2 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A, Figures - Redacted
ML20309A758
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 10/08/2020
From:
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20309A875 List: ... further results
References
RA-19-0424
Download: ML20309A758 (110)


Text

McGuire Nuclear Station UFSAR Appendix 9B. Figures Appendix 9B. Figures

McGuire Nuclear Station UFSAR Figure 9-1 (Page 1 of 1)

Figure 9-1. Fuel Building - General Arrangement (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-2 (Page 1 of 1)

Figure 9-2. Fuel Building Section (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-3 (Page 1 of 3)

Figure 9-3. Cask Drop Evaluation (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-3 (Page 2 of 3)

(14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-3 (Page 3 of 3)

(14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-4 (Page 1 of 1)

Figure 9-4. Cask Drop Evaluation (27 MAR 2002)

McGuire Nuclear Station UFSAR Figure 9-5 (Page 1 of 1)

Figure 9-5. Tornado Missile Study (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-6 (Page 1 of 1)

Figure 9-6. Spent Fuel Pool Arrangement Unit 1 (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-7 (Page 1 of 1)

Figure 9-7. Spent Fuel Pool Arrangement Unit 2 (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-8 (Page 1 of 1)

Figure 9-8. Deleted Per 1996 Update (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-9 (Page 1 of 1)

Figure 9-9. Fuel Storage Rack Assembly (Region 1)

(14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-10 (Page 1 of 1)

Figure 9-10. Fuel Storage Rack Module (Region 2)

(14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-11 (Page 1 of 1)

Figure 9-11. Region 1 Cell Layout (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-12 (Page 1 of 1)

Figure 9-12. Region 2 Cell Layout (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-13 (Page 1 of 1)

Figure 9-13. Summary Flow Diagram Spent Fuel Cooling System (KF)

(14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-14 (Page 1 of 1)

Figure 9-14. Reactor Manipulator Crane (30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 9-15 (Page 1 of 1)

Figure 9-15. Deleted Per 2009 Update (10 OCT 2009)

McGuire Nuclear Station UFSAR Figure 9-16 (Page 1 of 1)

Figure 9-16. Fuel Pool Manipulator Crane (30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 9-17 (Page 1 of 1)

Figure 9-17. New Fuel Elevator (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-18 (Page 1 of 1)

Figure 9-18. Fuel Transfer System (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-19 (Page 1 of 1)

Figure 9-19. Rod Cluster Control Changing Fixture (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-20 (Page 1 of 1)

Figure 9-20. Spacer for Spent Fuel Storage (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-21 (Page 1 of 1)

Figure 9-21. Reactor Vessel Head Lifting Device (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-22 (Page 1 of 1)

Figure 9-22. Reactor Internals Lifting Device (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-23 (Page 1 of 1)

Figure 9-23. Reactor Vessel Stud Tensioner (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-24 (Page 1 of 1)

Figure 9-24. Auxiliary and Reactor Building Refueling Canal Layout/Longitudinal Section (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-25 (Page 1 of 1)

Figure 9-25. Flow Diagram of Recirculated Cooling Water System (30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 9-26 (Page 1 of 1)

Figure 9-26. Flow Diagram of Recirculated Cooling Water System (KR)

(14 APR 2005)

McGuire Nuclear Station UFSAR Figure 9-27 (Page 1 of 1)

Figure 9-27. Flow Diagram of Recirculated Cooling Water System (KR)

(06 OCT 2003)

McGuire Nuclear Station UFSAR Figure 9-28 (Page 1 of 1)

Figure 9-28. Flow Diagram of Recirculated Cooling Water System (KR)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 9-29 (Page 1 of 1)

Figure 9-29. Flow Diagram of Recirculated Cooling Water System (KR)

(06 OCT 2003)

McGuire Nuclear Station UFSAR Figure 9-30 (Page 1 of 1)

Figure 9-30. Flow Diagram of Recirculated Cooling Water System (KR)

(14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-31 (Page 1 of 1)

Figure 9-31. Nuclear Service Water System (RN)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figures 9 9-38 (Page 1 of 1)

