|
---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630'-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
8 7 6 5 4 3 2 1
!NORTH ARROW HANGER DATA *1PER SfL STRESS Rft.PDRT 11<-
E:MD *5Z85 RHR*lt,;, R£V. 0~ .....
- GENERAL NOTe.5: L H /. f'OR !N5TALLATION SEE: <:,M72!* 8240- 2 MARK LOGIC ZONE I TYPE DETAIL IOWG JN-23291 TYPE I PART 8/M 8/M I TE,M fiiiir LOAD COLD PIPE MOVE I E-W I N-~
K/C L U-0 REMARKS H Z. ATTACH HANGeR TO STRUCTU!?E: IN ACCORDANCE !NITH 5?732
- 3. Rf:A10Vt. l=XCE:SS GREASf: FROM THReADf:.D l'I/EM5el-<5 AFTEF?.
eRlCTION. -*
- d, AfTEI?. E,9.E:CTION IS CO/vfPLETE., FJELD rVILL FURNISH EG47 WITH A MARl<ED COPY OF THIS Dl?AWING GIVING AS*BUILT OIMENSIOlVS
- 5. FOP. SUPPORT .SYSTEM COMPONENT STf1lfC7VRAL *cALCULATIONS E!/*3i.59*t:i02 I 04 ~,"IUB "'ll*'
415S tl**"'"')l.<>bW I.G.5$ J.19!J I No&/.: :JO
.SEE. DES!GKCALCULATION .. NUMBER. /JC G35 ON FILE IN THE FEAMI 2 *- l' !~*<Mo/
DOCUMENT CONT/'iOL CENTER,
- r22N6/ 'l REFERENCE ORA WINGS :
/, ii,M721*3!59*! PIPE FABRICATION ISOMETRIC E!l *..3/59*?'03[ D4 I.SYllEi p,
- 15754 IC**W) l.$6\'J l,S4N 1.21u I ,,;opt£ 3 3
- 2. 3M2329
. 3. 5P 732
- 4. r;p. 921
,, 1.A . 5. 3M 2331
- PIPE LUGS {! lLJ(j RETA/Nf:RS
.. &, -307/*42 *-.SPECIF/CATION H~Nl::J/EA j,1/ATEAIAL, E// *3159*G04 J-D4 .IS4LIP
. ~ 12261( Y*P) 1- sow 1-:>61')!I 0 ;fol): G4
~
o/'k, ch G EU.;3/S<;r-co.s-l 05:ISNUB -gg&1i t-1 J'lO/ll:).l(t"-u,)1.s':l\\Jj.2()'?,j.Qlj) I ;/o?'E 58 G
~ 9*
~ .
- _,-
- +//'.J0 '* '
GEflERAL NOTES CONTINUED
- 0. 'Bt4'5 NO lON<$R APPLY, S/JP/::>ORT SKETCHG5 o/11 Pill:- IN DOCUMt:.NT CONTROL. E // *.315.f! *GOGI D5 !SOLIQ ' - 4~2'3 l(u.,:,) J,<,,o'l,jj,_2~';,J O J,11ot)E 55
- 1. A.L,L TI-\ERM,t,.L(PIPE) MOVEMcl-lTS ,t,."'. ',,1-\0WN IN THE SEE H/>.t-.lC.eR. 'DAT~ ,i>,.e,1,..1:, l"OR ':>l<.l:.W '$UPPORT$ ARE
/ la WM- E11-5305-'
X />.\..01--\G TH& TR./>.\.l<;;, LF>-TcD AXIS. DI RE.C.T1 ON.%>
1>101<.~~ UJ;?, ~ J=A;=,T ARE PO<;;,\TIVE:. Al>l'D .EQUIVI\LE.ITT
"' "'.."' -~~
,. TO l". X, Y/!:/'-Z: SKE;W.c'D A.il'E>. l-\QI\I .,- 5l<l.:..'NED Al?.E l>.LO~G Tl-IE- <:;LOli:,A,L.. AX.P:, *.
I, £/J.,315.9:c,?)71.£5 i3Nl7B1 l,,,a,3-/E\9,
.2. ,'l),!41
~' '
1742 l(N*S) [. <,,1,W[.34t f,04 U I 1.Jo Di: so e,.. ~/
~.
,.,.1oe.\ 1l I Nt,W
'7 1-; ti:k
'"I-.,/~~
~ .~s~ .E"!L* 3/59sG08 £ 0 I lcu1aj b .... ;,s *"°-"'JM 1014 Y,i-SKl'illli:>'oW Ia J,o4ulN',pE" 3,;
. ,.10 "
__L:!.Q ~ '
- ~,ff,,
~ 41
- F--l"C'.i'4PZ::'5 ,:...,,
,-_)
~I ~tt/ ~II ~O<.
F It) r:,.;
?'j C
,."l\':,V 1'-J *-
yz;'V
'?,SJ,2 0,..., c'/1;3!59*G09J DC l50L!l
,-s-;-'f'-i--r~",-
..= d .
~- G4i'o6l{u-o)j.4'o\~ l,?>'e>SI a I N*oo!F .30 F
lifr ~) .
~ ./ I: " riGXkvv
,--~ ,_/
i:J
1')
BY§
~
~ :,'1 ,ff c0Nf*1 51* 1 /
1e ,.,,
~-:i- _<>,,-I', .
/ ' e../'
r11-3;59,cno. J .oi;. l<',t/1oEI
.lztt:. i9<>9l(cSli'E~ o J.4e,',j.OSDj,</o.020B.
