Requests CRGR Review of Proposed NUREG-1262, Answers to Questions at Public Meetings Re Implementation of 10CFR55 on Operators Licenses. Ofc of General Counsel Offers No Objection to Issuance of Document
ML20235P685
Person / Time
Issue date: 07/14/1987
From: Murley T
Office of Nuclear Reactor Regulation
To: Jordan E
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
Shared Package
ML20235P690 List:
References
FOIA-87-787, RTR-NUREG-1262 GL-87-07, GL-87-7, NUDOCS 8707200578
Download: ML20235P685 (180)


Text

~

4d pu.s n. D l c

k UNITED STATES l I

8 t.

o j

NUCLEAR REGULATORY COMMISSION w AsHWGTON, D. C. 20666

^ g, .

h;

~s., * * " * /

JUL 141987 MEMORANGUM FOR: Edward Jordan, Director Office for Analysis and Evaluation of Operational Data FROM: Thomas E. Murley, Director Office of Nuclear Reactor Regulation

SUBJECT:

CRGR REVIEW 0F PROPOSED NUREG-1262: " ANSWERS TO QUESTIONS AT PUBLIC MEETINGS REGARDING IMPLEMENTATION OF TITLE 10, CODE OF FEDERAL REGULATIONS, PART 55 ON OPERATORS' LICENSES"  ;

l In accordance with Attachment 2 to Revision 4 of the CRGR Charter dated April 1987, this memorandum requests CRGR review of proposed NUREG-1262. The document sumarizes NRC office practices which were discussed with the industry during a series of four public meetings held to explain the implementation of 10 CFR 55 and associated Regulatory Guides. These public, meetings, held from April 9-20, 1987, were announced in the Federal Register (52 FR 9453), and via Generic Letter 87-07.

For purposes of CRGR review, we have identified the subject document as Category 2, and as applicable to all plants and to test and research reactors. The proposed document does not increase or decrease any requirements or staff positions. Rather, as stated on pages viii-ix, it represents office practices and policies on how the staff will implement the rule that was effective on May 26, 1987. The views expressed in the report are intended as guidance, and are meant to reflect the rule and its statement i of considerations; these views are not intended to interpret the rule or any of its provisions.

The Office of General Counsel has reviewed the subject document and has no legal objection to its issuance. This concurrence is based upon the assurance provided from NRR to OGC that the License Application Appeals process as described in the preface to the document does not differ in the final document from that version which OGC originally reviewed.

Y Thomas . Murley, Director Office of Nuclear Reactor Regulation

Enclosure:

Proposed NUREG-1262

[gg7- 7f 7 cc: V. Stello 1 Taylor O/h

[O x S hQ

y'

~

MEMORANDUM FOR: Edward L. Jordan, Chairman, CRGR .

Robert M. Bernero, NMSS l T. T. Martin, RI Denwood F. Ross, RES James H. Sniezek, NRR Joseph Scinto, OGC THRU: John E. Zerbe i Assistant for CRGR Operations, AEOD -!

FROM: T. Larry Bell, Senior Instructor  !

Technical Training Center, DOA, AEOD

SUBJECT:

ISSUE IDENTIFICATION AND

SUMMARY

FOR CRGR MEETING NO. 120 Enclosed for your information and use is the staff summary associated with Proposed NUREG-1262, " Answers to Questions at Public Meetings Regarding Implementation of Title 10, Code of Federal Regulations, Part 55 on Operator's Licenses."

This matter is scheduled for CRGR review at Meeting No. -120 on Wednesday, August 12, 1980 in Room P-422, 1-3 p.m.

T. Larry ell,-Senior Instructor.

TTC, DOA, AEOD

Enclosure:

As stated cc: V. Stello

):Gn 87- 787 oli

-__------,--___.------_----___----------------,a- - - - - - - _ - - - - - - - - - - - - - _ _ . . - - - . - . - - - - . . , - - --_ --,a--- - - - ---a.--. - - - -------A

J ,

Issue Summary CRGR Review Item - Meeting No. 120 August 12, 1987 IDENTIFICATION Answers to Questions at Public Meetings Regarding Implementation of Title 10, Code of Federal Regulations, Part 55 on Operator's Licenses:

NUREG-1262 OBJECTIVE The proposed NUREG provides answers to questions that were asked in public meetings conducted from April 9 to April 20, 1987. The meetings discussed implementation of the Commission's final rule governing Operator's Licenses and Conforming Amendments (10 CFR Parts 55 and 50).

BACKGROUND On March 25, 1987, the U.S. Nuclear Regulatory Commission published in the Federal Register (52 FR 9453) revisions to 10 CFR 55 to meet NRC responsibilities under Cection 306 of the Nuclear Waste Policy Act of 1982. The rule, Operator's Licenses and Conforming Amendments, became effective on May 26, 1937.

From April 9, 1987 to April 20, 1987, the NRC staff held four public meetings to discuss implementation of the requirements of this and related issues. Those attending asked numerous questions which the staff answered. The proposed NUREG presents the answers to those questions taken from the transcripts of the four meetings, as well as to written questions which were submitted at the conclusion of the meetings.

NUREG-1762 was submitted to CRGR for review by memorandum, T. E. Murley to E. Jordan dated July 14, 1987,

Subject:

CRGR Review )

of Proposed NUREG-1262: Answers to Questions at Public Meetings I Regarding Implementation of Title 10, Code of Federal Regulations, Part 55 on Operator's Licenses. ]

DISCUSSION / ISSUES For the most part, the proposed NUREG's answers to the questions are reiterations of 10 CFR 55 and other documents that have been endorsed by the NRC. However, there are concerns that the proposed NUREG presents staf f positions on Operator's License issues. For example, the proposed NUREG states that if the NRC administers a written and operating requalification examination, these examinations may be substituted for the facility administered requalification examinations required by 55.59 (Q. 344, pg. 94). While this seems to be more than fair, it provides guidance on satisfactory compliance with regulations. A second example is the explanation of 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> per quarter given on page 78 (Q. 277) of the proposed NUREG. Again, the

policy is reasonable, but represents an NRC position. Positions such as these need to be established so that the candidates, training departments and examiners have a clear understanding of Operator License's issues.

However, guidance provided by the EDO states that NUREGs are not the i correct vehicle for the statement of NRC positions (memo f rom W.

Dircks to H. Denton, May 7, 1984.) Therefore, the CRGR may wish to consider issuing this information as a generic letter with the Questions and Answers as an attachment. Implenectation of Fire l Protection Requirements (Generic Letter 86-10) was issued in this format. NRC responses to industry questions were included as an enclosure to this letter.

When the Answers to the Requalification Related Questions are reviewed, one can imagine the strain NRC-administered requalification exams will place on examiner manpower. However, the requirement for.

these exams is contained in 10 CFR 55 instead of NUREG-1262, and it is this document that the CRGR is reviewing.

1 i

i

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ ____ ___ _A

1 ..

1 NUREG-1262 l

Answers to Questions at Public Meetings Regarding l Implementation'of Title 10, l Code of Federal Regulations, l Part 55 on Operators' Licenses (

U.S. Nuclear Regulatory 32 Commissio.n . .

Office of Nuclear Reactor Regulation

]

,~~~,,

c' l

l l

I

ABSTRACT This document presents questions and answers based on the transcripts of four public meetings (and from written questions submitted after the meetings) conducted from April 9 to April 20, 1987 by the staff of the U.S. Nuclear Regulatory Commission. The meetings discussed implementation of the Commission's final rule governing Operators' Licenses and Conforming Amendments (10 CFR Parts 55 and 50). The rule became effective May 26, 1987 and is intended to clarify the regulations for issuing licenses to operators and senior operators; revise the requirements and scope of written examinations and operating tests for operators and senior operators, including a requirement for a simulatian facility; clarify procedures for administering requalification examinations; and describe the form and content for operator license applications.

1

- e

  • 1 iii

t l I

s.

x

)

i' \

'N 9'

4 4

, r

'q s -

(

TABLE OF CONTENTS i e

t s [ age

\'

ABSTRACT ................................. ..............^...). \n.... iii PREF 4CE ..... ................................................4...... . vii INTRLOUCTION ......................................................... ix ACRON WS AND INITIALISFS ............&..t....':.......................... xvi t {

GENERAL ISSUES PERTAINING TO 10 CFR PART 55 . . . . . . . . . . l. . . . . . . . . . . . . .

1~

z BackgroundtotheReguiition.......................s'............. 1 Definitions (Subpart A,'Section 55.4) ..............,............ 3 Communications (Subpart4,Section55.5)........................ 3 General Exemptions (Subpart B, Section 55.13) ............... ... 4 .

APPLICATIONS ......................................................... 7 How to Apply (Subpart D, Section 55.31; NRC Form 398) . . . . . . . . . . . 7 Medical Examination (Subpart C, Section 55.21). ............ ..... . 19  ;

Certification (Subpart C, Section 55.22; NRC Form 396) ..........

19 l , ). i.1 Incapacitation Because of Disability or Illness (Subpart C, '

Section 55.25) ................................................ 21

  • s Documentation (Subpart C, Section 55.27) ........................ 22; Regulatory Guide 1.8 and ANSI /ANS 3.1 ........... ............... 22 q

WRITTEN EXAMINATIONS AND OPERATING TESTS ............................. 31 II.

General Issues (Including Learning Objectives and Examination 7 Question Bank) ........................................... ...., . 31 Written Examinations and Operating Tests (Statement of A d Considerations) ............................................s..< 33 Written Examination: Operctors (Subpart E, Section 55.41) .,,....'- . 35 Written Examination: ser.Nr O (Subpart E, Section 55.43) ....................perators .........................;.......... 38 Operating Tests: Content (Subpart E, Section 55.45(a)) .......... f 40 Waiver of Examination and Test Requirements (Subpart E, ,

Section 55.47) ................/.,................Jc.

.......... 41  !

SIMULATION FACILITIES ...................................'............. 42 WrittenExaminationian00peratingYets: Implementation (Subpart E, Section set 45(b)) ...!.i............r....'........... ,! 42 Regulatory Guide 1.149 .....-.. h....i...........'.V.............. 50 -

ANSI /ANS 3.5, 1980'..........................,....'.,............. 52 Simulation Facility Certification (Including performance Testing, NRC Form 474, NUREG-1258) ................,........... seq # j 1

v i

.)

1

_ _ - _ - - _ _ _ - _ _ _ _ _ _ _ - - - - _ _ J

=, . . _ - - _ - _ _ _ _ _ _ _ _ _ _ _ -

1 1- Y 6 3 ,

t

.f

- t! 1 t i

' . TABLE 0F CONTENTS (Contiriued)-

. t1, % s y

! .% y Page._

t LICENSES ............................................................. 68 l

' q Special Senior Operator Licenses (Including Instructor 4

f

  • Certification) ................................................ 68

. .'" Actively Performing

.0perator" the Functions of an Operator or Senior

... ................................................. . 71 -

73 i

1{,ConditionsofLicenses(SubpartQ,Section55.53)...............

[ , d REQUALI FICATION AN9 RENEWAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82 1

Requalification and Renewal (Statement,of Considerations) ...... 82 Renewal of i.icanses (Subpart H, Section,55.S?) .................. .82 f Requalification (Subpart H, Section 55.59) ...................... 88 T' '

CONFORNINGAMENDMENTSIN10CfRPART50.............................. 115 OPERATOR LICENSING EXAMINER STANDARDS (NUREG-1021) ................... 117.-

EEFERENCES ........................................................ .. ' 122 APPEUDICES ,

t A 1 Ge ne ri c Lette r 37 3 7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1 B 10 CFR Parts 50 and 55 -- Opsr,. tors' Licenses and Conforming Amendments ...................................... B-1 C Regulatory Guide 1.134 -- Medical Evaluation of Licensed . H Personnel for Nuclear Power Plants ......................... C-1 D Regulatory Guide 1.149 -- Nuclear Power Plant Simulation

, Facilities for Use in Operator. License Examinations ........ 0-1 1 E Regulatory Guide 1.8 -- Qualification and Training for Personnel for Nuclear Power Plants ......................... E-1

, . 1 t i j ',b

\.I (f,i I

, s 5 e-c i<

I s

[ t  %

_" {

) p' '(

y, k

I s ~)

$ 1 m .

i i N , yj 1 l s

[

g. /  %

\[. , i

I PREFACE On March 25, 1987, the U.S. Nuclear Regulatory Commission published in the Federal Register (52 FR 9453) revisions to 10 CFR 55 to meet NRC responsibili-ties under Section 306 of the Nuclear Waste Policy Act of 1982. The rule, Operators' Licenses and Conforming Amendments, became effective on May 26, 1987 and is intended to:

1. clarify the regulations for' issuing licenses to operators and senior operators;
2. revise the requirements and scope of written examinations and operating tests for operators and senior operators, including a requirement for a simulation facility;
3. clarify procedures for adm'nistering requalif ation examinations; and,
4. describe the form and content for operator license applications.

