ML20238A185
| ML20238A185 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 09/02/1987 |
| From: | CAROLINA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20238A172 | List: |
| References | |
| NUDOCS 8709090178 | |
| Download: ML20238A185 (13) | |
Text
_ - _ _ _ _ _ _ _ _
r l
l l
l ENCLOSURE 2 REVISED TECHNICAL SPECIFICATION PAGES UNIT 1 1
1 1
(
l 8709090178 070902 PDR ADOCK 05000324 (5296 BAT /pp)
P PDR
.e (BSEP-1-93) 3/4.8 ELECTRICAL POWER SYSTEMS
?>/4 '.1 A.C.' SOURCE 3 OPERATION OF ONE OR BOTH UNITS LIMITINC CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:
Two physically independent circuits between the offsite transmission a.
network and the onsite Class 1E distribution system, and b.
Four separate and independent diesel generators, each with:
1.
A separate engine-mounted fuel tank containing a minimum of 100 gallons of fuel, 2.
A separate day fuel tank containing a minimum of 22,650 gallons of fuel, and -
3.
A separate fuel trar.sfer pump.
c.-
A plant fuel storage tank contaitaing a minimum of 74,000 gallons of fuel.
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.
ACTION:
With one offsite circuit of the above required A.C. electrical power a.
sources not capable of supplying the Class 1E distribution system:
1.
Demonstrate the OPERABILITY of the remaining A.C. offsite source by performing Surveillance Requirement 4.8.1.1.1.a within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter; 2.
Verify within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> that all redundant systems, subsystems, trains, components, and devices required to be OPERABLE are also OPERABLE; otherwise be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; 3.
Demonstrate the OPERABILITY of the diesel generators by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereafter on those diesels not already operating; i
4.
Restore the inoperable diesel generator to OPERABLE status within l
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
(
and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
BRUNSWICK - UNIT 1 3/4 d-1 Amendment No.
(BSEP-1-93)
LIMITINC CONDITION,FOR OPERATION ACTION (Continued) b.
With a diesel generator of the above A.C. electrical power sources inoperable:*
1.
Demonstrate the OPERABILITY of the A.C. offsite sources by performing Surveillance Requirement 4.8.1.1.1.a within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter; 2.
Verify within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> that all redundant systems, subsystems, trains, components, and devices required to be OPERABLE are also OPERABLE; otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; 3.
Demonstrate the OPERABILITY of the remaining diese? generators by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereafter; 4.
Restore the inoperable diesel generator to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
c.
With one offsite circuit and one diesei generator of the above required A.C. electrical power sources inoperable:
1.
Demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirements 4.8.1.1.1.a, 4.8.1.1.2.a.4, 4.8.1.1.2.a.5 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter; 2.
Restore at least one of the inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; 3.
With the inoperable offsite A.C. power source restored, demonstrate the OPERABILITY of the remaining A.C. power sources as required by ACTION b; restore four diesel generators to OPERABLE status within 7 days from time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />;
\\
l A diesel generator shall be considered to be inoperable from the time of failure until it satisfies the requirements of Surveillance Requirements 4.8.1.1.2.a.4 and 4.8,1.1.2.a.5.
BRUNSWICK - UNIT 1 3/4 8-2 Amendment No.
y.
(BSEP-1-93) i LIMITING CONDITION FOR OPERATION I
ACTION (Continued) 4.
With the inoperable diesel generator restored, demonstrate the OPERABILITY of the remaining A.C. power sources as required by j
ACTION a; restore two offsite circuits to OPERABLE status.within i
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
d.
With two of the above required offsite A.C. circuits inoperable:
1.
Demonstrate the OPERABILITY of four diesel generators by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.142.a.5 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter, unless the d'esel generators are already operating; 2.
Restore at least one of the inoperable offsite sources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; 3.
With one offsite source restored, demonstrate the OPERABLITY of the remaining A.C. power sources as required by ACTION a; restore two offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> I
from time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 l
hours.
With two of the above required diesel generators inoperable:
e.
1.
Demonstrate the OPERABILITY of the remaining A.C. power sources by performing Surveillance Requirements 4.8.1.1.1.a, 4.8.1.1.2.a.4, and 4.8.1.1.2.a.5 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter; 2.
Restore at least three diesel generators to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at-least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; 3.
With one diesel generator restored, demonstrate the OPERABILITY of the remaining A.C. power sources as required by ACTION b; restore at least 4 diesel generators to OPERABLE status within 7 days from time of initial loss or be in at least HOT SHUTDOWN within'the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
l l
BRUNSWICK - UNIT 1 3/4 8-3 Amendment No.
(BSEP-1-93) a I
SURVEILLANCE H6QUIREMENTS 4.8.1.1.1 Each of the above required independent circuits between the offsite transmission network and the onsite Class lE distribution system shall be:
Determined OPERABLE at least once per 7 days by verifying correct a.
breaker alignments and indicated power availability, and b.
Demonstrated OPERABLE at least once per 18 months during shutdown by manually transferring unit power supply from the normal circuit to the alternate circuit.
4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE:
a.
