MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3382021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-3045, Diagram Main Steam Isolation Valve Leakage Control System ML21055A3372021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-01, Rev. AC, One Line Diagram, 120VAC Inst. & Cont., Power Feeders Division 1 & 2 Reactor Building ML21055A3352021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4953, Radwaste Building Heating Ventilating and Air Conditioning Flow Diagram ML21055A3342021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-3, Technical Support Center Miscellaneous Diagrams of HVAC Systems ML21055A3332021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2050, P & Id Equipment Drains & Floor Drains Divisions I & II R.H.R Complex ML21055A3322021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5861, Process Diagram Core Spray System ML21055A3302021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-10, One Line Diagram 260/130V Ess Dual Battery 2PA Distribution - Division I ML21055A3292021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-11, One Line Diagram 260/130V. Ess. Dual Battery 2PB Distribution - Division II ML21055A3282021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4945, Piping & Instrumentation Diagram Fill Station Auxiliaries, Cooling Water Booster Pumps ML21055A3272021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-01, One Line Diagram Plant 4160V. & 480V. System Service ML21055A3262021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5875, High Pressure Coolant Injection System-Simplified Drawing Test Mode During Plant Operation ML21055A3252021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2402, Fire Protection Evaluation Reactor and Auxiliary Buildings Basement - Plan - El. 562'-0 ML21055A3242021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2833, Diagram Reactor Re Circulation System Nuclear Boiler System ML21055A3232021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5668, Core Spray - Accident Condition ML21055A3222021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5007, Diagram Primary Containment Pneumatic Supply System ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2682021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6C721-2361, Reactor Building Framing Section 40-40 Upper Area ML21055A2692021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2089, System Diagram Nuclear Boiler System ML21055A2702021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2220-06, Rev. D, Logic Diagram High Pressure Coolant Injection System ML21055A2712021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2017-1A, Diagram Off Gas Process System and Vacuum System Sheet 1A Vacuum System and Recombiner Chains ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System ML21055A2742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2003, Diagram - Main Turbine Extraction Steam System ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2762021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing M-2240-1, Rev. Aq, (Zone B/C-8) ML21055A2772021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2005, Diagram Feedwater Heater Drains, Emergency Drains and Heater Air System ML21055A2782021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5I721-2440-06, Logic Diagram Emergency Equipment Cooling Water System Valves Div. I Auto Open ML21055A2792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2007-01, Arrangement of Equipment on Combination Operating Panel H11P603 ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A3392021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5743, Biocide Injection/Dehalogenation Systems Functional Operational Sketch and Diagram ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684' - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630'-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
8 7 6 5 4 3 2 1 H H
- - - - -~\MED OUT TIMER ---
Dll (S>\._ H ~ 115E TIMER MODI HIIPG04 TIMf P, RSE -
~H JO 846A - - 1 - START REF.DOC STAP, T K607B .
l1P60 ~I ," Ht1P604 (17,18,19) HIIP604 ------~H II <@> ,' 1----~
1 oOI
---1 I ',
I ~
I 3 1
1---~ 8---1 ~LIINOP LINEAR (RME11 LllNOP IONITOR 602 L____
RME K601 Pl 16&
IIEf,POC.14 LOGARITHMIC',
Pl30I REF 00(; 14 ""'"
.01& -
~<§> 846B Q
*1 I r--~-- ~
ss ) - ~ - ~ - - - - 7
~--1 I I L--------, _J MON ITOPiS - 11P604 l1P60' HI-HI I r - - - ___.. ._ - -----
MECH VAf.. PU<PS AND I l I HI -HI GLAN! ?'!L, ST* [XH'S. _ _ _ _ _,t,_ ___ -------+- - - -...+-- --7 I MECH. VII:. PI>PS AND I Glll<D SEAL ST* EX*s.
1 - ---+-----~,~ -- .,-t-.. - - - - - -*---""- -
Dll D11 D11 A' C TRIPS I I .l i Il*,181-01. ZONc n-a, I -T-- .8., *0* TRIPS KB42 .K841A.
