Category:Drawing
MONTHYEARML23107A0412023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 11, Figures ML23107A0122023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 2, Figures ML23107A0582023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 6, Figures ML23107A0362023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 3, Figures ML23107A0622023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 4, Figures ML23107A0232023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 5, Figures ML23107A0572023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 10, Figures ML23107A0402023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 1, Figures ML23107A0222023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 9, Figures ML21125A3112021-04-14014 April 2021 5 to Updated Final Safety Analysis Report, Chapter 3, Figures ML21125A3292021-04-14014 April 2021 5 to Updated Final Safety Analysis Report, Chapter 6, Figures (Redacted) ML21125A2902021-04-14014 April 2021 5 to Updated Final Safety Analysis Report, Chapter 2, Figures ML21125A3152021-04-14014 April 2021 5 to Updated Final Safety Analysis Report, Chapter 11, Figures (Redacted) ML21125A3142021-04-14014 April 2021 5 to Updated Final Safety Analysis Report, Chapter 1, Figures (Redacted) ML21125A3342021-04-14014 April 2021 5 to Updated Final Safety Analysis Report, Chapter 14, Figures (Redacted) ML21125A2952021-04-14014 April 2021 5 to Updated Final Safety Analysis Report, Chapter 7, Figures (Redacted) ML21125A3032021-04-14014 April 2021 5 to Updated Final Safety Analysis Report, Chapter 4, Figures ML21125A3062021-04-14014 April 2021 5 to Updated Final Safety Analysis Report, Chapter 8, Figures ML21125A2992021-04-14014 April 2021 5 to Updated Final Safety Analysis Report, Chapter 5, Figures ML19154A2902019-05-23023 May 2019 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Figures ML19154A2772019-05-23023 May 2019 4 to Updated Final Safety Analysis Report, Chapter 4, Primary Coolant System, Figures ML16120A3442016-04-18018 April 2016 Final Safety Analysis Report Update, Revision 32, Chapter 2 - Site and Environment - Figures ML16123A3262016-04-18018 April 2016 Final Safety Analysis Report Update, Revision 32, Chapter 15 - Quality Assurance Program - Figures ML16120A5882016-04-18018 April 2016 Final Safety Analysis Report Update, Revision 32, Chapter 8 - Electrical Systems - Figures ML16120A6022016-04-18018 April 2016 Final Safety Analysis Report Update, Revision 32, Chapter 10 - Steam and Power Conversion System - Figures ML16120A3792016-04-18018 April 2016 Final Safety Analysis Report Update, Revision 32, Chapter 4 - Primary Coolant System - Figures ML16120A4152016-04-18018 April 2016 Final Safety Analysis Report Update, Revision 32, Chapter 5 - Design of Structures, Systems and Components - Figures ML16120A5962016-04-18018 April 2016 Final Safety Analysis Report Update, Revision 32, Chapter 9 - Auxiliary Systems - Figures ML16120A3592016-04-18018 April 2016 Final Safety Analysis Report Update, Revision 32, Chapter 3 - Reactor - Figures ML15190A2632015-05-14014 May 2015 Report 1400669.401, Rev. 0, Evaluation of the Palisades Nuclear Plant Branch Line Nozzles for Primary Water Stress Corrosion Cracking ML12272A1682012-08-22022 August 2012 E-mail from A. Shaikh to D. Alley, Et Al., Subject: (Untitled) ML0726801882007-06-26026 June 2007 Drawing C-52, Rev. 23, Heating & Ventilation Auxiliary & Containment Plan at Elevation 639'-0 & 649' -0'. ML0725408072007-01-12012 January 2007 Drawing M-15, Rev. 12, Equipment Location Turbine Building Sections. ML0725408022006-11-15015 November 2006 Drawing C-51, Rev. 30, Architectural Auxillary & Reacator Building Floor Plans at 639' - 0 and 649'-0. ML0726801792006-01-12012 January 2006 Drawing C-52, Rev. 15, Architectural Roof Plan. ML0725407902006-01-11011 January 2006 Drawing C-2, Rev. 16, Plant Area and Switchyard Plan. Sheet 1 ML0633901872004-08-0303 August 2004 Drawing No. M-206, Rev. 6, System Diagram Safety Injection, Containment Spray & Shutdown Cooling System. Sheet a ML0633901832004-08-0202 August 2004 Drawing No. M-204, Rev. 7, System Diagram Safety Injection, Conatinment Spray & Shutdown Cooling System. Sheet a ML0633901912004-08-0202 August 2004 Drawing No. M-209, Rev. 7, System Diagram Component Cooling System. Sheet a ML0628304702000-08-14014 August 2000 Drawing C-51, Rev 29, Architectural Auxiliary Reactor Building Floor Plans. ML0628304772000-08-14014 August 2000 Drawing C-51, Rev 29, Architectural Auxiliary Reactor Building Floor Plans. ML18347B2951999-05-13013 May 1999 Submit Revised Dilution Water Increase - Proposed Modification, to Modify Requested Flow Changes & to Respond to Mdnr & Michigan Dept of Environmental Quality Concerns for NPDES Permit No. MI0001457 ML0725408031999-04-0808 April 1999 Drawing C-127, Rev. 2, Containment Vessel Typical Details. ML0725408061998-10-12012 October 1998 Drawing C-141, Rev. 5, Containment Ventilation Stack. ML0725407951998-10-0505 October 1998 Drawing C-38, Rev. 6, Field Erected Tanks. Sheet 2 ML0725407971998-02-25025 February 1998 Drawing C-50, Rev. 20, Architectural Auxiliary & Reactor Buildings Floor Plan at El 625'-0. ML0725500561998-01-14014 January 1998 Drawing M-119, Rev. 8, Heating and Ventilation Mechanical Equipment Room Plan and Sections El. 629' -2. Sheet 4 ML0725408091997-11-0404 November 1997 Drawing M-29, Rev. 13, Piping Drawing Area 2 Plan of El. 625' - 0. ML0725408111997-02-27027 February 1997 Drawing M-40, Rev. 29, Piping Drawing Area 3 Plan of El. 625' - 0 & Sections. ML0725408161997-01-17017 January 1997 Drawing M-65, Rev. 13, Piping Drawing Main Steam System. 2023-03-31