,oP ~-o <<'o#-**~-t9:,._ . ~:,t-,
"'1.-cP ~ \' pi/G 40 s!l
,~ r 'o.~,.,~ c~/-
B"ii2 "VI-soc*
-J0o .. ..,,.""
ii!,~ t= 11-:;1S9-G f I I l,3 ls~uB k; 11 n(v-v, 1.eo1_"7_[._s9N l-4sll 1,10.aE:11 ec,\.- 59:' ,
1/~I:, to
--S. + ""< G
. -i"<""c ,
,i;::,
'11..,
~k. i,
. ~ ~ ..., ~g ....ti,.,......,,,
,<:-, -,...4"
/~,;:. <
-r:.----
. ..S-o<
'Gt".:/-' '--------
i-1
-r IQ-
- ,,I/_ 7'G'~4* .
'.J-k-
~c;~=,£c:;,.,
q
/;f/-,515'?-GtfZ. I 03 l3PRC, 382Z *'-4WI-SBN J.40U 11-loOE. <,e, rJll'p~~/4. A~ti,._v /,,
' 5 ,,
i.l .'I,;;
1
. ':./
~;-ff'+
~
/.
t,, _'l'.5,;,, \i,,,C / ~
~
'0,, ,i 1..0 12." 5 -<"'":.<-
E *"$.i,,
I~ -.
~ - plrf~~e cU . i:!..f+
u-* ' ,//VJ
""*--, 2." )( I' 50 L 1:)'IX :JI,,,RE/J,/1>/Sf.!.H (DN) _:
/ . '*, ..
/
.,.. ~/ E Q/0. 1--' , 1,/s* J111r; D£.,);,N ,,.;*/
.... 12' 1 j"'/.IJJ p1P£ i(:1/' rf.%~t~
\I_
--' ~* i4* j)lrftf @8 , ,, ')l,~:f L6, *-.......\.21~9. *,.
//
")I .f'.;
I'{. fif'!*p C,
11t;7 9/
111".i P1Pl!N#l.i: ............... " //
,Jff., "C" ,, ~ _,, 3/4'NPT ' ........,_
.,,..,,,,., /
ti <ft,:,,I !j N 3 &,6(R, Q J' 1W ""'""'
J"-s-:,., N3~ , . A.1 CAP
. /
,:16 <,
~a 9 .. J)_,, ~*~- I' ~f
- '"' _,/
\\ *,
.3/4. / ' ......
~--
' *Ic, 1:-~ "'-.,
/~IJ-
\,* /
f, 3(1)
/ / ,.,,, ~f
,.?,"' .,,,/
q;,'!,J',,,.."'
_,,/'
r,,, . , .
' II,"'
~\ ~
/
~'~,__
. ~ ~I
,* 101'
""yo'\'t,1'
. ' II II
.:2.4 Ji 12... Wal.
)2
_./ _..,:,,r* _/,..
j{ $ ca ( UP r
~ "' ,. ~,7 ~ -...... - - --s D '? <:t.4-' RHR RE.'TURM 'HOR . vA,,'Oq.. ~ : ~ , . , ~ D
' ,,"::,,.,, ~
~-
~--,;Jll " ,,.-...0 '<:I
...,,. . E.L 5 75'-0" CONl"O 01\1 owe,
~,;,,'r' .J,,.,;_,<-;,,?
<:,,"'><f)") (c,M7?..f -'l!.J,4<'., 6v....:,._<;...":>', ~*
"'<' ~ _.. J.J'\_ ...
D"=>"'i C C 6M721-3159-2 LATEST REVISION R
CLASS 1
~ INSTALLAT! N
~
B B NUCLEAR SAFETY RELATED
¥ STRESS REPORT DOES NOT REFLECT SUPPORT RELOCATIONS
- STRESS REPORT DOES NOT REFLECT SUPPORT RELOCATIONS
- REFLECT STRESS REPORT DOES NOT SUPPORT REL CATI NS THIS IS A MICROSTATION PRODUCED DRAWING.
LISTED IN REV.H LISTED IN REV.G I.ISTED IN REV.F CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.
THIS DRAWING WAS REFORMATTED EY MICROSTATION AT REVISION R" . ALL INC.CODE Detroit Edison Fermi 2 R IDCD'S INCORPORATED:
PREVIOUS APPROVAL SIGNATURES ARE ON FILE ON MICRO]'IL.M IN DOCtlliENT CONTROL PREPARED BY u
DATE TITLE HANGERS - PIPING ISOMETRIC RHR CONTAINMENT SPRAY (NORTH)
A PORTION OF THIS DRAWING IS AFFECTED BY THE FOLLOWING:
EDP 37084.B013 REV, A FROM HDR TO RPV VESSEL A OTHER REVISIONS:
* I TC CHANGE DOCU1(ENT I CHECKED BY I DATE I APERTURE CARD TITLE REACTOR BLDG IA APPRO"VED-BY HGR RHR C_QNT SPRAY NORTH Pl.ANT IDENTIFICATlON SYSTEM NUMBER ARMS RECIPIENT #
+-------------< E1150 PREPARED BY C MCDONELL DATE 1-28-16
iDATE~
Vlol/(p I I OTHER APPROVALS l DAT>;
I DOCUMENT TYPE CODE DDDMEC I NUC OPS FILE 1001 NO.I DATE lSSUJ!JD TO IS tl/1'1/ll.t
.APPROVED BY Jo/(,()
- H?::fiPS p'cj!-
EDP POSTING ENTRJES REQtnm:: THE DRAWING NUMBER 6 M* 7 21-- 3 15 g - 2 REV. R
......-- ti '122KJ.l;!B DATE ADnmoN OF THE ARYS STATUS CODE:
EITHER "AFC" OR "ASB" ..!..
1 8 7 6 5 4 /
8 ?