ML20309A748

From kanterella
Jump to navigation Jump to search
2 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Figures
ML20309A748
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 10/08/2020
From:
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20309A875 List: ... further results
References
RA-19-0424
Download: ML20309A748 (206)


Text

McGuire Nuclear Station UFSAR Appendix 15B. Figures Appendix 15B. Figures

McGuire Nuclear Station UFSAR Figure 15-1 (Page 1 of 1)

Figure 15-1. Illustration of Overtemperature and Overpower T Protection (14 OCT 2000)

McGuire Nuclear Station UFSAR Figures 15 15-6 (Page 1 of 1)

Figure 15-2. Deleted Per 1998 Update.

Figure 15-3. Deleted Per 1998 Update.

Figure 15-4. Deleted Per 1998 Update.

Figure 15-5. Deleted Per 1998 Update.

Figure 15-6. Deleted Per 1998 Update.

(14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-7 (Page 1 of 1)

Figure 15-7. Excessive Increase in Feedwater Flow (11 NOV 2006)

McGuire Nuclear Station UFSAR Figure 15-8 (Page 1 of 1)

Figure 15-8. Excessive Increase in Feedwater Flow (11 NOV 2006)

McGuire Nuclear Station UFSAR Figure 15-9 (Page 1 of 1)

Figure 15-9. Ten Percent Step Load Increase, Minimum Reactivity Feedback, Manual Reactor Control (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-10 (Page 1 of 1)

Figure 15-10. Ten Percent Step Load Increase, Minimum Reactivity Feedback, Manual Reactor Control (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-11 (Page 1 of 1)

Figure 15-11. Ten Percent Step Load Increase, Maximum Reactivity Feedback, Manual Reactor Control (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-12 (Page 1 of 1)

Figure 15-12. Ten Percent Step Load Increase, Maximum Reactivity Feedback, Manual Reactor Control (13 APR 2008)

McGuire Nuclear Station UFSAR Figures 15 15-16 (Page 1 of 1)

Figure 15-13. Deleted Per 1998 Update Figure 15-14. Deleted Per 1998 Update Figure 15-15. Deleted Per 1998 Update Figure 15-16. Deleted Per 1998 Update (31 DEC 2007)

McGuire Nuclear Station UFSAR Figure 15-17 (Page 1 of 1)

Figure 15-17. Reactivity Versus Moderator Temperature (09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-18 (Page 1 of 4)

Figure 15-18. Failure of a Steam Generator Safety or Dump Valve (10 OCT 2009)

McGuire Nuclear Station UFSAR Figure 15-18 (Page 2 of 4)

(10 OCT 2009)

McGuire Nuclear Station UFSAR Figure 15-18 (Page 3 of 4)

(10 OCT 2009)

McGuire Nuclear Station UFSAR Figure 15-18 (Page 4 of 4)

(10 OCT 2009)

McGuire Nuclear Station UFSAR Figure 15-19 (Page 1 of 4)

Figure 15-19. Failure of a Steam Generator Safety or Dump Valve (10 OCT 2009)

McGuire Nuclear Station UFSAR Figure 15-19 (Page 2 of 4)

(10 OCT 2009)

McGuire Nuclear Station UFSAR Figure 15-19 (Page 3 of 4)

(10 OCT 2009)

McGuire Nuclear Station UFSAR Figure 15-19 (Page 4 of 4)

(10 OCT 2009)

McGuire Nuclear Station UFSAR Figure 15-20 (Page 1 of 1)

Figure 15-20. Deleted Per 1998 Update.

(14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-21 (Page 1 of 1)

Figure 15-21. Steamline Break, Offsite Power Maintained 1200 1000 STEAM LINE PRESSURE, PSIG 800 600 FAULTED LOOP INTACT LOOPS 400 200 0

0 25 50 75 100 125 150 175 200 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-22 (Page 1 of 1)

Figure 15-22. Steamline Break, Offsite Power Maintained 600 550 COLD LEG TEMPERATURE, °F 500 450 400 FAULTED LOOP INTACT LOOPS 350 300 0 25 50 75 100 125 150 175 200 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-23 (Page 1 of 1)

Figure 15-23. Steamline Break, Offsite Power Maintained 600 550 HOT LEG TEMPERATURE, °F 500 450 400 FAULTED LOOP INTACT LOOPS 350 300 0 25 50 75 100 125 150 175 200 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-24 (Page 1 of 1)

Figure 15-24. Steamline Break, Offsite Power Maintained 20 18 CORE AVERAGE BORON CONCENTRATION, ppmB 16 14 12 10 8

6 4

2 0

0 25 50 75 100 125 150 175 200 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-25 (Page 1 of 1)

Figure 15-25. Steamline Break, Offsite Power Maintained 1000 500 CORE REACTIVITY, PCM 0

-500

-1000

-1500 0 25 50 75 100 125 150 175 200 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-26 (Page 1 of 1)

Figure 15-26. Steamline Break, Offsite Power Maintained 40 35 CORE AVERAGE NEUTRON POWER, % OF 3411 MWth 30 25 20 15 10 5

0 0 25 50 75 100 125 150 175 200 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-27 (Page 1 of 1)

Figure 15-27. Turbine Trip, Maximum Secondary Pressure Case (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-28 (Page 1 of 1)

Figure 15-28. Turbine Trip, Maximum Secondary Pressure Case (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-29 (Page 1 of 1)