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23107A0262023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 3, Reactor ML23107A0552023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 2, Tables ML23107A0202023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 12, Figures ML23107A0502023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 2, Site and Environment ML23107A0542023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 1, References ML23107A0462023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 7, Appendices ML23107A0402023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 1, Figures ML23107A0592023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 1, Tables ML23107A0472023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operations ML23107A0572023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 10, Figures ML23107A0352023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 8, References ML23107A0342023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 9, References ML23107A0382023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems ML23107A0302023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 11, Tables ML23107A0132023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 5, Design of Structures, Systems, and Components ML23107A0452023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 11, References ML23107A0312023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations ML23107A0422023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 9, Tables ML23107A0562023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 4, Primary Coolant System ML23107A0192023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 10, Tables ML23107A0232023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 5, Figures ML23107A0152023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safeguards Systems ML23107A0122023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 2, Figures ML23107A0292023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 8, Figures ML23107A0162023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 5, Tables ML23107A0272023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23107A0252023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management and Radiation Protection ML23107A0612023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 1, Introduction & General Description of Plant ML23107A0282023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, List of Effective Pages ML23107A0242023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 15, Figures ML23107A0392023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 15, Quality Assurance Program ML23107A0482023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 6, References ML23107A0172023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 8, Tables ML23107A0492023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 7, References ML23107A0322023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 4, Tables ML23107A0332023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Table of Contents ML23107A0582023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 6, Figures ML23107A0182023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 7, Figures PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23107A0142023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 14, Figures ML23107A0412023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 11, Figures ML23107A0522023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 3, Tables ML23107A0532023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis ML23107A0432023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 2, References ML23107A0602023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23107A0362023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 3, Figures ML23107A0372023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 14, Tables ML23107A0512023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 6, Tables ML23107A0212023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML23107A0222023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 9, Figures 2023-03-31
[Table view] |
Text
FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS FIGURE 6-1, SHT 1 Revision 25 PIPING & INSTRUMENT DIAGRAM SAFETY INJECTION CONTAINMENT SPRAY AND SHUTDOWN COOLING SYSTEM 8
7 6
5 4
3 2
H H
G G
F F
E E
D D
C C
B REACTOR COOLANT
~
I
~--------v!'----------------~~-~D>-----------------------------i-~~-~
cccece c::::JiD I
acm
~---------v-?---------------------------~--~~~___,D>-------------------0-~~~
~
I
~-
~-~
~
B A
8 6
5 4
3 2
FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS FIGURE 6-1, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM SAFETY INJECTION CONTAINMENT SPRAY AND SHUTDOWN COOLING SYSTEM 8
7 6
5 H
- *~;;' '. --CD-"-, - CD !M 0 ------------------------
_ __ TOPPC PT.HJ.
