Text
1 A
B C
D E
F G
H J
ci
- z 1
2 3
4
(
REQUIRES COINCIDENT TRIP OF REACTOR VESSEL REACTOR VESSEL I
LOW LEVEL LOW LEVEL SWITCH 2-3-72A OR 2-3-72D AND 2-3-72C OR 2-3-728 TO START SYSTEM rr--
---77 I
2-3-72A 2-3-72D v-SEE REF DWGS 6, 7, 8 & 9 FOR ADDITIONAL I
I FUNCTIONS PERFORMED BY THIS SET REF. DWG 2 OF SWITCHES I
I REACTOR VESSEL REACTOR VESSEL LOW LEVEL LOW LEVEL I
I LIS LIS START
~
/
NOT PERMISSIVE \\ I NOT PERMISSIVE \\
WITH RCIC WITH RCIC ISOLATION ISOLATION r- **rnno, """
NOTE 1
\\
IS/
I
\\
IS/
9-4 5
6 8
9 10 MANUAL ISOLATIDN PUSHBUTTON RMS CR 9-4 VALVE 16 ONLY PERMISSIVE WHEN \\
INITIATION SIGNAL IS PRESENT
\\
AUX DEVICE LP I 1 1 NO4 NO3 NO2 NO.
12 REV DCN 96-0118 REV PER DCN 97-0815 REV & REDRAWN PER APA DCN C93-1784 RAC JAC KG 4-19-99 RRT JAC ACG 8-12-97 DR JAC BAM 12 01 93 DFT CKD APP DATE REVISIONS DCN REVISIONS BY N.P.P.D.
FOR PREVIOUS REVISIONS, SEE SUP ERSEDED CARDS.
NOTE 4 ~-- -- -- -- -- ir ONE SET OF STEAM LEAK
- 7 DETECTORS SEE NOTE 6 I VALVE13=i'soN~ I VALVE13-150NLY 7 1
CONTROL SWITCH I
I
/s\\ /c\\
IN "OPEN" EXCESS TEMP EXCESS TEMP REACTOR REACTOR POSITION STEAM LINE STEAM LINE r
'""'= romcro= we "'
PRESSURE PRESSURE SPACE SPACE SWITCH 79A OR 8DA LOW LOW AND 81A OR 82A I
I
~
~
I TO ACTUATE ISOLATION RMS CR TS-LP TS-LP VALVE CLOSURE PSL-LP PSL-13-79A 13-8DA 13-87A 13-87B 3 POSITION SWITCH 9-4 I
I I
I "OPEN"-"AUTO" - "CLOSE"
£=4~
SPRING RETURN TO "AUTO" FROM "OPEN" I
I '-VALVE16 00'
-- ~
I I
AND "CLOSE" (TYP UNLESS OTHERWISE TYPICAL FOR LOGIC B VALVE 15 ONLY SPECIFIED)
ISOLATION I
EXESS TEMP EXCESS TEMP I I STEAM LINE STEAM LINE I
I REACTOR I
REACTOR SIGNAL LOGIC A STEAM LINE STEAM LINE HIGH DP HIGH DP PRESSURE PRESSURE RESET SPACE SPACE LOW LOW I
I I I
I I
TS-TS-
- DPS-
=.J L..:: -
1 __
AUTO ISOLATION _J I
UTO SI LINE BREAK DETECTION UNTIL REQUIRES TRIP OF SWITCH CONTROL SWITCH SIGNAL NOTE 1 83 OR 84 TO ACTUATE IN "CLOSE" PMIS INPUT POINT ISOLATION CLOSURE N787 "CHANNEL A" SIGNAL FOLLOWING A POSITION N788 "CHANNEL B" 1.5 TO 15 SEC TIME DELAY 0\\
RMS CR CONTROL SWITCH IN "OPEN"
/
VALVE LIMIT
\\
~
CONTROL SWITCH POSITION 9-4 SWITCH IN "CLOSE" POSITION PERMISSIVE WHILE OPENING RMS CR
\\
LIMIT SWITCH ON
/
VALVE RMS CR 9-4 9-4
/
NOT PERMISSIVE
/
VALVE TORQUE
~
/:ALVE LIMIT
\\
/:ALVE TORQUE
\\
WITH AUTO SWITCH PERMISSIVE ISOLATION SIGNAL WHILE CLOSING SWITCH PERMISSIVE SWITCH PERMISSIVE WHILE OPENING WHILE CLOSING
\\
AUX LP I
\\
TORQUE ON
/
\\
LIMIT ON
/
\\
TORQUE ON
/