Figure 15-29. Turbine Trip, Maximum Secondary Pressure Case (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-30 (Page 1 of 1)

Figure 15-30. Turbine Trip, Maximum Secondary Pressure Case (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-31 (Page 1 of 1)

Figure 15-31. Turbine Trip, Maximum Secondary Pressure Case (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-32 (Page 1 of 1)

Figure 15-32. Turbine Trip, Maximum Primary Pressure Case (11 NOV 2006)

McGuire Nuclear Station UFSAR Figures 15 15-34 (Page 1 of 1)

Figure 15-33. Deleted Per 2006 Update Figure 15-34. Deleted Per 2006 Update (31 DEC 2007)

McGuire Nuclear Station UFSAR Figure 15-35 (Page 1 of 1)

Figure 15-35. Loss of Offsite Power (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-36 (Page 1 of 1)

Figure 15-36. Loss of Offsite Power (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-37 (Page 1 of 1)

Figure 15-37. Loss of Offsite Power (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-38 (Page 1 of 3)

Figure 15-38. Loss of Normal Feedwater (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-38 (Page 2 of 3)

(13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-38 (Page 3 of 3)

(13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-39 (Page 1 of 2)

Figure 15-39. Loss of Normal Feedwater (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-39 (Page 2 of 2)

(13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-40 (Page 1 of 1)

Figure 15-40. Feedwater System Pipe Break, Long Term Core Cooling Analysis (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-41 (Page 1 of 1)

Figure 15-41. Feedwater System Pipe Break, Long Term Core Cooling Analysis (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-42 (Page 1 of 1)

Figure 15-42. Feedwater System Pipe Break, Long Term Core Cooling Analysis (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-43 (Page 1 of 1)

Figure 15-43. Feedwater System Pipe Break, Long Term Core Cooling Analysis (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-44 (Page 1 of 1)

Figure 15-44. Feedwater System Pipe Break, Long Term Core Cooling Analysis (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-45 (Page 1 of 1)

Figure 15-45. Feedwater System Pipe Break, Long Term Core Cooling Analysis (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-46 (Page 1 of 1)

Figure 15-46. Feedwater System Pipe Break, Long Term Core Cooling Analysis (14 OCT 2000)

McGuire Nuclear Station UFSAR Figures 15 15-50 (Page 1 of 1)

Figure 15-47. Deleted Per 1992 Update Figure 15-48. Deleted Per 1992 Update Figure 15-49. Deleted Per 1992 Update Figure 15-50. Deleted Per 1992 Update (31 DEC 2007)

McGuire Nuclear Station UFSAR Figure 15-51 (Page 1 of 1)

Figure 15-51. Partial Loss of Forced Reactor Coolant Flow (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-52 (Page 1 of 1)

Figure 15-52. Partial Loss of Forced Reactor Coolant Flow (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-53 (Page 1 of 1)

Figure 15-53. Partial Loss of Forced Reactor Coolant Flow (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-54 (Page 1 of 1)

Figure 15-54. Partial Loss of Forced Reactor Coolant Flow (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-55 (Page 1 of 1)

Figure 15-55. Deleted per 2003 Update (06 OCT 2003)

McGuire Nuclear Station UFSAR Figure 15-56 (Page 1 of 1)

Figure 15-56. Complete Loss of Forced Reactor Coolant Flow 1.0 0.9 TOTAL RCS FLOW (FRACTION OF INITIAL) 0.8 0.7 0.6 0.5 0.4 0 1 2 3 4 5 6 7 8 9 10 TIME (SECONDS)

(06 OCT 2003)

McGuire Nuclear Station UFSAR Figure 15-57 (Page 1 of 1)

Figure 15-57. Complete Loss of Forced Reactor Coolant Flow 1.0 0.8 REACTOR POWER (FRACTION OF INITIAL) 0.6 0.4 0.2 0.0 0 1 2 3 4 5 6 7 8 9 10 TIME (SECONDS)

(06 OCT 2003)

McGuire Nuclear Station UFSAR Figure 15-58 (Page 1 of 1)

Figure 15-58. Complete Loss of Forced Reactor Coolant Flow 1.0 CORE AVERAGE HEAT FLUX (FRACTION OF NOMINAL) 0.8 0.6 0.4 0.2 0 1 2 3 4 5 6 7 8 9 10 TIME (SECONDS)

(06 OCT 2003)

McGuire Nuclear Station UFSAR Figure 15-59 (Page 1 of 1)

Figure 15-59. Complete Loss of Forced Reactor Coolant Flow 590 588 LOOP AVERAGE TEMPERATURE (DEG F) 586 584 582 580 0 1 2 3 4 5 6 7 8 9 10 TIME (SECONDS)

(06 OCT 2003)

McGuire Nuclear Station UFSAR Figure 15-60 (Page 1 of 1)

Figure 15-60. Complete Loss of Forced Reactor Coolant Flow 2400 2350 PRESSURIZER PRESSURE (PSIG) 2300 2250 2200 2150 0 1 2 3 4 5 6 7 8 9 10 TIME (SECONDS)

(06 OCT 2003)

McGuire Nuclear Station UFSAR Figure 15-61 (Page 1 of 1)

Figure 15-61. Deleted per 2003 Update (06 OCT 2003)

McGuire Nuclear Station UFSAR Figure 15-62 (Page 1 of 1)