C33 Z>+1306!1.ll G
z--Es~Es(:~ cc-cc-:_;..:_::
F E
D C
A 8
7 6
5 4
_ see~
£_C-6*_* *-
0 0
1~~~1~~::~: 2 5
,c-e,
-- TG PPC Pl.10.
Zl-1'1:i.lBB.O c-i3 r----""93
, +----~,
~
\\~J~,-.j:~n;-10.
~
~
',,\\~~,---:;~~
-..-(~~
~i B 037~-IJ
~ "';/~
C-13
/ :~~l:s!.~G LOIi PRESSURE INJECTION H - 204 i;t< l 1o~r~/'m.
I
~~i:.~-0 ---1 p~~r*~"s'i,E~.~T~~I< - --i
<Cf'CN & cur..E:,
i w~~~t~fgf ___..J 4
3 2
- z.
A l'AOCEDUJ>E: CONTFIO\\.LEOTEl'lf'ORtlRYHOlllFICATJONEXISTS TO CONNECT I> HOSE QA POIHASLC PUt<!' ANO,105ES BEHICCN W
,F[~~Y7!A{~JiCf~~E}r~i~~¥:;ls!'.f1J~r~E 3,
T THROTTLEO,
~~Ll.l~.r----~
! t----w"
'~"~
CONTAI NMENT SPRAY 3
2 MEA~'xf.t'.i~ci'i?i.1~eA H-2il4$HI PIPIN(; 8,.
INSTRUMENT DI AGRAl"t S AFE TY INJECTION. CONT41NMENT SPRAY ANO SHJTDO\\o'N COOL I NG SYSTEM M-203 H
E D
C 2
28
FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS FIGURE 6-2, SHT 1 Revision 33 PIPING & INSTRUMENT DIAGRAM SAFETY INJECTION CONTAINMENT SPRAY AND SHUTDOWN COOLING SYSTEM 8
7 6
H G
,o-u B TRAI N
.. -2":ISH-2 cc:m:~\\~!r~*v F
E (8**Nl38H30R*32H
)
NOTE 10
,v, I.. :c. GC-HI' 0o-----1a-===- ic-"=','~~:'.::'
D G£*J-f.
C A
7 6
5 Slll.l.LOll.lil
-"""l.l!,ll; HEAT EXCHANGERS 5
4 tie....SaE£ll.
JN JFCTIQN PIJMP 1'=Slil!.
4 3
I Z-*Nl~3-J222 G* l,P-54B 4"- N2'lM20R- :JZl8 llil" HC-3* 14" 3
2 SPRAYRECIRCTOSIRW P668SUOCOOLINC H-204 SH.)8
,~~;.*,~*'" '
8"*N26M:JOR-320'3 ii~7
- ~, i ~
~
7 0
c:c H
- fi
~
z~
g
(lEsa400)c~o:;
i oc-s-e-LC
~ cl~~;:~21
' L __ [tl 2
10, THlS!SACONNECTlO,.POINT FOR THEFLEXSTRATEGY.