From April 9, 1987 to April 20, 1987, the NRC staff held four public meetings to discuss implementation of the requirements of this rule and related issues.

Those attending asked numerous questions which the staff answered. This docu-ment presents the answers to those questions taken from the transcripts of the four meetings, as well as to written questions which were submitted at the con-clusion of the meetings. The questions are grouped to eliminate excessive duplication. However, where different questions addressed similar concerns, they were retained in this report if they provided clarification or a different perspective. Questions related to Regulatory Guides, industry standards, and other documents associated with the rule are included with the applicable por-tion of the rule.

This report attempts to retain the intent, tone, and nuance of each question without reproducing each. verbatim from the transcripts. In some cases, ques-tions submitted or recorded by the transcriber contained unintended or inad-vertent factual errors. When identified, these errors were corrected. Simi-larly, verbatim answers in the transcripts have been edited where necessary for clarity and conciseness.

NRC staff discussions held since the final public meeting indicate that the answers provided to questions in the area of " Conditions of Licenses," spe-cifically the proficiency requirements in 10 CFR 55.53(e), may have conveyed the impression that the staff advocated minimum shift staffing, and that this might have been construed to be counterproductive to safety. The apparent confusion stems from the definition of " Actively performing the functions of an operator or senior operator" in Section 55.4 of the regulation, which appears to tie the proficiency issue to a minimum staffing requirement in the facility licensee's technical specifications.

f s

vii j

- _ _ - _ _ _ _ _ - _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ a

The intent of the 10 CFR 55.53(e) requirements regarding maintenance of active operator or senior operator status is that personnel maintain proficiency,by actively performing the functions and duties of the licensed operator positions.

Because facility licensees assign to a shift more than the minimum number of operators required by their Technical Specifications, concerns have been raised since the public meetings that 10 CFR 55.53(e), if implemented in the manner discussed at these meetings, might discourage utilities from augmenting shift crews. These concerns apparently stem from the definition of " Actively perform-ing the functions of an operator or senior operator" in Section 55.4 of the re-gulation, which may appear to link maintaining proficiency to a minimum staffing requirement in the facility licensee's Technical Specifications.

It is not NRC's intent to discourage augmenting shift crews; clearly, thi:

practice can result in a significant safety enhancement. However, assigning a large number of operators to a shift could reduce the range of responsibili-ties of any one operator to a level where sufficient experience in directing shift operations and/or in manipulating controls is not being obtained. NRC's intent in 10 CFR 55.53(e) is that operators taking credit for watchstanding on shift to maintain an active license engage meaningfully and fully in the func-tions and duties of the positions required by the Technical Specifications.

The intent is not to have licensees augment a shift with a contingent of opera-tors whose main purpose is to acquire the minimum number of watches to meet 10 CFR 55.53(e) requirements. Their role is to fulfill the duties that the facility licensee judges are necessary and prudent for safe operations.

Facility licenses can take credit for more than the minimum number of watch-standers required by Technical Specifications provided that there are admini-strative controls which assure that functions and duties are divided and rotated in a manner which provides each watchstander meaningful and significant oppor-Lunity to maintain proficiency in the performance of the functions of an opera-  !

tor and/or senior operator as appropriate. Normally, more than one additional watchstander at each Technical Specification position would not be considered acceptable with respect to the proficiency issue.

Any answers to questions on this subject that were raised during the public meetings, and which might have conveyed the impression that NRC advocated such minimum shift staffing, have been revised in this report to reflect the staff's position as clarified above. Such answers are identified in this report by an asterisk next to the question number.

Similarly, NRC staff discussions held during the preparation of this report have j identified a number of answers given during the public meetings which either mis-stated an NRC policy or may have been open to misinterpretation. These answers have been revised for this report and are identified by an asterisk next to the question number.

The views expressed in this report represent office practices and policies on how the staff will implement the rule. These views are intended as guidance and are meant to reflect the rule and its statement of considerations. The views expressed are not intended to interpret the rule or any of its provisions. Al-though any request for formal interpretation should be sought from the Office of General Counsel under 10 CFR 55.6, the NRC staff may provide informal guidance viii

1 as needed and as appropriate. This report does not impose any requirements on facility licensees nor does it replace or supersede any existing regulations.

II INTRODUCTION This rule (10 CFR 55) represents a significant move toward less prescriptive regulatory requirements for utilities that have accredited training programs and acceptable simulation facilities. It attempts to differentiate clearly between training programs sponsored through industry initiatives by the Nuclear Utility Management and Resources Committee (NUMARC) and the Institute for Nu-clear Power Operations (INPO), and Nuclear Regulatory Commission (NRC) licens-ing and examination requirements. One of the most important changes to the regulation is the flexibility it affords licensees in reviewing the content of continuing training (requalification) programs, and tailoring those programs to the needs of the job incumbents. This degree of flexibility represents a major change from the way NRC has implemented regulations in the past in that it . q relies on industry initiatives to provide both training and qualifications for  ;

license applicants. With this rulemaking NRC has moved out of the area of L specifying training program content and qualifications for instructors. 1 INP0 Accreditation It is a precedent-setting move, and NRC is pleased that the industry has taken this initiative to improve its training of licensed operators and others.

Although moving out of the training areas potentially leaves a void, particu-larly as it relates to some of the more prescriptive requirements used in the past, NRC has placed great importance in the INP0 accreditation process. In l its review of INP0 accreditation criteria, the staff has concluded that they L are equivalent to NRC's. If a utility implements an accredited training pro-gram, the accreditation will constitute the basis for NRC acceptance of that certification from a responsible utility officer, as indicated in Generic Letter 87-07.

The Appeal Process NRC is also implementing a change to the appeal process for operator license candidates and job incumbents to clarify the process. The following figures describe the proposed appeal process.

Figure 1. NRC's appeal process has always permitted both informal reviews and

]

hearing rights on issues which were in dispute between the candidate and the j examiner. Informal reviews were conducted by regional management and, when necessary, a second level of reviews was conducted at NRC headquarters. The exercise of hearing rights, described in Part 2 of the Commission's regulations, becomes operable should there be a license application denial. 1 Figure 2. Informal reviews and hearing rights are also available to the candi-date for any adverse action, whether for a failure of the written examination .

or operating test, or for a rejected application. The informal review will go l to the Director, Division of Licensee Performance and Quality Evaluation (DLPQE). I In the past, on occasion, NRC has not completed action on appeals in a timely j manner and, in some cases, candidates have not submitted information that is I

ix 1 m_________.__ _ _ _ ____ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _

necessary to review an appeal. We have tightened up the schedule by allowing 20 days for the candidate to decide to appeal and 30 days for informai manage-ment review.

Figure 3. Those schedules will work as follows. The day that the candidate gets the notification letter of a failure or notification of a rejected appli-cation, we have called day zero. He has 20 days to decide whether to request an informal review.

If the candidate does not act'within that 20-day period, the notification letter automatically converts to a proposed denial, which will avail him of hearing rights under Part 2 of the Commissions regulations. If he requests an infor-mal review, he submits the information to the Director, DLPQE, who reviews it, and either sustains or overturns the examination failure or the rejected application.

If the candidate's examination failure or application rejection is sustained, a Notice of Proposed License Denial or Proposed License Application Denial, as appropriate, will be issued. The candidate can then request a hearing under Part 2, or he can choose at that point to accept the Proposed Denial, waive his hearing rights, and have the denial become final. It takes an affirmative action by the candidate to waive his hearing rights, through an NRC form letter which provides the information about the date of his examination, his docket number, and the like. He simply signs that, and returns it tb NRC.

If he takes no action, the proposed denial still stands, but in order to imple-ment the hearing process, he would have to request the hearing and notify the NRC Office of General Counsel. The Examiner Standards will contain sample letters and procedures that describe this process. The 80-day time frame for this process does not include mailing time. We will be using certified mail, request return receipts, and will place the correspondence associated with the appeal in the docket file.

In addition, we will provide copies of all relevant correspondence to the facil-ity licensee's authorized representative who signed the application. This will be done at the time we mail it out to the individual. The reason for this is thit the authorized representative is a part of this process, in that he cer-tified the completion of training. Further, the facility reviewed a written exam and provided comments on the exam and the answers.

Figure 4. This figure shows the proposed denial / hearing process, beginning with the administration of the examination. NRC will complete the grading, make an initial determination within 30 days, and mail the results to the candidate.

This letter constitutes a notification of examination, the letter will become a proposed denial if the candidate takes no action within 20 days after receiving it.

If he does act within 20 days, he has three options. He may accept the results, or he may request a hearing or an informal review by the Director, DLPQE.

If he requests a hearing, the hearing process will be initiated. He may allow the 20 days to elapse, decide that he does not wish an informal review, and go immediately to hearing by simply letting the letter announcing the results of the examination become a Proposed Denial after 20 days and submitting a hearing x

request to the Office of General Counsel. Certified mail is used for all cor-respondences, so that NRC has a firm understanding of the dates on which actions must be taken.

If the candidate requests an informal review, he must send in a complete infor-mation package to the Director, DLPQE. He has 20 days to decide on the request, and 10 more days to submit the information. The Director would review the sub-mittal and make a determination within 30 days. If the Director sustains the failure or the application rejection the candidate would receive the decision by certified mail. The candidate could at that point request a hearing, or accept the results. If the candidate accepts the results, NRC would issue a final denial and put it into his docket file. After the required length of time from the date of final denial (immediately in the case of an application denial) he could start the reapplication process.

This process is more formal than past practice. A candidate may not reapply l under the provisions of 10 CFR 55.12 until he has a final denial in hand. Thb only way he can get a final denial is either to agree with the staff's proposed denial, waive his hearing rights and accept the outcome, or go to hearing, where an independent determination will be made in his case. The types of hearings i under Part 2 may vary from informal to formal adjudicatory hearings. It.is the candidate who controls the process. It is the staff's responsibility to ensure that the candidate understands his rights.

The review process as outlined is currently under staff review for ways in which it can be expedited.

xi

l y

n o

S g .

T n e5 f H

i r o) t p u 3 6 G n(

l I

e i 5

R c f a5 i o r c t c o G a nR N .

oF e)

I R

es t t i

t C j5 e(

a r A ah g n0 l

a ,

E d i r n

i i H

i d r 1 m r el f o )4(

n g a e di a D o n x n e N ci r edn d A y a gu eD e

i t

m ()c b e s 1 S h n ol y 3 S d p a we i .

E t

n n n5 C i g oioi n r F a5 1

O o n l l

e p t o

i p v aRF e

r R i f d s -

u g P y a i

f n w l y y tp n l l yC

$ p l

A a

d pl a e o p0 p n ci s E t n aici a1 P .

aa e r

f ace e r r P d a l n ed -

e A ei yot yd L p n ait ag an A p e od mad ci d r i n mu M t i

l na e o

'n R s d e p O e t

a p oe t at i

F e s d oCH d a N b o i d r i

d i c

I p l n o n e - - np or of t op C p C o C a x

i '

e S g T e d H t G a w ju n d e e o s

I R p v e i

i d r e eiv u G n r t a v .

w N d  :

a n c a t et r o s

I i

P v nt i A e e e e s t c

r f u r i

e E

M u

f a q mi e

n a d s t et i

c g m v s s r n D a e a d l

e a e d e

A N

o h t o mn a n m t e i o

S t

y t

h g ma t t

d a e S e b g n s e r e E z i

r a r r u t

2 a eC r

i l n mt e o s d g

u O a i o e r e f

n i P; s h e d i

F P

m s r t i t l

a ab u n c n q o a oh e s g t c L f g d a od n A

i n

i r h g ai r d r

$ y e e a e o P e e s r h e s n t e i

f f

P i a a y h i

w A b h al a l

c s oi d a ei e y L s s t d l w

mmla p v a A ad n a r r s e d h n e a o o m r M a l

c t f f r el 0 R st b n n n o l a

s sr a aiif u 2 O e c e c d m F e h e r N c i l

p t i

l p

I od - - - h o -

r n p o p cf P u A t A S n i i l  ;

I l

~ .

s r

e l

S t a T s r i n

t a H l e _

G u u D I n s q R e o e d r i g r a e G u e s

l e w n N

i a R e H e c

I f

R y i

v y i A

n b e b L s E o r e H i w d t

a n w

e s e e m D n o i

'n i s i t

N i i v o v o g e e p g A mt a e c r i

g r o n n j e r i r i S x e l

a R l

a P a l

i S E R e a E m f m f. h m 3

C f r o r o e

r u O ono f o f o r e g

n n n n o i

F R nt i

o o f d P i oac i i

t i

i t l u .