Figure 15-62. Locked Rotor RCS Flow (Fraction of Initial) - Offsite Power Lost 1.2 1.0 0.8 RCS FLOW (FRACTION OF INITIAL) 0.6 0.4 0.2 0.0 Faulted Loop

-0.2 Intact Loop

-0.4 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 TIME (SECONDS)

(06 OCT 2003)

McGuire Nuclear Station UFSAR Figure 15-63 (Page 1 of 1)

Figure 15-63. Uncontrolled RCCA Bank Withdrawal at HZP 2.0 1.0 0.0 REACTIVITY ($)

-1.0

-2.0

-3.0

-4.0 0 2 4 6 8 10 12 14 16 18 20 TIME (SEC)

(30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-64 (Page 1 of 1)

Figure 15-64. Uncontrolled RCCA Bank Withdrawal at HZP 300.0 250.0 200.0 NEUTRON POWER (% FP) 150.0 100.0 50.0 0.0 0 2 4 6 8 10 12 14 16 18 20 TIME (SEC)

(30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-65 (Page 1 of 1)

Figure 15-65. Uncontrolled RCCA Bank Withdrawal at HZP 300.0 250.0 200.0 NEUTRON POWER (% FP) 150.0 100.0 50.0 0.0 0 2 4 6 8 10 12 14 16 18 20 TIME (SEC)

(30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-66 (Page 1 of 1)

Figure 15-66. Uncontrolled RCCA Bank Withdrawal at HZP 1100.0 1000.0 FUEL AVERAGE TEMPERATURE (DEG F) 900.0 800.0 700.0 600.0 500.0 0 2 4 6 8 10 12 14 16 18 20 TIME (SECONDS)

(30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-67 (Page 1 of 1)

Figure 15-67. Uncontrolled RCCA Bank Withdrawal at HZP 650.0 640.0 Single Loop (RCP off) T-hot Triple Loop T-hot 630.0 Single Loop T-cold HOT & COLD LEG TEMPERATURES (DEG F)

Triple Loop T-cold 620.0 610.0 600.0 590.0 580.0 570.0 560.0 550.0 0 2 4 6 8 10 12 14 16 18 20 TIME (SEC)

(30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-68 (Page 1 of 1)

Figure 15-68. Uncontrolled RCCA Bank Withdrawal at HZP 8.0 7.0 MDNBR (WRB-2M CHF CORRELATION) 6.0 5.0 4.0 3.0 2.0 1.0 0 5 10 15 20 TIME (SEC)

(30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-69 (Page 1 of 1)

Figure 15-69. Uncontrolled RCCA Bank Withdrawal from 10% Power (30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-70 (Page 1 of 1)

Figure 15-70. Uncontrolled RCCA Bank Withdrawal from 10% Power (30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-71 (Page 1 of 1)

Figure 15-71. Uncontrolled RCCA Bank Withdrawal from 10% Power 600 595 RCS LOOP AVERAGE TEMPERATURE (DEG F) 590 585 580 575 570 565 560 555 0 10 20 30 40 50 60 70 TIME (SECONDS)

(30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-72 (Page 1 of 1)

Figure 15-72. Uncontrolled RCCA Bank Withdrawal from 10% Power (30 NOV 2012)

McGuire Nuclear Station UFSAR Figures 15 15-75 (Page 1 of 1)

Figure 15-73. Deleted per 2003 Update Figure 15-74. Deleted per 2003 Update Figure 15-75. Deleted per 2003 Update (31 DEC 2007)

McGuire Nuclear Station UFSAR Figure 15-76 (Page 1 of 1)

Figure 15-76. Single RCCA Withdrawal (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-77 (Page 1 of 1)

Figure 15-77. Startup of an Inactive Reactor Coolant Pump at an Incorrect Temperature (11 NOV 2006)

McGuire Nuclear Station UFSAR Figure 15-78 (Page 1 of 1)

Figure 15-78. Startup of an Inactive Reactor Coolant Pump at an Incorrect Temperature (11 NOV 2006)

McGuire Nuclear Station UFSAR Figure 15-79 (Page 1 of 1)

Figure 15-79. Startup of an Inactive Reactor Coolant Pump at an Incorrect Temperature (11 NOV 2006)

McGuire Nuclear Station UFSAR Figure 15-80 (Page 1 of 1)

Figure 15-80. Startup of an Inactive Reactor Coolant Pump at an Incorrect Temperature (11 NOV 2006)

McGuire Nuclear Station UFSAR Figure 15-81 (Page 1 of 1)

Figure 15-81. Startup of an Inactive Reactor Coolant Pump at an Incorrect Temperature (11 NOV 2006)

McGuire Nuclear Station UFSAR Figure 15-82 (Page 1 of 1)

Figure 15-82. Interchange Between Region 1 and Region 3 Assembly (05 APR 2011)

McGuire Nuclear Station UFSAR Figure 15-83 (Page 1 of 1)

Figure 15-83. Interchange Between Region 1 and Region 2 Assembly, Burnable Poison Rods Being Retained by the Region 2 Assembly (05 APR 2011)

McGuire Nuclear Station UFSAR Figure 15-84 (Page 1 of 1)

Figure 15-84. Interchange Between Region 1 and Region 2 Assembly, Burnable Poison Rods Being Transferred to the Region 1 Assembly (05 APR 2011)

McGuire Nuclear Station UFSAR Figure 15-85 (Page 1 of 1)