SEEEC 6 6 '3 lF LEX EC"2>FOR OETAJLS
- 11. "c"~~~e, i'J~~ J'ED~c~i~ t'8J"i~~.. ltf.MDS HOSC 87 il~j/1 INCORPCAi>TEO EC652"l6 TO <OJ PCV -3025.
PIPING & INSTRUMENT OIAGRAM SAFETY INJECTION CONTAINMENT SPRAY ANO SHUTDOWN COOLING SYSTEM M-204 I
88 H
G F
E D
C B
FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS FIGURE 6-2, SHT 1A Revision 32 PIPING & INSTRUMENT DIAGRAM SAFETY INJECTION CONTAINMENT SPRAY AND SHUTDOWN COOLING SYSTEM H
G F
I I
ii e:
~
111; **
'"~-
~g ~ :!
i 00_~
- ~
I i@&~
i B
su w v\\~'\\ NL~~~ k1cREEN5 F - !C66 SEENOTE11 P<>SS! VESTR"' INERS F- !ll~J it;: ~~:
Cl0' - N2&M31DA-J20 2 l
- -::,,._,-<6?,~~-~::f-a,mJ,-..L-~~
~:,,:__~__1m:~-tt-::+::r=1.::=;:t,~r:~~-
,:,::-r.:
TO{i~i~~IO.----
r~
'7""" '
I' =cs,
--'~_: ___ r
__ ----~
.,.,.. --1 'l:,:.~ I l-----jnw,,~ I SEE NOTE l l i
590'EL E FL OOR DRAIN SCREENS F-105'1
)
E 0°i,/flNv ~~~~ D M-2IISH.1 C
i 'Ls
,-----~7-----,----------,,------6 -----,------------g-5 ----,----~4 -------,------
3,-------------,--------,------
2
~
M-204
FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS FIGURE 6-2, SHT 1B Revision 31 PIPING & INSTRUMENT DIAGRAM SAFETY INJECTION CONTAINMENT SPRAY H
G F
E D
C A
8 7
5 ffi t,
[!J
""E*~~"']'~,,1,:>-.J-+i-+;~~=::::tli!i'.-+---,=--<'la=:::=:~,rll-~-~------
=
I L.---- ----------------,
11,,
-.,1i'"t;'"t"';;i""m"'r:e<~-,t,--
\\:,i
-+-@
i
,rn l
{======1{
~ I~
~,,.,-,
ii~
5'~,0:,"~~'a,~ci,'>.--="--1 ~
-X L
<t_E:8° w~--
Nffi=t5 TOPPCPT.10.
ZliC;lll31.
7 5
RAO\\IASTE EMINERAL)lEIIS 4
3 2
I.
REFEl!T00WGM*Wqf RSAFEOUMDSP'\\JMPSCQI._ING.
- 2.
REHR 10 D\\IG M-21! f R SAf"EGUAR05 R00>IS S\\JMPS.
- 3.
REFER TD D\\IG N~5!1*6~6-m:E mm 2%6-0-32041 FOR L.P.
SAFEH INJECTICINPU>IPSVENT ANllORAINPIPING, REFER TU WG N.555-6~5-l(Cf 01/G l%6*0*5~621 FOR H.P.
SAFETY IWECTI N PUMPS vrnr A~ RMN PIPING.
S, REFERT P&IOM*225FORCON"fRL"'1RSVSTEKDET/IJL5.
- 6.
FOR EQLJIPMENT RET!RHI !N PLACE SEE O\\IG.M20~ SH.IC, aj~J~t~/~ni:s ARE "ES' AND TAI.UEO AS SUIL T UNLESS r~~~~3}2 gw~ fNg~Gs~::i~l~ ~rn:o~EtH~~EIJ<<l OF
'l.
~fEoCJg}-M 0l~RAJJ~'lL~Erg:wirr EfJc°j:"{~H'l,M~fN APPROVED 111.
NEW TANKFLOORl"9TALLED.F'£REC44509COVERSSIRWT~K ORA!N LINE AT ORAIN/IOZZLE "WON eOTTOM l)F TANK.
