MONTHYEARML24239A7892024-08-21021 August 2024 08-21-2024 Email: Acceptance of 06-25-2024 Request to Amend License SNM-42 - Enterprise Project Identifier L-2024-LLA-0094 ML24134A0262024-05-0909 May 2024 Document Request for Upcoming EP - FP Inspection ML24087A1592024-03-26026 March 2024 Notification of NRC Operational Safety Inspection ML23355A1512023-12-21021 December 2023 Acceptance Letter 23-060 - Exemption Request ML23163A1242023-06-0606 June 2023 06-06-2023 Email: Request for Additional Information Proposed Changes to BWXT NOG-L Physical Protection Plan - EPID L-2023-SPR-0000 ML23125A2362023-05-0404 May 2023 05-04-2023 Email: Acceptance of Request to Amend License SNM-42 in Accordance with the Revised Physical Protection Plan - Enterprise Project Identifier L-2023-SPR-0000 ML23048A2472023-02-14014 February 2023 2023-001 BWXT NCS Document Request ML23019A3412023-01-17017 January 2023 01-17-2023 Email: Acceptance of Request to Amend License SNM-42 in Accordance with the Revised Fundamental Nuclear Material Control Plan - Enterprise Project Identifier L-2022-LLA-0180 ML22263A4602022-09-15015 September 2022 09-15-2022 Email: Acceptance of Updated Decommissioning Documents for BWXT NOG-L - Enterprise Project Identifier L-2022-DFA-0007 ML22161A0222022-06-0808 June 2022 Request for Additional Information - Decommissioning Cost Updates EPID L-2021-DFA-0010 ML22068A1162022-03-0808 March 2022 BWXT NOG-L 03-08-2022 Email to Revise the Scope of the Physical Protection Plan Amendment Request ML22025A4142022-01-25025 January 2022 01-25-2022 Email Acceptance of Updated Decommissioning Documents for BWXT NOG-L - Enterprises Project Identifier - L-2021-DFA-0010 ML21298A0812021-10-20020 October 2021 Submittal of Page Change Updates on Chapter 5 of SNM-42 License Application ML21335A0292021-10-12012 October 2021 BWXT 2021-004 OPS Inspection Document Request ML21273A3772021-09-29029 September 2021 09-29-2021 Email: Request for Additional Information on the BWXT NOG-L Request for Exemption from the Biennial Emergency Preparedness Exercise ML21064A1872021-03-0505 March 2021 Document Request Operational Safety Inspection at BWXT ML20162A0392020-06-0404 June 2020 BWXT Email 10 CFR 70.50(b)(1) Exemption Request Enterprise Project Identification L-2019-LLA-0103 ML20098D8012020-04-0303 April 2020 04-03-2020 Email, E.J.Spiva (BWXT) to T.Harris (Nrc/Nsir) Part 26 Relief ML20093F3092020-04-0101 April 2020 Acceptance of Revision to Training Qualification and Equipment Plan Enterprise Project Identifier L-2020-SPR-0005 ML20073L5572020-03-12012 March 2020 J.Downs March 12, 2020, Email to C. Terry BWXT RAI - Exemption Request from 24-Hour Reporting Requirement ML19346F8722019-12-11011 December 2019 Notification of Inspection and Request for EP NCS 202000X ML19268A2182019-09-24024 September 2019 Email to Cterry, BWXT Receipt of Revisions to Chapters 4 and 11 ML19267A0522019-09-23023 September 2019 Email to C.Terry, BWXT, Receipt of 3/5/19 Revision to Fnmc Plan ML19105A4222019-04-10010 April 2019 E-mail to P. Overall, Ecan Project Sapphire Shipper/Receiver Differences ML18096A3812018-01-23023 January 2018 E-Mail to C Terry: Acceptance of Request to Amend Chapter 5 2024-08-21
[Table view] Category:Inspection Report