DEVICE SWITCH VALVE SWITCH VALVE SWITCH VALVE SEAL IS NOT REQUIRED SEAL IN NOT REQUIRED ON MO 13-15 SEAL ON MO 13-30 SEAL SEAL SEAL IN IN IN PMIS
~
IN r--
~
TABLE m TABLE m OPEN CLOSE OPEN I
CLOSE DC REVERSING CONTACTOR 72
- VALVE MO 13-16 STEAM SUPPLY LINE VALVE MO 13-30 TEST BYPASS TO ISOLATION VALVE (DC OPERATED)
CONDENSATE STORAGE TANK CKT FOR MO 13-15 IS INDENTICAL (THROTTLING TYPE VALVE) NOTES 2 & 5 EXCEPT AC REVERSING CONTACTOR ( 42)*
TYPICAL FOR FOR VALVE MO 13-33 REDUNDANT NOTES 2 & 5 SHUT-OFF TO CONDENSATE STORAGE TANK RCIC CONTROL SWITCH FLOW IN "OPEN" LOW POSITION FSL LP RMS CR 13-57 9-4 CONTROL SWITCH CONTROL SWITCH RCIC CONTROL SWITCH IN "OPEN" IN "CLOSE" FLOW IN "CLOSE" POSITION POSITION PERMISSIVE WHEN \\
/
PERMISSIVE WHEN \\
HIGH POSITION INITIATION SIGNAL
~~liciE:u~:E~~tRE IS PRESENT IS AVAILABLE FSH RMS CR RMS CR 13-57 LP RMS CR 9-4 9-4
\\
AUX DEVICE LP I
\\
PSH-13-88 LP I 9-4 n
TURBINE
-~ ::J
/
NOT PERMISSIVE TRIP SIGNAL WITH AUTO CLOSE SIGNAL PRESENT
\\
AUX DEVICE LP I
/
VALVE LIMIT
- ~
/
VALVE TORQUE
~
SWITCH PERMISSNE SWITCH PERMISSIVE WHILE OPENING WHILE CLOSING
\\
LIMIT SWITCH ON
/
VALVE
\\
/
VALVE SEAL SEAL IN 1
- MINIMUM FLOW BYPASS TO SUPPRESSION CHAMBER VALVE MO 13-27 NOTES 2 & 5 2
3 4
SEAL IN 5
/
VALVE LIMIT E\\
/
VALVE TORQUE E\\
SWITCH PERMISSIVE SWITCH PERMISSIVE WHILE OPENING WHILE CLOSING
\\
LIMIT SWITCH ON
/
VALVE
\\
~
1 I
PMIS TABLE m OPEN I
CLOSE DC REVERSING CONTACTOR 72
- PUMP DISCHARGE VALVE MO 13-21 (TYPICAL FOR PUMP DISCH VALVE MO 13-20 AND COOLING WATER SHUTOFF VALVE MO 13-132)
NOTE2&5 6
ON
/
VALVE VALVE FULLY OPEN LIMIT ON VALVE SWITCH MO 41 SEAL IN r
'""'= ro.. cr,= m,e"'
SWITCH 87A AND 87C OR 878 AND 87D TO ACTUATE ISOLATION LP CLOSURE OF VALVE 13-16 (13-15)
VALVE v-NOTE 4 I
I LP I
-- ::J EMERGENCY CONDENSATE STORAGE TANK 1A LOW WATER LEVEL LSL LOCAL 23-74A TYP 23-75A SEAL IN 8
FULLY OPEN LIMIT ON VALVE EMERGENCY SWITCH MO 41 CONDENSATE STORAGE TANK
/
NOT PERMISSIVE 18 LOW WATER LEVEL WHEN VALVE CLOSURE SIGNAL LSL LOCAL IS PRESENT 23-748 I
\\
AUX LP TYP 3 POSITION SWITCH "OPEN"-"NORMAL"-"CLOSE" DEVICE 23-758 r ""~ ~'" ro --*~ "rn*
AND "CLOSE" CONTROL SWITCH CONTROL SWITCH CONTROL SWITCH CONTROL SWITCH IN "OPEN" IN "CLOSE" IN "OPEN" IN "CLOSE" POSITION POSITION POSITION POSITION RMS CR RMS CR RMS CR RMS CR 9-4 9-4 9-4 9-4
/
VALVE LIMIT
'E\\
/
VALVE TORQUE E\\
/
VALVE LIMIT SW \\
/
SWITCH PERMISSIVE SWITCH PERMISSNE WHILE OPENING WHILE CLOSING PERMISSIVE PERMISSNE WHILE OPENING WHILE CLOSING
\\
LIMIT ON
/
\\
TORQUE ON
