Forwards Request for Addl Info Re Emergency Preparedness Program Implementation Appraisal Schedule.Appraisal Must Be Rescheduled
ML20244B850
Person / Time
Site: Grand Gulf, 05000000
Issue date: 03/08/1982
From: Grimes B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20244B854 List:
References
FOIA-89-226 NUDOCS 8203180504
Download: ML20244B850 (4)


Text

__ -_

' 1 d

,p*dp 4,

<cy,j, o UNITED STATES i

p*

c. - 8 f

g E

., ( A NUCLEAR REGULATORY COMMISSION 7

, f'

' ,, j WASHING TON, D. C. 20555 k..,...o8 March 8, 1982 MEMORANDUM FOR: Darrell G. Eisenhut, Director Dir'sion of Licensing Nud ear Reactor Regulation '."

~

FROM: Brian K. Grimes, Director _', .

Division of Emergency Preparedness .

Office of Inspection & Enforcement

SUBJECT:

GRAND GULF LICENSING SCHEDULE '.'

.c. I

_ My memorandum to you dated November 18,1981, (same subject) identified a potential problem regarding the applicant's schedule for the emergency preparedness program. This H vision initiated an emergency preparedness ~'

implementation appraisal which was discontinued on January 8,1982, after it was concluded by the appraisal team (and corroborated by the applicant) that the emergency preparedness program was at such an incomplete stage that no determination as to program adequacy could be made. At the exit meeting MP&L agreed to' furnish the NRC a schedule for completion of all of the areas covered by the appraisal program.

On January 25, 1982, MP&L submitted a schedule (enclosed) in anticipation i of a March 15 appraisal. Our evaluation of their schedule does not support their proposed date. Based on a telecon with the applicant on February 8,1982, it was concluded that only two of approximately sixty open items were completed during the prior 30 days. In addition, their list of incomplete items does not address certain areas of their program.

In order to reschedule the appraisal, additional information from the applicant is required. Based on this information we will determine when the applicant's program will be at a stage of completion that would warrant a resumption of the appraisal.

By copy of this memorandum we are requesting the NRR Branch Chief to forward the enclosed letter to the applicant.

[ Brian K. Grimes, Director

~ s Division of Emergency Preparedness Office of Inspection & Enforcement

Enclosure:

As stated ff cc: D. Houston, NRR

.Y/ G. Jenkins, Region II L/ R. Tedesco

/ 00L Branch Chiefs G//

E :. "

42- .

p =

F DRAFT Docket No. 50-416

~

GENTLEMEN:

SUBJECT:

RESCHEDULE OF GRAND GULF EMERGENCY PREPAREDNESS IMPLEMENTATION APPRAISAL 1

This responds to your letter of January 25, 1982, which established . pro-

,' ' posed schedule for the~ completion of various areas of the GGNS emergency preparedness program. . After a careful review of the schedule, the staff

, concludes that all areas of your emergency prepsedness program were not

addressed and' consequently additional information is required (see Enclosure).

As to'your proposed date of March 15, 1982 for the resumption of the appraisal, please be advised that we will determine when the state of your preparedness program is at a point which warrants the resumption of the appraisal. This determination will be based, for the most part, on the current status.of your preparedness program. Because the appraisal requires considerable lead time, you are requested to provide EPLB an update, via telecon, every two weeks. The .

(

NRC contact in this matter is Mr. D Perrotti at (301) 492-4537.

Should you have any questions, we will be pleased to discuss them with you.

Sincerely. .

4

Enclosure:

As stated I

_ - _ _ _ _ _ _ _ - _ _ - _ _ - _ . i

' * ~'

,e * . Enclosure.

  • i

)

i GRAND GULF EPIA SCHEDULE i

d 1

Completion dates for the following are requested:

Emergency preparedness training of all key members of the onsite and offsite  :

emergency organizations.

Preoperational acceptability tests:

Eut =

a. C83PT01, Plant Security Sys. Preop. Test (Incl. P65, Fire Detection and Alarm)
b. C85PT01, Seismic Instrumentation Sys. Preop. Test
c. D17PT02, Off Gas Radiation Monitoring Preop. Test
d. 017PT03, Ventilation Radiation Monitoring Preop. Test
e. 017PT04, Liquid Process Radiation Monitoring Preop. Test
f. 021PT01, Area Radiation Monitoring (ARM) Sys. Preop. Test
g. D23PT01, Drywell Radiation Monitoring Sys. Preop. Test
h. N64PT02, Off Gas Sys. Preop. Test
i. N72PT01, Chlorination Sys. Acept Test J. R61PT01, Radio Communication Sys. Preop. Test
k. R61PT02, Plant Communications Public Address, Intercom Sys.
1. 251PT01, Control Room HVAC Sys. Preop. Test
m. Z92PT01, Control Room and Emergency Lighting Sys. Preop Test Installation of non-radiation process monitors and associated readouts in the control room. We note that the comment that non-radiation process monitors

g.. - -

-i;
..f',

.. n ,

4 7,;3,~,y

~

w ,

' are not'used for emergency classification (i.e., unusual Event; Alert, etc.) --

w:

p does not appear valid. . Table 4-l' of the GGNS Emergency Plan specified many-F .

EAL's whict, include readings froa non-radiation process monitors and/or ]

j t

systems'.(e.g., reactor water level. drywell pressure, reactor dome pressure,

)

i safety / relief. valve position,. fire detection devices, seismic instrumentation,-

'etc.). '

e Facilities & Equipment:

, i

a. Control Room
b. Offsite laboratories
c. ' Assembly areas
d. . Expanded support
e. News centers Procedures:
a. ' Stack effluent and liquid efflaent sampling and analysis
b. Emergency environmental monitoring program
c. Protective actions during emergencies

'd . Inventory, operability test and maintenance of environmental-monitoring

, kit's' at the Corp,orat'e Office i

For these potential high noise areas that will not have visual alarms installed i

prior to the power ascension startup testing phase, provide an implementation date for interim measures (e.g. , security guard check, administrative access controls,' etc.) that will be used to clear these areas in the event of a site '

evacuation.

\

- 1