<§> K8418.
~EF. DOC.23 I : I I JC'. I : l 1 ~181*01. ZIM D*B)
G HtlP6Q4 Hl1P604 H~
B21 7'9 1
I I
H&--t B2 056 I
I 7Tr_3q I REF IOOC.II I I ~H 09 21 I
I I f\EF.DOG.23 H
G 1
NOTE 6 ~ NOTE 8 _kl MOTEi> I l"?"......:"I I ,.,....,,., ,-:,,--.._.., ,..,,........, ,.,,...._.., 21 L '
C51A- ~- RME L- l.OGAl?.ITHMIC OFF*u/>.S SAMPLE RACK-JOo&ij L __ _L...:::- - - - - ,
START SGTS DIV,Il. CLOSE P/C CS!A-1..
Z2A A RME K603A Z2B ,, K603B RME
Z2C RME K603D C51A*
Z2D MOl~llUI::$
-- ---1 -- INoTE8 I START SGTS DIV.I. C.L05E PIC 4iT. 2~3 I&OLATION VALVES, TP.IP AND (, I\EF.OOC.14 ISOLATION VALVES, TMPANO HIIP606I HIIP606 HIIP606 Hl!P606 HIIP606 HIIP606 MOTE1o~HIIP606 HIIP606 ( NOTE 10)
TI 't RI 00,I
_DJlPOJI~
I
.,,.~
FI RIO!
____, TTe----J. Nt--0--+-..,,
V
©--
/
7 I I I
I j
I I
150LATE REACTOP, 6UILDING VENT SYSTEM, ISOLATE CONTROL C.ENTEP. ANUINITIATE EMEP.6ENCV RECIP.CULAllON.
7 K~
0 I
6m, PEN 01
,~
RRE R605 PEN #2
'~7
<BLUD
~H I
r--
1 iSOLATE REACTOR l:ll.llLDING VENT SYSTEM.ISOLATE CONTROL CENTEI\ ANP INITIATE EMERGEMCY l'iEClf\~ULil.TION.
4~ I \
tNOTE~~:81
\
~ i NOTEbi~ ~H ~ c: ~ ~H
\
~
I I
L--
~--_J :, I @ RE REF, DOC 22 I I
n-""1 I t-
~~ W
~
I
_j I flEF.DOC.22 L/INP I I
I
- I~ L/INP
- !!'1
- :0 v.i,;n 1
L -
@EI 0068 I- - - - ,
L/INP ".l 1
<II~
_J w 1
I L/INP I r--- c11A ME 1 rc,1A
-t---::e
==1 I 0..: I 004
,!A'---) I I ~17..oZ& 6J:::....I e
V4 llfili~ I I _(M.\ 2,le; I I I l>
L .."' ~: _JI REAC101l &\ILDlNCi i \tlOIO 1 1 I
I I
~- ~-- -l F VENT EXHAUSl.PUCT EASJ I I +------<@> F 0 0 0
~TI\EP.!/10
V3 I 11-JOP I I I I I lNOP V--- STEAi/i LINE ( T'IP.)
REF. DOC.19, 20,21 I
I I D11P006 I Rl:AC,OR 601LOIN6 I I VENT £!HAUS! DUCT WEST I I I M
SEE NOTE 15 vs ~ t'@,,-
PUR&E
,----tam'II PURGE (ROOM AIR)
I I
I -IIOTE101!,
I I RE l
I MAIN STEAM LINE RADIAT:\.Q!i MONlTOR SUBSYSfEMS 1'.EF.DOC 17 ,, '
N6200 I I I F 1 8 L _ _ f o \ REF DOC. 13 I : N010 SAFETY l'\1:LATfV SYSTEM FO!O CR1iv" I * > ~ ,owe 1,1,*
I I I I I I
1 I ----lJ'1 I FOIi F012 I I 1TE f ~ I Fl12 I I 'GSili' 1/4"
~ REF. ~1:~@-J I 2D HIIP606!
f OFF *GAS V1iL_SAMPLER- JOO]~_ - - - DOC. 13 (HIIP606 YZ NE 'B6' L RRE ...J
' ' ' ,, ' ,, ' ' HV 1'7"_,., f7""1 DllPOO? FINE SOP.E HOLLOW ,- 606
,,@ , ,@, ,,~\ }~\ fl\21 EIV PI EJV NEEDl.f COIIINE<;TOP.