MONTHYEARML24303A3692024-10-30030 October 2024 BWXT Nuclear Operations Group, Inc. - Integrated Inspection Report 07000027/2024003 ML24236A7672024-08-26026 August 2024 BWXT Nuclear Operations Group - Lynchburg - Physical Security Core Inspection Report 07000027-2024403 ML24205A0802024-07-24024 July 2024 BWXT Nuclear Operations Group, Inc. – Integrated Inspection Report 07000027/2024002 ML24151A4602024-06-20020 June 2024 BWXT Nuclear Operations Group, Inc. – NRC Core Inspection Report 07000027/2024006 and Apparent Violation ML24116A2842024-04-26026 April 2024 BWXT Nuclear Operations Group, Inc. - Integrated Inspection Report 07000027-2024001 ML24024A1502024-01-25025 January 2024 BWXT Nuclear Operations Group, Inc. – Integrated Inspection Report 07000027/2023004 ML23292A1252023-10-25025 October 2023 BWXT Nuclear Operations Group, Inc. - Integrated Inspection Report 07000027/2023003 ML23248A3072023-09-0505 September 2023 Lynchburg Technology Center - Physical Security Core Inspection Report 07000027/2023406 ML23209A8272023-08-24024 August 2023 BWXT Nuclear Operations Group, Inc. - Lynchburg - Notice of Violation and Proposed Imposition of Civil Penalty - $87,500; NRC Inspection Report No. 07000027/2023007 ML23115A0202023-05-0505 May 2023 BWXT Nuclear Operations Group, Inc., - Lynchburg - NRC Inspection Report 07000027/2023006 and Apparent Violations ML23116A0862023-04-27027 April 2023 BWXT Nuclear Operations Group, Inc. – Integrated Inspection Report 07000027/2023001 ML23089A3842023-03-31031 March 2023 BWXT Nuclear Operations Group, Inc - Material Control and Accounting Program Inspection Report 07000027/2023401 ML23025A0912023-01-30030 January 2023 BWXT Nuclear Operations Group, Inc. – Integrated Inspection Report 07000027/2022004 ML22297A1342022-10-27027 October 2022 BWXT Nuclear Operations Group, Inc. - Integrated Inspection Report 07000027/2022003 ML22207B2302022-07-26026 July 2022 BWXT Nuclear Operations Group, Inc. - Lynchburg - Integrated Inspection Report 07000027/2022002 ML22123A0502022-06-0606 June 2022 BWXT Nuclear Operations Group, Inc. - Lynchburg NRC Inspection Report No. 07000027/2021006 and Apparent Violations ML22024A2692022-01-25025 January 2022 BWXT Nuclear Operations Group, Inc. - Lynchburg - Integrated Inspection Report 07000027/2021004 ML21342A0682021-12-13013 December 2021 Cover Letter- Babcock & Wilcox Nuclear Operations Group - Security Baseline Inspection Report 07000027/2021402 ML21298A1482021-10-25025 October 2021 BWXT Nuclear Operations Group, Inc. Lynchburg Integrated Inspection Report 07000027/2021003 and Notice of Violation ML21211A5172021-07-30030 July 2021 BWXT Nuclear Operations Group, Inc.-Lynchburg - Integrated Inspection Report 07000027/2021002 ML21113A1062021-04-23023 April 2021 BWXT Nuclear Operations Group Nuclear Regulatory Commission Integrated Inspection Report 70-27 2021-001 ML21064A1872021-03-0505 March 2021 Document Request Operational Safety Inspection at BWXT ML21064A5222021-03-0505 March 2021 BWXT Nuclear Operations Group Licensee Performance Review Inspection Report 070000027/2021005 ML21029A1572021-01-29029 January 2021 BWXT Nuclear Operations Group - Nuclear Regulatory Commission Integrated Inspection Report 07000027/2020004 