ML21109A112

From kanterella
Jump to navigation Jump to search
8 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Table of Contents
ML21109A112
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/08/2021
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21110A638 List: ... further results
References
Download: ML21109A112 (6)


Text

PBAPS UFSAR SECTION 13.0 - CONDUCT OF OPERATIONS TABLE OF CONTENTS SECTION TITLE 13.1

SUMMARY

DESCRIPTION 13.2 ORGANIZATIONAL STRUCTURE 13.2.1 Offsite Organization 13.2.2 Operating Organization 13.2.2.1 Deleted 13.2.2.1.1 Deleted 13.2.2.1.2 Deleted 13.2.2.1.3 Deleted 13.2.2.1.4 Deleted 13.2.2.1.5 Deleted 13.2.2.2 Deleted 13.2.2.3 Deleted 13.2.2.4 Deleted 13.2.2.5 Deleted 13.2.2.6 Deleted 13.2.3 Qualification of Nuclear Plant Personnel 13.2.3.1 Qualification Requirements 13.2.4 Deleted 13.3 TRAINING 13.3.1 Plant Personnel Training Program 13.3.1.1 INPO Accredited Training Programs 13.3.1.2 Other Training Programs 13.3.2 Records 13.3.3 Training Organization 13.4 PRE-OPERATIONAL TEST PROGRAM 13.4.1 Objectives 13.4.2 Pre-Operational Test Schedule Considerations 13.4.3 Summary of Pre-Operational Test Content 13.4.3.1 Construction Tests 13.4.3.2 Acceptance Test Program 13.4.3.2.1 Raw Water Treatment System 13.4.3.2.2 Screen Wash and Chlorination System 13.4.3.2.3 Makeup Demineralizer System 13.4.3.2.4 Auxiliary Boilers 13.4.3.2.5 Feedwater Heating System 13.4.3.2.6 250-V dc Power Supply System to Turbine-Generator Emergency Bearing Oil Pump 13.4.3.2.7 Circulating Water System CHAPTER 13 13-i REV. 25, APRIL 2015

PBAPS UFSAR TABLE OF CONTENTS (Contd)

SECTION TITLE 13.4.3.2.8 Turbine and Auxiliaries 13.4.3.2.9 Generator and Auxiliaries 13.4.3.2.10 Air Conditioning System - Control Room Complex 13.4.3.3 Demonstration Tests 13.4.3.3.1 Service Water System 13.4.3.3.2 Fire Protection Systems 13.4.3.3.3 Instrument and Service Air Systems 13.4.3.3.4 Condensate Filter-Demineralizer System 13.4.3.3.5 Reactor Building Cooling Water System 13.4.3.3.6 Turbine Building Cooling Water System 13.4.3.3.7 Standby ac Power Supply to Emergency System 13.4.3.3.8 Off-Site ac Power Supplies to the Emergency System 13.4.3.3.9 125/250-V dc Power Supply System 13.4.3.3.10 24-V dc Power Supply System 13.4.3.3.11 Drywell Ventilation System 13.4.3.3.12 Standby Gas Treatment System 13.4.3.3.13 Condensate and Feedwater System 13.4.3.3.14 Gaseous Radwaste System 13.4.3.3.15 Liquid Radwaste Collection System 13.4.3.3.16 Condensate and Demineralized Water Storage and Transfer System 13.4.3.3.17 Turbine Electro-Hydraulic Control System 13.4.3.3.18 Heating and Ventilation - Recombiner Facility Building 13.4.3.3.19 Heating and Ventilation - Turbine Building 13.4.3.3.20 Heating and Ventilation - Reactor Building 13.4.3.3.21 Heating and Ventilation - Radwaste Building 13.4.3.3.22 Emergency Ventilation Air Supply to Control Room 13.4.3.3.23 Primary Containment Atmospheric Control System 13.4.3.3.24 Emergency Cooling Tower System 13.4.3.3.25 120-V Instrument ac Power Supply System 13.4.3.3.26 Containment Isolation Valves Leak Rate Measurement System 13.4.3.3.27 Primary Containment Leak Rate Measurement System 13.4.3.3.28 Control Rod Drive Hydraulic System 13.4.3.3.29 Control Rod Drive Manual Control System 13.4.3.3.30 Fuel Pool Cooling and Cleanup System 13.4.3.3.31 Fuel Handling and Vessel Servicing Equipment 13.4.3.3.32 Reactor Water Cleanup System 13.4.3.3.33 Standby Liquid Control System 13.4.3.3.34 Residual Heat Removal System 13.4.3.3.35 Feedwater Control System 13.4.3.3.36 Nuclear Boiler System 13.4.3.3.37 Reactor Core Isolation Cooling System 13.4.3.3.38 Reactor Recirculation and Motor-Generator Sets 13.4.3.3.39 Core Spray System CHAPTER 13 13-ii REV. 25, APRIL 2015