At least once per 31 days on a STAGGERED TEST BASIS by:
1.-
Verifying the fuel level in the engine-mounted fuel tank, 2.
Verifying the fuel Ic. vel in the day fuel tank, 3.
_ Verifying the fuel transfer pump can be started and transfers fuel from the day tank to the engine mounted tank, 4.
Verifying the diesel starts and accelerates to at least 514 rpm in less than or equal to 10 seconds,*
5.
Verifying the generator is synchronized, loaded to greater than or equal to 1750 kw, and operates for greater than or equal to 15 minutes, and 6.
Verifying the diesel generator is aligned to provide standby power to the associated emergency buses.
b '.
At least once per 31 days by verifying the fuel level in the plant fuel storage tank.
c.
At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank, obtained in accordance with ASTM-D270-65, is within the acceptable limits specified in Table 1 of ASTM-D975-74 when checked for viscosity, water and sediment, 1
l' I
- The diesel generator start (10 seconds) from ambient conditions shall be performed at least-once per 184 days in these surveillance tests. All other engine starts for the purpose of this surveillance testing may be preceded by a manually initiated engine prelube period and/or other warmup i
procedures recommended by the manufacturer so that mechanical stress and wear.on the diesel engine is minimized, l'
BRUNSWICK - UNIT 1 3/4 8-4 Amendment No.
l
(BSEP-1-93)
SURVEILLANCE REQUIREMENTS (Continued) d.
At least once per 18 months during shutdown by:
1.
Subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service, 2.
Verifying the generator capability to reject a load equal to one core spray pump without tripping,
~
3.
Simulating a loss of offsite power in conjunction with an emergency core cooling system test signal, and:
a) -Verifying de-energizction of the emergency buses and load shedding from the emergency buses.
b)
Verifying the diesel starts from ambient condition on the auto-start signal, energizes the emergency buses with permanently connected loads, energizes the auto-connected loads through the load sequence relays and operates for greater than or equal to 5 minutes while its generator is loaded ath the emergency loads.
4.
Verifying that on the emergency core cooling system test signal, all diesel generator trips except engine overspeed, generator differential, low lube oil pressure, reverse power, loss of field and phase overcurrent with voltage restraint, are automatically bypassed.
5.
Verifying the diesel generator operates for greater than or equal to 60 minutes while loaded to greater than or equal to 3500 kw.
6.
Verifying that the auto-connected loads to each diesel generator do not exceed the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating of 3850 kw.
7.
Verifying that the automatic load sequence relays are OPERABLE with each load sequence time within 10% of the required value.
l BRUNSWICK - UNIT 1 3/4 8-4a Amendment No.
--w--,-
O ENCLOSURE 3 REVISED TECHNICAL SPECIFICATION PAGES UNIT 2 (5296 BAT /pp)
(BSEP-2-96)l 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES OPERATION OF ONE OR'BOTH UNITS LIMITING CONDITION FOR OPERATION
.3.8.1.11 As a minimum, the following A.C. electrical power sources shall be OPERABLE:
LTwo physically independent circuits between the offsite transmission a.
network and the onsite Class 1E distribution system, and b.
-Four separate and independent diesel generators, each with:
1.
A separate engine-mounted. fuel tank containing a minimum of 100 gallons of. fuel, 2.
A separate day fuel tank containing a minimum of 22,650 gallons of fuel, and 3.
A separate fuel transfer pump.
c.
A plant fuel storage tank containing a minimum of 74,000 gallons of fuel.
l:
' APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.
ACTION:
With one offsite circuit of the above required A.C. electrical power l
a.
sources not capable of supplying the Class 1E distribution system:
1.
. Demonstrate the OPERABILITY of the remaining A.C. offsite source by performing Surveillance Requirement 4.8.1.1.1.a within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter; 4
2.
Verify within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> that all redundant systems, subsystems, trains,. components, and devices required to be OPERABLE are also OPERABLE; otherwise be in at least HOT SHUTDOWN within the ner.t 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; l;
3.
Demonstrate the OPERABILITY of the diesel generators by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least once per 72 thereafter on those diesel generators not already operating; l
4.
Restore the inoperable offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOVN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOVN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
BRUNSWICK - UNIT 2 3/4 8-1 Amendment No.
(BSEP-2-96) l ELECTRICAL POWER SYSTEMS LIMITING CONDITION FOR OPERATION (Continued) b.
With a diesel generator of the above required A.C. electrical power sources inoperable:*
1.
Demonstrate the OPERABILITY of the A.C. offsite sources by performing, surveillance Requirement 4.8.1.1.1.a within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at lealt once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter; 2.
Verify wi:hin 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> that all redundant systems, subsystems, trains, components, and devices required to be OPERABLE are also OPERABLE; otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN withF.n the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; 3.
Demonstrate the OPERABILITY of the remaining diesel generators by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereafter; 4.
Restore the inoperable diesel generator to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
c.
With one offsite circuit and one diesel generator of the above required A.C. electrical power sources inoperable:
1.
Demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirements 4.8.1.1.1.a, 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter; 2.
