ML21055A391

From kanterella
Jump to navigation Jump to search
3 to Updated Final Safety Analysis Report, Drawing 4M721-5879, Reactor Core Isolation Cooling Simplified Drawing Test Mode
ML21055A391
Person / Time
Site: Fermi, 07200071  DTE Energy icon.png
Issue date: 02/02/2021
From:
DTE Electric Company
To:
Office of Nuclear Reactor Regulation, Office of Nuclear Material Safety and Safeguards
Shared Package
ML21055A091 List: ... further results
References
NRC-21-0002
Download: ML21055A391 (1)


Text

D C

B A

4 CONDENSATE STORAGE PllOOA005 P1100F042 REACTOR VESSEL HIGH WATER LEVEL INITIATE RCIC TURBINE TRIP 4

~E41 SPARGER RING PRIMARY CONTAINMENT HIGH STEAM LIP INITIATE RCIC TURBINE TRIP &

CLOSE VALVES f007, FOOS,

~

YE N660

__ J_ __ J STEAM LINE 3

REACTOR VESSEL PRESSURE LOIJ-INITIATE RCIC TURBINE TRIP & CLOSE VALVES F007, fOOB VENT'---~

r;!Ns7 2

1 FOR TESTING OF THE RCIC, F029 & FO31 ARE REMOTELY MANUALLY CLOSED IF OPEN, AND FO22

& FO11 ARE THEN MANUALLY REOPENED. F022 WILL AUTOMATICALLY CLOSE FOR AN RCIC INITI-ATION SIGNAL.

~

r-------1='~

FEEDIJA TER LINE REACTOR VESSEL LIJ IJATER LEVEL -

INITIATE RCIC E5too I,,_,

F040 I ;;:

E5100 F030 I 1:1 I§ I~

11 It;;

D DCD'S INCORPORATED:

EDP 36178.B012, REV, ¢ OTHER REVISIONS:

3 I

_ SIGNAL PENS VALVES _____ ~

I I

M r--

f045 I

I r---7-----------------7 I

I I

()--=;:

Sl'£CTAt!.£ fl.ANGE E5150II006 CONTROL MINIMUM E5100

.l._____w F016

~

'--4'---,

FLIJ BYPASS E5100 F021 E5100 FOll THIS DRAWING WAS REFORMATTED BY MICROSTATION AT REVISION *c*. ALL PREVIOUS APPROVAL SIGNATURES ARE ON FILE ON MICROFILM IN DOCUMENT CONTROL TC A PORTION OF TH1S DRAWING IS AFFECTED BY THE FOLLOWING:

CHANGE DOCUMENT I

I RCIC TURBINE E5101C002 BAROMETRIC CONDENSER E5100B001 AD F004 A

FOOS VALVES CLOSE WHEN F045 IS NOT FULLY CLOSED PREPARED BY CHECl(ED BY DRAIN PT A

F025 A

F026 VALVES CLOSE WHEN F045 IS NOT FULLY CLOSED INC.CODE TITLE NOTES:

1.

FOR TECH SPEC SETTING VALVES, REFER TO TECH. SPECS.

2.

ALL INSTRUMENTATION SHOWN ON THIS DIAGRAM SHOULD BE PREFIXED BY E51 UNLESS NOTED OTHERWISE.

3.

ALL VALVES ANO ORIFICES SHOWN ON THIS DIAGRAM SHOULD BE PREFIXED BY E515O UNLESS NOTED OTHERWISE.

4M721-5879 LATEST REVISION D

NUCLEAR SAFETY RELATED THIS IS A MICROSTATION PRODUCED DRAWING.

CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.

Detroit Edison Fermi 2 u

REACTOR CORE ISOLATION COOLING DATE SIMPLIFIED DRAWING TEST MODE DATE APERTURE CARD TITLE UFSAR FIG. 5.5-11 f----+-----------j

_ __!.AP=PR~O~VE=D_;B~Y~-l--1!DO,l,ATE:ri,;__--I PLANT IDENTIFICATION SYSTEM NUMBER E5100 ARMS RECIPIENT#

1 D

C B

A J