PBAPS UFSAR TABLE OF CONTENTS (Contd)

SECTION TITLE 13.4.3.3.40 High-Pressure Coolant Injection System 13.4.3.3.41 Emergency Switchgear and Battery Rooms Heating and Ventilating System 13.4.3.3.42 Solid Radwaste System 13.4.3.3.43 Reactor Protection System 13.4.3.3.44 Neutron Monitoring System 13.4.3.3.45 Traversing In-Core Probe Calibration System 13.4.3.3.46 Rod Worth Minimizer 13.4.3.3.47 Process Radiation Monitoring System 13.4.3.3.48 Area Radiation Monitoring System 13.4.3.3.49 Environs Monitoring System 13.4.3.3.50 Process Computer Interface 13.4.3.3.51 Heating and Ventilation - Emergency Cooling Tower Pump Rooms and Switchgear Rooms 13.5 STARTUP AND POWER TEST PROGRAM 13.5.1 Program Description and Objectives 13.5.1.1 General 13.5.1.2 Fuel Loading and Shutdown Power Level Tests 13.5.1.3 Initial Heatup to Rated Temperature and Pressure 13.5.1.4 Power Testing from 25 Percent to 100 Percent of Rated Output 13.5.1.5 Warranty Demonstrations 13.5.2 Discussion of Startup Tests 13.5.2.1 General 13.5.2.2 Test Purpose, Description, and Acceptance Criteria 13.5.3 EPU Power Ascension Test Plan 13.5.3.1 General 13.5.3.2 Power Ascension Testing 13.5.4 MUR Power Ascension Test Plan 13.5.4.1 General 13.5.4.2 Power Ascension Testing 13.6 NORMAL OPERATIONS AND PROCEDURE CONTROL 13.6.1 General 13.6.2 Power Operation 13.6.3 Maintenance and Testing Procedures 13.6.4 Emergency Response Procedures 13.6.4.1 Introduction 13.6.4.2 Training 13.6.4.3 Communications and Alarms 13.6.4.4 Medical Assistance 13.6.5 Security Procedures 13.6.6 Procedure Revisions 13.6.6.1 Procedure and Administrative Policy 13.6.6.2 Temporary Changes to Procedures 13.6.7 Procedure Review and Approval CHAPTER 13 13-iii REV. 25, APRIL 2015

PBAPS UFSAR TABLE OF CONTENTS (Contd)

SECTION TITLE 13.6.7.1 New Procedure and Procedure Change 13.6.7.2 Reviewing, Approving and Authorizing New Procedure and Procedure Change 13.6.7.3 Not Used 13.6.7.4 Performing Functions of SQR 13.6.7.5 Recording Documentation 13.6.8 Requirements Relocated out of Technical Specifications 13.7 RECORDS 13.7.1 Initial Tests and Operations 13.7.2 Normal Operations 13.7.3 Maintenance and Testing 13.7.4 Other Records 13.8 OPERATIONAL REVIEW AND AUDITS 13.8.1 General 13.8.2 Onsite Review 13.8.3 Independent Review 13.8.4 Assessment Program 13.8.5 Operating Experience Assessment Program 13.8.6 Independent Technical Review Program CHAPTER 13 13-iv REV. 25, APRIL 2015

PBAPS UFSAR SECTION 13.0 - CONDUCT OF OPERATIONS LIST OF TABLES TABLE TITLE 13.2.1 Shift Crew Composition - Minimum Requirements 13.5.1 Major Plant Transients 13.5.2 Stability Tests 13.5.3 Startup Test Program 13.5.4 Control Rod Drive System Tests 13.5.5 EPU Power Ascension Test Program CHAPTER 13 13-v REV. 25, APRIL 2015

PBAPS UFSAR SECTION 13.0 - CONDUCT OF OPERATIONS LIST OF FIGURES FIGURE TITLE 13.2.1 Deleted 13.2.2 Deleted 13.2.3 Deleted 13.2.4 Deleted 13.2.5 Deleted 13.3.1 Deleted 13.4.1 Pre-Operational Test Sequence 13.5.1 Startup Test Sequence 13.5.2 Test Point Designation Power Flow Map CHAPTER 13 13-vi REV. 27, APRIL 2019