Forwards SER Re Operation of MSIVs During First Cycle W/ Refurbished Seat & Ball (Leak Integrity Problem).Resumption of Startup Testing & Operation for First Operating Cycle W/ Installed Refurbished MSIVs Authorized.Salp Input Also Encl
ML20238C198
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/02/1987
From: Lainas G
Office of Nuclear Reactor Regulation
To: Adensam E
Office of Nuclear Reactor Regulation
Shared Package
ML20238A944 List:
References
FOIA-87-438 TAC-63454, NUDOCS 8709090702
Download: ML20238C198 (1)


Text

w"~

,7

/ '

.f

_ gp Mouq'e;p' '

i 4 l.

M' UNITED STATES

/~

,.r, c ' f g -

4'

,9f ~ ~

NUCLEAR REGULATORY COMMISSION

, ~ *.

,[ T

i. -

W ASHINGTON, D. C. 20S55 l

T Vi3

,'q w

=;?

(k l Q.

h-

.f

?

o ss.

,,i focket h h 60-410 MEMORANDUM FOR; Elinor Adensam Director

,j Project Directorate #3 t,O F

Diyision of BWR Licensing pe FROM:

Gus C. Lainas,' Assistant Director Division'cT.BWR Licensing

SUBJECT:

SAFETY EVALUATION FOR OPERATION OF MAIN STEAM ISOLATION VALVES DURING FIRST FUEL CYCLE WITH REFURBISHED SEAT AND BALL (LEAK INTEGRITY PROBLEM - TAC # 63454) f Ec By letters dated January 14', 23 and 27 and February 3, 1987 (NMP2L 0971, 0977, 0980, 0981, and 0990), the licensee has provided additional information on the

!" hine Mile Point Unit 2 Main Steam Isolation Valve (MSIV) leakage problem which l

supplements that which was evaluated in our October 27, 1986 SER. This information describes the recurrence of the MSIV leakage problem during preoperational testing in December, 1986, additional valve stroking and leak testing, as well as details on the MSIV prototype test program.

E The. enclosed SER covers the expected MSIV performance, MSIV leakage testing, the' prototype test program, the radiological evaluation of MSIV leakage greater than Technical Specification limits, and the equivalence of a 12 SCFH between the seat leakage test to that of a 6 SCFH through the valve test.

From the standpoint of Velve leak tightness, we find that Nine Mile Point Unit 2 may resume startup testing and operation for the first operating cycle with the installed refurbished MSIVs. The two additional MSIV problems on defective actuator and actuator control system logic are being addressed in separate SERs.

Our SALP input-is also enclosed.

/

3 l

V Gus f. Lainas, Assistant Director Division of BWR Licensing

Enclosures:

As stated cc w/ enclosures:

R. W. Houston M. Haughey C. McCracken R. Hermann J. Calvo-R. Stevens Rv Bosnak J. Lombardo

Contact:

F. Witt. X29440 r:

FoT S - 8 7-U7 BIO 9090702 070028 3

PDR FDIA WETTERHG7-438 PDR m

s