Forwards List of Items Required for Full Power Operation.No Problem Impacting on License Issuance Anticipated
ML20247G323
Person / Time
Site: Palo Verde, 05000000
Issue date: 04/11/1985
From: Sherman C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20244B854 List:
References
FOIA-89-226 NUDOCS 8909190038
Download: ML20247G323 (2)


Text

. ;__,___....

m 1 w' D 'r.,,

o j;

y<

l April 11, 1985' l

C, l

MEMORANDUM FOR:

L. Miller, Chief Reactor Projects 'Section II THROUGH:

G. Yuhas Chief Facilities Radiological Protection Section FROM:

C. Sherman Radiation Specialist

-- SUBJECT :

PALO VERDE UNIT 1 (50-528); READINESS FOR FULL POWER OPERATION

Items required for full power operation are listed in the enclosure. No problems. impacting on the license issuance are anticipated.

6

-d Conrad Sherman Radiation Specialist

Enclosure:

As stated

-q l

1 l

d

-)

RV.gdf Shentn:rc Yuhas 04/11/85 04/11/85

[$lhh e909190038 090913 h$f.LIA

-226 PDR k

1

-)

d a6 l

d

4 :

n j]

f7 a,_-, _..,, v. m ENCLOSURE 1

Items required prior to full power operation j

1.

License Condition 2.C.17 PASS (5% power) i No problems are anticipated in this area by the licensee. Progress in l

completing system modifications is on schedule. Completion of all testing is expected prior to 5% power.

2.

License Condition 2.C.20 Radiochemistry Laboratory (10/24/84 letter)

The licensee is maintaining the Unit 2 chemistry laboratory. It is expected that they will complete work to make the lab able to handle PASS samples prior to exceeding 5% power.

3.

Action to correct Deficiencies in licensed' operator training related to the rad 1ation monitoring system'(RMS) and the RMS alarm response procedure identified in Inspection Report 84-64 have not been inspected. This item will be reinspected at.the earliest opportunity.

l 1

l l}