and Notice of Violation ML20339A6712020-12-0404 December 2020 BWXT Nuclear Operations Group, Inc. U.S. Nuclear Regulatory Commission Inspection Report Number 70000027/2020406 ML20302A2442020-10-27027 October 2020 BWXT Nuclear Operations Group - Nuclear Regulatory Commission Integrated Inspection Report 70-27/2020-003 ML20211L6982020-07-29029 July 2020 BWXT Nuclear Operating Group - Nuclear Regulatory Commission Integrated Inspection Report 70-27/2020-002 ML20024F6422020-01-24024 January 2020 BWXT Nuclear Operations Group - Nuclear Regulatory Commission Integrated Inspection Report 70-27/2019-005 ML19298A1172019-10-24024 October 2019 BWXT Nuclear Operations Group - Nuclear Regulatory Commission Integrated Inspection Report 70-27/2019-004 ML19211D5622019-07-30030 July 2019 BWXT Nuclear Operations Group - Nuclear Regulatory Commission Integrated Inspection 70-27/2019-003 and Notice of Violation ML19107A1632019-04-17017 April 2019 BWXT Nuclear Operations Group - Nuclear Regulatory Commission Integrated Inspection Report 07000027/2019-002 ML19030A1382019-01-30030 January 2019 BWXT Nuclear Operations Group, Inc., NRC Integrated Inspection Report 07000027/2018005 ML18297A0842018-10-24024 October 2018 BWXT Nuclear Operations Group - Nuclear Regulatory Commission Integrated Inspection Report 07000027/2018-004 ML18200A0332018-07-18018 July 2018 BWXT Nuclear Operations Group, Inc., NRC Integrated Inspection Report 07000027/2018003 Final ML18115A2682018-04-25025 April 2018 BWXT Nuclear Operations Group - Nuclear Regulatory Commission Integrated Inspection Report 7000027/2018002 ML18031A4042018-01-29029 January 2018 BWXT Nuclear Operations Group - Nuclear Regulatory Commission Integrated Inspection Report 70-27/2017-005 (Public) 2024-08-26
[Table view] |
Text
Rivera Ortiz, Joel ML21064A187 From: Rivera Ortiz, Joel Sent: Friday, March 05, 2021 11:24 AM To: Terry, Chris T Cc: Michel, Eric (Eric.Michel@nrc.gov); Alen, Alejandro (Alejandro.Alen@nrc.gov); Edwards, Denise (Denise.Edwards@nrc.gov); Pitoniak, Noel (Noel.Pitoniak@nrc.gov); Sippel, Timothy
Subject:
Document Request - NRC Inspection on April 19, 2021 Attachments: NRC Doc Request - OPS1 Insp at BWXT (4-19-2021).pdf
Dear Mr. Terry,
The NRC will conduct a routine inspection at the BWX Technologies - Lynchburg facility on April 19, 2021. The inspection will implement the following NRC inspection procedure (IP):
IP 88020 - Operational Safety (Inspectors: Joel Rivera-Ortiz and Denise Edwards)
This email requests a number of documents that we would like to obtain for our preparation activities (see attachment). If practical, we would like to have the documents at least 7 days prior to the inspection to facilitate our preparation and be able to conduct a productive inspection. In the attachment, we also specified some items that we will need during the on-site inspection week.
If you have any questions or concerns regarding this request, please contact me to discuss.
Best Regards, Joel Rivera-Ortiz Sr. Fuel Facility Inspector U.S. Nuclear Regulatory Commission/Region-II Division of Fuel Facility Inspection Projects Branch 1 404-997-4825 Joel.Rivera-Ortiz@nrc.gov 1
U.S. Nuclear Regulatory Commission - Region II 245 Peachtree Center Ave. N.E.
