ML21055A373

From kanterella
Jump to navigation Jump to search
3 to Updated Final Safety Analysis Report, Drawing No. 4M721-5880 Rev. E, Reactor Core Isolation Cooling Simplified Drawing Minimum Flow Mode
ML21055A373
Person / Time
Site: Fermi, 07200071  DTE Energy icon.png
Issue date: 02/02/2021
From:
DTE Electric Company
To:
Office of Nuclear Reactor Regulation, Office of Nuclear Material Safety and Safeguards
Shared Package
ML21055A091 List: ... further results
References
NRC-21-0002
Download: ML21055A373 (1)


Text

D C

B A

4 CONDENSATE STORAGE I E4 Pl!OOA005 P1100F042 REACTOR VESSEL HIGH WATER LEVEL INITIATE RCIC TURBINE TRIP B2~1s I--

N693 A,B 4

SPARGER RING PRIMARY CONTAINMENT HIGH-STEAM AP INITIATE RCIC TURBINE TRIP &

CLOSE VALVES FOO?, FOOS,

__ J_ __ J

~-

?

3 REACTOR VESSEL PRESSURE LO\\HNITIATE RCIC TURBINE TRIP & CLOSE VALVES FOO?, FOOS VENT~~ rm

~

2 B2100 FOlOB FEEDVATER LINE i-------

li2100 F011B B21 w21 NG 2

,B,C, SUPPRESSION POOL REACTOR VESSEL LOV

....; VATER LEVEL-INITIATE RCIC I

I I

E5100 I.,_,

F040

=:';

I ::;

[5100 F030 I t::l

\\g I~

I~

I °'

I I

I 1

1--------

_ SIGNAL OPENS VALVES _____ J TURBINE EXHAUST DRAIN POT I

I I

I I

I r---7-----------------~

I I

I

~"°~~~

F014 FSE PSE

()--=;:

N002 r N020 SPECTACLE I FLANGE cs1soooo6 L

_J

_ ____]:

CONTROL MINIMUM FLOV BYPASS I Troi6 t-@

E5100 T

~

E5100 F021

[5100 FOIi I

I I

I *_*:_1 I I

I I

I DCD'S INCORPORATED:

TSR-35639, REV A x' I-"" l-- - J THIS DRAWING WAS REFORMATTED BY MJCROSTAT!ON AT REVISION "C". AIL PREVIOUS APPROVAL SIGNATURES ARE ON FILE ON MICROFILM IN DOCUMENT CONTROL.

A PORTION OF TH1S DRAWING IS AFFECTED BY THE FOLLOWING:

1 Go

~

DRAIN POT I nu I 2( TRIP cnsa' THROTTLE VALVE I MC I )(GOVERNING en,,

VALVE AD RCIC TURBINE E5101C002 BAROMETRIC CONDENSER E5100BOOI AO F004 AO F005 I

VALVES CLOSE WHEN F045 IS NOT FULLY CLOSED PREPAREl> __ BY F026 VALVES CLOSE WHEN F045 IS NOT FULLY CLOSED INC.CODE TITLE u

DAT 1

TRIP SETTINGS TO INITIATE THE RCIC MINIMUM FLOW MOOE TRIP A DISCHARGE PRESSURE AND PUMP DISCHARGE LOW FLOW SETTING 125 PSIG E51 FSE N002 ACTION OPEN: F019 TRIP SETTINGS TO STOP THE RCIC MINIMUM FLOW MODE TRIP SETTING ACTION PUMP DISCHARGE HIGH FLOW NOTES:

CLOSE: F019 FSE N002

1.

FOR TECH SPEC SETTING VALVES, REFER TO TECH. SPECS.

2.

ALL INSTRUMENTATION SHOWN ON THIS DIAGRAM SHOULD BE PREFIXED BY E51 UNLESS NOTED OTHERWISE.

3.

ALL VALVES AND ORIFICES SHOWN ON THIS DIAGRAM SHOULD BE PREFIXED BY E5150 UNLESS NOTED OTHERWISE.

4M721-5880 LATEST REVISION E

NUCLEAR SAFETY RELATED THIS IS A MICROSTATION PRODUCED DRAWING.

CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.

Detroit Edison Fermi 2 REACTOR CORE ISOLATION COOLING SIMPLIFIED DRAWING D

C B

TC CHANGE DOCUMENT j____ __________

_j---+------t------"'CHE=C=KED!L.£Be.;_Y -t-_J,!lD =---,

MINIMUM FLO w MO DE A

OTHER REVISIONS:

1----+----------I APERTURE CARD TITLE UFSAR FIG. 5. 5-12 I

I I

APPROVED BY I DATE I PLANT IDENTIFICATION SYSTEM NUMBER E5100 ARMS RECIPIENT #

PREPARED BY DATE DATE 1------+--------------1 DOCUMENT TYPE CODE NUC OPS FILE NO.

DATE ISSUED TO IS A, PATEL 7/24/12

~{,,-/Z, OTHER APPROVALS DATE DDDMEC 1801

'6-'l -L'2..-

APPROVED BY

-,,, /(',t,/, /A < ;/5,F /f!c,/1....

DATE EDP POSTING ENTRIES REQUJRE THE DRAWING NUMBER REV.

~J M~ ~~f!itl?t!f,(Z ~-61!01 ADDITIONE~~~:1:i1~~ CODE:

4 M7 21-58 8 0 E

3 2

1