|
---|
Category:Drawing
MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3382021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-3045, Diagram Main Steam Isolation Valve Leakage Control System ML21055A3372021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-01, Rev. AC, One Line Diagram, 120VAC Inst. & Cont., Power Feeders Division 1 & 2 Reactor Building ML21055A3352021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4953, Radwaste Building Heating Ventilating and Air Conditioning Flow Diagram ML21055A3342021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-3, Technical Support Center Miscellaneous Diagrams of HVAC Systems ML21055A3332021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2050, P & Id Equipment Drains & Floor Drains Divisions I & II R.H.R Complex ML21055A3322021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5861, Process Diagram Core Spray System ML21055A3302021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-10, One Line Diagram 260/130V Ess Dual Battery 2PA Distribution - Division I ML21055A3292021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-11, One Line Diagram 260/130V. Ess. Dual Battery 2PB Distribution - Division II ML21055A3282021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4945, Piping & Instrumentation Diagram Fill Station Auxiliaries, Cooling Water Booster Pumps ML21055A3272021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-01, One Line Diagram Plant 4160V. & 480V. System Service ML21055A3262021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5875, High Pressure Coolant Injection System-Simplified Drawing Test Mode During Plant Operation ML21055A3252021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2402, Fire Protection Evaluation Reactor and Auxiliary Buildings Basement - Plan - El. 562'-0 ML21055A3242021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2833, Diagram Reactor Re Circulation System Nuclear Boiler System ML21055A3232021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5668, Core Spray - Accident Condition ML21055A3222021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5007, Diagram Primary Containment Pneumatic Supply System ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2682021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6C721-2361, Reactor Building Framing Section 40-40 Upper Area ML21055A2692021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2089, System Diagram Nuclear Boiler System ML21055A2702021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2220-06, Rev. D, Logic Diagram High Pressure Coolant Injection System ML21055A2712021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2017-1A, Diagram Off Gas Process System and Vacuum System Sheet 1A Vacuum System and Recombiner Chains ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System ML21055A2742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2003, Diagram - Main Turbine Extraction Steam System ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2762021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing M-2240-1, Rev. Aq, (Zone B/C-8) ML21055A2772021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2005, Diagram Feedwater Heater Drains, Emergency Drains and Heater Air System ML21055A2782021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5I721-2440-06, Logic Diagram Emergency Equipment Cooling Water System Valves Div. I Auto Open ML21055A2792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2007-01, Arrangement of Equipment on Combination Operating Panel H11P603 ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A3392021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5743, Biocide Injection/Dehalogenation Systems Functional Operational Sketch and Diagram ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684' - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630'-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