1 1 1 1 "". r- FA1; P.104 Fl\14
\/ N6200
/ .. F231 )I. PT,2>4
~ ll.EF l)OC, 14 I I L- 7 7 I ABIE.r.!il DllP007 DIIP007
'E I L ___
L __ 7 Tf.~--- I I I Y------- --
_J
/
~.-.......--b-,:._--+---b~
I ~ FUEL POOL VENTILATION EXHAUST RADIATION MONIIQR_SIJ65YSTEM.
E r-< LIS i I I r------ --::~-ISO
+-,
Dl!02C005 VACUUM PUMP SAFET'I P.E[ATED SYSTEM r 1~ ~ ~ ~+----- ~ ____ /1
_L _ _ _ -\__Y_J_ F009 FOO?
-LEGEND t ________ _j . 114*1
- I-.-- - - _:1- ~-y'RSi.s,r REF.OOC2, 7 i 7 <.:;: i ,,,,,
~M
<9) ~-~µ,~-,,
CPI I LMS >
I BMS >
LOCATED IN MAIN CONTROL ROOM LOCAL MANUAL SWITCH REMOTE MANUAL SWITCH E/V I CBPB >
F!!3 I
~
CONTROL ROOM PUSH BUTTON FA22 F004 RIOS E j Dll02C002 FOOS F006 I~, ;~ '--~
,.~~ 2 F~,3 DIIP007 £.._ I I '~OP
..._I Rse: --1 L/tNOP~ I ss > SELECTOR SWITCH 7\!NOP I~
~ ' .:H . FOOS I PARTICULATE I FILTER E/V s I
I I IL MIST I ffiEj_J- RMEaLOGARIIHMIC 6tlP6:ful L ~.:-J_*-~s~o~s l 1 ~--
KbOlO : 17 I,,
HIIP604 (I? "I DI 1 & ERIS COMPllTEI'\ POINT
~
FA25 I I ELIMINATOR K604 MOtllTOP, K844 1
I ,4---L_ LO&~RITHMI&
OFF-GA.5 P.A.DIATION MONITOR SUBSYSTEM I:©------ ----**< LMS I ~ SAMPLE PUMP Dl102C002 NOU 6 W l:.;-;o,'iU HIIP604I MONITO~$ REFERENCE DOCUMENTS,
- 1. 22Al 371AF RADIATION MONITORING OF PROCESS FLUIDS & GASES DES. SPEC. <DEC FILE ND. Rl*9)
NON5AFETY RELATEO 5~STEM . . ,JV NOTE 5-;---,,,,I 2. 22A2999 SPECIAL \./IRE AND CABLE <DEC FILE ND. R! *114)
( REF':'OOC 18> I')) 3.
I 4.
D <§> 5.
- 6. D
- 7. 732E181 REACTOR PROTECTION SYSTEM <DEC FILE ND. R!-109)
NOTEE.-....,p 8. CECO CENTRAL COMPONENT DATABASE SCHEMATIC DIAGRAM PROCESS RADIATION M N!T RING SYSTEM PD\./ER DISTRIBUTION
' /
.... (rJ/ Cl\ NOTE 10
- 9. 1-2185-01 10.
11.ew* REWr NOTEIO~ 11. 1-2174-20 SCHEMATIC DIAGRAM EMERGENCY RESPONSE INF . SYSTEM
/~~!>, "'T' ND-07 ~WELL 1009 WELL JD11~ N009/ n .fl ~ i;t:!ELL J 010 12. M-2001 INSTRUMENT SYMBOLS AND IDENTIFlCATI N C.ESHJM
CH!'I --!