Figure 9-32. Deleted Per 1993 Update Figure 9-33. Deleted Per 1993 Update Figure 9-34. Deleted Per 1993 Update Figure 9-35. Deleted Per 1993 Update Figure 9-36. Deleted Per 1993 Update Figure 9-37. Deleted Per 1993 Update Figure 9-38. Deleted Per 1991 Update (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-39 (Page 1 of 1)

Figure 9-39. Residual Decay Heat (09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 9-40 (Page 1 of 1)

Figure 9-40. Residual Decay Heat (09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 9-41 (Page 1 of 1)

Figure 9-41. Total Heat Rejected (09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 9-42 (Page 1 of 1)

Figure 9-42. Standby Nuclear Service Water Pond Area/Volume Curve (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-43 (Page 1 of 1)

Figure 9-43. Low Level Nuclear Service Water Pipe and Standby Nuclear Service Water Pipe Routing Plan Security-Related Information - Figure Withheld Under 10 CFR 2.390 (24 APR 2014)

McGuire Nuclear Station UFSAR Figure 9-44 (Page 1 of 1)

Figure 9-44. Profile of Standby Nuclear Service Water Pipes (09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 9-45 (Page 1 of 1)

Figure 9-45. Profile of Low Level Nuclear Service Water Pipe (24 APR 2014)

McGuire Nuclear Station UFSAR Figures 9 9-53 (Page 1 of 1)

Figure 9-46. Deleted Per 2012 Update Figure 9-47. Deleted Per 2012 Update Figure 9-48. Deleted Per 2012 Update Figure 9-49. Deleted Per 2012 Update Figure 9-50. Deleted Per 2012 Update Figure 9-51. Deleted Per 2012 Update Figure 9-52. Deleted Per 2012 Update Figure 9-53. Deleted Per 2012 Update (30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 9-54 (Page 1 of 1)

Figure 9-54. Flow Diagram of Conventional Low Pressure Service Water System (RL)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 9-55 (Page 1 of 1)

Figure 9-55. Flow Diagram of Conventional Low Pressure Water System (RL) (Service Bldg.

Cooling Coils)

(14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-56 (Page 1 of 1)

Figure 9-56. Flow Diagram of Conventional Low Pressure Service Water System (RL)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 9-57 (Page 1 of 1)

Figure 9-57. Component Cooling System (14 OCT 2000)

McGuire Nuclear Station UFSAR Figures 9 9-64 (Page 1 of 1)

Figure 9-58. Deleted Per 1996 Update Figure 9-59. Deleted Per 1996 Update Figure 9-60. Deleted Per 1996 Update Figure 9-61. Deleted Per 1996 Update Figure 9-62. Deleted Per 1996 Update Figure 9-63. Deleted Per 1996 Update Figure 9-64. Deleted Per 1996 Update (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-65 (Page 1 of 1)

Figure 9-65. Refueling Water System (FW)

(13 APR 2008)

McGuire Nuclear Station UFSAR Figure 9-66 (Page 1 of 1)

Figure 9-66. Flow Diagram of Filtered Water System (24 APR 2014)

McGuire Nuclear Station UFSAR Figure 9-67 (Page 1 of 1)

Figure 9-67. Flow Diagram of Filtered Water System (YF)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 9-68 (Page 1 of 1)

Figure 9-68. Filtered Water System (YF)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 9-69 (Page 1 of 1)

Figure 9-69. Flow Diagram of Makeup Demineralized Water System (YM)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 9-70 (Page 1 of 1)

Figure 9-70. Flow Diagram of Makeup Demineralized Water System (YM)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 9-71 (Page 1 of 1)

Figure 9-71. Flow Diagram of Makeup Demineralized Water System (YM)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 9-72 (Page 1 of 1)

Figure 9-72. Flow Diagram of Makeup Demineralized Water System (YM)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 9-73 (Page 1 of 1)

Figure 9-73. Makeup Demineralized Water System (YM)

(22 APR 2017)

McGuire Nuclear Station UFSAR Figure 9-74 (Page 1 of 1)