/
\\
LIMIT ON
/
\\
TORQUE ON
/
SWITCH VALVE SWITCH VALVE SWITCH VALVE SWITCH VALVE SEAL SEAL SEAL IN IN IN OPEN I
CLOSE OPEN I
CLOSE DC REVERSING CONTACTOR 72
- PUMP SUCTION FROM SUPPRESSION PUMP SUCTION FROM CONDENSATE CHAMBER VALVE MO 13-41 STORAGE TANK VALVE MO 13-18 NOTES 2 & 5 NOTES 2 & 5
.!llQIES:
- 1. THE RCIC SYS IS ARRANGED FOR TEST OF PUMP AT FULL FLOW AND ALL VALVES FOR OPEN AND CLOSE CAPABILITY AT ANY TIME REFERENCE DRAWINGS*
DWG MPL NO 8E961BC BE846BC 9A4738 OE149BB OE140BB 9E402BB 9E589BB 8E833BA 1E264 EXCEPT WHEN INITIATION SIGNAL OR AUTO ISOLATION SIGNAL P&ID RCIC 71 IS ACTIVATED. IN EVENT THE INITIATION SIGNAL OCCURS WHILE TEST IS UNDER WAY THE SYS AUTOMATICALLY RETURNS
- 2.
NUCLEAR BOILER VESSEL INSTRUMENT P&ID 71 TO START-UP MODE.
- 3.
LOGIC SYMBOLS 20
- 2. ALL POWER FOR OPERATION OF DC VALVE MOTORS SHALL ORIGINATE
- 4.
FUNCTIONAL CONT DIAG NUCLEAR BOILER MISC SYSTEM 73 FROM A PLANT DC BUS. POWER FOR AC OPERATED VALVES SHALL
- 5.
FUNCTIONAL CONT DIAG RHR SYSTEM 73 ORIGINATE FROM ANY EMERGENCY AC BUS.
- 6.
FUNCTIONAL CONT DIAG CORE SPRAY SYSTEM 72
- 3. ALL PART NUMBERS ARE PREFIXED BY 13 EXCEPT WHERE
- 7.
FUNCTIONAL CONT DIAG HPCI SYSTEM 72 OTHERWISE SHOWN.
- 8.
P&ID REACTOR WATER CLEANUP SYSTEM 71
- 4.
ISOLATION SIGNAL SWITCHES SHALL BE OF THE TYPE THAT CLOSE
- 9.
ELE. DIAGRAM RCIC SYSTEM 79 CONTACTS FOR THE SPECIFIED ISOLATION EVENT WHERE AUX RELAYS ARE USED IN THE ISOLATION CHANNELS. THEY SHALL BE POWERED FROM THE STATION BATTERIES.
NOTE:
RHR STEAM CONDENSING IS NO
- 5. AUXILIARY RELAYS AND DEVICES NOT SHOWN ON FUNCTIONAL LONGER AN OPERATIONAL MODE.
CONTROL DIAGRAMS EXCEPT WHERE REQUIRED TO CLARIFY FUNCTION.
- 6.
SET A OF EXCESS TEMP STEAM LEAK DETECTORS ARE SHOWN.
SETS B, C, & D SHALL BE CONNECTED IN THE SAME WAY WITH EACH SET A OR C (B OR D) GIVING AN INDEPENDENT ISOLATION CLOSURE SIGNAL TO VALVE NO. M0-15 & M0-16.
- 7. OPERATION OF HIGH STEAM FLOW SWITCHES DPIS-83 & 84
.LEGEN.P; ARE DELAYED BY TDR-K12 & K32 FOR 1.5 TO 15 SEC.
. -SWITCHGEAR DEVICE FUNCTION NO USAS SPEC C37.2
+
-FURNISHED WITH TURBINE. SEE REF DWG 4.
A -
SIGNAL B -
SHEET NO.
C -
COORDINATES INFORMATION ONLY
2 3
4 5
6 CHECKED COOPER NUCLEAR STATION JAC I DATE 10-25-93 I DATE 10-29-93 I
DO N OT REVISE MANUALLY GE NERAL ELE r---
r---
0 APPROVED DATE c T R r c t FUNCTIONAL CONTROL DIAGRAM BAM 12/01/93
~ 8 t------r---~~----------r----t Ii:
REACTOR coRE ISOLATION cooLING sYsTEM FILMED 729Es11sc sH. 1 ;ro4 ~
9 10 1 1 12 A
B C
D E
F G
H J