Restore at least one of the inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the follcwing 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; 3.
With the inoperable offsite A.C. powet source restored, demonstrate the OPERABILITY of the remaining A.C. power sources as required by ACTION b; restore four diesel generators to OPERABLE status within 7 days from time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; i
i l
i
)
A diesel generator shall be considered to be inoperable from the time of j
failure unell it satisfies the requirements for Surveillance 1
Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5.
i BRUNSWICK - UNIT 2 3/4 8-2 Amendment No.
j
__-_____________a
3 (BSEP-2-96)
ELECTRICAL POWER SYSTEMS LIMITINC CONDITION FOR OPERATION (Continued)
-4.
With the inoperable diesel generator restored, demonstrate the OPERABILITY of the remaining A.C. power sources as required by ACTION a; restore two offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
d.
With two of the above required offsite A.C. circuits inoperable:
1.
Demonstrate the OPERABILITY of four diesel generators by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within two hours and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter, unless the diesel generators are already operating; 2.
Restore at least one of the inoperable offsite sources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; 3.
With one offsite source restored, demonstrate the OPERABILITY of the remaining A.C. power sources as required by ACTION a; restore two offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
With two of the above required diesel generators inoperable:
e.
1.
Demonstrate the OPERABILITY of the remaining A.C. power sources by performing Surveillance-Requirements 4.8.1.1.1.a, 4.8.1.1.2.a.4, and 4.8.1.1.2.a.5 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter; 2.
Restore at least three diesel generators to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; 3.
With one diesel generator restored, demonstrate the OPERABILITY of the remaining A.C. power sources as required by ACTION b; restore at least 4 diesel generatora to OPERABLE status within 7 days from time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
BRUNSWICK - UNIT 2 3/4 8-3 Amendment No.
(BSEP-2-96)
ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS 4.8.1.1.1 Each of the above required independent circuits between the offsite transmission network and the onsite Class lE distribution system shall be:
a.
Determined OPERABLE at least once per 7 days by verifying correct breaker alignments and indicated power availability, and b.
Demonstrated OPERABLE at least once per 18 months during shutdown by manually transferring unit power supply from the normal circuit to the alternate circuit.
4.8.1.1.2. Each diesel generator shall be demonstrated OPERABLE:
a.
At least once per 31 days on a STACCERED TEST BASIS by:
c 1.
Verifying the fuel level in the engine-mounted fuel tank, 2.
Verifying the fuel level in the day fuel tank, 3.
Verifying the fuel transfer pump can be started and transfers
- /
fuel from the day tank to the engine mounted tank, 4.
Verifying the diesel starts and accelerates to at least 514 rpm in less chan or equal to 10 seconds,*
5.
Verifying the generato is synchronized, loaded to greater than or equal to 1750 kw, anc operates for greater than or equal to 15 minutes, and B
6.
Verifying the diesel generator is aligned to provide standby power to the associated emergency buses.
I b.
At least once per 31 days by verifying the fuel level in the plant fuel storage tank.
M c.
At least once per 92 days by verifying that a sample of diesel fuel i
from the fuel storage tank, obtained in accordance with ASTM-D270-65, is within the acceptable limits specified in Table 1 of ASTM-0975-74 when checked for viscosity, water and sediment, 9
1 The diesel generator start (10 seconds) from ambient conditions shall be performed at least once per 184 days in these surveillance tests. All other engine starts for the purpose of this surveillance testing may be preceded by a manually initiated engine prelube period and/or other warmup procedures recommended by the manufacturer so that mechanical stress and wear on the diesel engine is minimized.
'J l
BRUNSWICK - UNIT 2 3 / '4 8-4 Amendment No.
(BSEP-2-96) a SURVEILLANCE REQUIREMENTS (Continued) d.
At least once per 18 months during shutdown by:
1.
Subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service, 2.
Verifying the generator capability to reject a load equal to one core spray pump without tripping, 3.
Simulating a loss of offsite power in conjunction with an emergency core cooling system test signal, and:
a)
Verifying de-energization of the emergency buses and load shedding from the emergency buses.
b)
Verifying the diesel starts from ambient condition on the auto-start signal, energizes the emergency buses with permanently connected loads, energizes the auto-connected loads through the load sequence relays and operates for greater than or equal to 5 minutes while its generator is
-loaded with the emergency loads.
4.
Verifying that on the emergency core cooling system test signal, all diesel generator trips except engine overspeed, generator differential, low lube oil pressure, reverse power, loss of field and phase overcurrent with voltage restraint, are automatically bypassed.
5.
Verifying the diesel generator operates for greater than or equal to 60 minutes while loaded to greater than or equal to 3500 kw.
6.
Verifying that the auto-connected loads to each diesel generator do not exceed the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating cf 3850 kw.
7.
Verifying that the automatic load sequence relays are OPERABLE with each load sequence time within 10% of the required value.
l t
g, J
BRUNSWICK - UNIT 2 3/4 8-4a Amendment No.
tL_________-_--__-
.u
'.l l
c i
l LE 6 V 8-d3S L8bt S0-02NSO
. _ -.