SIBlLI/lliK_
>IE\\/ TANK FLOOR INSTALLED PER EC4450<1 COVERS SIR\\/ TANK ONE INCHNOZlLE"J'ONBOTTOMOFT/\\NK.
Hf~XCH c~i-~TE
~
: M~m~
r-"""'-------.------j'!'f-r~;;;;;,;;;;;-----c1----,
~~
4 FUELF>OO..
l'.'lKlc!NG PUMPS SLJCTlUtl M-nlSH.2 eves B
FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS FIGURE 6-3 Revision 26 CONTAINMENT AIR COOLERS RELIEF PANEL & CONDENSATE DRAIN
2 X 6 NOMINAL 4 NOMINAL M.H.A. FLOW DRAIN FLAPPER BLADE NORMALLY HELD CLOSED DUE TO FAN SUCTION AND OPENS AS THE WATER LEVEL RISES.
1/1* ALUMINUM ~IOU.
RIVETS ON II IA.
VARIOUS CTRS RELIEF (TYPICAL-SEE PLANT DRAWING M-123 PANEL FOR ACTUAL" AS-IUILT" FOR PANEL.)
DETAIL *1*
All FLOW t:°*.z:"*....;.-*------
.... --'--:::===is~
OIIN8E \\
1* X 7*
FLAPPEI BLADE USIET 3/11* 1.
CONTAINMENT COOLER WATEI LEVEL SWITCH RATIN61/J CLOSES All AURN
*--- *~:::![ ::E TYPICAL CONTAINMENT COOLER COOLER_./
Sll4P
"'-o* x 1*-0* ----'"-
REL I EF PANEL
, '\\
&RAT I NG ~
AT I PSIG THE!,, '-=------~-
NORMAL 2*
RIVETS IN THE *"\\'~*
HINGE DRAIN SIZED IELI EF PANEL
\\2 SEE COOLER FOR 20 6PM WILL RUPTURE &
DETAIL *1" SUMP THE PANEL WILL SWING OPEN SIDE VIEW (TYPICAL - SEE PLANT DRAWING M-123 AND M-124 FOR ACTUAL "AS-BUILT" FOR EACH PANEL.)
END VIEW OPENS WHEN THE WATER LEVEL RISES TO e*
(SEE DETAIL *2*)
FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS FIGURE 6-4 Revision 21 CONTAINMENT VENT FILTER 1000 CFM RADIOLOGICAL FILTER VF70 1-z uJ
- z z
1-z 0
(.)
FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS FIGURE 6-5, SHT 1 Revision 34 CONTAINMENT PENETRATIONS H
F E
D C
A 8
8 CA * !)
~"
EXH.,USI MAJN STEAM
!S.C. E-!10A!
-EAST-LINE IS.C.E-SlilB*
GENERA TOR
<E-!50A>
STEAM
<E - '!108) 8L0W00WN STEAM 7
6
,.,..,... ]"'"
FL""'-'JE J BD* Bl* B' Tl.RBINE
~l NO
~"F~J; *f-r--r-(a!)-<~S* ~"'*"
<E-5081 M0- 8 r-"J--p<>,j s*
m~
7 CENEA<>TOR
<E * !50 A)
STE"'1 GENERA TOR
<E -!108>
GENERATOR
<E-51ilAl 6
PENE TRAT IO
& P&ID NOS.
10 11 12 13 14 15 16 17 FEEOWATEFI STEAM GENEFIATO!l
<E-~Bl Slla"A"I
<E- !50A>
WA TER SUF'PLY COl"PONEJ,11 WATE R COCt. lNO WATER GE'IERAIOR REC IRCULATING PAESSUflE ATIO" 5
ASSOCIATED EDUIPMENT 4
,~
MAINcti!f:~MPS EB-'1-18" 8 3lil '
l8'- FW701
~~ LC -(,i.*-~*<1*7 )
=
, *-cam ASSOC IATED EQUI PMENT STE"""'
<E - '5081 AI R COMPRESSORS
<C-2,,,,8,&Cl AIR RECEIVERS n -BA,B&D r
~
12' SERVICE "'IA
,..-----------Oc LC 2 '
cotnJf,n,tENT LC~
'T~
SERVICE WATER~
<P~lici
@He-2:i 1s*
'
~,m?**
,~'*'"~"'
~
i *::;1,*
5 4
3 PENETRATIO
& P&ID NOS 18A 18 19 20 21 22 23 24 25 26 27 28 29 NOTE:
FUEL TRANSFER TUBE COt,ITAINl"CNT HYOROOEN MONIIORINO SuPPLY
<llEOUNO"Nl)
INJECTION CL EAl'< lo'"SlE RECEIVE R TANl(VE NT TO STACK ASSOCI ATED EQUIPME NT TRAIN)
PRESSURE INJ ECTION
<P-66A&.B, 312*
-IN EXHAUST F ANSCV*6A&.81 OUTSIDE CONT.