8 7 6 5 4 3 2 1 PANEL ITEM
.~ o.
IN:lTR.
NO, BM NO, OESCRI PT ION LEGEND ENGRAVING MAKE.
GENERAL 5'(5 RE.F NO.
INSiR DIA&
NO.
1-2796-f>ANE.L-
!'TEM No.
IN'a:,l"R '.BM No. }lo.
DI:: SC 'R.l l'l" IOl'l L EC3/4 I=- HD ENGi'RAV IN.~
MAKE 5YS INSTR.
REF DlAGi No. No, PANEL ITEM NO INSTRUMENT NO BM NO DESCRlPTION LE-GENO ENGRAVING MAKE ..,
SYSTt!M NO IN$TR DIAGRAM NO IOOC.79 NiA N/A 2 PCS. SEL, SW, NORMAL B"l'PA55 ELEtTRIC C35 01
\..EC.,. E. ND E1150-F006C IOOC~]:5 N/A ~/A DIV 1 RHR PUMP C FIELD C :E,p l-2796-H I OOC BO NIA ti!.IA c P05. SEL SW, NORMAL BYPA55 SENEllAl C35 1-2796- 'P l..A Te. SDC SUCT ISO VL V 01 H,
__,I 55 ELE.CTRIC 01 lOOCa CMC SWITCH
,____H_2_1_P_1_0_0_ \OOC&.i:>
E1150-F003A DIV 1 RHR HX Cl-303E uslvu
~.~~~ CRD
<..,vv.1.A HONEYWELL C35 1-2796-RC.IC STEAM LEAK 1-2796- OUTLET VLV 01 lllOC. Bl N/A N/A LEGEND PlATE C35 *-
FIELD 01 l00C4 CMC SWITCH C1106 COOIB HONEYWELL OEiE.C.TION B"l'Pf\55 IOOC/Q7 E1150-F04 7A DIV 1 RHR
¥i~Ji CRD IOOC5 C35R003 PRESSURE INDICATOR C35-Rcoo SEE IOOCBZ r.J/A N//!, LEGEND PLATE COMMUN lC.flTION JAC.K HX INLET VLV DIV 1 B._~Aq!,~R VESSEL 1 PT CECO NIA NIA p, HI\ 10 OCG.8 E1150-F027 A DIV 1 RHR TORUS SPRAY IS l00C6 C35R002 LEVEL C35 R002 DIV 1 REACTOR VESSEL
- SEE IOOC83 LEGEND PLATE C3S. (lll*ZZO IN HzO) lND CECO HX A ITT'\r I r-yi:-1 E5150-F012 lOOC7* BACK LIGHTEO PB MASTER IOOC84 IOOC0 S NIA NIA NIA NIA LEGEND PLATE LEGEND PLATE PSIG PSIG C3S 1ooe~~ RCIC DISCHARGE OTB ISO VAL VE es150-F044
<o",,' a: 100C8*
Ol'fN (RED)
BACK LIGHTED PB >-
E1150-F009 RHR SDC INBD SUCTION ISO VL V SPECIALTIES MASTER I OOC70 RC!C TURB CLOSED (GREEN) SPECIALTIES 100C86 N/A N/A LEGEND PLATE 6-1847 FIELD NIA N/A --*-*- -.--*--*- CONTROL VAL VE SU Fl"RE $ & \0~
- 100C9 BACK LIGHTED PB OPEN (RED)
- E1150-F008 RHR SOC TED MASTER SPECIALTIES 100C87 N/A N/A LEGEND PLATE RCIC RM HIGH TEMP FIELD C35 1-27%-01 JOOC71 IOOC72.
'POOL 'o '1"' R A"1' V'l:.NT TO
BACK LIGHTED I'S CLOSED (GREEN) llAC K Li GKTE D PB
- SUCTION ISO VL V MASTER SPECIALTll:S MASTER IOOC88 N/A N/A LEGEND PLATE FIELD C35 OPEN (REDl El150-F006A LOGIC B ISO DEFEAT S'w e, u 'P 1" 1'1.1=.,:>'l:> \ o ~ 1" 0 o L SPECIALTIES
\/E.\--l'T 'TO IOOCl 2* llACK LIGHTED PB ,. DIV 1 RHR PUMP A SDC SUCT ISO VL V MASTER IOOC73 CLOSED (GREEN) SPECIALTIES
..$ I) 'f' P 1"- c. ~'S I o " 1"00 L 100C13 BACK LIGHTED PB MASTER G IOOC74 MAIN STE.AM LIKE. 1:>
100C14 OPEN IRED\
BACK LIGHTED PB
' i B3105-F023A N RR PUMP SUCTION VLV SPECIALTIES MASTER G!
CLOSED (GREEN) SPECIALTIES IOOCil RHR COOLll'tG,i F'OND lOOCl !I' BACK LIGHTED PB OPEN (RED)
- B2104-F013A MASTER SPECIAL TIES 1ooc,e COMMUNICATION JACK ~ll4!Cl!IJ'T C'3S 100C16* BACK LIGHTED PB ,. DIV 1 MS LINE D SRV MASTER
- **---**--*" CLOSED IGREl:N) SPECIALTIES I OOClT" BAC ~ LI GHTfD PB OPEN 'fiiE!il
- B2104-F013B MAsTER SPECIALTIES r:-- :7 100C18' BACK LIGHTED PB ,. DIV 1 MS LINE C SRV MASTER CLOSED (GREEN) SPECIA l Tl ES I 52 I SI.
I 1 53 54 SUf'PRESSHlN POOL WATER
- lOOC\9* BA,._K LIGHTED PB Ol'fN (RED)
E1150-F015A MASTER SPECIALTIES I
I ,____. I I TE.iAl'lRf\TURE
- 1ooc20* BACK LIGHTED PB CLOSED (GREEN) >-
DIV 1 LPCI INBD ISO VL V MASTER SPECIALTIES L ___ _J
BACK LIGHTED PB OPEN IRED\
E1150-F017A DIV 1 LPCI MASTER SPECIALTIES
"'--. l!AAlOER
~
I ?3
~
172
- 1ooc22* BACK LIGHTED PB CLOSED (GREEN)
TBD ISO VLV MASTER SPECIALTIES R.l:RCTDR, B2104F013A B2104F013B tOOC23*
t OOC24*
BACK LIGHTEO PB OPEN (REDl BACK LIGHTED PB >
E1150-F004A DIV 1 RHR PUMP A TORUS lSUCT IS l
/4) 0 MASTER SPECIALTll'S MASTER F
r;;::::::71LEVEl
~ ~ CLOSED _lQ..RE_!Nl SPECIALTIES F
""'""°,,,,._
\4,s,,!L f'Ra~Sllo& I I I j 1ooc25* CMC SWITCH El102-C002A DIV 1 RHR HONEYWELL
-f-...::;:::;::.J'--_::::::::L----~-----tC::::Jl62 ,, ,r-=-:-7 ,~- PUMP A I ~I +---1--- - - - - - - - - - - - - - - - - - - - - - - - - - - r - - -~-~163 100C26* BACK LIGHTED PB - MASTER MOTE'S.
r----, CCV[R Pl Al E. I : l00C27*
OPEN fREDl BACK LIGHTED PB ,.