L t i t

s a t

s a t

s c al cpp e c e c e n A i i u

i E i u f u f f

iA q i q

i q t P t t

o t

o e o P o r e e n

A R N R N R N o s

L s s e A s s s y y o M s y y y a a D R y a a a d d O a d d d  :

F d 0 0 E N O O 0 0 0 2 T I

2 5 7 1 1 O

+ + + + + N y

i  !

m ) '

11 s.

i

+li 1

~

- T 2 := i us -

h ti!=i :ls 3 a i r-N/in .r li il r  :

ins :n is

.s a r I" a a 21 11 il 3 n!ig _l i

=

3 mi!. in 1 . ,

s = i

  • 2 Me
  • 5 I a __,

s 3- .ni >

e -

unl. -

1,. I-

sug l= . 3 iis
e. ii t i Illi ,ll i

l -3.ll i

/

N/ lIII -

si. g.

~

isl a!

i

.m!

M ll 3 8 Ig n Il_1 1! inn 3

n r g4

'Ej E

4 la ,

. gn .

_E,j_ EE A ,

XV

ACRONYMS AND INITIALISMS ANS American Nuclear Society ANSI American National Standards Institute BOP Balance of Plant BWR Boiling Water Reactor CE Combustion Engineering CRD Control Rod Drive E0P Emergency Operating' Procedure ES Examiner Standard FSAR Final Safety Analysis Report GE General Emergency -

IE OfficeofInspectionandEnforcement(NRC)

INPO Institute of Nuclear Power Operations

/

K/A Knowledge and Abilities LER Licensee Event Report NLO Nonlicensed Operator NRC U.S. Nuclear Regulatory Commission NRR Office of Nuclear Reactor Regulation (NRC)

NTOL Near-Term Operating License NUMARC Nuclear Utility Management and Resources Committee OJT On-the-Job Training OMB Office of Management and Budget PWR Pressurized Water Reactor I Reg Guide Regulatory Guide RG Regulatory Guide Requal Requalification 1 R0 Reactor Operator i RWP Radiation Work Permit

]

SAE Site Area Emergency 4 SAT Systematic (or $ystems) Approach to Training SFEP Simulation Facility Evaluation Procedure SRO Senior Reactor Operator ,

STA Shift Technical Advisor  !

Tech Specs Technical Specifications TSD Training System Development

  • UE Unusual Event t xvi

e O

GENEP,AL ISSUES PERTAINING TO 10 CFR PART 5

Background to the Regulation Q. 1. The Supplemental Information to NRC Generic Letter 87-07 states that, "These rules supersede all current regulations for operator licenses." Are training requirements from Mr. H. R. Denton's March 28, 1980 letter superseded by the new rule?* 1 A. The rule supersedes all requirements where those requirements are less restrictive. Where individual commitments are more restrictive, you must fol-low those commitments until you change them.

In some cases that change may require an amendment to the license. In other cases it can be done by yourself under 10 CFR Part 50.59, and you simply inform us of what you're doing. That would b-lude any change within your authority to do under Part 50.59 that does not sunstitute a reduction in the effective-ness of the program, because it's being done to conform to the rule. Addition-ally, as a matter of interest, we are no longer, under the rule, permitted to' certify instructors.

l Q. 2. Will the revision to 10 CFR 55 cancel NUREG-0737, NUREG-0094, and the Denton letter? If so, will references to these documents be removed from NUREG-1021?

A. NUREG-1021, " Operator Examiner Licensing Standards," has been reviewed and the items left are required by the Regulation, or by Regulatory Guide 1.8. The items from NUREG-0737 and NUREG-0094 that are superseded have only to do with operator licensing. Items from Regulatory Guide 1.8 Revision 2, will be incor-porated into NUREG-1021, Rev 4, when Regulatory Guide 1.8 becomes effective on March 31, 1988. Some items may be very similar to what was there in the past, due to NUREG-0737, or NUREG-0094. For example, four years of power plant experience are incorporated into NUREG-0737 and Denton's letter, and it's still in Regulatory Guide 1.8 and NUREG-1021.

Q. 3. Is it true that the NUREG-0737 requirements being incorporated in 10 CFR Part 55 are only those that relate to operator training and licensing?

A. The requirements pertain only to operator licensing, not training.

Q. 4. We also make commitments in NUREG-0737 for training and mitigating core damage of other work groups. Also, there is training related to STAS. For in-stance, Reg Guide 1.8 talks about the number of shifts that an STA must serve.

So, nothing in this regulation affects these commitments even though there is some reference to it? ]

A. Yes, that's correct. It does not modify those prior commitments regarding training for STAS and other work groups.

  • H. R. Denton, NRC, Letter to All Power Reactor Applicants and Licensees.

Subject:

Qualification of Reactor Operators, March 28, 1980.

NUREG-1262 1

Q. 5. If NUREG-0737 is still applicable in areas not applicable to regulations for operator licenses, are you going to publish a NUREG that supersedes NUREG-0737 in those areas?

A. No, we'll not issue a new NUREG that applies to the areas that have not been superseded.

Q. 6. Are experience requirements in NUREG-1021 for the R0 and the SRO super-seded by this change?

A. No. NUREG-1021 will be revised to reflect the changes that have been adopted in ANSI 3.1 as endorsed by Regulatory Guide 1.8. We anticipate these changes will be made in about one year.

Q. 7. Can licensees file an FSAR amendment for Commission approval to modify existing initial licensing and requalification training programs?

A. Yes. See Generic Letter 87-07 for guidance on how to file such FSAR {

amendments.

Q. 8. What other means are available for filing for program changes?

A. You can write a letter and say that you have substituted an accredited training program, which is performance-based, for the previously NRC-approved program, and indicate the date(s) your new program was accredited. See Generic Letter 87-07 for further guidance on how to submit such a letter.

Q. 9. Our FSAR commits us to ANSI /ANS-3.1-1978.

A. Recall that this Regulation and associated documents supersede all prior requirements. The rule identifies the Regulatory Guides that are part of the rulemaking package. The implementation of Reg Guide 1.8, which endorses, with exceptions, ANSI /ANS 3.1, 1981, takes effect March 31, 1988, to allow for a phase-in period.

Q. 10. Will we do anything different in the inspection of requalification ac-tivities due to the end of the two year moratorium in INPO accreditation? Has the new rule been timed to coincide with the end of the two year period?

A. This issue is currently under advisement by the Commission. No decision has been made to date. Publication of the regulation was independent of the two year period.

Q. 11. Is failure to meet an INPO program requirement that was in the benchmark-accredited program grounds for issuance of a Notice of Violation?

A. Failure to meet INPO Guidelines, or loss of accreditation status through action taken by the National Nuclear Accreditation Board, will result in further evaluation by NRC. Such failure in itself would not be grounds for a Notice of Violation. However, per the " Policy Statement on Training and Qualification of Nuclear Power Plant Personnel" (50 FR 11147), "Nothing in this Policy State-ment shall limit the authority or responsibility of the NRC to follow up on operational events or place any limit on NRC's enforcement authority when regulatory requirements are not met."

NUREG-1262 2

Q. 5. If NUREG-0737 is still applicable in areas not applicable to regulations for operator licenses, are you going to publish a NUREG that supersedes NUREG-0737 in those areas?

A. No, we'll not issue a new NUREG that applies to the areas that have not been superseded.

Q. 6. Are experience requirements in NUREG-1021 for the R0 and the SRO super-seded by this change?

A. No. NUREG-1021 will be revised to reflect the changes that have been adopted in ANSI 3.1 as endorsed by Regulatory Guide 1.8. We anticipate these changes will be made in about one year.

Q. 7. Can licensees file an FSAR amendment for Commission approval to modify existing initial licensing and requalification training programs?

A. Yes. See Generic Letter 87-07 for guidance on how to file such FSAR amendments.

Q. 8. What other means are available for filing for program changes? 1 A. You can write a letter and say that you have substituted an accredited training program, which is performance-based, for the previously NRC-approved program, and indicate the date(s) your new program was accredited. See Generic Letter 87-07 for further guidance on how to submit such a letter.

Q. 9. Our FSAR commits us to ANSI /ANS-3.1-1978.

A. Recall that this Regulation and associated documents supersede all prior requirements. The rule identifies the Regulatory Guides that are part of the I rulemaking package. The implementation of Reg Guide 1.8, which endorses, with exceptions, ANSI /ANS 3.1, 1981, takes effect March 31, 1988, to allow for a phase-in periti.

Q. 10. Will we do anything different in the inspection of requalification ac-tivities due to the end of the two year moratorium in INPO accreditation? Has the new rule been timed to coincide with the end of the two year period?

A. This issue is currently under advisement by the Commission. No decision has been made to date. Publication of the regulation was independent of the two year period.

Q. 11. Is failure to meet an INPO program requirement that was in the benchmark- i accredited program grounds for issuance of a Notice of Violation?  !

A. Failure to meet INPO Guidelines, or loss of accreditation status through i action taken by the National Nuclear Accreditation Board, will result-in further '

evaluation by NRC. Such failure in itself would not be grounds for a Notice of Violation. However, per the " Policy Statement on Training and Qualification i of Nuclear Power Plant Personnel" (50 FR 11147), "Nothing in this Policy State- i ment shall limit the authority or responsibility of the NRC to follow up on operational events or place any limit on NRC's enforcement authority when '

regulatory requirements are not met."

NUREG-1262 2 i

f l

Definitions (Subpart A, Section 55.4)

Q. 12. Why did you change terms from " reactivity manipulations" to " control manipulations?"

A. For the purposes of Part 55, " controls" refers to the controls that affect reactivity or power.

Q. 13. By what means are utilities to determine NRC's interpretation of " refer-ence plant" as it applies to multi-unit plants at one site (from the same vendor and vintage)? It seems that compliance with Part.55 is contingent on a clear interpretation of this term. ,

A. The definition of " reference plant" has been provided in Section 55.4 of the regulation. Sectien D, which is the implementation section of Regulatory Guide 1.149, provides clear guidance for the use of one simulation facility' for more than one plant or unit, since each plant has a unique docket number.

The greater the similarity between the units, of course, the more likely it is that you'll be able to submit one certification form for each, identifying any exceptions as necessary against ANSI /ANS-3.5.

If your operators are dual-licensed, that's a pretty good indication that a certification, with exceptions, would be considered satisfactory for multiple units or multiple plants. If your operators are not dual-licensed, it is still possible to certify with exceptions, although more work may need to be done to justify acceptability for the conduct of operating tests.

Q. 14. In the discussion of the term, " plant-referenced simulator," mention was made of the simulator being required to use controlled copies of procedures?

What do you mean by the word control?

A. Controlled copies refers to procedures that are identical to those you use in the control room of the plant, and are maintained current through adminis-trative control.

Q. 15. Do they necessarily have to be up to date to the minute or to the hour?

A. We expect them to be up to date.

Q. 16. As far as the references go?

A. Yes.

Q. 17. Revisions?

A. Yes.

Communications (Subpart A, Section 55.5)

  • Q. 18. Section 55.5(b)(2)(iv) states that applications and correspondence should be submitted to the Regional Administrator. Should copies be submitted to the Regional Section Chief for Operator Licensing?