Figure 9-74. Flow Diagram of Makeup Demineralized Water System (YM)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 9-75 (Page 1 of 2)

Figure 9-75. Flow Diagram of Makeup Demineralized Water System (YM)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 9-75 (Page 2 of 2)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 9-76 (Page 1 of 1)

Figure 9-76. Flow Diagram of Drinking Water System (YD)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 9-77 (Page 1 of 1)

Figure 9-77. Flow Diagram of Conventional Waste Water Treatment System (WC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 9-78 (Page 1 of 1)

Figure 9-78. Deleted Per 1993 Update (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-79 (Page 1 of 1)

Figure 9-79. Summary Flow Diagram of Instrument Air System (VI)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figures 9 9-82 (Page 1 of 1)

Figure 9-80. Deleted Per 1993 Update Figure 9-81. Deleted Per 1993 Update Figure 9-82. Deleted Per 1993 Update (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-83 (Page 1 of 1)

Figure 9-83. Flow Diagram of Station Air System This figure is currently unavailable in an electronic format. It can be located in a hardcopy version of the UFSAR.

(14 OCT 2000)

McGuire Nuclear Station UFSAR Figures 9 9-89 (Page 1 of 1)

Figure 9-84. Deleted Per 1993 Update Figure 9-85. Deleted Per 1993 Update Figure 9-86. Deleted Per 1993 Update Figure 9-87. Deleted Per 1993 Update Figure 9-88. Deleted Per 1993 Update Figure 9-89. Deleted Per 1993 Update (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-90 (Page 1 of 1)

Figure 9-90. Summary Flow Diagram Of Nuclear Sampling System (NM)

(11 NOV 2006)

McGuire Nuclear Station UFSAR Figure 9-91 (Page 1 of 1)

Figure 9-91. Flow Diagram of Nuclear Sampling System (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-92 (Page 1 of 1)

Figure 9-92. Flow Diagram of Nuclear Sampling System (09 OCT 2015)

McGuire Nuclear Station UFSAR Figures 9-93 95 (Page 1 of 1)

Figure 9-93. Deleted Per 1996 Update Figure 9-94. Deleted Per 1993 Update Figure 9-95. Deleted Per 1993 Update (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-96 (Page 1 of 1)

Figure 9-96. Flow Diagram of Chemical and Volume Control System (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-97 (Page 1 of 1)

Figure 9-97. Deleted Per 1993 Update (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-98 (Page 1 of 1)

Figure 9-98. Summary Flow Diagram of Chemical and Volume Control System (NV)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figures 9 9-106 (Page 1 of 1)

Figure 9-99. Deleted Per 1993 Update Figure 9-100. Deleted Per 1993 Update Figure 9-101. Deleted Per 1993 Update Figure 9-102. Deleted Per 1993 Update Figure 9-103. Deleted Per 1993 Update Figure 9-104. Deleted Per 1993 Update Figure 9-105. Deleted Per 1993 Update Figure 9-106. Deleted Per 1993 Update (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-107 (Page 1 of 1)

Figure 9-107. Flow Diagram of Boron Thermal Regeneration System (NR)

(30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 9-108 (Page 1 of 1)

Figure 9-108. Flow Diagram of Boron Thermal Regeneration System (30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 9-109 (Page 1 of 1)

Figure 9-109. Deleted Per 2012 Update (30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 9-110 (Page 1 of 1)

Figure 9-110. Flow Diagram of Boron Recycle System (NB)

(14 OCT 2000)

McGuire Nuclear Station UFSAR Figures 9-111 116 (Page 1 of 1)

Figure 9-111. Deleted Per 1994 Update Figure 9-112. Deleted Per 1994 Update Figure 9-113. Deleted Per 1994 Update Figure 9-114. Deleted Per 1994 Update Figure 9-115. Deleted Per 1994 Update Figure 9-116. Deleted Per 2002 Update (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-117 (Page 1 of 1)

Figure 9-117. Flow Diagram of Auxiliary Building Ventilation System (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-118 (Page 1 of 1)