El150-F024A DIV 1 RHR SPECIALTIES ALL f'F\NEl ITEM~ MARK.ED
! ITU~! ClOSED (GREEN)
TORUS CLG ISO MASTER SPECIALTIES WlTH RN A'5TERJSK. 'jE- ARE EUSOF015A EllSOFOl 7 A
..___,j69 I l00C28* BACK LIGHTED PB . MASTER DESIGNATE[) ClA'S'i> re.
I OPEN (RED'> El150-F028A DIV 1 RHR SPECIAlTIES
.. DEl>II.N flTES BOP IT EMS 100C29* 111\CK LI GHiED PB I ~
TORUS ISO VL V MASTER j CLOSED (GREEN) SPECIALTIES DESl&NATES DllllI ITEMt
..- I ~- I 1ooc3o* MCK LIGHTED PB OPEN /REOl
- MASTER
- DE.$1<Sl,J/l,TE5 'S\oJI~<'. "BU'.! 1"!'!:MS E1150-F048A SP!cCIALTIES L_,::.J
'-BAR~ IER 100C31* llACK LIGHTED PB ,, DIV 1 RHR HX BYPASS VL V MASTER CLOSED IGREEN) SPECIALTIES
R_HR RCII'.
FLOW 100C32* BACK LIGHTED PB OPEN (REOl
- El150-F068A MASTER Sl'fCIALTIES DIV 1 RHR HX FLDW 100C33*
~'WIDE BORDER LINE BLACK (fYPl _, -* ,., ,, .
BACK LIGHTfD PB CLQ,S!,~, (GREEN)
~ SERV 'wTR OUTLET FCV MASTER SP!cC IA LTI ES l OC34 FLOW C35R005 I bfJ-rO~~R HX SEE R.HR
'----'ss I 34 41 I~ Ell Bl 100C35*
INDICATOR CMC SWITCH OUTLET FL 'w INDICATOR rilv 1lc~~~11,/
CECO HONEYWELL E 3 ------:~tt:-t.>':!""::i-t><l-- 1: 174 100C36* CMC SWITCH PUMP A E1151-C001C HONEYWELL E
-7 70 ~1~I ~J ~4~LSJ I DIV 1 lHRS'w PUMP .
100C37* CMC SWITCH HONEYWELL
,,U) r--
I I
I I
El150F008 E1150F004A {----------1
! RCIC i 5 8 t00C38* CMC SWITCH
~h'c;Tl F,;.~R1\'w E!156 CUOJC HONEYWELL E1150F003A DIV 1 RHRS'w I I' --1 h MDCT FAN C I ,__ __,I ss (nr
'4 11_;)
r' \OOC39 C35R001 PRESSURE INDICATOR C35-R001 SEE
" _J I I r- _-~BARRIER 1 PT DIV 1 DRY'wELL PRESSURE IND CECO P'wER E
- o:
El150F048A 100C40 C35R004 TEMPERATURE C35-R004 SEE
!l.lR~R ~ ----~ LINE FILTER FOR INDICATOR gLY,~l~~gRUS VATER CECO E1150F006A 100C41 C35R006 FLOY, C35 R006 RCIC FLO\,/ INDICATOR C35R006 ~Fl,~, PH11f DISCHARGE SEE I I INDICATOR CECO
~ I I 100C42* BACK LIGHTED PB MASTER OPEN (RED\ SPECIALTIES --~. ,--*-
I L - -rr==...J':='.;°--., 100C43* BACK LIGHTED PB El150F047A 871 ,---,I BI as CLOSED (GREEN)
MASTER SPECIALTIES r-r-7 I
, J..
\-
I r "11 lOOC44 BACK LIGHTED OISPLAY OffN (RED)
MASTER SPECIALTIES
[ I T's1 I 7 65 L-L-J E1150F068A 100C45 BACK LIGHTED DISPLAY MASTER I I 35 100C46 CLOSED /GREEN\ ~~rnoffi~i~TLE VL~ SPECIALTIES BACK LIGHTED PB MASTER OPEN IREDl l SPECIALTIES D 100C47 BACK LIGHTED 1' f!.