NUREG-1262 3

3 A. No. Copies of applications and correspondence under Section 55.5 need not be sent to the Regional Section Chiefs. i Q. 19. Is Form 474 to be submitted directly to the Director of the Office of Nuclear Reactor Regulation (NRR) in Washington, D.C., as opposed to Regional Administrators?

A. Yes. We made a conscious effort to ensure that Form 474 certifications and the applications for approval be submitted to NRR at Headquarters. Offi-cially, they should be filed in accordance with 10 CFR Part 50.4, which spe-cifies that those submittals go to ATTN: Document Control Desk, Washington, DC 20555. .

Q. 20. Who specifically receives the certification referred to in Generic Letter 87-07, the region or headquarters?

A. Generic Letter 87-07 describes the form of notification to the NRC, which basically is a letter telling us that you have an INP0-accredited program, or an otherwise systematic approach to training at your facility. That submittal ,

is made to NRC Headquarters in accordance with 10 CFR 50.4. It comes to the Director of the Office of Nuclear Reactor Regulation, and is to be submitted in accordance with 10 CFR 50.4, ATTN: Document Control Desk, Washington, DC 20555.

Q. 21. 10 CFR 50.4 is explicit regarding written communications and volume reduction; however, this part of the regulation seems to be inconsistent with 55.5. Which regulation do we follow?

A. For communications concerning 10 CFR 55, licensees should follow 55.5.

General Exemptions (Subpart B, Section 55.13)

Q. 22. With regard to Section 55.13, can you clarify the intent behind these exemptions?

A. Yes. There ars certain skills and knowledge that an operator must have, for example, to perform a reactor start up. Hopefully, he would understand some reactor theory, the effects of subcritical multiplication, and other as-pects of the controls he is manipulating.

If the candidate has not completed those phases of training, he should not per-form reactor startup, whether or not it's included in the instruction. That's the concept. Now, if in your program, information is transmitted to him such that he is prepared to perform the function because he understands what he is doing -- he has either had the systems training, or he's had the theory train-ing, or he's gotten it in some other earlier program, such that you are assured that the sequence of training is appropriate and the potential for him making an error is small--then the exemption applies.

We don't want to repeat an event which occurred a few years ago where an in-dividual performed a startup soon after entering training. They had a high startup rate, short period transient, and the individual did not understand what he was doing. He had no appreciation for the procedure because he had not received the appropriate on-the-job training for the evolution. There were l

NUREG-1262 4

two concerns with that event: First, they put the plant at risk because some-one manipulating the controls didn't know what he was doing and, second, they provided negative training. '

l The sequence of training that leads to on-the-job performance is important.

That approach is consistent, by the way, with the INP0 accreditation process and criteria. If you look at the objectives in INPO 85-002 for on-the-job training, you will find that they intend that the person adequately understand the task before performing it.

Q. 23. Can trainees manipulate facility controls under the appropriate super- I vision of licensed personnel? ,

l A. If their training program leads to a license if carried to completion, they may manipulate controls under ir.:truction if they have been properly trained. Properly trained means that the sequence of training that has. led them up to that point is appropriate for the manipulations they perform.

Q. 24. In Section 55.13, Item 1, are you using training and education i interchangeably?

A. No. Students at test or research reactors receive training on a reactor as part of a course of study to further their education. They may manipulate controls as a part of that course of instruction.

Q. 25. With respect to Section 55.13, is someone who is in a course, but from a visiting institution, considered a student? Would a group of high school students visiting a university for a couple weeks to familiarize themselves with the school be considered students; that is, could I sit them down at the control panel and tell them what steps to go through to operate the panel?

A. Both groups are considered students. There are colleges and universi-ties that have exchange programs with high schools and other institutions where you bring students in to attend courses. If these students attend some part of classroom training, and as a part of that activity they manipulate the controls, then that's part of their instruction as students.

We want to avoid the situation where an individual comes in off the street without any training and starts manipulating the controls.

Q. 26. If the facility career path program considers all nonlicensed operators to be license candidates, can nonlicensed operators manipulate the controls under the direction and in the presence of the reactor operator's senior opera- .

tor if the candidate is not currently in a hot licensed class? I A. No. The candidate must officially be enrolled in the hot license class.

Simply being a nonlicensed operator on a designated career path is not suffi-cient to meet the intent without being enrolled in the hot license class.

More importantly, the candidate must have completed the necessary classroom or simulator training in accordance with the appropriate training sequence prior to manipulating the controls of the facility.

NUREG-1262 5

Q. 27. If the operator is in a licensing class, has completed the classroom and the simulator portion, and has an opportunity to take part in an unplanned evolution, can he receive credit toward the training program for that participation?

A. Yes.

Q. 28. Is a senior operator license required to move fuel in a dry storage area, or away from the reactor vessel?

A. The Regulation doesn't specifically talk about the dry storage area or the refueling pool. It specifically talks about moving fuel in and out of the vessel. If there is a potential- for criticality, a senior operator would be required to be there, as in some instances in a refueling pool. If not( no.

Q. 29. Can the licensed senior operator who supervised fuel handTing be a senior operator licensed for fuel handling only? /

A. Yes.

N l

NUREG-1262 6

1 l,

I I

i

)

l

}

APPLICATIONS

]

l

. 1 How to Apply (Subpart 0, Section 55.31; NRC Form 398)

Q. 30. For a person who has dropped his license, what, if anything, must be done to later upgrade his status to an SR0 beycnd meeting the requirements of an accredited SR0 training program?

A. He muiet submit completed Forms 398 and 396 and be examined as an SRO.

Q. 31. Has Form 398 changed?

A. Not yet, but a change is in process. It is' scheduled tc be available for ordering by the end of May 1987.

Q. 32. Will the current Regional requirements for complete licensee history on Form 398 for license renewal be reduced to the data included in the OMB approval, 8150-0090?

A. If you have an INP0-accredited program with an acceptable simulation i facility (approved or certified), you can eliminate giving us information unoer blocks 11, 12, and 13, with the exception of the five significant control mani-pulations. Those still must be included.

For renewal, the same rules would apply; there is a block specifically on the Form for renewal. You will only have to provide information on candidate train-ing, education, and experience dating from that last application for a license '

renewal 1

There will be a block on the Form 398 to indicate the number of on-shift hours,  !

or the experience that has been received. That's all you will have to provide  !

if you meet the two other criteria, i.e. , having been INP0 accredited, and hav-ing an acceptabla simulation facility. If you do not meet these two check points, then you will have to provide the additional data on training, educa-tion, and experiance.

Q. 33. On Form 398, since test and research reactors don't have simulators, are we required to completely fill out the form?

A. What you are currently doing will continue to be acceptable. For all test and research reactors, we con't intend to change the process e'xcept in terms of license operators being re-examined during the six year license.

Your requalification programs basically stay the same. We still intend for you to use ANSI 15.4 for selection, training, and medical certification. We've also adjusted the requirements for resuming an active license to six hours of parallel watch-standing.

Q. 34. I understand that the designation of the authorized representative for a facility is changing. Is that true?

A. We will accept, as the authorized representative, the senior individual on site responsible for operations. Some companies have a vice president on site, some have a site manager. Others may choose to designate someone at a higher NUREG-1262 7 ll

.____-____-__--___--______-______.-.._____m__r___ _ _ _ _ _ _ _ _ _ _ _ - - - _ _ - _ _ - - - _ . - _

i level, and send it off site to the corporate office. That is acceptable to us.

It is also acceptable for it to be done on site. It need not be the same authorized representative who requests license amendments under Part 50.

l There is, under the facility license, only one authorized representative, generally that is somebody at the corporate level, a senior vice president. If that is the authorized representative for the facility, that's who signs Part 50 license amendment requests and makes other certifications. We will accept, for Part 55 licensing, the senior person responsible for operations on site.

Please note a new requirement un Forms 396, 474, and 398. Above the signature there is now a statement that any false statement or omission in this document, including attachments, may be subject'to civil and criminal sanctions, to the person signing it. The statement says: "I certify, under penalty of perjury, that the information in this document and attachments is true and correct."

That's why we're adjusting the requirement so that the person on site, who's closer to the information, can be absolutely sure when attesting to the-accuracy of the information.

Q. 35. Is it the intent of the Commission to limit the number of licensees at a facility to a specific position?

A. No. It is the facility licensee's decision as to whether to have a person in a licensed position or not, and how many of them are needed. We will not question the judgment of facility management.

Q. 36. Is it the NRC's intent that the facility licensee identify organiza-tional positions as needing an NRC Operator License beyond those required by Tech Specs?

A. No. The facility licensee determines the need for whom they want licensed beyond the requirements of the Technical Specifications. However, all indivi-duals who are licensed must be enrolled in the facility licensee's requalifica-tion program.

Q. 37. Does an applicant for a license have to be a member of the shift crew to obtain a license?

A. No. Although, an applicant doesn't have to be a member of the shift crew ,

to obtain it, the facility just must certify that there is a need for him to i have a license.

Q. 38. In answer to the question: "Are experience requirements in NUREG-1021 I for the R0 and SRO superseded," you said, "no, that there were experience re- ]

quirements that would still apply." Is that still in effect even if you have '

an accredited program?

A. The accreditation process has its own experience requirements identified within that program. For those facilities which have an INP0-accredited program and a simulation facility acceptable to the NRC, you do not have to designate on the Form 398 those experience requirements for those individuals. You need only check the blocks associated with the simulation facility and the accredited program.

NUREG-1262 8 4

Q. 39. Other than as stated in 10 CFR 55, are there any other requirements that must F included in initial or continuing training programs for licensed personnel ~ i I

A. Yes. All previous requirements are in effect unless superseded by the rule,

{

until the training program is accredited. j Q. 40. Is accreditation by INP0's National Academy of Training sufficient?

As indicated in Generic Letter 87-07, if it is based on a systems approach A.

to training, it is sufficient. We believe that a program developed following the INP0 guidelines for continuing operator training for licensed operators, issued in October, constitutes an adequate basis for concluding that the pro-gram has been developed in accordance with the system approach to training. If you follow that, and you are accredited, that's sufficient.

Q. 41. Is the systems approach to training development referred to in the neW 10 CFR 55 based on the systems approach described in NUREG-1220 or on INP0 standards?

A. It's both. The Commission has specifically endorsed the INPO accredita-tion objectives and criteria as being a systems approach to training.

NUREG-1220 simply repeats the criteria that are contained in the policy state-ment. It then has subordinate questions that we use for information gathering to determine whether a systems approach to training is in place.

There have been questions in the past about the level of detail we are looking for in some areas. They generally relate to conditions and standards associated with learning objectives and whether you need to develop K/As or not.

We've reached agreement with INP0 on that process; on how you're back-fitting existing programs that do not have K/As but have learning objectives.

In general the agreement has been that if it's a new task or new training, it should be developed with K/As. If it's an existing task or training, a panel of subject matter experts (job incumbents) could conclude that the existing training programs adequately cover the material,.and therefore, it need not be back- fi t.

Q. 42. Generic Letter 87-07 speaks of substituting an accredited training program for initial and requalification training programs previously approved by NRC. What if the initial training program was never formally approved by the NRC?

A. By virtue of your having been issued a license, your training program, as described in your FSAR, can be considered NRC-approved. If you subsequently submitted a change to your program for NRC approval, you can assume it was approved, unless NRC has notified you to the contrary.

Q. 43. Is this true even if it's not currently in the updated FSAR? j A. Yes. See Generic Letter 87-07 for guidance on how to revise your current )

training program to conform to the new regulation. l 1

NUREG-1262 9

.____ _-___ - -_a

I l

l 4

Q. 44. Programs developed using a systems approach to training are, by intent of the systematic approach, subject to revision on the basis of feedback and input to the system from legitimate sources. Once a training program is accred-ited and appropriate certifications are made to the NRC, do subsequent revisions to these programs need to be certified to the Commission?

A. No. For accredited programs, the particular evaluation, feedback and J modification of your program is part of the process. For those programs that I are not accredited or SAT-based, then, in accordance with 50.54, you will have to notify the Commission when you make changes that would decrease the scope of that program.

The program of record is the program to be implemented until s'uch time as you .

change it, whether it be an SAT-based program or an NRC-approved program. We l do not intend for the change process to be used after the fact, to justify what training has already been done; that is, a failure to implement your existing program - you cannot get out of that failure-to-implement loop by going back and changing it after the fact.