Figure 15-85. Enrichment Error: A Region 2 Assembly Loaded into the Core Central Position (05 APR 2011)

McGuire Nuclear Station UFSAR Figure 15-86 (Page 1 of 1)

Figure 15-86. Loading a Region 2 Assembly into a Region 1 Position Near Core Periphery (05 APR 2011)

McGuire Nuclear Station UFSAR Figure 15-87 (Page 1 of 1)

Figure 15-87. Single RCCA Withdrawal (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-88 (Page 1 of 1)

Figure 15-88. Single RCCA Withdrawal (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-89 (Page 1 of 1)

Figure 15-89. Single RCCA Withdrawal (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-90 (Page 1 of 1)

Figure 15-90. Dropped Rod Accident (22 APR 2017)

McGuire Nuclear Station UFSAR Figures 15 15-93 (Page 1 of 1)

Figure 15-91. Deleted Per 1998 Update.

Figure 15-92. Deleted Per 1998 Update.

Figure 15-93. Deleted Per 1998 Update.

(31 DEC 2007)

McGuire Nuclear Station UFSAR Figure 15-94 (Page 1 of 2)

Figure 15-94. Inadvertent Opening of a Pressurizer Safety Valve (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-94 (Page 2 of 2)

(13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-95 (Page 1 of 1)

Figure 15-95. Inadvertent Opening of a Pressurizer Safety Valve (13 APR 2008)

McGuire Nuclear Station UFSAR Figures 15 15-136 (Page 1 of 3)

Figure 15-96. Deleted Per 1998 Update.

Figure 15-97. Deleted Per 2001 Update.

Figure 15-98. Deleted Per 1996 Update.

Figure 15-99. Deleted Per 1998 Update.

Figure 15-100. Deleted Per 1996 Update.

Figure 15-101. Deleted Per 1996 Update.

Figure 15-102. Deleted Per 1996 Update.

Figure 15-103. Deleted Per 1996 Update.

Figure 15-104. Deleted Per 1996 Update.

Figure 15-105. Deleted Per 1996 Update.

Figure 15-106. Deleted Per 1996 Update.

Figure 15-107. Deleted Per 1996 Update.

Figure 15-108. Deleted Per 1996 Update.

Figure 15-109. Deleted Per 1996 Update.

Figure 15-110. Deleted Per 1996 Update.

Figure 15-111. Deleted Per 1996 Update.

Figure 15-112. Deleted Per 1996 Update.

Figure 15-113. Deleted Per 1996 Update.

(31 DEC 2007)

McGuire Nuclear Station UFSAR Figures 15 15-136 (Page 2 of 3)

Figure 15-114. Deleted Per 1996 Update.

Figure 15-115. Deleted Per 1996 Update.

Figure 15-116. Deleted Per 1996 Update.

Figure 15-117. Deleted Per 1996 Update.

Figure 15-118. Deleted Per 1996 Update.

Figure 15-119. Deleted Per 1996 Update.

Figure 15-120. Deleted Per 1996 Update.

Figure 15-121. Deleted Per 1996 Update.

Figure 15-122. Deleted Per 1996 Update.

Figure 15-123. Deleted Per 1996 Update.

Figure 15-124. Deleted Per 1996 Update.

Figure 15-125. Deleted Per 1996 Update.

Figure 15-126. Deleted Per 1996 Update.

Figure 15-127. Deleted Per 1996 Update.

Figure 15-128. Deleted Per 1996 Update.

Figure 15-128. Deleted Per 1996 Update.

Figure 15-130. Deleted Per 1996 Update.

(31 DEC 2007)

McGuire Nuclear Station UFSAR Figures 15 15-136 (Page 3 of 3)

Figure 15-131. Deleted Per 1996 Update.

Figure 15-132. Deleted Per 1996 Update.

Figure 15-133. Deleted Per 2001 Update.

Figure 15-134. Deleted Per 1998 Update.

Figure 15-135. Deleted Per 1996 Update.

Figure 15-136. Deleted Per 1996 Update.

(31 DEC 2007)

McGuire Nuclear Station UFSAR Figure 15-137 (Page 1 of 1)

Figure 15-137. Small Break Power Distribution Assumed for LOCA Analysis (14 OCT 2000)

McGuire Nuclear Station UFSAR Figures15-138 153 (Page 1 of 1)

Figure 15-138. Deleted Per 1998 Update Figure 15-139. Deleted Per 2001 Update Figure 15-140. Deleted Per 1998 Update Figure 15-141. Deleted Per 1998 Update Figure 15-142. Deleted Per 1998 Update Figure 15-143. Deleted Per 1998 Update Figure 15-144. Deleted Per 1998 Update Figure 15-145. Deleted Per 1998 Update Figure 15-146. Deleted Per 1998 Update Figure 15-147. Deleted Per 1998 Update Figure 15-148. Deleted Per 1998 Update Figure 15-149. Deleted Per 1998 Update Figure 15-150. Deleted Per 1998 Update Figure 15-151. Deleted Per 1998 Update Figure 15-152. Deleted Per 1994 Update Figure 15-153. Deleted Per 1994 Update (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-154 (Page 1 of 1)

Figure 15-154. RCCA Position Versus Time to Dashpot (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-155 (Page 1 of 1)

Figure 15-155. Normalized Rod Worth Versus Percent Inserted (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-156 (Page 1 of 1)