Atlanta, GA 30303-1200 March 5, 2021 INSPECTION DOCUMENT REQUEST Licensee: BWX Technologies Facility: BWX Technologies - Lynchburg, VA Docket Number: 07000027 License Number: SNM-042 Inspection Report 2021-002 Number:
Enterprise Number: EPID: I-2021-002-0039 Inspection Dates: April 19 - 22, 2021 Inspection IP 88020 - Operational Safety, Rev. 12/14/2020 Procedure(s):
Inspector(s): Joel Rivera-Ortiz (Team Leader)
P: 404-997-4825 Sr. Fuel Facility Inspector E: Joel.Rivera-Ortiz@nrc.gov U.S. Nuclear Regulatory Commission (NRC)
Region-II Office Denise Edwards P: 404-997-4432 Fuel Facility Inspector E: Denise.Edwards@nrc.gov U.S. NRC Region-II Office
Inspection Document Request for NRC Inspection at BWX Technologies - Lynchburg The following is a broad list of documents the U.S. Nuclear Regulatory Commission inspectors are interested in reviewing prior to the on-site inspection visit. The current version of these documents is expected unless specified otherwise. Electronic media such as Microsoft Word format or searchable .pdf files is preferred for receiving the information, if readily available. The documents provided in response to this request should contain enough information to facilitate the selection of specific inspection samples. Some of the information requested may not apply to the facility. The licensee is not required to provide documents that are already available in ADAMS. If there are any questions or concerns regarding the information requested, please contact the NRC inspection team lead.
INSPECTION PROCEDURE 88020 - OPERATIONAL SAFETY Documents Requested for In-Office Preparation
- 1) Latest version of the license application
- 2) Latest version of the Integrated Safety Analysis (ISA) Summary (if different from the revision submitted to the NRC in January 2021)
- 3) Procedures governing the implementation of the following management measures, as applicable to items relied on for safety (IROFS) and/or other safety controls credited in the license application:
Configuration Management Maintenance Training and Qualifications Procedures Development and Implementation Audits and Assessments Incident Investigations and Corrective Action Records Management Quality Assurance (QA) for IROFS
- 4) List of corrective action program documents generated in the last 12 months related to problems with IROFS (e.g. IROFS failures) and operational issues. Please include a brief description of the problem, if practical.
- 5) List of plant changes implemented in the last 12 months that affected IROFS; including modifications of existing controls, elimination of previous controls, and addition of new controls
- 6) List of changes in the Operations Safety organization in the last 12 months that were subject to the position-specific requirements of the license application
- 7) List of temporary compensatory measures put in place in the last 12 months to support degraded or failed IROFS. Please include a brief description of the compensatory measure, if practical.
- 8) Copy of the most recent self-assessment and/or audits report in the area of Operational Safety 2
- 9) Contact information for key personnel expected to support the Operation Safety inspection Documents/Support Requested for On-site Inspection
- 1) The inspectors plan to focus their review on the process areas covered in Safety Analysis Reports 15.14, 15.18, and 15.19. The inspectors will select a sample of credited safety controls (e.g. IROFS) in these areas for review. Due to the sensitive nature of the safety information related to those process areas, the IROFS will most likely be selected onsite. For the IROFS to be selected for review, the inspectors will need the items below.
- a. Plant procedures showing the specific operation and implementation of the IROFS.
For example, operating procedures showing the implementation of administrative controls or the operation of active engineered controls.
- b. Procedures and recent records of management measures performed to demonstrate availability and reliability of the IROFS. For example, recent records of testing, inspection, calibration, and preventive maintenance performed on the selected IROFS.
- c. Procedures and records showing that training requirements for the selected IROFS have been maintained
- d. Complete configuration management package for recent changes affecting the selected IROFS
- 2) The inspectors will need site support to conduct plant tours and observe ongoing operations in the control room (if applicable), operations in production areas, and maintenance activities.
- 3) The inspectors will need site support to coordinate interviews with plant operators.
- 4) The inspectors will need site support to attend the plan of the day meetings.
- 5) Please keep inspectors informed of plant operations on a daily basis.
- 6) Please inform the inspectors of any updates to the Operational Safety program that have occurred since this document request was issued.