Q. 45. Is it the Commission's intention that approved training programs will continue to be approved until accredited, and that the use of the simulators  ;

referenced therein will be acceptable for use until May 26, 1991?

A. Yes.

Q. 46. If a facility licensee does not include an approved systems approach to training, can operators be trained and licensed?

A. Yes. Until the program is accredited, they still have to abide by their current approved program, as upgraded by the requirements of the Regulation.

We will still lice.nse those individuals.

Q. 47. When the new rule becomes effective, will all training programs pre-viously accredited by the National Nuclear Accreditation Board be considered approved in accordance with the final policy statement on training and qualification of nuclear power plant personnel?

A. Yes, but for clarification, they won't be approved in accordance with the policy statement; they will be approved in accordance with the regulation, with the intent as expressed in the Statement of Considerations that if you have  ;

been accredited by the National Nuclear Accreditation Board, you're considered {

to have NRC approval. t Q. 48. Will utilities with INPO-accredited training programs be required te submit these programs to the NRC for approval?

A. No. Programs that have been accredited by INPO are assumed to have NRC approval. All that is needed is an update to your FSAR in accordance with 10 CFR 50.71(e)(4). However, programs must be available for NRC review and inspection on site.

NUREG-1262 10 l

1

But since it is still Commission approval that you need, there may be cases where an accredited program is not implemented appropriately and, therefore, NRC approval might be removed.

Q. 49 If the utility has an INP0-accredited operator training program, but does not yet use a simulation facility acceptable to the Commission, will an application that states that the operator training program is accredited by INPO and gives details of the simulator instructions be adequate for the license application?

A. The Form 398 will have a block on it to indicate whether or not the appli-cant has graduated from an INPO-accredited training program. If the answer is yes, and the facility has an approved'or a certified simulation facility, then the information on education, experience, and training need not be filled out on the Form 398.

On the other hand, if the individ ul is a graduate of an INPO-accredited traih-ing program and the facility does not have an approved or certified simulation facility, then all that information will need to be submitted.

We would like you to begin certifying simulation facilities early on, and since nearly everyone has accredited programs with graduates, the process gets much simpler when you reach those two major milestones; otherwise, it stays diffi-cult with you providing all of the details, which we subsequently review to verify eligibility, training and experience.

Q. 50. If the facility certifies the training program as being based on the SAT process, will NUREG-1220, " Training Review Criteria and Procedures," audit findings and comments be considered violations of 10 CFR 55?

A. If we did go to an accredited program, and we used NUREG-1220 to do a post-accreditation audit, and found problems, they would be addressed in one of two ways. Depending on their severity, they would be either left to the utility to resolve with INPO or, if they were of a more severe nature, we might ask for a performance-based inspection. Depending on the results of that in-spection, there may or may not be any need for enforcement action.

Q. 51. If the SAT process is evaluated to be unsatisfactory during inspection, can operators be trained and licensed?

A. That will have to be determined on a case by case basis. If your program is deemed unsatisfactory, it would obviously depend on what the problems are.

Q. 52. When filing an application, the facility is required to provide evi-dence that the applicant has successfully completed the facility licensee's re-quirements to be licensed as an operator or senior operator.

Part of the training program is not complete prior to filing the application for the license due to the Examiner Standard (NUREG-1021) guidance to file an i application 30 to 60 days prior to the examinations. This has been acceptable l in the past due to the statement on the application above the facility repre-sentative signature. It states that: "The individual has or will have com-pleted by the time of the examination all the required training." Will this continue to be an acceptable approach under the new rule?

NUREG-1262 11


_______j

. 1 .

I A. No. This will not be continued. The Form 398 will be revised to remove the words "or will hava."

The Commission has stated in the rulemaking that the authorized representative certifies that the individual has conpleted all training. It's not a future -

completion, and we don't want to get into situations such as "at the time l' signed it I thought he was going to complete, but he didn't." You are certify-ing that training is complete.

We have had some experiences in the past where commitments that were reads were not completed, and they resulted in significant enforcement' actions associa1;ad with the failure to complete training programs, even after examining, lot r0cne at the time af examining. -

Q. 53. The Regulation requires INPO accreditation for NRC approval, whilt Mr. Denton's Generic letter 87-07 requires that the training program be boe accredited, and based on .in SAT process. Which is the' governing document?"-

A. The Rtgulation governs. The Generic Letter just restated what was in the Regulation. To receive relief under the Regulation, the program must be based upon a systems approach to training. And some of the earlier plants, which '

were accredited very early, were based upon the INPO guidelines, and not upon the INPO accreditation objectives and criteria as endorsea by the Commission in i the Policy Statement. '

In that case, what they are doing now by way of updating their program and revising it, and the fact that they now understand the process, would be the basis for them to certify to us that they have, indeed, done it orr'a,T SAT basis. They need not go back and wait until the next time through with the-Accrediting Board. ,

i Q. 54. Is a Commission-apptcved training program defined as an INPO-accredited training program, or are there otNr criteria for approval by the Commission of a utility's training program? How is a training program approved by the Commission?

A. NRC is getting out of thiapproval process for training programs. If tnere is an INP0-accredited training program, it only needs to be certified to us as indicated in Generic Letter 87-07. If a utility wishe.s to submit a revision tc the present NRC-approved training program and asks for ar. NRC review and ap-proval of that, while we are not prepared to do that now, we would probably have to deal with that using the SAT-based, performance-based approach spe-cified in NUREG-1220.

{

To clarify, if a utility has a program that has been accredited by INPO, we ex-pect that it will be the program of record. The Commission endorsed this pro-gram based upon the industry commitments to improve training, and the Commission is moving out of the role of reviewing and approving training prograns. {

The staff does not see that there is any need for, or value in, doing a review to come up with a lesser regulatory standard, because $AT-based programs are now the standard of record with NRC. If you are accredited, we expect you to follow the accredited program. We have revised the approach to the inspection ,

NUREG-1262 12

of training programs, and we do not expect you to maintain a lesser standard for licensing with NRC than you have for training the people.

Therefore, the staff would consider a review of amendments or modifications to the cold license training program, which is SAT-based, and we would use as f f guidance in doing that review the kind of information that is contained in p NUREG-3220, or you could propose that you have done it in accorcance with the TSD process, which INP0 is using. If you show that it's comparatale to that, we would also consider it. That is a vehicle for getting a Commission approval of

.. a performance-based or SAT-based program on a case-by-case basis for a cold

! plant. We don't mean to exclude you from being able to do performance-based trr,ining.

j Q. 55. Are you still going to bat Fonn 398 60 days prior'to-an e.ncination?

A. We want to get to the point where, and if you are accredited and have an  !

approved simulation facility, all that is required is the certification. No .  !

prior review of the application will be necessary to determine alighility, so the time between sobaittal of the application and the conduct of the exam could be very sh:rt.

However, .until then, the Region needs time to review applicicfons to determine whether the candidate is eligible, and to have an opportunity to interact with the training department to supplement that opplicaticn in some cases. In those instances, we're still going to want to see it on the order of 30 to 60 days prior to the examination to start the review. However, we cannot take action on an application until the final completed application is filed.

Q. 56. There is one situation wh9re you say you can administer the vitten exam and operating test but not issue a license until required evidence of con-trol manipulations b noolied. It would seem a logical extension of this to allow us to put somebody up who hasn't completred all the requirements, pass him, and make the request, "Do not issue a license until he's subsequently certified."

Does that make sense or is that completely prohibited?

A. The exception for. manipulating the controls to which you refer is only for the individual whn has not had an opportunity to perfore the manipulations be-cause the facility has been in extended shutdown. It is a condition beyond that candidate's control. ~ frsever, we are moving into the role of tecepting facility certification, and we w nt that certification to be unconditional. So the two situations are not coiaparable.

Q. 57. With' respect to the icgistics of submitting NRC Foro 398 only after all program requirements have been completed, and; in Eddition, having to submit it 60 days prior to the examination date, would a *easonable compromise be to submit the 398s, unsigned by the facility, merely for a screening by the region, given that the the 60-day requirement h due to the time involved in such a screening? We could then follow them up once the program's been com-pleted, maybe a day or a week before the examination, for approval by the Region.

A. Although those types if issues need to be worked out on an individual basis, NUREG-1262 13 L______-_________________ . _ _ -

\.

3.

it is preferable not to have lionsing decisions mdde upon draft materials, par-ticularly when there may be cheMes to them during the 60-day, time frame.

Advance copies (unsigned) may be subnitted on a case-by-case basis if there is a concern about a particular candfaste's ei.gibility, experience, or tUjning. 1 However, what we review and base our licensing decisions on should be,tne application as it is submitted. The Regulation does not provide for rsview of  ;

drafts and other documents along those lines. '

The time between submission of the document and when the candidate takes the m examination appears to be the issue that's of greatest concern. There is on@ ,

way you can shorten that time frame. Certify your simulation facilities early.

That's one of the things that we would like people to pursue. The other thing .-

we can do is to expedite the review, give the applications a review when they, -

first come in, and see if we can't shorten the time needed since we can shorts the submission times between the time it has to come in and when we finalize for the exam. In other words, we will reconsider the 60-day time frame that was in the earlier version of the examiner standards in light of this requirement. ( >

Q. 58. Ifafacilityhasanaccrkditedinitialprogramthat'sSATbasedand ,

has a plant-referenced simulator dceptable to the" staff, then the time betwen submittal of the application and the exam can be o* the order of a couple weekJ A. Well, we're going to need to know well in advance of that bu many candi- , g dates there are for licerises, but the review for eligibility, tdining and

  • experience requirements is significantly reduced if all we have to do is look at two blocks on the form. l '.

~

The intent of the rulemaking is to make the application process eader, and to put the burden of the determination of completion and eligibility on the facil s '

ity, rather than on the staff, and accept that certification. 1 The issue that is significant'is one of managing our own resources and knowing howmanycandidatesaregoing(obeputupandhowmanyexaminerswehaveto r ,

arrange for. Because it s a Nsourte-intensive effort, we have to know,1 candidates you are going to have s about the time for an exam on a of thedate.

given 90-day letter,wehow Sowever, donmany't need to know the specifics of who is being scheduled for the exam at that point. '

Q. 59. Is there any difference between an "approvcd simulation facility" and a 'i  !

" certified simulation facility?"

A. An acceptable simulation facility is defined as one that is either certified or approved.

Q. 60. What is a significant control manipulation? 1 f A. Significant control manipulations are defined in Regulatory Guide 1.8.-

Examples can be found in items A-F of 55.59(c)(3) (On-the-Job Training f or '

Requalification), although that's not an inclusive list. Basically, "signifi-cant control manipulations" involve situations that affect either power or reactivity, and that require manipulation c controls. Therefore, the plant.

should not be shutdown wh n these manipulations are performed.

1 NUREG-1262 14 x

+

. ) 3

\ >

7 Q. 61. Willinanipulations or, a simulator be adequate?

x s l '

D Those five control manipul'ations have to be performed on the plant, unless -

j the> plant has not completed preoperational testing and it in its initial start-

'uo test program. '

Q. 62. Where does the requirement for five reactivity manipulations on the plant coat from? Why can't they be performed on the simulator?

A. The condo 1 manipulation on the plant has been required for some time.

That's not a change. W bave now put it in the Regulation to make it explicit.

In fact, for a long time, if you had not performed a start up and shut down of i i the plant, we actually had you perform them as a part of the NRC examination.

So this is not, p6'%f.e a change in practice.

5 Q. 63 Must the five control manipulations be different?

i A. Regulatory Guide 1.8 asks for diversity. Therefore, the intent is to have different manipulations; however, this is not necessarily required. If reactiv-ity manipulations are repeated, this fact should be indicated in the comment '

section on the application.

Q. 64. As far as the five significant control manipulations are concerned,  ;

what'sgoingtoconstitot4cvidence?

A. Documentation ok th'e OJT qualification cards consisting of a simple "per- '

formed" code next to the signature of someone on shift is sufficient evidence.

