2212023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Response 260.1 ML23292A2202023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 441.1 Through 441.15 ML23292A2182023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Chapter 1, Questions 010.1 Through 010.26 ML23292A2152023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 423.1 Through 423.58 ML23292A2142023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 005.1 Through 005.6 ML23292A1982023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Chapter 17, Section 17.2, Quality Assurance During the Operations Phase ML23292A2102023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions 313.1 Through 313.9 ML23291A1132023-10-12012 October 2023 Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report ML23292A2082023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 422.1 Through 422.4 ML23292A2052023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions 021.01 Through 021.88 ML23292A2042023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 130.1 Through 130.28 ML23292A2032023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 211.1 Through 211.296 ML23292A2012023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Chapter 16, Section 16.2, Proposed Final Technical Specifications ML23292A2002023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Chapter 18, Responses to TMI Related Requirements ML23292A1992023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 371.1 Through 371.30 ML23292A1952023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 281.1 Through 281.29 ML23292A2132023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 362.1 Through 362.25 ML23292A2092023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 421.1 Through 421.42 ML23292A2162023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 040.1 Through 40.99 ML23292A1942023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Response 361.1 Through 361.5-1 ML23292A1962023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions 123.1 Through 123.9 ML23292A2282023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Question and Response 440.1 ML23292A2112023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 400.1 ML23292A2072023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions 230.1 Through 230.8 ML23292A2022023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Response 112.1 Through 112.10 ML23292A2192023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 231.1 Through 231.5 ML23292A2272023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Figures Referenced in the FSAR Are Withheld Under 10 CFR 2.390 ML23292A2262023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Chapter 16, Section 16.1, Preliminary Technical Specifications ML23292A2062023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 372.1 Through 372.28 ML23292A2172023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 410.1 Through 410.13 2023-10-24
[Table view] |
Text
SSES-FSAR Text Rev. 61
1.1 INTRODUCTION
1.1.1 TYPE OF LICENSE This FSAR is submitted by PPL Susquehanna, LLC in support of its application for an operating license for Susquehanna Steam Electric Station (Susquehanna SES) Units 1 and 2.
1.1.2 IDENTIFICATION OF APPLICANT Application is made by PPL Susquehanna, LLC, Two North Ninth Street, Allentown, Pennsylvania, 18101.
1.1.3 NUMBER OF PLANT UNITS The plant consists of two units which have a common control room, diesel generators and refueling floor, turbine operating deck, radwaste system, and other auxiliary systems.
1.
1.4 DESCRIPTION
OF LOCATION The 2,355 acre plant site is located in Salem Township, Luzerne County, Pennsylvania, approximately 20 miles southwest of Wilkes-Barre, 50 miles northwest of Allentown and 70 miles northeast of Harrisburg.
1.1.5 TYPE OF NUCLEAR STEAM SUPPLY The Nuclear Steam Supply System for each unit consists of a General Electric Boiling Water Reactor, BWR/4 product line with a 3952 MWt nominal rating.
1.1.6 TYPE OF CONTAINMENT The containment is a pressure suppression type designated as Mark II. The drywell is a steel-lined concrete cone located above the steel-lined concrete cylindrical pressure suppression chamber.
The drywell and suppression chamber are separated by a concrete diaphragm slab which also serves to strengthen the entire system.
1.1.7 CORE THERMAL POWER LEVELS The rated core thermal power for each unit is 3952 MWt. The nominal turbine generator output at 3952 MWt is 1300 MWe for both Unit 1 and Unit 2.
1.1.8 SCHEDULED FUEL LOAD AND OPERATION DATA Unit 1 original fuel load was on July 27, 1982 with a commercial operation date of June 8, 1983.
Unit 2 original fuel load was March 28, 1984 with a commercial operation date of February 12, 1985.
FSAR Rev. 69 1.1-1
SSES-FSAR Text Rev. 61 1.1.9 FSAR ORGANIZATION The Susquehanna SES Final Safety Analysis Report (FSAR) has been organized using Regulatory Guide 1.70 Revision 2 (September, 1975).
Where information has been presented that has not been specifically requested by the standard format, the information is presented in the appropriate chapter as a section or subsection, and follows the information specifically requested by the standard format.
Tabulations of data are designated "tables" and are identified by the section number, followed by a dash and number of table according to its order in the text; e.g., Table 3.4-5 is the fifth table of Section 3.4. Drawings, pictures, sketches, curves, graphs, and engineering diagrams are identified as "figures" and are numbered in the same manner as tables.
FSAR Rev. 69 1.1-2