Figure 15-156. Normalized RCCA Bank Reactivity Worth Versus Normalized Drop Time (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-157 (Page 1 of 1)

Figure 15-157. Steamline Break Offsite Power Maintained 30 25 CORE AVERAGE HEAT FLUX, % OF 3411 MWth 20 15 10 5

0 0 25 50 75 100 125 150 175 200 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-158 (Page 1 of 1)

Figure 15-158. Steamline Break Offsite Power Maintained 18 16 14 12 PRESSURIZER LEVEL, %

10 8

6 4

2 0

0 25 50 75 100 125 150 175 200 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-159 (Page 1 of 1)

Figure 15-159. Steamline Break Offsite Power Maintained 2500 2000 PRESSURIZER PRESSURE, PSIG 1500 1000 500 0

0 25 50 75 100 125 150 175 200 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-160 (Page 1 of 1)

Figure 15-160. Steamline Break Offsite Power Maintained 5000 4500 4000 3500 BREAK FLOW, LBM/SEC 3000 2500 2000 1500 1000 500 0

0 25 50 75 100 125 150 175 200 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-161 (Page 1 of 1)

Figure 15-161. Steamline Break Offsite Power Maintained 12,000 10,000 CORE INLET MASS FLOW, LBM/SEC 8,000 FAULTED QUADRANT INTACT QUADRANTS (per Quadrant) 6,000 4,000 2,000 0

0 25 50 75 100 125 150 175 200 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-162 (Page 1 of 1)

Figure 15-162. Steamline Break Offsite Power Lost 1200 1000 STEAM LINE PRESSURE, PSIG 800 600 FAULTED LOOP INTACT LOOPS 400 200 0

0 25 50 75 100 125 150 175 200 225 250 275 300 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-163 (Page 1 of 1)

Figure 15-163. Steamline Break Offsite Power Lost 600 550 COLD LEG TEMPERATURE, °F 500 FAULTED LOOP 450 INTACT LOOPS 400 350 300 0 25 50 75 100 125 150 175 200 225 250 275 300 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-164 (Page 1 of 1)

Figure 15-164. Steamline Break Offsite Power Lost 600 550 HOT LEG TEMPERATURE, °F 500 450 400 FAULTED LOOP INTACT LOOPS 350 300 0 25 50 75 100 125 150 175 200 225 250 275 300 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-165 (Page 1 of 1)

Figure 15-165. Steamline Break Offsite Power Lost 60 50 CORE AVERAGE BORON CONCENTRATION, ppmB 40 30 20 10 0

0 25 50 75 100 125 150 175 200 225 250 275 300 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-166 (Page 1 of 1)

Figure 15-166. Steamline Break Offsite Power Lost 1000 500 CORE REACTIVITY, PCM 0

-500

-1000

-1500 0 25 50 75 100 125 150 175 200 225 250 275 300 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-167 (Page 1 of 1)

Figure 15-167. Steamline Break Offsite Power Lost 25 CORE AVERAGE NEUTRON POWER, % OF 3411 MWth 20 15 10 5

0 0 25 50 75 100 125 150 175 200 225 250 275 300 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-168 (Page 1 of 1)

Figure 15-168. Steamline Break Offsite Power Lost 16 14 CORE AVERAGE HEAT FLUX, % OF 3411 MWth 12 10 8

6 4

2 0

0 25 50 75 100 125 150 175 200 225 250 275 300 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-169 (Page 1 of 1)

Figure 15-169. Steamline Break Offsite Power Lost 18 16 14 12 PRESSURIZER LEVEL, %

10 8

6 4

2 0

0 25 50 75 100 125 150 175 200 225 250 275 300 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-170 (Page 1 of 1)

Figure 15-170. Steamline Break Offsite Power Lost 2500 2000 PRESSURIZER PRESSURE, PSIG 1500 1000 500 0

0 25 50 75 100 125 150 175 200 225 250 275 300 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-171 (Page 1 of 1)

Figure 15-171. Steamline Break Offsite Power Lost 5000 4500 4000 3500 BREAK FLOW, LBM/SEC 3000 2500 2000 1500 1000 500 0

0 25 50 75 100 125 150 175 200 225 250 275 300 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-172 (Page 1 of 1)

Figure 15-172. Steamline Break Offsite Power Lost 10,000 9,000 8,000 CORE INLET MASS FLOW, LBM/SEC 7,000 6,000 FAULTED QUADRANT INTACT QUADRANTS (per Quadrant) 5,000 4,000 3,000 2,000 1,000 0

0 25 50 75 100 125 150 175 200 225 250 275 300 TIME (SEC)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-173 (Page 1 of 1)

Figure 15-173. Deleted Per 1998 Update (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-174 (Page 1 of 1)

Figure 15-174. Locked Rotor Neutron Power (Fraction of Initial) - Offsite Power Lost (05 APR 2011)

McGuire Nuclear Station UFSAR Figure 15-175 (Page 1 of 1)

Figure 15-175. Locked Rotor Core Average Heat Flux (Fraction of Nominal) - Offsite Power Lost 1.2 1.1 1.0 HEAT FLUX (FRACTION OF INITIAL) 0.9 0.8 0.7 0.6 0.5 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 TIME (SECONDS)

(06 OCT 2003)

McGuire Nuclear Station UFSAR Figure 15-176 (Page 1 of 1)