Q. 65. What constitutes an extended shutdown?

l '

A. An extended shutdown would be anything that is long enough to prevent an applicant from completing required manipulations or training prior to taking the examination.

i I

As an example, if the plant is in a refueling outage that lasts for a year and I the candidate did not get an opportunity to perform the control manipulations  !

becadse the plant never got to Mode 2 or Mode 1, we would consider giving that L individual an exam, and even issuing him a license limited to shutdown conditions.

When he completes the contrch manipulations on a hot plant, we would then re-move the condition on his licer.se that limits it to shutdown. Wa do not intend to penalize individuals bechtse of an extended outage, but we a'.so don't intend to give waivers for what's clearly a requirement of the regulations.

T Q. 66. If you have to complete the initial simulator and classroom training p prior to allowing a nonlicensed operator to manipulate the controls from the I control room, how can a person get their initial license? After the time needed for your simulator and classroom training, and for the NRC exam, there is not misch time left to complete the five reactivity manipulations.

s N

/ ,

NUREG-1262 15 1 1 l l r

i d' j

i 1

A. This applies only to a hot license. If the individual has not had the opportunity to perform control manipulations on shift because of an extended shut down, we would consider examining him. And if he passes that exam, we may issue a license which is limited to shut down. i Q. 67. Will startup and shutdown experience gained on a certified simulation facility be considered adequate experience for operator and senior operator candidates?

A. Yes. The same answer applies to the use of an approved simulation facility.

The application goes to whatever is in your NRC-approved training program, or your INP0-accredited program for start.up and shutdown experience. j Q. 68. How much time can pass before the five control manipulations must be completed before the written exam and operating tests are completed? 3 A. Up to six years. If, for example, we had given a shutdown license to a plant experiencing an extended shutdown, and we had given a license to a candi- J date who was constrained to shutdown mode, he could actually serve out the term )

of that license for a period of six years.

Q. 69. Does NRC intend to make start-up certifications a part of the operating l test for every new licensed applicant? If so, what is the status of the pre-sent start-up certification?

A. Start-up certifications are done on an audit basis, and it is left to the chief examiner to determine which initial license candidates will be audited.

Therefore, there are no changes from our past practice.

Q. 70. For NRC licensing examinations which have already been scheduled for the remainder of 1987, will relief be granted from the new requirement that all training program requirements be 100 percent completed prior to the submittal of NRC-398 and NRC-396 forms? These 1987 licensing exams were scheduled in the fall of 1986. .

A. Form 398s submitted after May 26, 1987 must comply with the new regulation.

Q. 71. What kind of " written request" is discussing paragraph 55.31(a)(3)?

A. An authorized representative of the facility licensee is required to re-quest that the written examination and operating test be administered to the applicant. This request may be included in the transmittal letter forwarding the applications to the NRC. In order for the NRC to approve such a request, the facility licensee must provide suitable facilities for the administration of the written examination and operating test.

Q. 72. If an approved training program based on SAT is used for initial or re-qualification training pursuant to 55.31(a)(4) and 55.59(c), are there _any NRC imposed minimum training requirements? Of specific interest is the 3 months of on-th-job training for initial training and the annual requirements of 55.59(c)(3)(i)and(ii)?

NUREG-1262 16

_ _ _ _ _ _ _ _ _ _ _ _ _ _ __ n

A. There are no additional requirements provided that Generic Letter 87-07 l response is filed and the facility plans to or has incorporated the INP0 guide-lines86-025 and 86-026. We are aware that INP0 guidelines83-022 "PWR Control ,

Room Operator, Senior Control Room Operator and Shift Supervisor qualifhattan" )

does contain the 3 months on shift training period. {

Q. 73. Reg Guide 1.8 endorses ANSI /ANS 3.1 for R0s and SR0s. In reviewing the ANSI /ANS 3.1 annual and biennial manipulation requirements, it was noted that (

the ANS 3.1 manipulation list does not agree with the 10CFR55 manipulation list for five manipulations. This deviation was not stated as an exception in Reg. l Guide 1.8. Please clarify whether Regulatory Guide 1.8 should have taken ex-ception to this deviation.

A. The five manipulations specified in the rule are necessary for eligibility, i not for requalification.

Q. 74. At a minimum, five significant control manipulations must be performed which affect reactivity or power level. For a facility that has not completed pre-operational testing and the initial startup test program as described in its FSAR, the Commission may accept evidence of satisfactory performance of  ;

simulated control manipulations as part of a Commission approved training pro- i gram by a trainee on a simulation facility. If the facility is in an extended l shutdown, the NRC may administer the examinations, but may not issue the li- I cense until the required evidence of control manipulations is supplied. l Do we need to submit waivers since we don't have full power license yet? Does this apply only to initial license candidates, or to all license holders, e.g. l renewal? Does the NRC accept in lieu of the above simulator manipulations the use of a research reactor? {

4 A. If a plant has not completed the initial startup test program, successful )

j completion of an approved training program on a simulation facility satisfies j this requirement, and no waiver is required, j l

These requirements apply to initial and replacement license applicants. Re-quirements for renewal of licenses are covered in part 55.57. For plants that have completed their initial startup test program, applicants must complete the control manipulations on.their actual plant.

  • Q. 75. How will NRC evaluations of INP0-accredited programs affect NRC's willingness to allow use of a Commission approved program developed by using a systems approach to training? Notwithstanding the generality of this initial question, please address the following two specific situations within the answer.

(1) How would an " unfavorable" NRC review of an accredited program affect a facility's abilit 55.59(c)(2), (3) yand to use (4) an approved pursuant program ir, lieu of paragraphs to 55.59(c)?

(2) How will the NRC determine that a requal and/or initial program is based on a SAT during their evaluations? Of particular interest is the evaluation of element (5) under the 55.4 definition of SAT.

NUREG-1262 17

?

A. For clarification, an INP0-accredited program and an NRC-approved program are the same. (1) Unfavorable NRC review may be due to a number of conditions q as outlined in the Commission Policy Statement of March 20, 1985, and continuing i evaluations using NUREG-1220 or examinations administered by the regiois An unfavorable review would not have any direct effect on your program. NRC ,

would work with INP0 to resolve identified deficiencies. However, NRC has dis-cretionary enforcement authority under the Policy Statement, and this could be imposed if continuing problems were identified as a result of performance-based inspections.

(2) The criteria used by NRC may be found in NUREG-1220.

Q. 76. Will any combination of significant control manipulations be acceptable as dictated by the facility's modes of operation during which the applicant is in training?

A. Refer to Reg Guide 1.8 Regulatory Position C.I.h for guidance on what the Commission considers to be acceptable.

The acceptability of any alternatives will have to be determined on a case-by-case basis by the facility and indicated in the comments sections of the application.

Obviously, some significant manipulations may not be possible in Mode 4 of a plant. It may be possible in Mode 5 or 6, whichever you use for refueling, in the case of a fuel-handling foreman, so it's going to have to be on a case-by-case determination.

Q. 77. In the staff's presentations under Training Pro mentioned that in order to implement 555.31(a)(4) and55.59(c),

$ gram Approval, the next it was annual FSAR update could delete training program details. Please clarify what (event or achievement) is meant by " implementation" of 655.3)(a)(4) and 555.59(c): what would the staff expect to see in the FSAR update different from that information which would be provided under Reg Guide 1.70 and the basis for development of the information sought (Reg Guide 1.70, Standard Review Plan, etc.). Should utilities assume that besides stating that the training program is INPO. accredited the FSAR should retain revised program details in accordance with details sought under Reg Guide 1.70?

A. The staff plans to revise Section 13.2, Training of NUREG-0800 to provide guidance for information contained in revisions to the FSAR. There are no plans at this time to revise Regulatory Guide 1.70. In lieu of additional guidance at this time the staff recommends that the licensed training programs which are accredited and are based on a systems approach to training only need reference Generic Letter 87-07 and the dates the programs were accredited.

Plans for certification of simulation facilities should also be included.

With regard to other training programs contained in Section 13.2 of the FSAR, those training programs listed in the March 20, 1985 Commission Policy Statement on Training and Qualification of Nuclear Power Plant Personnel which are accredited need to reference the date of accreditation. For those i facilities which are developing programs under the accreditation process the I FSAR should identify the programs and provide the dates that SERs were or are  ;

planned to be submitted.

NUREG-1262 18

l Medical Examination (Subpart C, Section 55.21)

Q. 78. How long before administration of a license exam must an individual have had a medical exam?

A. The form verifying the medical exam should come in at the same time the license application comes in. It'll be good for six months from the date it is I signed by the physician; waivers, as stated in ES-111, will apply. '

Q. 79. Assume a physician may not desire to release personnel medical data due to a patient-doctor relationship. What does the utility do if the information  ;

is treated as privileged by the physician?

l A. The Privacy Act Statement contained in NRC Form 396, " Certification of Medical Examination by Facility Licensee," does not allow for privileged infor-mation being withheld by the facility or the physician if it is requested by NRC. It is the utility's responsibility to ensure that the records can be made available for inspection. Utilities should ensure that the physician under-stands this requirement. l Q. 80. For individuals who are currently under either license conditions or j letters from the regions to submit continuing medical follow up information l (e.g., quarterly blood pressure readings) for review and analysis, do these conditions continue to apply after May 26, or should the individual submit this l information to the utility's physician for evaluation and analysis (without a ^

copy to the regions)?

A. Continue to report quarterly blood pressure or other restrictions. High blood pressure or other restrictions are usually associated with some remedial programs (diet, medication, or a combination) and should result in normal or ac- )

ceptable conditions. At that time the physician can request termination of i these reporting requirements. j Certification (Subpart C, Section 55.23; NRC Form 396)

Q. 81. Has NRC Form 396 changed? i A. Yes. A copy of the new version has been distributed to everyone at the public meetings.

Q. 82. Must a Form 396 be submitted for every license application?

A. Yes, but the detailed medical information only has to be submitted when a conditional license is requested.

Q. 83. Under the new Rule will you receive a Form 396 only upon license renewal?

A. That is correct. We expect to receive a Form 396, " Certification of Medical i Examination by Facility Licensee," at the end of the appropriate license period,  !

when the renewal application is submitted.

NUREG-1262 19 I

l

Q. 84 Is the examining physician an authorized representative of the facility licensee and thus allowed to complete and sign an NRC Form 396? l A. No. The Form 396 does not have a place for the physician to sign. The physician's name and license number are there, but the authorized representa-tive is the highest level of corporate management who signed the application. )

That will be the same person who signs the Form 398. 1 l

Q. 85. Can Form 396 be held by the licensees for the two year update or do they have to be submitted to the Commission? If the latter, how often do they have to be submitted?

A. You don't have to keep the Form 396 on file, but you must keep some docu-mentation that the medical exam was performed and that the operator meets the {

ANSI standard. The Form 396 is only the means by which you transmit that in- J formation to us upon renewal of a six year license.

Q. 86. For a multiple-unit site, can the signature on the application be from the individual responsible for operations, the highest ranking individual at that site? So that you could have different signatures; i.e., Sequoyah appli- .

cations would different signatures than those of Brown's Ferry?  !

A. Yes.

Q. 87. Will the Commission develop a protocol to ensure that detailed medical records will be forwarded to the NRC medical experts and not made available to lay persons?

A. This is an issue for which industry initiative may be appropriate, and it has been discussed by NRC, INPO and the accrediting board.

The staff needs to have assurance that the medical examination was done in accordance with the ANSI standard. The staff does not need to see the private medical record from tne doctor, because it may include other medical informa- )

tion not related to the standard, or may get into the area of privileged in- I formation between doctor and patient.

It might be appropriate for the industry to develop an examination form which l would track the standard, such that the doctor would provide a statement to the j responsible officer that the examination had been completed and which would '

identify the areas evaluated. Such a report would be all that is necessary for the individual's file, and it would be available on site.

If, in the case of a request for a license condition based upon some medically disqualifying condition that can be accommodated through medication, therapy, or something else, the doctor would submit the examination form and any addi-tional supporting information for the staff medical doctor to review to make a determination as to whether to issue a conditioned license.

That information would be handled in the same manner as we now handle confiden-tial information that is covered by the Privacy Act. Once submitted to NRC, the information would be exempt from further public disclosure, and it would be the basis for our review.

l NUREG-1262 20

i 1

We don't anticipate developing any new protocols for handling that type of information, but we recommend that you have evidence available on site showing that the medical doctors conducted the examination in accordance with the ANSI standard, or that you provide the physician a copy of the standard and let him complete whatever form you use now for that type of examination. It's only a suggestion. The actual requirement is that the examination be conducted in accordance with the standard.