CLOSED (GREEN\
j 1~i~C~7TF045
~ \ /I \ I MASTER SPECIAL TIES D
77 IRHR SER~IC'E WfiTERI 57 100C48 S\>~R.E
<o) 100C49* PUSHBUTTON SWITCH E5100-Ml::l:;; GENERAL fENt"rWIT IA TIDN , ELECTRIC 100C51* 2 POSITION KEYLOCK C3500-M130 ELl:trROSWITCll SWITCH DIV 2 DC TRANSFER S'w!TCH 1oocs2* 2 POSITION KEYLOCK C3500-M131 ElECTltO'SW\TCH SWITCH BOP TRANSFER S'w!TCH 100C53* 2 POSITION KEYLOCK C3500-MI32 ELECTR~ITCH SWITCH DIV 1 DC TRANSFER S~ITCH 100C54* 2 POSITION KEYLOCK C3500-M133 ElEtTiO'oWITGH SWITCH DIV 1 AC TRANSFER S'w!TCH 100C55 LEGEND PLATE H21-P100 VENDOR REMOTE SHUTDO'wN PANEL 100C56
- ~- -~*- f,-.
LEGEND PLATE RHR VENDOR 100C57 LEGEND PIA TE RHR SERVICE WATER VENDOR SYMBOL LE<.ENI)
C 100C58 LEGEND PLATE RCIC VENDOR C
f,-
t:;iil QACK. L\Q.HTEO 1'1!.
~----- t] BACK Ll~TEI> lllS'?Lf\Y IOOC~I G,l\A\>\-llC S'(ltlll<>Y,L'E<.,t. El102 C002C VEHl,03/4 a ilACkc LIIJ,HTE:D S.l'L\T SCREEN DISPLAY DIV 1 RHR OF CMe. &Wl,-CI-\ 'PLA"'I'£ PUMP C fll:Ll) 14---------------,--- .___,I LEGEND PLATE 8'0"-----------------------------------------~ ICl0tt2 LEI.END PLATE 11111111 llTEAN\ LINE ~ENDOll REFERENCE DOCUNIENi~
\ODCl',5 Cl-31\lE LEGEND PLATE. FEEll\\'RTER. LINE ~ENDO!t cas I-2796-01
'S.YSTEM D\AGRRNI I-2796-01 FOR PI\NEl l.OCllilON SEE. A-2001
- 100Cb4 C!-W* 'l P051110N 51/J ITC.1-l 1<:E'IL.O<:-' C3500-M134 S'w!NG BUS TRANSFER S\./ITCH EL~tw-.wrrci-J c"s 1-2796 01 61721-2791-01 LATEST REVISION (REAtil>lt BLD&, 2ND FLOOR -SWITCH C.EIIR R.hl) 0 tlll'e.cDMENT !>!';TAIL~ - E-2832-05 FOR. ~PPLICAl5LE COtlES, REFER TO Blll t\-303E:
B B NUCLEAR SAFETY RELATED THIS IS AN AUTOCAD PRODUCED DRAWING.
CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.
THIS DRAWING WAS REFORMAlTED BY AUTOCAD AT REVJSION "K". ALL fNC.CODE Detroit Edison Fermi 2 PREVIOUS APPROVAL SIGNATURES ARE ON FILE ON MICROFIU.I IN DOCUMENT CONTROL u TITLE ARRANGEMENT AND DESCRIPTIONS r-o-=nc=-cDcc.s=-=1Nc;:Cc;:cOc;,R"°'PO"'R""A"'T"°'ED"",--------,----------,-.;.PREP""'-'AR°"EI>""'aY;-t---;D;-;,AT"'E' 0 F EQUIPMENT ON REMO TE SHUTDOWN A PORTION OF THIS DRAWING TSR-32172, REV. ¢
,. AFFECTED BY THE FOLLOWINC, p AN EL H21 p 1OO ,
A 1-ccc==-====c------------t-TC--irc_HANC_E_Do_CUMENT OTHER REVISIONS:
_ _ _ _ ___,~-C~RE~CKE~D_B_Y~,-"-'TE~l--------------------------,
APERTURE CARD TITLE A I LCR 03-046-UFS REMOTE SHUTDOWN PNL H21P100 REFERENCE CARD 98-10348 APPROVED BY PLANT IDENTIFICATION SYSTEM: NUMBER MMS RECIPIENT#
C3500 PREPARED BY C. M. Brzustewicz0?/02/03 DATE OTHER APPROVALS DOCUMENT TYPE CODED DD INC NUC OPS 1801 FlLE NO. DATE ISSUED TO IS 7-/0-D3 APPROVED BY :::r- 'iU/ _ EDP POSTING ENTRIES REQUIRE THE ADDITION OF TBE ARMS STATUS CODE:
DRAWING NVMBER '.REV.
EITHER "AFC" OR "ASB" 61721-2791-01 0 8 7 6 5 4 3 2 1