ML20247A313

From kanterella
Jump to navigation Jump to search
Zech Response to Sharp Subcommittee on Energy & Commerce Question 1(a) Posed in
ML20247A313
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/02/1988
From: Zech L
NRC COMMISSION (OCM)
To: Sharp P
HOUSE OF REP., ENERGY & COMMERCE
Shared Package
ML20247A310 List:
References
SHARP-880802, NUDOCS 8903290095
Download: ML20247A313 (1)


Text

m . , . ,

~

t 4

'a.

I s y 00EST:0! ( 'fd When did the NRC.'first receive allegations that a senior-rranager had been in the control room ir an impaired conditior? -

AN51.lr R On January 7. 1987, the NRC Resident Inspecter (RI) at Davis-Besse tverheard licer. sed operators discussing the significance of the. plant manager coming 4 into the control recm shortly.after drinking alcohol and his disruption of control reor activitics. Although the RI attempted to obtain additional informatici. ccr.cernint tre event, he had little success. On January 8, 1987, the NRC Ser.icr Pesident Inspector (SRI) at Davis-Desse wrote a memo (Document No. 1-3 of Enclosure (1)(d)-2) to Region III (RIII) identifying'this in-formation as ar, c11cgatien (Rill-87-A-0001) and suggesting that further inspection was warranted.

1 I

l 8903290095 B36866~'

PDR COMMS NRc0 CORRESPONDENCE PDR