Figure 15-176. Locked Rotor Loop Average Temperature (Deg F) - Offsite Power Lost 600.0 595.0 LOOP AVERAGE TEMPERATURE (°F) 590.0 585.0 580.0 Faulted Loop Intact Loop 575.0 570.0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 TIME (SECONDS)

(06 OCT 2003)

McGuire Nuclear Station UFSAR Figure 15-177 (Page 1 of 1)

Figure 15-177. Locked Rotor Pressurizer Pressure (psig) - Offsite Power Lost 2400 2380 2360 PRESSURIZER PRESSURE (PSIG) 2340 2320 2300 2280 2260 2240 2220 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 TIME (SECONDS)

(06 OCT 2003)

McGuire Nuclear Station UFSAR Figure 15-178 (Page 1 of 1)

Figure 15-178. Locked Rotor RCS Flow (Fraction of Initial) - Offsite Power Maintained (06 OCT 2003)

McGuire Nuclear Station UFSAR Figure 15-179 (Page 1 of 1)

Figure 15-179. Deleted Per 1998 Update.

(14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-180 (Page 1 of 1)

Figure 15-180. Dropped Rod Accident (22 APR 2017)

McGuire Nuclear Station UFSAR Figure 15-181 (Page 1 of 1)

Figure 15-181. Dropped Rod Accident (22 APR 2017)

McGuire Nuclear Station UFSAR Figure 15-182 (Page 1 of 1)

Figure 15-182. Dropped Rod Accident (22 APR 2017)

McGuire Nuclear Station UFSAR Figure 15-183 (Page 1 of 1)

Figure 15-183. Dropped Rod Accident (22 APR 2017)

McGuire Nuclear Station UFSAR Figure 15-184 (Page 1 of 1)

Figure 15-184. Rod Ejection Accident (BOC,HFP) 120 100 NEUTRON POWER (% OF NOMINAL) 80 60 40 20 0

0 0.5 1 1.5 2 2.5 3 3.5 4 TIME (SECONDS)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-185 (Page 1 of 1)

Figure 15-185. Rod Ejection Accident (EOC,HZP) 700 600 500 NEUTRON POWER (% OF NOMINAL) 400 300 200 100 0

0 0.5 1 1.5 2 2.5 3 3.5 4 TIME (SECONDS)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-186 (Page 1 of 1)

Figure 15-186. Uncontrolled RCCA Bank Withdrawal at HZP Max. RCS Pressure 2800.0 2700.0 2600.0 MAX RCS PRESSURE (PSIG) 2500.0 2400.0 2300.0 2200.0 2100.0 0 2 4 6 8 10 12 14 16 18 20 TIME (SEC)

(30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-187 (Page 1 of 1)

Figure 15-187. Uncontrolled RCCA Bank Withdrawal from 8% Power (14 APR 2005)

McGuire Nuclear Station UFSAR Figures15-188 206 (Page 1 of 2)

Figure 15-188. Deleted Per 2001 Update Figure 15-189. Deleted Per 1998 Update Figure 15-190. Deleted Per 1998 Update Figure 15-191. Deleted Per 1998 Update Figure 15-192. Deleted Per 2001 Update Figure 15-193. Deleted Per 2001 Update Figure 15-194. Deleted Per 2001 Update Figure 15-195. Deleted Per 2001 Update Figure 15-196. Deleted Per 2001 Update Figure 15-197. Deleted Per 2001 Update Figure 15-198. Deleted Per 2001 Update Figure 15-199. Deleted Per 1998 Update Figure 15-200. Deleted Per 1998 Update Figure 15-201. Deleted Per 1998 Update Figure 15-202. Deleted Per 2001 Update Figure 15-203. Deleted Per 2001 Update Figure 15-204. Deleted Per 2001 Update Figure 15-205. Deleted Per 1996 Update (14 OCT 2000)

McGuire Nuclear Station UFSAR Figures15-188 206 (Page 2 of 2)

Figure 15-206. Deleted Per 1996 Update (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-207 (Page 1 of 1)

Figure 15-207. Excessive Increase in Feedwater Flow (11 NOV 2006)

McGuire Nuclear Station UFSAR Figure 15-208 (Page 1 of 1)

Figure 15-208. Excessive Increase in Feedwater Flow (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-209 (Page 1 of 1)

Figure 15-209. Excessive Increase in Feedwater Flow (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-210 (Page 1 of 1)

Figure 15-210. Deleted per 2003 Update (06 OCT 2003)

McGuire Nuclear Station UFSAR Figure 15-211 (Page 1 of 1)

Figure 15-211. Excessive Increase in Feedwater Flow (RFA Fuel)

(11 NOV 2006)

McGuire Nuclear Station UFSAR Figure 15-212 (Page 1 of 1)

Figure 15-212. Loss of Offsite Power (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-213 (Page 1 of 1)

Figure 15-213. Loss of Offsite Power (14 OCT 2000)

McGuire Nuclear Station UFSAR Figures15-214 225 (Page 1 of 1)

Figure 15-214. Deleted Per 2001 Update Figure 15-215. Deleted Per 2001 Update Figure 15-216. Deleted Per 2001 Update Figure 15-217. Deleted Per 2001 Update Figure 15-218. Deleted Per 2001 Update Figure 15-219. Deleted Per 2001 Update Figure 15-220. Deleted Per 2001 Update Figure 15-221. Deleted Per 2001 Update Figure 15-222. Deleted Per 2001 Update Figure 15-223. Deleted Per 2001 Update Figure 15-224. Deleted Per 2001 Update Figure 15-225. Deleted Per 2001 Update (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-226 (Page 1 of 1)