I. NOT A CONT AINMENT ISOL AT ION VAL VE 3
2
~
I ASSOCIATED EQUIPMENT RECEIVER TAN~S lT* G* A.B.c& m 4 7"~;13 REV I SED TO JNCOFlf'ORATE EC63832 2
H G
F E
D C
8
FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS FIGURE 6-5, SHT 2 Revision 32 CONTAINMENT PENETRATIONS
' I
FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS FIGURE 6-5, SHT 2A Revision 32 CONTAINMENT PENETRATIONS I
- 3.
5 PENETR'N &
P&ID NOS.
52A (A -2 )
52 (A - I >
528 (A - 2 )
56 (A-2 )
M211 IXI NORTH ELEC.
M-222 IX I SOUTH ELEC.
M-222 ASSOC I ATED EQUIP MENT OUTSIDE CONT.
CONFIGURATION C:Pf§I>1'lF)-....:
LC
~
INSIDE CONT.
ELECTRICAL PENETRA TIONS CANISTERS I I ASSOCIATED EDUIP HEN T
FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS FIGURE 6-5, SHT 3 Revision 32 CONTAINMENT PENETRATIONS H
G F
E D
C A
65 66 67 68 8
CLE A.'-' WASTE RE(.EIVER TAN K PUM P RECIRC 8
ASS=IATED ECLCIPMi:NT 7
'"""'~;;,., o <
~ -°'~"'
~HTfUSf'Hlc>i:
Alf< SPACE PURGE FAN IV - 46) 7 6
6
"-CTRAF l :>N NO. & P &i O 69 70 71 72 73 CLE AN WASTE REC E IVE R TANI<
PUMP SUCTION Rlc /\\Cr::> R RCFUl:L ING C AVIT Y DRAIN 5
4 CONTAI NMENT PENETRAT IONS RECEIVE R TANK F'\\AVP (P- ~9A&B)
NO NO 1_,-
R~;:~Ts"."c ~6JIN's CV-1044 CV-1(M " 69 4*
LC
,*-cm,518 5
4 AS'>OC fATEcl L OUIPM ENT
- NOTES, PENET-~,*;1*K:<'1 NO A. P A or, NLt <lli H. F.C 3
2 ASsoc,,,TLl)
O UTS:DE lcQ\\) IP,,,ENT CON T I
i
~-I
- l.
NOT A CONl.. TNMC. N T !50U.TJCN V~ LV E.
I -
A55C>CIATF r>
EQUIPME NT H
G F
E D
C B
FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS REACTOR CAVITY FLOODING SYSTEM Portions of this page have been redacted per 10 CFR 2.390( d)( 1 ).
FIGURE 6-6 Revision 27
FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS FIGURE 6-7 Revision 21 CAPACITY CURVE 1713A NOZZLE R-5334 I I I
- JO n
20 15 10 *
4 3
2.5 2
1.5 1,5 2
2,S 3
I I
I I
I I
I I
V I
I I
I 4
5 6
1 a 9 10 15 CAPACITY (GPM)
I I
I NOTE:
...... UII FLOW IS 5.5 CGPII)
FLOW DATA Pressure flow Dro8 (PS (GPM) 10 7.6 20 10.7 30 13.3 40 15.2 50 17.0 20 25 3
4 5
6 7
8
!I 10