Figure 9-118. Flow Diagram of Auxiliary Building Ventilation System (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-119 (Page 1 of 2)

Figure 9-119. Summary Flow Diagram of Auxiliary Building Ventilation (VA) System (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-119 (Page 2 of 2)

(14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-120 (Page 1 of 1)

Figure 9-120. Flow Diagram of Turbine Building Ventilation System (10 OCT 2009)

McGuire Nuclear Station UFSAR Figure 9-121 (Page 1 of 1)

Figure 9-121. Flow Diagram of Containment Purge and Ventilation System (VP)

(13 APR 2008)

McGuire Nuclear Station UFSAR Figure 9-122 (Page 1 of 1)

Figure 9-122. Deleted Per 1994 Update (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-123 (Page 1 of 1)

Figure 9-123. Flow Diagram of Diesel Building Ventilation System (27 MAR 2002)

McGuire Nuclear Station UFSAR Figure 9-124 (Page 1 of 1)

Figure 9-124. Deleted Per 2018 Update (13 OCT 2018)

McGuire Nuclear Station UFSAR Figure 9-125 (Page 1 of 1)

Figure 9-125. Deleted Per 2018 Update (13 OCT 2018)

McGuire Nuclear Station UFSAR Figures 9-126 131 (Page 1 of 1)

Figure 9-126. Deleted Per 1993 Update Figure 9-127. Deleted Per 1993 Update Figure 9-128. Deleted Per 1993 Update Figure 9-129. Deleted Per 1993 Update Figure 9-130. Deleted Per 1993 Update Figure 9-131. Deleted Per 1993 Update (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-132 (Page 1 of 1)

Figure 9-132. Communication Systems Security-Related Information - Figure Withheld Under 10 CFR 2.390 (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-133 (Page 1 of 1)

Figure 9-133. Communication Systems Security-Related Information - Figure Withheld Under 10 CFR 2.390 (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-134 (Page 1 of 1)

Figure 9-134. Communication Systems Security-Related Information - Figure Withheld Under 10 CFR 2.390 (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-135 (Page 1 of 1)

Figure 9-135. Communication Systems (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-136 (Page 1 of 1)

Figure 9-136. Communication Systems Security-Related Information - Figure Withheld Under 10 CFR 2.390 (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-137 (Page 1 of 1)

Figure 9-137. Communication Systems Security-Related Information - Figure Withheld Under 10 CFR 2.390 (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-138 (Page 1 of 1)

Figure 9-138. Communication Systems Security-Related Information - Figure Withheld Under 10 CFR 2.390 (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-139 (Page 1 of 1)

Figure 9-139. Flow Diagram of Diesel Generator Engine "1A" Fuel Oil System (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-140 (Page 1 of 1)

Figure 9-140. Deleted Per 1993 Update (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-141 (Page 1 of 1)

Figure 9-141. Flow Diagram of Diesel Generator Engine Cooling Water System (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-142 (Page 1 of 1)

Figure 9-142. Deleted Per 1993 Update (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-143 (Page 1 of 1)

Figure 9-143. Flow Diagram of Diesel Generator Engine Starting Air System (VG)

(13 OCT 2018)

McGuire Nuclear Station UFSAR Figure 9-144 (Page 1 of 1)

Figure 9-144. Flow Diagram of Diesel Generator Engine Lube Oil System (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-145 (Page 1 of 1)

Figure 9-145. Deleted Per 1993 Update (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-146 (Page 1 of 1)

Figure 9-146. Groundwater Drainage System (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-147 (Page 1 of 1)

Figure 9-147. Flow Diagram of Diesel Generator Engine Crankcase Vacuum System (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-148 (Page 1 of 1)

Figure 9-148. Flow Diagram of Diesel Generator Room Sump Pump System (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-149 (Page 1 of 1)

Figure 9-149. Flow Diagram of Diesel Generator Engine Air Intake & Exhaust System (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 9-150 (Page 1 of 1)

Figure 9-150. Containment Air Release and Addition System (14 OCT 2000)