Ile Form ES-301-3
ML20308A742
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 07/13/2020
From: -Neednewvalue, Patricia Pelke, Chuck Zoia
Operations Branch III
To:
NRC/RGN-III/DRS/OLB
Zoia C
Shared Package
ML10121A251 List:
References
50-237/20-01, 50-249/20-01 50-237/OL-20, 50-249/OL-20
Download: ML20308A742 (1)


Text

ES-301 Operating Test Quality Checklist Form ES-301-3 Facilitv: Dresden Generatina Station Date of Examination: 6/8/20 Operatina Test Number: 2020-301 Initials

1. General Criteria a b. c*

The operating test conforms to the previously approved outline; changes are consistent with a.

~ Yll samplina reauirements (e.a .* 10 CFR 55.45, operational imoortance. safety function distribution).

b. There Is no day-to-day repetition between this and other operating tests to be administered durina this examination.

f1/1

c. The operating test shall not duplicate items from the applicants' audit test(s) (see Section 0 .1.a.). ~ f1f1
d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. ~ 11H
e. It appears that the operating test will differentiate between competent and less-than-competent aoolicants at the desianated license level.

~~ /1h

2. Walkthrouqh Criteria -- -- --
a. Each JPM includes the following, as applicable:
  • initial conditions
  • initiating cues
  • references and tools, including associated procedures
  • reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee
  • operationally important specific performance criteria that include- ~~ H1

- detailed expected actions with exact criteria and nomenclature

- system response and other examiner cues

- statements describing important observations to be made by the applicant

- criteria for successful completion of the task

- identification of critical steps and their associated performance standards

- restrictions on the seauence of steps, if applicable

b. Ensure that any changes from the previously approved systems and administrative walkthrough outlines (Forms ES-301-1 and ES-301 *2) have not caused the test to deviate from any of the acceptance criteria (e.g .. item distribution, bank use, repetition from the last two NRC I~ HM examinations) specified on those forms and Form ES-201 -2.
3. Simulator Criteria -- -- -

The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4, and a copv is attached.

~ hH a.

b.

c.

Author Facility Reviewer (*)

NRC Chief Examiner (#)

Derek Siuda IP r i n " 5 9 ;- ? ; /

Matt McCormick Chuck Zoia Charles D. Zoia - ~-

,-~--;~;' ~

Digitally signed by Charles D. Zoia Date: 2020.06.08 13:27:54 -05'00'

'iii

.,,!, 'UJ

d. NRG Supervisor Patricia J. Pelke Digitally signed by Patricia J. Pelke Date: 2020.06.08 22:55:57 -05'00'
  • The facility licensee signature is not applicable for NAG-developed tests.
  1. The independent NRC reviewer initials items in column "c"; the chief examiner concurrence is reaui red .