ML20238A940
| ML20238A940 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 08/28/1987 |
| From: | Grimsley D NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| To: | Wetterhahn M CONNER & WETTERHAHN |
| Shared Package | |
| ML20238A944 | List:
|
| References | |
| FOIA-87-438 NUDOCS 8709090482 | |
| Download: ML20238A940 (5) | |
Text
. - _ ______- _ _.
U.S. NUCLEAR RESULATO*.Y COMMISSION Nac soia atoutsY Nuustms:
m Foz A - W-41gpr A
7.ts#0Nst Tve I n%
"^I *<
xi a-'a' (g*.
ResPOuse TO rRecoOm Or INFORMATION ACT (FOIA) REQUEST v
AUG 2 81987
- g*ee.*
O\\(p
~~~ -
TtoutsTER J
A V
PART 4.-R(cop 68 RELEASED OR NOT LOCATED (See checked bonest No agency records subject to the request have been located.
No additonal agency records subsect to the request have been located.
Agency records sub#ect to the request that are identifed in Appendin M,
are airoedy available for public inspection and copying in the NRC Public Document Room, 1717 H Street. N W., Washington, DC.
Agency records subject to the request that are identifed in Appendix are being made eveilable for public inspection and copying in the NRC Public Document Room 1717 H Street, N W., Washington, DC, in a folder under this FOIA number and requester name.
The nonpropnetary version of the proposaHal that you egreed to accept in a telephone conversation with a member c,f my staff is now being made evelab6e for public inspection i
and coying at the NRC Public Document Room,1717 H Street, N W, Washington, DC. in a folder under the FOIA number and requester name.
Ergioned is information on how you mcy obtain access to and the charges for copying reentds placed in the NRC Public Document Room,1717 H Street, N.W., Washington, DC.
Agtncy records subject to the request are enclosed. A9y applicablu charge for copies of the records provided end payment procedures see noted in the comments section.
Ricorcs subsect to the request have been referred to another Federa: agencHies) for revow and direct response to you.
In view of NRC's response to this request, no further action is being taken on oppeal letter dated PART lt.A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE CGrtain informaton in the requested records is being withheld from pubhc declosure pursus.it to the FOIA exemptions described in and for the reasono stated in Part it, sec-tons B. C. and D. Any released portions of the documents for which only part of the record is being w*thheld are being made available for public inspection and copying in the NRC Fublic Document Room,1717 H Street, N W., Washington, DC, in a folder under the FOIA number and requester name.
Comments l
l 8709090402 070828 l
PDR FDIA
[
WETTERH87-438 PDR i
DgT W" of mutts AND atCoRDSp w ca. s SiGNATu t
-4 l
l l
l l
NIC TOT.M 4H tPan n i$b
]
l Re:
F0f A-87 438 APPENDIX A
RECORDS MAINTAINED AMONG PDR FILE 5' Accession No's Date From h
Subject
-1.
8611110366 10/31/86 R. Bernero C. Mangan Low Power License 2.
8611140324 10/31/86 USNRC NUREG-1047 Supp No. 5 3.
8705260328 5/15/87 D. Neighbors C. Mangan Amend 2 to NPF-54 4.
8705270514 05/15/87 W. Russell C. Mangen SALP 50-410/86-99 5.
8706010377 05/26/87
'W.
Cook Distribution PNO-I-87-45 i
I 1
Re:
FOIA 87-438 APPENDIX g
RECORDS MAINTAINED IN THE PDR UNDER THE ABOVE RE0 VEST NUMi NUMBER DATE i
_ DESCRIPTION 1.
10/26/84 Letter to F. Weehuizen from Walter F. Pasedag
Subject:
CSNI/GREST Meeting (14 pages) 2.
2/15/85 Mercrandum to Thomas M. Novak, Division of Licensing from James P. Knight, Division of Engineering
Subject:
APPLICATION FOR AUTHORIZATION TO UTIllZE AN ALTERNATE T0. THE REQUIREMENTS OF 10 CFR 50.55a FOR THE NINE MILE POINT NUCLEAR STATION UNIT 2, DOCKET NO. 50-410 (3 pages) 3.
2/22/85 Letter to James F. Saccoccio, Contract Administrator
Subject:
ACCEPTANCE FOR REFERENCING OF LICENSING TOPICAL REPORT G&WFSD (NP), " NUCLEAR MAIN STEAM ISOLATION VALVE SYSTEMS" (25 pages) 4.
9/13/85 Note to Central File from Mary F. Haughey,5 Project Manager, LBl2, DOL,
Subject:
CORRESPONDENCE BETWEEN THE NRC AND THE HAUPTABTEILUNG FUR DIE SICHERHEIT DER KERNANLAGEN CONCERNING THE USE OF GULF AND WESTERN BALL VALVES AT THE LEIBSTADT NUCLEAR POWER STATION (6 pages) 5.
8/27/86 Memorandum to Elinor Adensam. Director, BWR Projeqt Directorate No. 3, from Gus C. Lainas, AD, Division of Licensing, NINE MILE POINT UNIT 2 TECHNICAL SPECIFICATION (27 pages) 6.
8/27/86 NINE MILE POINT - UNIT 2, MSIV's, briefing and drawings (12 pages) 7.
Undated Draft paper on Ball and Seat Repairs. E/ attached letter dated 10, 1986 from J.T. Conway to R.B. Abbott subject: VSIV Testing During Power Ascension. (11 pages).
8.