I t--- CRPB 13. I-2181-01
- 14. I-2174*43 PRMS SYSTEM DIAGRAM SCHEMATIC DIAGRAM EMERGENCY RESPONSE INF RMATl N G.E. PARTS LIST SOURCE CHEC~ ¥
,,-y, I I 1
>-tEStUM-137
- 15. 238Xl26AB
- 16. I-2185-05 SCHEMATIC DIAGRAM FF*GAS VENT PIPE RADIATI N MONITORING SUBSYSTEM IIEF.DOC,li> I SOURCE CHECII, 17. 1*2185*04 SCHEMATIC DIAGRAM FF-GAS RADIATION MONITORING SUBSYSTEM I 18. 1-2185-06 SCHEMATIC DIAGRAM LIQUID PROCESS RAD[ATION M NIT R[NG SUSYSTEMS 4-!------- REF. DOC. II, 19. 1-2185°02 SCHEMATIC DIAGRAM PROCESS RADIATION MONITORING SYSTEM ANNUNC[ATDR INPUTS RAOWASTE REACTOR BLOG GENERAL 20. 1-2185-07 & 08 SCHEMATIC DIAGRAM FUEL POOL VENTILATION EXHAUST RADIATION MONITORING SUBSYSTEM
' / SEE NOTES 6 EE NOTES 6 EFFLUENT CLOSED COOLING SERVICE WATER 21. 1*2145*01 THRU 46 ELEMENTARY DIAGRAM NEUTRON MONITORING SYSTEM 14 j /If) WATE~ SYSTEM EFFLUENT MONITOR 22. I-2611-10 & 11 SCHEMA TIC DIAGRAM IS SIGNALS I
REl'OOC.H, CRPB > ,~\CR
__J____
AND 14
- - - - - - - 1 II III I .-
L--~
j
- _______ ..,_.._ , ,y, LIQUID PROCESS Rt.OlATION MONITOR SUBS"l5TEM5 NONSAFET~ RELATl:D &~STEM
- 23. I-2185*03
- 24. 21Al726
- 25. I-2255*08 SCHEMATIC DIAGRAM MAIN STEAM LINE RADIATION MONITORING SUBSYSTEM PROCESS RADIATION MONITORING SYSTEM SCHEMA TIC DlAGRAM RAD\./ASTE SYSTEM INSTRUMENT LOOP PART 2
_ __JII - 7 ..!..I+!+-- I I , , NOTES, j....- STACK GAS SAMPLE
' I ' I I RACK AND PUMP 1. THE FF-GAS VENT PIPE SAMPLE LINE SHALL BE 1' X 0.058' \./ALL THICKNESS C Pl r.:rt1l(R) ~I C
_.=e 1 ASSEMBLY POOi SEAMLESS STAINLESS STEEL TUBING. THE TUB[NG MINIMUM BEND RADIUS SHALL 1 1 1 I
.1'.101> I (NOTE BE 20'. THE TUBING LENGTH SHALL BE J INED \./ITH S\./AGEL K TYPE 1610-6*316
~,,, I I I I 10) r7 __ ,.1, t LJ __
I '@'
RELAY - - -
I I I
I II I 1 I I I
DR ENGINEER[NG APPROVED EQUIVALENT UNIONS. THE TUBING SHALL SLOPE SD THAT CONDENSATE RUNS OFF TD DRAIN TEE.
- 2. REMOVABLE SECTION SHALL BE PROVIDED NEAR THE ISDKINETIC PROBE FDR THE INSERTION OF A CHARCOAL FILTER. THE FITTINGS, ETC., SHALL PROVIDE SMOOTH TRANSITIONS \./ITH UT DlSC NTINU!TIES DR REDUCING THE CR SS*SECTl NAL AREA OF THE FLO\./ STREAM.
,, ' I I I 3.
EIV I I I 4.
- 5. THE DETECTORS <N006l SHALL BE LOCATED AS CLOSE AS PRACTICAL TD THE At& I I I ; PARTICULATE HEAT f~ACING PRIMARY C NTA[NMENT AND ARRANGED TD VIE\./ EQUALLY ALL FOUR STEAM LINES.