Figure 15-226. Steam Generator Tube Rupture (13 OCT 2018)

McGuire Nuclear Station UFSAR Figure 15-227 (Page 1 of 1)

Figure 15-227. Steam Generator Tube Rupture (13 OCT 2018)

McGuire Nuclear Station UFSAR Figure 15-228 (Page 1 of 1)

Figure 15-228. Steam Generator Tube Rupture (13 OCT 2018)

McGuire Nuclear Station UFSAR Figure 15-229 (Page 1 of 1)

Figure 15-229. Steam Generator Tube Rupture (13 OCT 2018)

McGuire Nuclear Station UFSAR Figure 15-230 (Page 1 of 1)

Figure 15-230. Steam Generator Tube Rupture (13 OCT 2018)

McGuire Nuclear Station UFSAR Figure 15-231 (Page 1 of 1)

Figure 15-231. Steam Generator Tube Rupture (13 OCT 2018)

McGuire Nuclear Station UFSAR Figure 15-232 (Page 1 of 1)

Figure 15-232. Steam Generator Tube Rupture (13 OCT 2018)

McGuire Nuclear Station UFSAR Figure 15-233 (Page 1 of 1)

Figure 15-233. Lower Bound Containment Pressure Used for Best-Estimate Large Break LOCA (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-234 (Page 1 of 1)

Figure 15-234 LBLOCA Peak Cladding Temperature (Reference Transient)

(14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-235 (Page 1 of 1)

Figure 15-235. LBLOCA Liquid Mass Flowrate at Inlet to Hot Assembly (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-236 (Page 1 of 1)

Figure 15-236. LBLOCA Vapor Mass Flowrate at Blowdown PCT Location (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-237 (Page 1 of 1)

Figure 15-237. LBLOCA Entrained Liquid Mass Flowrate at Blowdown PCT Location (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-238 (Page 1 of 1)

Figure 15-238. LBLOCA Accumulator Discharge Flowrate (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-239 (Page 1 of 1)

Figure 15-239. LBLOCA Pumped Safety Injection (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-240 (Page 1 of 1)

Figure 15-240. LBLOCA Collapsed Liquid Level in the Lower Plenum (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-241 (Page 1 of 1)

Figure 15-241. LBLOCA Collapsed Liquid Level in Hot Assembly (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-242 (Page 1 of 1)

Figure 15-242. LBLOCA Collapsed Liquid Level in Downcomer (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-243 (Page 1 of 1)

Figure 15-243. Duke Energy Best-Estimate LBLOCA Duke Energy Best-Estimate LBLOCA (05 APR 2011)

McGuire Nuclear Station UFSAR Figure 15-244 (Page 1 of 1)

Figure 15-244. LBLOCA Axial Power Distribution for Reference Transient Duke Energy Best Estimate LOCA Analysis Power Shape 10 (05 APR 2011)

McGuire Nuclear Station UFSAR Figure 15-245 (Page 1 of 1)

Figure 15-245. McGuire Units 1 and 2 2-Inch Pressurizer Pressure (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-246 (Page 1 of 1)

Figure 15-246. McGuire Units 1 and 2 2-Inch Core Mixture Level (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-247 (Page 1 of 1)

Figure 15-247. McGuire Units 1 and 2 2-Inch Core Exit Vapor Temperature (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-248 (Page 1 of 1)

Figure 15-248. McGuire Units 1 and 2 2-Inch Break Vapor Flow and Upper Head Spray Nozzle Vapor Flow (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-249 (Page 1 of 1)

Figure 15-249. McGuire Units 1 and 2 2-Inch Break Liquid Flow and Total Safety Injection Flow (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-250 (Page 1 of 1)

Figure 15-250. McGuire Units 1 and 2 2-Inch Peak Clad Temperature and Maximum Transient Oxidation (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-251 (Page 1 of 1)

Figure 15-251. McGuire Units 1 and 2 2-Inch RCS Mass (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-252 (Page 1 of 1)

Figure 15-252. McGuire Units 1 and 2 3-Inch Pressurizer Pressure (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-253 (Page 1 of 1)

Figure 15-253. McGuire Units 1 and 2 3-Inch Core Mixture Level (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-254 (Page 1 of 1)

Figure 15-254. McGuire Units 1 and 2 3-Inch Peak Clad Temperature and Maximum Transient Oxidation (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-255 (Page 1 of 1)

Figure 15-255. McGuire Units 1 and 2 4-Inch Pressurizer Pressure (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-256 (Page 1 of 1)

Figure 15-256. McGuire Units 1 and 2 4-Inch Core Mixture Level (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-257 (Page 1 of 1)

Figure 15-257. McGuire Units 1 and 2 4-Inch Peak Clad Temperature and Maximum Transient Oxidation (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-258 (Page 1 of 1)

Figure 15-258. McGuire Units 1 and 2 1-1/2-Inch Pressurizer Pressure (05 APR 2011)

McGuire Nuclear Station UFSAR Figure 15-259 (Page 1 of 1)

Figure 15-259. McGuire Units 1 and 2 1-1/2-Inch Core Mixture Level (05 APR 2011)

McGuire Nuclear Station UFSAR Figure 15-260 (Page 1 of 1)