10/22/86 Memorandum to Elinor Adensam. Director, BWR Project Directorate No. 3 from Gus C. Lainas. AD, Division of BWR Licensing,
Subject:
REQUEST FOR EXEMPTION:
MSIY OPERABILITY (4 pages) 9.
10/27/86 Memorandum to Elinor Adensam, Director, Project Directorate #3, Division of BWR Licensing from i
Gus C. Lainas, Assistant Director, Division of BWR Licer. sing,
Subject:
SAFETY EVALUATION FOR OPERATION OF MAIN STEAM ISOLATION VALVES DURING FIRST FUEL CYCLE l
WITH REFURBISHED SEAT AND BALL (9 pages)
g.
11/19/86 Memorandum to Elinor G. Adensam, Director, BWR Project Directorate No. 3, Division of BWR Licent ng from Gus Lainas, AD, Division of BWR i
Licenn ig,
Subject:
NINE MILE POINT UNIT 2 SEQUEHLE CHANGE IN REFURBISHING MSIVS (TAC #63454)
(2 pages) y.
11/20/86 Letter to Mr. C. V. Mangan, Senior V.P., Niagara Mohawk Power Corp., from Robert M. Bernero, Director, Division of BWR Licensing,
Subject:
REMOVAL OF MSIV ACTUATORS FROM VALVES BEING USED TO MAINTAIN SECONDARY CONTAINMENT INTEGRITY w/ enclosure to facility: Nine Mile Point Nuclear Station Unit 2 (NMP-2) from Niagara Mohawk Power Corp (NW C),
Subject:
SUMMARY
OF OCTOBER 15, 1986, MEETING WITH NMPC ON MAIN STEAM ISOLATION VALVES FOR 6
NMP-2 (2 pages) 11/20/86 Facility: Nine Mile Point Nuclear Station Unit g*
2 (NMP-2 to Applicant: Niagara Mohawk Power Corp.
(NMPC)
Subject:
SW94ARY OF OCTOBER 15, 1986, MEETING WITH NMPC ON MAIN STEAM ISOLATION VALVES FOR NMP-2 (44-pages) f3.
2/2/87 Memorandum for Elinor Adensam, Director, PDl3, Division of BWR Licensing from Gus C. Lainas, AD, Division of BWR Licensing,
Subject:
SAFETY EVALUATION FOR OPERATION OF MAIN STEAM !$0LATION VALVES DURING FIRST FUEL CYCLE WITH REFURBISHED SEAT AND BALL (LEAK INTEGRITY PROBLEM - TAC #63454)
(11 pages)
J9 2/$/87 Memorandum fcr Elinor Adensam, Director, PDl3, Division of BWR Licensing, from Gus C. Lainas.
AD, Division of BWR Licensing,
Subject:
SAFETY EVALUATION FOR OPERABILITY OF MODIFIED MAIN STEAM ISOLATION VALVES (MSIV) DURING FIRST FUEL CYCLE FOR NINE MILE POINT, UNIT 2 (10 pages)
Jg*
2/27/87 BRIEFING FOR CO MISSIONER ASSELSTINE ON NMP-2 MAIN STEAM ISOLATION VALVES (29 pages)
/4 3/9/87 Note to James McKnight, Document Control Branch from Mary F. Haughey, Project Manager, BWR Project Direc-torate No. 3, Division of BWR Licensing,
Subject:
GEN-ERAL ELECTRIC REPORT, 'KKL IN SERVICE EXPERIENCE WITH EPG BALL VALVES (NIAGARA MOHA9K TASK N0. GE-1)
(16 pages) jg, 3/12/87 Memorandum to William F. Kane, Director, Division of Project and Resident Programs from Mary F. Haughey, Project Manager, Project Directorate No. 3. Division of BWR Licensing,
Subject:
NRR SALP INPUT - NINE MILE POIN1 NUCLEAR STATION UNIT 2 (9 pages)
7
/8 4/8/87 Memorandum to Elinor Adensam Director, Project Dir-ectorate #3, Division of BWR Licensing from L. G. Hulman, Chief Plant Systems Branch, Division of BWR Licensing
Subject:
SAFETY EVALUATION FOR OPERATION OF NINE MILE POINT UNIT 2 WITH WYE PATTERN GLOBE MAIN STEAM ISOLA TION VALVES WITHOUT A LEAKAGE CONTROL SYSTEM (TAC M871)
(10 pages) 19 5/14/87 Note to Don Neighbors frw. Joe Scinto, Re: Nine Mile 2 Valves 873116.(1page).
No Date Nine Mile Point Unit 2, MSIY Prototype Test 4ng (4 pages)
.1t l.
No Date Yu-graphs:
Sumary; Radiological Consequence i
Parameters (2 pages); NMP2 Isolated Condenser Flow Path; NMP2 Site Plan; Assumptions; Dispersion Factors; Model Development; Total Gama Dose in Control Room vs. MSIV Leak Rate; Total Beta Dose in Control Room vs. MSIV Leak Rate; Control Room Thyroid Dose Evaluation; EA8
& LPZ Gama Doses vs MSIV Leak Rate; Tnyroid Dose - EA8 & LPZ at 1000 SCHFH; Rcsults and Conclusions.
(Foregoing untitled, source unknown (presumably Niagara-Mohawk.)
(15 pages) 1:1.
No Date Draft, handwritten Safety Evaluation concerning Main Steam Isolation Valve Leakags Problem (25-pages)
I
_ _ _ _ _ _ _ _ _ _ _ _ - - _ _ -