I I I AND HALOGEN TO l'.EACTOfl BLOG. 6. ALL CABLE TD CONFORM TD G.E. SPEC. REF. 2 ON SHT. 1.
PURGE I I FILTERS THERMOSTAT)
( COIIITMlU.£D VENT EXHAUST PIPE
_J ! : j 7.
_L 61721-2181-02
, - _ _ _ _iATMOS__!,!!LET) _ _ * - - J002 _ 8.
9.
I ,------ ='""" _________ - - - - ---:..JI i<_ l~. I~ 10. FDR LOCATION AND SPECIFICATION OF !NSTUMENTS, SEE INSTRUMENT DATA SHEETS LISTED IN REF. DOCUMENTS 15 & 24, AND INSTRUMENT DATA LISTED IN CECO LATEST REVISION Q
11.
- RXE 11 12.
~-- -"1-(, ~!~ I lI I I _ _ _ _J
~\Oi, -- - -
, 1,, 1eH4'1---+===;1=ir I I Fl07 ll_FF*GAS VENT PIPE RADIATION MONITORING SYSTEM IS AN [NSTALLED SPARE SYSTEd"' <"o"'
~
~~-¥ EC-80001 REMOVED SPARE RATEMETERS D11K600A AND DllK600B FROM PANEL HllP604.
}v, B $ CE>IUM-137 L ~
REF. DOC.I?>
ZONE 'CS' F108
- 15. VALVE 'VS' AT RACK Dl P O
- 16. UNLESS THER\./[SE SHO\./N, ALL INSTRUMENT PIS NUMBERS ARE PREFIXED Dll ALL VALVE AND EQUIPMENT PIS NUMBERS ARE PREF[XED DllOO I S A L USE IN LO\./ FLO\./ ALARM TESTING.
~-------------------~
B SOURCE I NUCLEAR SAFETY RELATED REF,DOC.13 ZONE 'CS' I GRAB I SAMPLE THIS IS A MICROSTATION PRODUCED DRAWING.
l.___.__,.. RETURN CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING
- - ------ - - - _EllPOOl I DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.
DRAIN FF-GAS VENT PIPE RADIA TI N M NI T DR SUBSYSTEM ( e,1:e NOTE 14 ) THIS DRAWING WAS REFORMATIED BY MICROST.A.TION AT REVISION "tf', All.
INC.CODE Detroit Edison Fermi 2 NON-SAFETY RELATED Q IDCD'S INCORPORATED:
PREVIOUS APPROVAL :SIGNATURES ARE ON FILE ON MICROFILM [N DOCUMENT CONTROL.
PREPARBD BY u
DATE TITLE PROCESS RADIATION MONITORING DIAGRAM A PORTION OJ' TH[lj DRAWING IS AFFECTED BY THE FOLLOlrlNO:
EDP 80001.006 REV. A SUBSYSTEMS TC CHANGE DOCUHENT CH~J<:BD_BY _D~'l'E A OTHER REVISIONS: I APERTURE CARD TITLE IA APPROVBD BY P&ID PRM SUBSYSTEMS PLANT IDENTIFICATION SYSTEM NUMBER ARMS RECIPIENT
~, -- '
f ~---, i ' ,_.
PREPARED BY L. HALE "i:)ATE 4/16/19
""'lif,'.J,._;,
1/.,
'? l DATE 4'-ll-tO/ OTHER APPROVALS DATE DOCUMENT TYPE CODED DD INC NUC OPS nLE N0,1 DATE 1801 1ss6~o' TO 1s 617 2 1 2181 0 2 APPROVED BY .., Moses <or Tom
] onn DATE EDP POSTING ENTRIBS REQUIRE CODE:
THE DRAWING NUMBER REV.
ADDl'['[ON OP THE ARMS STATUS wJ MurphyUiper J.n
_____TI"IPE~p~()Cl~.dl'J" J0 EITHER RAFC"' oa RASB" - -
8 7 6 5 4 -...,