September 1, 2021
SUBJECT:
UPDATED INSPECTION PLAN FOR GRAND GULF NUCLEAR STATION (REPORT 05000416/2021005)
Dear Mr. Franssen:
The enclosed inspection plan lists the inspections scheduled through June 30, 2023, for Grand Gulf Nuclear Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant.
Inspection procedure (IP) 71111.21N.03 is included in the plan as a placeholder for your next Design Basis Assurance Inspection (Programs). The NRC is still determining the specific technical area to replace the previously performed power-operated valves programs inspection, IP 71111.21N.02. Once the inspection focus area has been determined, an inspection procedure will be issued publicly at least six months prior to the start of this inspection.
In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the Reactor Oversight Process (ROP). Each planned inspection is being carefully reviewed to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules as needed. This review is conducted in accordance with guidance contained in the February 1, 2021, memo, Calendar Year 2021 Inspection Guidance During COVID-19 Telework Restrictions (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help to ensure the health and safety of both NRC and licensee staff while fulfilling the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other modifications needed due to changing conditions during the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff to coordinate inspection planning and scheduling.
As a result of the NRCs current assessment of the safety performance of the Grand Gulf Nuclear Station as being in the Degraded Performance column (Column 3) of the NRCs ROP Action Matrix, we are conducting a supplemental inspection at your facility in accordance with Inspection Procedure 95002, Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area. The NRC will continue to coordinate with Entergy regarding this inspection, which is currently in progress.
On March 12, 2018, the NRC issued a Confirmatory Order (ADAMS Accession No.
ML18072A191) (EA-17-132 and EA-17-153) to the Entergy fleet that included the Grand Gulf Nuclear Station. I have approved the staffs plan to conduct a follow-up inspection of Entergys implementation of actions required by the Confirmatory Order actions in accordance with Inspection Procedure 92702, Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, And Alternative Dispute Resolution Confirmatory Orders. The NRC will continue to coordinate with Entergy regarding this inspection.
The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these inspections is being developed by the NRC staff. The staff expects to communicate the schedule for these inspections to each utility separately.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Mr. Jason Kozal at 817-200-1144 with any questions you have regarding this letter.
Sincerely, Scott A. Morris Regional Administrator
Docket No. 05000416 License No. NPF-29
Enclosure:
Inspection Plan
cc w/ encl: Distribution via LISTSERV
Scott A. Morris Digitally signed by Scott A.
Morris Date: 2021.09.01 08:22:56 -05'00'
ML21232A225 SUNSI Review ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
By:
Yes No Publicly Available Sensitive NRC-002 OFFICE DRP DRP:BC RIV:RA
NAME CYoung JKozal SMorris
DATE 08/19/21 09/01/21 09/01/21
07200050 - Grand Gulf (ISFSI)
07/01/2021 - 06/30/2023 Unit Start End Activity CAC Title Staff Count Grand Gulf ISFSI Loading Inspection (1 week in October)
1 9/6/2021 9/30/2021 IP 60855 001001 Operation Of An ISFSI Prepared on 8/25/2021 10:50:56 AM 1 of 3 IP 22b Site Inspection Activity Plan
Grand Gulf 07/01/2021 - 06/30/2023 Unit Start End Activity CAC Title Staff Count GG 2021 BRQ
1 8/8/2021 8/21/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance
8/15/2021 8/21/2021 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance
8/15/2021 8/21/2021 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance Grand Gulf 95002 Inspection
1 8/23/2021 9/3/2021 IP 95002 000939 Supplemental Inspection Response to Action Matrix Column 3 (Degraded Performance) Inputs FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - GG
1 11/1/2021 11/5/2021 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
12/13/2021 12/17/2021 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Heat Sink Performance 07T - Grand Gulf
1 12/6/2021 12/10/2021 IP 71111.07T 000700 Heat Sink Performance Inservice Inspection RF23 - GG
1 2/26/2022 3/8/2022 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
License Renewal Inspection 71003 (Phase 1) - GG
1 3/7/2022 3/11/2022 IP 71003 000687 Post-Approval Site Inspection for License Renewal RP 1,2,PI
1 3/7/2022 3/11/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
3/7/2022 3/11/2022 IP 71124.02 000726 Occupational ALARA Planning and Controls Security Access Control.02
1 4/4/2022 4/8/2022 IP 71130.02 000734 Access Control
4/4/2022 4/8/2022 IP 71130.09 001656 Security Plan Changes
4/4/2022 4/8/2022 IP 71151 001338 Performance Indicator Verification Grand Gulf 2022 Biennial PI&R
1 4/25/2022 4/29/2022 IP 71152B 000747 Problem Identification and Resolution
5/9/2022 5/13/2022 IP 71152B 000747 Problem Identification and Resolution EP 2022 Program & PI Inspection - GG
1 6/20/2022 6/24/2022 IP 71114.02 000717 Alert and Notification System Testing
6/20/2022 6/24/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
6/20/2022 6/24/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
6/20/2022 6/24/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness
6/20/2022 6/24/2022 IP 71151 001397 Performance Indicator Verification Prepared on 8/25/2021 10:50:56 AM 2 of 3 IP 22b Site Inspection Activity Plan
Security Training/Equip Maint.07 and.04
1 7/25/2022 7/29/2022 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
7/25/2022 7/29/2022 IP 71130.07 000739 Security Training Power-Operated Valves Inspection - 21N - Grand Gulf
1 8/15/2022 9/2/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements GG 2022 INITIAL EXAM
1 9/11/2022 9/17/2022 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
10/9/2022 10/15/2022 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
Security Protective Strategy.05
1 9/12/2022 9/16/2022 IP 71130.05 000737 Protective Strategy Evaluation RP 5,8
1 11/14/2022 11/18/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation
11/14/2022 11/18/2022 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Design Bases Assurance Inspection (Team) - 21M - Grand Gulf
1 1/1/2023 6/30/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
EP 2023 Exercise In-Office Scenario Rvw 71114.08 - GG
1 1/15/2023 2/18/2023 IP 71114.08 000723 Exercise Evaluation Scenario Review RP 6,7
1 2/13/2023 2/17/2023 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment
2/13/2023 2/17/2023 IP 71124.07 000731 Radiological Environmental Monitoring Program EP 2023 Biennial Exercise & PI Inspection - GG
1 3/20/2023 3/24/2023 IP 71114.01 000716 Exercise Evaluation
3/20/2023 3/24/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
3/20/2023 3/24/2023 IP 71151 001397 Performance Indicator Verification Security FFD.08
1, 2 3/27/2023 3/31/2023 IP 71130.08 000740 Fitness For Duty Program Cyber Security Inspection - GG
1 3/27/2023 3/31/2023 IP 71130.10P 000741 Cyber Security RP 1,3,PI
1 5/1/2023 5/5/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
5/1/2023 5/5/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation MC&A
1 5/1/2023 5/5/2023 IP 71130.11 000742 Material Control and Accounting (MC&A)
Prepared on 8/25/2021 10:50:56 AM 3 of 3 IP 22b Site Inspection Activity Plan