Figure 15-260. Deleted Per 2008 Update (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-261 (Page 1 of 1)

Figure 15-261. Loss of Normal Feedwater - Short Term Core Cooling 120 REACTOR POWER (% OF NOMINAL) 100 80 60 40 20 0

0 10 20 30 40 50 60 70 80 90 100 TIME (SECOND)

(30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-262 (Page 1 of 1)

Figure 15-262. Loss of Normal Feedwater - Short Term Core Cooling (30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-263 (Page 1 of 1)

Figure 15-263. Loss of Normal Feedwater - Short Term Core Cooling (30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-264 (Page 1 of 1)

Figure 15-264. Loss of Normal Feedwater - Short Term Core Cooling (30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-265 (Page 1 of 1)

Figure 15-265. Loss of Normal Feedwater - Short Term Core Cooling (30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-266 (Page 1 of 1)

Figure 15-266. Loss of Normal Feedwater - Short Term Core Cooling (30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-267 (Page 1 of 1)

Figure 15-267. Deleted Per 2011 Update (05 APR 2011)

McGuire Nuclear Station UFSAR Figure 15-268 (Page 1 of 1)

Figure 15-268. Loss of Normal Feedwater - Short Term Core Cooling 2.90 2.70 2.50 2.30 MDNBR (RFA FUEL) 2.10 1.90 1.70 1.50 0 10 20 30 40 50 60 70 TIME (SECOND)

(30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-269 (Page 1 of 1)

Figure 15-269. Partial Loss of Forced Reactor Coolant Flow 4.0 3.5 MDNBR (WRB-2M CHF CORRELATION) 3.0 2.5 2.0 1.5 0 1 2 3 4 5 6 7 TIME (SECONDS)

(06 OCT 2003)

McGuire Nuclear Station UFSAR Figure 15-270 (Page 1 of 1)

Figure 15-270. Complete Loss of Forced Reactor Coolant Flow (13 APR 2008)

McGuire Nuclear Station UFSAR Figure 15-271 (Page 1 of 1)

Figure 15-271. Locked Rotor Neutron Power (% of Nominal) - Offsite Power Maintained (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-272 (Page 1 of 1)

Figure 15-272. Locked Rotor Core Average Heat Flux (Fraction of Nominal) - Offsite Power Maintained (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-273 (Page 1 of 1)

Figure 15-273. Locked Rotor Loop Average Temperature (Deg F) - Offsite Power Maintained (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-274 (Page 1 of 1)

Figure 15-274. Locked Rotor Pressurizer Pressure (psig) - Offsite Power Maintained (14 OCT 2000)

McGuire Nuclear Station UFSAR Figure 15-275 (Page 1 of 1)

Figure 15-275. Locked Rotor RCS Pressure - Peak RCS Pressure 2600 2550 2500 RCS PRESSURE (PSIG) 2450 2400 2350 2300 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 TIME (SECONDS)

(06 OCT 2003)

McGuire Nuclear Station UFSAR Figure 15-276 (Page 1 of 1)

Figure 15-276. Deleted Per 2005 Update (14 APR 2005)

McGuire Nuclear Station UFSAR Figure 15-277 (Page 1 of 1)

Figure 15-277. Deleted per 2003 Update (06 OCT 2003)

McGuire Nuclear Station UFSAR Figure 15-278 (Page 1 of 1)

Figure 15-278. Uncontrolled RCCA Bank Withdrawal from 10% Power 1.5 OTT Trip High Pressure Trip 1.45 MDNBR (WRB-2M CHF CORRELATION)

High Flux Trip 1.4 1.35 1.3 11.5 11.7 11.9 12.1 12.3 12.5 12.7 12.9 13.1 13.3 13.5 REACTIVITY INSERTION RATE (PCM/SEC)

(30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-279 (Page 1 of 1)

Figure 15-279. Uncontrolled RCCA Bank Withdrawal from 50% Power 1.55 OTT Trip High Flux Trip MDNBR (WRB-2M CHF CORRELATION) 1.5 1.45 4.5 5 5.5 6 6.5 7 7.5 8 8.5 REACTIVITY INSERTION RATE (PCM/SEC)

(30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-280 (Page 1 of 1)

Figure 15-280. Uncontrolled RCCA Bank Withdrawal from 100% Power (30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-281 (Page 1 of 1)

Figure 15-281. Uncontrolled RCCA Bank Withdrawal from 98% Power (30 NOV 2012)

McGuire Nuclear Station UFSAR Figure 15-282 (Page 1 of 1)

Figure 15-282. Steamline Break at Power (09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-283 (Page 1 of 1)

Figure 15-283. Steamline Break at Power (09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-284 (Page 1 of 1)

Figure 15-284. Steamline Break at Power (09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-285 (Page 1 of 1)

Figure 15-285. Steamline Break at Power (09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-286 (Page 1 of 1)

Figure 15-286. Steamline Break at Power (09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-287 (Page 1 of 1)

Figure 15-287. Steamline Break at Power (09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-288 (Page 1 of 1)

Figure 15-288. Steamline Break at Power (09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-289 (Page 1 of 1)

Figure 15-289. Steamline Break at Power (09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-290 (Page 1 of 1)

Figure 15-290. Steamline Break at Power (09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 15-291 (Page 1 of 1)

Figure 15-291. Steamline Break at Power (22 APR 2017)