Incapacitation Because of Disability or Illness (Subpart C, Section 55.25)

Q. 88. Must the felony blocks on Form 396 be completed in order for the form to be considered complete and to be accepted by the NRC?

A. No. The facility licensee may insert a statement in the remarks section i as follows: "This certifies that the felony record, if any, of this applicant hasbeenreviewedandfoundaccep'tableinmeetingtherequirementsofthis facility for licensed operators.

Q. 89. Will a standardized form be provided by the Commission for notification of disability or illness?

A. The intent is that licensees keep the records. We don't need to be involved when someone breaks an arm or may be out for an extended illness. If it's a temporary condition, no notification is required.

We ask the question, "can the operator perform licensed duties?" If the in-dividual is roing on shift, and there is any question in your mind, we would say submit a revised Form 396 to describe the condition / remedy. We may tell you it's not necessary to make a ruling on it. But you can have a problem if you don't notify us and some individual has a problem in performing licensed duties. If a person is to resume duties after a disabling condition, then we would need to be notified with a Form 396.

Q. 90. What is the relationship between the facility licensee and the licensee with regard to responsibility for notification on medical issues? The Regula-tions indicate that we have 30-day notification period upon learning the diag-nosis. The question really is, what's the mechanism for the facility to become aware of the diagnosis; and what responsibility does the individual licensee have to make that notification to the facility? There's the potential to get into a problem if we don't learn of a licensee's medical condition.

A. It is the operator's responsibility not to operate that plant in a disabled condition. The Regulation says that the facility licensee shall notify the Commission, but we believe that, logically, the operator should have enough re-sponsibility to tell you there's a problem. Facility procedures should be set i

up to ensure that that occurs.

There is nothing in the Regulation that obligates the operator, or the senior operator, to let the facility know. But there is an obligation for you, on the biennial medical examination, to identify and report disabling medical conditions. ,

1 Q. 91. If the individual has a medical problem during the period of the l license, for instance a broken arm, does this need to be reported to NRC if the j I

1 NUREG-1262 21 l l

1 - __

operator is not carrying on licensed duties? For example, if he is training individuals in a classroom, do we still have to report it, or only if he's carrying on licensed duties per the Tech Specs?

A. It's when that person serves on shift that we have to know about a dis-ability. Usually, if he has a temporary disability that would preclude him from performing regular duties, he's not to perform those duties with that temporary disability. We need not know if it's temporary. When you return him to shift duties, if he has been absent for a period of time, you control that process with the 40-hour parallel shift duties and maintain the certification on file. It's only in case of a permanent disability that we would have to be notified. In that circumstance you want to include a qualification in the license to allow the operator to perform licensed duties with the medical con-dition if some compensatory measure effectively offsets that condition.

Q. 92. How is an individual returned to active licensed duties after the medi-cal disability has been corrected, but a portion of the requal program has been missed?

A. The operator must be current in the requalification program before he returns to duty.

Documentation (Subpart C, Section 55.27) l Q. 93. The utilities must maintain some records in fire proof vaults. I don't feel that the physician's offices meet those requirements. Yet this is a qualification record, as defined by that ANSI Standard. Are we going to have to provide physicians some type of fire proof storage? How do we handle that aspect of this record keeping?

A. We recommended to INPO, and they are considering the development of, an examination report form which would cover the areas in the ANSI Standard and which would be submitted from the medical examiner to the facility for retention.

Q. 94. Can private physicians maintain medical records for the facility licensee, as is currently practiced?

A. That responsibility can be delegated to them, but it is, indeed, your responsibility to ensure that the appropriate records are available for '

inspection.

Regulatory Guide 1.8 and ANSI /ANS 3.1 Q. 95. When we want to go from a non-accredited status to an accredited status, what would the step-by-step progression, and the changes in the regulatory environment be for us?

A. The date you receive accreditation from the Academy, you would send NRC a letter that says "we've been accredited on this date." You then begin that program because the previous training program is superseded. You need not tell us about it until the next FSAR update, which is required pursuant to 10 CFR 50.71(e)(4).

NUREG-1262 22

I Simply send a letter saying that you were accredited and certify that your requalification program is based on a systems approach to training; this supersedes any prior commitments to NRC by way of additional training.

1 Q. 96. For the FSAR update following accreditation, it would not be necessary l to have the extent of detail in that update, as previously was the case, is that correct?

A. That is correct. It can be blank, except for the information about the date of accreditation. It need not say anything, other than you were accredited, and the date you achieved the accreditation. All records associated with your training program, following accreditation, are available to the staff on site for review; they need not be submitted.

Q. 97. If the facility does not certify its training programs in accordance with Generic Letter 87-07, when must FSAR Chapter 13 be revised and how do I do it?

A. The Rule becomes effective on May 26th, 1987, and at that time, you must comply with the new provisions in the requalification program. So, there would need to be a change to the FSAR submitted in accordance with 10 CFR 50.54(i) and 55.59(c), to conform to the regulation, if you chose not to certify the j training program.

{

1 The Commission endorsed the INPO Program for accreditation in the Policy State-ment. We said we would accept that program after it was accredited and certi-fied to be based on a systems approach to training. A utility that perceives they'get some advantage by leaving an old training progra on the docket because that s all NRC is going to inspect is misguided. That is not consistent with the intent of improving training in the industry. We do not require that you tell us all the details about an accredited program, but we do expect you to implement them.

We have heard rumors that some facilities intend to have one standard for NRC, and a different standard for INP0. That is not the Commission's intent in the Policy Statement and we would bring such a practice to the Commission's atten-tion promptly. We expect you to follow the accredited program when it is accredited. Failure to implement that program will be of concern both to INPO and to NRC.

Q. 98. Will NRC be prepared to approve or disapprove FSAR Chapter 13 changes within the 60 days allowed for implementing 10 CFR 55 requirements?

A. The approval is effective automatically, if you have an accredited program and have certified that it is based on a systems approach in accordance with GL 87-07. You shouldn't expect to see any response from the Commission on changes that are implemented as a result of this rule, with the exception of any license amendments which are required because of something in your Technical Specifications. There are a number of facilities that have a more restrictive requirement in their Technical Specifications than that for which they would  !

have to apply; amending their Technical Specifications to obtain relief is per-mitted under the rule. It would be an administrative change in order to con-form with the Regulation. But it would not have to be acted on within 60 days and would be processed as any routine change to the Technical Specifications.

NUREG-1262 23

. 1 l

l If you do not plan to certify that your program is based on a systems approach, we cannot act on it until we receive it in accordance with 10 CFR 50.54(i). '

It will then be reviewed in the usual way. In this case, it would not be rea-sonable to expect it to be completed by May 26, 1987 Q. 99. But in the meantime, is Revision 1 of Regulatory Guide 1.8 our commit-ment, as approved in our FSAR?

A. Yes. Your commitment is that which is approved in the FSAR. It is bindin as are any of the more restrictive requirements in the Rule, until you are ac g, credited and so inform us by letter. At that point, you can make changes pur-suant to 50.59 to remove things from your FSAR and your program. When you need to amend a license, you submit the application for an amendment to strike the sections in the Technical Specifications or in the license which have been superseded by accreditation.

Q. 100. Upon achieving accreditation, would we then become committed to Regulatory Guide 1.8, Revision 2?

A. No. Regulatory Guide 1.8, Rev. 2, goes into effect for all facilities, as is indicated in the implementation section of the Guide, on March 31, 1988.

However, if you have an accredited program, you are no longer obligated to follow the Guide. At that point, you can put the Regulatory Guide aside, but you now must implement your commitment to the Accrediting Board. We have looked at that information, and we've concluded that INPO guidelines in this' area are equivalent to the staff guidelines in Regulatory Guides.

Q. 101. This question addresses NRC approval of training programs. Do revi-sions to requal programs which reduce their scope require NRC review and ap-proval per 10 CFR 50.54.1-1 if the program is INP0 accredited? And can the term " reduction of scope" be clarified?

A. NRC review is not required if the program is accredited and is certified to be based upon a systems approach to training. Element 5 of the SAT includes revision of training in order to meet the needs of the job incumbents; there-fore, we expect you to update your program based on this feedback.

The intent is that if you are SAT based, and are revising the program based upon an evaluation of the needs of the trainees, that the result of that eval-uction is the program you are going to conduct. And you have a basis for that evaluation. Reducing the scope does not apply. The intent is to give you the flexibility to modify the program in order to provide the training that you, i the facility licensee, determines appropriate for your job incumbents.

We have seen that process work through the INPO-accreditation process. We have confidence in the process. And even though we are sure that there are going to be cases where there is content left out, where we are going to have some concerns about something not having been covered, the process is there so that you can cover what's needed.

The training and the feedback process you provide will permit the training to bejob-relevant. It is training which the trainees agree is important.

l i

NUREG-1262 24 1

i Probably the only exception is for the instructor who has had that training. i But the old test-out exemption is gone. You can't take an exam, do well on it, j and eliminate training in a systems approach. If someone misses a portion of j the training program because he has been ill or been away, you may use some- i thing like a required reading program and a test to ensure that he has covered the material. But when the Rule says training on a continuing basis, it refers to whatever cycle you have designed that has been accepted by the accrediting board.

NRC has separated itself from the training review. We would prefer, after you are accredited, that you certify you have a systems approach in place to us, and eliminate the details from your FSAR. Certification .t all that we need because the periodic reviews through the accreditation process are the vehicle for keeping your training programs current. We think that the separation of training from examining is the most significant part of this rule-making.

Q. 102. There are a lot of documents involved with the accreditation process, so if an IE inspector came in and said, "We think that your program is less I than the scope," what is he basing that on? )

A. Regional inspectors are governed by inspection module IP 41701, which requires a performance-based inspection. If you make a change to your program through the accreditation process using the mechanisms for revising and updating your pro-gram, based upon feedback and need, and that's the reason that you're revising it, we don't see that that is an issue of lessening the scope.

The lessening of a scope issue had to do with the old program when it was regulatory-based, where we required a certain number of hours in the classroom and certain types of content. The approach now is one of modeling the program based upon performance and need, and the process is one that has been endorsed by the Commission through the policy statement. To the extent that you need to change the program based upon feedback of your own performance, that's appropriate.

If you have an approved program today that calls for administering a comprehen-sive written exam annually and you want to change that to a comprehensive writ-ten exam every two years, the regulation is the basis for concluding that that is acceptable; that is not reducing the scope. That is simply conforming to the regulation. You can make changes to match the regulation either through the 50.59 review process or by amending your license. There are a few facili- l ties which have commitments to operator training programs associated with a I staffing requirement section in Section 6 of the Technical Specifications. If you are in that category, you can submit an amendment request to the Commission '

for an administrative change to your Technical Specifications to conform to the requirements of the reaulation, but you may not do less if it is, in fact, a requirement in your license now. You can't do less than what's currently in the license. If it's in your approved program, you can do a 50.59 review to conform to the regulation.

Q. 103. Let's say that in my systematic approach to training, I have determined that it doesn't take three years of experience to meet the requirements. I com-plete the program with whatever experience we determine is appropriate, and NUREG-1262 25 l

l

)

we've got an accredited program. Do we still have to have the experience re-quirements in our program? Do we still have to meet them if we have an accredited program?

A. The industry, through NUMARC, has made a commitment to NRC in both training

. and qualifications. We did not take exception to the three year requirement for experience. In the past we have accepted two years for reactor operators.

On the effective date of Regula'.ory Guide 1.8, March 31, 1988, we would expect people to meet ANS 3.1 unless they have already committed to that.

Within the accreditation process, there is a hierarchy of guidelines just as within the regulations. An acceptable way of meeting the regulation, as it relates to experience requirements, is by conforming to ANS 3.1. Another way is through the accreditation process, which also has guidelines.

In the case of a review and approval by the Staff, we would look at any bases.

for waivers of those requirements and alternatives that are proposed. In the accreditation process, the mechanisms are already built in for you to do that yourselves on a case-by-case basis.

So accreditation criteria for entering into training as it relates to qualifi-cations are described in the INPO training guidelines for each position. They articulate what the entry levels are for training and have in that process a mechanism for granting waivers to certain requirements.

