Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 6, Site Generated Waste Confinement and Management
ML20335A098
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 11/18/2020
From:
Exelon Generation Co
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML20335A110 List:
References
Download: ML20335A098 (9)


Text

CHAPTER 6 SITE GENERATED WASTE CONFINEMENT AND MANAGEMENT LIST OF EFFECTIVE PAGES PAGE REVISION PAGE REVISION LEP 6-1 20 6-i 8 6-ii 8 6.1-1 8 6.2-1 20 6.3-1 8 6.4-1 8 6.5-1 8 6.6-1 8 CALVERT CLIFFS ISFSI USAR LEP 6-1 Rev. 20

CHAPTER 6 SITE GENERATED WASTE CONFINEMENT AND MANAGEMENT TABLE OF CONTENTS PAGE 6.0 SITE GENERATED WASTE CONFINEMENT AND MANAGEMENT 6.1-1 6.1 ON-SITE WASTE SOURCES 6.1-1 6.2 OFF-GAS TREATMENT AND VENTILATION 6.2-1 6.3 LIQUID WASTE TREATMENT AND RETENTION 6.3-1 6.4 SOLID WASTES 6.4-1 6.5 RADIOLOGICAL IMPACT OF NORMAL OPERATIONS -

SUMMARY

6.5-1 6.6 REFERENCE 6.6-1 CALVERT CLIFFS ISFSI USAR 6-i Rev. 8

CHAPTER 6 SITE GENERATED WASTE CONFINEMENT AND MANAGEMENT LIST OF ACRONYMS DSC Dry Shielded Canister ISFSI Independent Spent Fuel Storage Installation CALVERT CLIFFS ISFSI USAR 6-ii Rev. 8

6.0 SITE GENERATED WASTE CONFINEMENT AND MANAGEMENT 6.1 ON-SITE WASTE SOURCES No radioactive wastes are generated during the storage life of the dry shielded canisters (DSCs). Radioactive wastes generated during loading operations are treated using existing Calvert Cliffs Nuclear Power Plant facilities and procedures.

CALVERT CLIFFS ISFSI USAR 6.1-1 Rev. 8

6.2 OFF-GAS TREATMENT AND VENTILATION No radioactive off-gas is produced at the Independent Spent Fuel Storage Installation (ISFSI).

Potentially contaminated air, nitrogen, and helium purged from the DSC during evacuation are directed to the Auxiliary Building processing systems or the spent fuel pool.

CALVERT CLIFFS ISFSI USAR 6.2-1 Rev. 20

6.3 LIQUID WASTE TREATMENT AND RETENTION No liquid waste is produced at the ISFSI. Contaminated pool water removed from loaded DSCs will normally be drained back into the spent fuel pool with no additional processing. A small amount (<15 ft3/DSC) of liquid waste results from transfer cask decontamination. The decontamination procedure results in a small amount of a detergent/demineralized water mixture being collected in the cask washdown pit. Liquid wastes collected in the cask washdown pit are directed to the power plant Liquid Waste Processing System described in Section 11.1.2.1 of Reference 6.1.

CALVERT CLIFFS ISFSI USAR 6.3-1 Rev. 8

6.4 SOLID WASTES No solid waste is produced at the ISFSI. A small quantity (<2 ft3/DSC) of low level solid waste is generated as a result of DSC loading operations and transfer cask decontamination. The solid waste generated is processed by compaction using the Solid Waste Processing System as described in Section 11.1.2.3 of Reference 6.1. This low level waste consists of disposable Anti-C garments, tape, decon cloths, etc.

CALVERT CLIFFS ISFSI USAR 6.4-1 Rev. 8

6.5 RADIOLOGICAL IMPACT OF NORMAL OPERATIONS

SUMMARY

No gaseous, liquid, or solid wastes are generated at the ISFSI. The small volumes of these wastes generated in the Auxiliary Building will have no significant impact on the ability of existing plant systems to process them.

CALVERT CLIFFS ISFSI USAR 6.5-1 Rev. 8

6.6 REFERENCE 6.1 Calvert Cliffs Nuclear Power Plant, Updated Final Safety Analysis Report, Docket Nos. 50-317 and 50-318, Baltimore Gas and Electric Company CALVERT CLIFFS ISFSI USAR 6.6-1 Rev. 8