Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 5, Figures
ML20335A100
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 11/18/2020
From:
Exelon Generation Co
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML20335A110 List:
References
Download: ML20335A100 (6)


Text

CASK HANDLING PIT FUEL POOL 0 0 LOWER CASK LOAD DSC DSC INTO INTO CASK FUEL POOL 1

0 FILL ANNULUS BETWEEN LOAD FUEL DSC AND CASK WITH ASSEMBLIES DEMINERAL IZED INTO DSC WATER 0 11 0 ,

CHECK 8c RECORD INSTALL AND IDENTITY 8c PRESSURIZE LOCATION OF ANNULUS SEAL EACH FUEL ASSY.

IN THE DSC 0 0 FILL DSC CAVITY PLACE TOP WITH SHIELD PLUG BORATED WATER ON DSC 0 1 DECONTAMINATE REMOVE THE OUTER SURFACE CASK/DSC OF CASK FROM FUEL POOL ISFSI LOADING OPERATIONS FLOWCHART USAR Calvert Cliffs Independent Figure 5.1-1 Spent Fuel Storage Page 1 of 3 Installation [See Reference 5.2] Revision 26

CASK DECON AREA AUX.BLDG TRUCK BAY HSM SITE 0 LOWER WATER LEVEL IN DSC WELD PLUGS OVER VENT AND MOVE CASK TO

,_.......,._lll"J SIPHON PORTS TRAILER OR MOVE CASK CAVITY AND SELF-PROPELLED TO HSM ANNULUS AND PERFORM NDE MODULAR TRANSPORTER BGE-A92.O1M SEAL WELD TOP INSTALL DSC SHIELD PLUG TOP COVER TO DSC PLATE LOWER CASK ONTO SUPPORT SKID

@) SEAL WELD PERFORM NDE ON COVER PLATE INSTALL SEAL WELD TO DSC SHELL TRUNNION RESTRAINTS


, DRAIN REMAINING WATER PERFORM NDE REMOVE FROM DSC AND ON SEAL WELD CASK BOTTOM ANNULUS COVER VACUUM INSTALL CASK INSTALL CASK DRY DSC TOP COVER PLATE INNER

  • OUTER PLUG ASSEMBLIES BACKFILL DSC CAVITY WITH HELIUM PERFORM HELIUM LEAK TEST ISFSI LOADING OPERATIONS FLOWCHART USAR Calvert Cliffs Independent Figure 5.1-1 Spent Fuel Storage Page 2 of 3 Installation [See Reference 5.2] Revision 26

HSM SHIE

INSPECT HSM I ALIGNI RAM AND I 1 I

INTERIOR F0R 1

~ PUSH D*SC OE1 BRIS, IN,TQ, HSU RE MOVE OR POSITION RE TRACT RAMI CASK 'WllH AHO PULL CASK HSM OPENING OUT 0r 1 MSM OP£NINC

  • I' I*

RE1 M0VE CASK I TOP COVER I' INSTAII..L DSC ALAT1E: 8. SIOD 1 IE ..OOWN

,........, EIRACKI[ 1 IF'AS 11'ENERS 1

1 1

1; SEISM1IC R£S,TRAINT ANO HSM DOOR

'I ALlGN AHO SEC URE HSM OOCt< CASK CLOSED DOOR WI TH HSM QPEN'ING St CURE SK J10 ANC IN5,TALL CASK ...,____.

IRESTRAJNT I SYSTEM ISFSI LOADING OPERATIONS FLOWCHART USAR Calvert Cliffs Independent Figure 5.1-1 Spent Fuel Storage Page 3 of 3 Installation [See Reference 5.2] Revision 26

HSM SITE 0 0 REMOVE OR RETRACT RAU POSIT ION CASI< Nm PULL CASK WITH HSM OUT OF HSM OPENING

© 1 I SECIR: CASK ON REMOVE HSM TRAILER OR DOOR Nm DSC SELF -PROPELLED SEISMIC MOOILM TRMSPORTER Ml>

RESTRAINT INSTALL TOP COVER PLATE 1 r AL ICN Nm DOCK REPLACE CASK WITH DOOR HSM OPENING ON HSM 0

INST ALL CASI< MOVE CASI<

RESTRAINT TO NEXT SYSTEM LOCATION ON SITE 1

ALIGN AND REMOVE CASI<

EXTEND RAU INNER Nm OUTER T_.OUGH CASI< PLUG INTO HSM ASSEMBLIES

© I PULL DSC OUT INSTALL CASI<

Of' HSM INTO BOTTOM CASI< WITH RAM COVER

~ ............. _

ISFSI RETRIEVAL OPERATIONS FLOWCHART USAR Calvert Cliffs Independent Figure 5.1-2 Spent Fuel Storage Page 1 of 3 Installation [See Reference 5.2] Revision 26

CASK llECDtl PII &IK.11.llf:i. TB!&K BAY

@) @

PLACE CASK REMOVE IN OECON - CASK

- TRUNNION PIT RESTRAINTS REMOVE CASK TOP COVER PLATE -

@ t LIFT CASK/DSC F'ROM TRAILER OR SELF'-PROPELLEO MOOULM TRANSPORTER REMOVE DSC BCE*A92.0N TOP COVER PLATE DRILL OUT VENT AND SIPHON PORT PLUGS

©

  • FILL DSC WITH BORATED WATER

@) FILL DSC AND CASK ANNULUS WITH WATER REMOVE SEAL WELD FROM DSC TOP COVER PLATE REMOVE DSC TOP COVER PLATE i

@ REMOVE SEAL WELD FROM TOP PLUG ASSEMBLY ISFSI RETRIEVAL OPERATIONS FLOWCHART USAR Calvert Cliffs Independent Figure 5.1-2 Spent Fuel Storage Page 2 of 3 Installation [See Reference 5.2] Revision 26

CASK DEGON PIT FUEL POOL 4 h

@)

MOVE CASK TO SPENT FUEL POOL

... REMOVE WATER FROM DSC CAVITY LOWER CASK INTO POOL

_. MOVE CASK TO CASK DEGON PIT 30 @ ' '

DECONTAMINATE SEAL WELD TOP EXTERIOR

- SHIELD PLUG REMOVE DSC TOP SURFACE AND COVER SHIELD PLUG OF CASK PLATE TO DSC

@) I PROCESSOR REMOVE FUEL STORE DSC AS ASSEMBLIES LOW LEVEL FROM DSC WASTE PLACE TOP SHIELD PLUG _..

ONTO DSC BGE-A92.01M ,,

Figure 5.1-2 ISFSI Retrieval Operations Flowchart Page 3 of 3

[See Reference 5.2]

Rev. 1