The Commission, through this rule making, has said, "We will accept the can-didate at the end of training if he is certified to have been a graduate of an accredited program." We have done that through promulgation of the policy statement on training and qualification and an endorsement of the accreditation program. That means that you control the review and waiver process, through your vehicle with INPO. Now, if you want to deviate significantly from the INPO guidelines, I would suggest that you need to contact INPO and they may need to contact NUMARC if you want to come up with a radically new interpretation.

But, in fact, if you have a basis for what you're doing which is documented, and you do that on an individual basis, we do not intend to second guess your judgement. In *v.t, we would not see it on the application.

That's a major c'.ange in the way we have done business in the past; it puts a lot of trust in the industry through the self-initiative of INPO and NUMARC in order to provide both training and qualifications.

Q. 104. Have the experience requirements to sit for an RO or SRO exam stated in Reg Guide 1.8 and FUREG-1021 changed?

A. Yes, in that the experience requirements are not operative if you have an accredited program and have certified your simulation facility. ES-109 will be changed under the revision to NUREG-1021 and under Regulatory Guide 1.8, which becomes effective March 31, 1988 for nonaccredited programs.

Q. 105. Will NRC change any of the eligibility requirements in the Examiner Standards for taking the SR0 exam discussed as a result of implementing 10 CFR 55? This question is being asked in light of the fact that 10 CFR 55 supersedes l

NUREG-1262 26 i

e previous regulations. Specifically, will NRC require that someone have one year of experience as an R0 before entering the training program for an SRO?

ANSI /ANS 3.1-1981 requires a minimum of six months.

A. Yes, there is a change to the eligibility requirements except if a facility i has an accredited program and an acceptable simulation facility. In that case, the requirement goes away because it becomes part of your accredited program.

Q. 106. The way I understand the Examiner Standards presently, the experienc9 requirement to take a reactor operator exam is two years of power plant experi-ence, one of which is nuclear. ANSI Standard 3.1-1981, specifies three years of power plant experience, one of which is nuclear. The two remaining years should be as a nonlicensed operator, and of that, six months should be as a nonlicensed operator at the facility for which you seek the license. So, that would be, in my interpretation, a three year requirement now, whereas in the l past it was a two year. Is that correct? 4 A. That is correct. The standard had not been imposed across the board in 1981. There are some facilities that have committed to that standard in their application, and were reviewed against that standard. A previcus version of the Examiner Standards was based upon ANSI N18.1-1971, because we had not endorsed ANSI 3.1. This rule making process endorses ANSI 3.1.-1981.

Q. 107. And the same applies for the senior operator. Examiner Standard 109 says four years, and ANSI 3.1 says three. So, you will be changing that one also?

A. The Reg Guide takes exception to tne ANSI Standard. Reg Guide 1.8 cites a four year requirement for experience for the SRO.

Q. 108. Reg Guide 1.8 endorses certain positions through ANSI 3.1-1981 for training and qualifications. The ANSI Standard has experience requirements which are different from those in the Examiner Standards. For instance, for a reactor operator, ANSI 3.1 of 1981 requires three years power plant experi-ence, one of which is nuclear. And I believe it says two years as a non-licensed operator, with six months as a nonlicensed operator at the facility.

Is the Reg Guide endorsing those eligibility requirements also, or just training? .

A. We have not taken exception to three years of experience for reactor operator. We have endorsed the ANSI Standard with respect to three years for R0, but have taken exception by requiring the four years for SRO. That's the same as the practice has been.

Q. 109. Are the experience requirements for operator licenses applicable also to research and training reactors?

A. The requirements for test and research reactors have not changed. Whatever has been approved in the past, in terms of eligibility requirements, continues for test and research reactors. The eligibility requirements in Regulatory Guide 1.8 refer to power reactors.

i i

NUREG-1262 27

I

\

l Q. 110. I have an accredited SAT-based program. The simulator should be avail-able next year and will meet ANSI /ANS 3.5 Standards. It's my understanding that we are okay because we meet those three elements, SAT, INPO accredited, and our simulator should meet your standards. Am I correct, that in meeting those standards, I don't have to worry about the ANSI Standards requiring two years as a nonlicensed operator with six months at the plant?

A. No, that's not entirely correct. While you don't have to submit that in-formation to NRC, the industry, through NUMARC and INP0's, training guidelines and accreditation, has standards comparable to those in the ANSI standard.

Therefore, we feel that the qualification requirements are still being met.

The only difference is that you don't have to submit all that information to us.

We had a case recently where an individual was a graduate of an accredited pro-gram but did not meet the experience eligibility requirements. His plant ex- I perience was that of a chemist, a position not comparable either to that of a control room operator or a shift engineer. We denied the application, and'it was denied on appeal. We aren't going to see that kind of information in the future, and we expect the industry to police itself with respect to ensuring that the NUMARC commitments are, indeed, met. Because we are stepping out of that area, and not requiring it to be submitted, does not mean that you can relax your standards.

Q. 111. In the example that you just gave you were apparently talking about an SR0 candidate, and I was referring, primarily, to RO candidates. In the past, particularly for those who weren't committed to the 1981 version of that ANSI Standard, there was no requirement for R0 candidates to have been nonlicensed operators. Now we are faced with the new requirement, and I've got a group of people who are in training now, who don't necessarily have that background.

A. There is one aspect of the accreditation process that you may be missing.

And it's a part of the process that pertains to meeting NRC eligibility require-ments. The accreditation process does include a mechanism for you to exempt, or waive aspects, based upon having performed an evaluation of the candidate's experience and/or'te' sting. That is the same kind of process that we use in making a judgement, on a case-by-case basis, about eligibility, where a person didn't cross all the "t's" and dot all the" i's".

We cre looking for you to use that same process. You may choose, for a docu-mented reason, as a part of your program, to waive a portion of the require-ment, based upon experience and/or testing. That is a part of the accredita-tion process, and we understand that, and we expect that to continue. And the only difference is, you don't have to submit it to us to request a waiver.

Q. 112. Will NRC continue to accept one year as a Navy reactor operator, engi-neering watch supervisor, etc., as meeting the one year reactor operator ex-perience requirement, if one year remains as a requirement?

i A. Yes.

Q. 113. The definition for related technical training in ANSI /ANS 3.1 says,

" Formal training beyond the high school level in technical subjects, associated with the position in question, such as acquired in several programs, including NUREG-1262 28

I utilities, and others. Such training program shall be of a scheduled and  !

planned length, and include text materials and lectures." All of our programs j meet that definition of related technical training, and yet we can't count it  !

for experience. Why not?  !

I A. Experience is an eligi'ility o requirement. If the person has the experience j and the qualifications, then he goes into a training program. You have mecha- l nisms, through your accreditation process, where you look at the entry level  !

into your training program. You can count time and training prior to that pro-  ;

gram, but we have not been giving credit for experience for the training which '

is required and has been approved by NRC as a part of the specific program leading up to license eligibility. ,

Q. 114. Do radiation protection personnel now require three years experience per ANS 3.1-1981, even if Tech Specs require less experience?

A. The requirements for radiation protection personnel in Reg Guide 1.8 are the same as those included in ANSI Standard 18.1 of 1971.

Q. 115. About five years ago, we all wrote our response to the Denton letter and said that we would do specific punch list items to train our STAS. Now if we have an approved STA training program, per INPO, the old prescriptive hours that we committed to no longer apply. However, .if that punch list item is in our FSAR, we need to remove it "per the INPO-accredited program." Is that correct?

A. That is correct, as it relates to licensed operator programs and other programs for which you have made training commitments which are covered by the Commission's Policy Statement on training and qualifications. And in both cases, it is simply a 50.59 type review to amend or update your FSAR to indi-cate the date on which you received accreditation, for instance, for the STA position. The only exception relates to the Commission Policy Statement on engineering expertise on shift or the use of the dual role SR0/STA compared with a separate STA, as indicated in Reg Guide 1.8, Regulatory Position C.1.j.

J Q. 116. When an applied science degree is being considered, what constitutes an acceptable degree? How do we know what specific degree allows someone to be an instant SR0 or whether he must first be an RO?

A. The staff reviews those and we use our best judgment, as do the people in the regions, in making a determination based on an application. If you feel that an application has been unfairly rejected, you can request reviews by re-gional and headquarter's management. If you want to bring it up through a re-view, we can certainly do that on a plant-specific basis.

Q. 117. Is it true that in the future it won't be a problem, because you won't check up on us? If we send an application in saying someone's an SRO, will you l accapt the application because you won't know what degree he has because it l won t be listed? l A. It's our understanding that the determination will be made in accordance with guidelines that have been established under your INP0-accredited program.

NUREG-1262 29

The Commission has made a determination that we're going to trust the industry and let the industry programs be operative in the area of training and qualifi-cations under the policy statement. We understand generically what those com-mitments mean, and we've reviewed them quite closely.

If we find that they're being abused, either through an inspection program or through any other vehicle, that's going to cause grave concern as to whether the industry is able to police itself and act responsibly, given what we have delegated to you through those programs.

We've been on team visits and at board meetings and we've seen utilities being put through their paces to describe what mechanisms they use to review and make determinations about the eligibility for candidates to enter into training and whether they are qualified to perform in that job position.

What we're saying is that we believe that process is the appropriate one to use.

If you do that in a straightforward, rigorous manner, that's what we're looking for. We're not going to nit pick and second guess your judgments, provided you have an adequate basis for them and provided they are consistent with what has been approved generically through the accreditation process and the guidance that INP0 has issued.

Q. 118. Are documents referred to, such as NUREG-0737, still required as references?

A. Revision 2 of Regulatory Guide 1.8 supersedes NUREG-0737 as it relates to operator licensing. However, there may be some aspects of NUREG-0737 which have been committed to in a facility training program, and the initial program may not yet have been accredited. Those commitments are still in effect. They are part of the approved program, and remain so until that program is super-seded by an accredited program, and you provide the letter to the staff, as is described in Generic Letter 87-07 which forwarded the Rule.

Q. 119. It seems that Regulatory Guide 1.8 says a diploma or equivalent is required only for the shift supervisor and senior operator. ANS 3.1 requires only a high school diploma for licensed operators. Is that what you intend?

A. Yes. The intent of the exception taken in regulatory position C.1.d. was to eliminate the 30 and 60 semester hours of college-level education from the j shift supervisor and SRO positions. The definition section in ANS 3.1 includes j the General Education Development Test as the equivalent to a high school j diploma, and it would be acceptable for all three positions. l Q. 120. 10 CFR 55 provides allowable t' raining exceptions from this rule if a l systematic approach to training is used. Reg. Guide 1.8 however, does not I state that there are allowable training exceptions from following ANSI /ANS 3.1 l for R0s and SR0s. Please explain why exceptions were not allowed for R0 and l SRO training when a systematic approach is used. l A. Exemptions are allowed under Section D, Implementation, of Regulatory I Guide 1.8, which states that the guidance in Section C does not apply to those l training programs which have been accredited under an accreditation program which has been endorsed by the NRC.

NUREG-1262 30

3 8

5 WRITTEN EXAMINATIONS AND OPERATING TESTS 1

1 1

I

General Issues (Including Learning Objectives and Examination Question Bank)

Q. 121. Will the format of the written exams change? If so, how?

A. At the present time the format of the examinations is not expected to change, although there are numerous initiatives under way which may lead to format changes in one way or another as we refine the process.

Q. 122. The exam content states that Licensee Event Reports (LER) will be in-cluded in the exam. How is the scope of LERs determined and communicated to the individual taking the examination?

A. We expect your training program t6 include relevant LERs. We would sample from your learning objectives, but we would not necessarily be limited to those.

We would not take an LER from a significantly different plant and try to adapt it to your plant. But if there were LERs that reflect either training needs or operational safety, we are going to include those in the exam process. It may be in the written exam or on the operating test.

Q. 123. Will there be any effort by NRC to ensure a consistent level of de-tail in the facility's learning objectives?

A. Yes. We have a major effort under way to evaluate the quality of learning objectives that are submitted for an exam. This is a significant issue be-cause we have seen a large spectrum of differences in learning objectives.

As a part of our examination development efforts, we have been reviewing the quality of the learning objectives submitted with materials for the 90-day letters. We're evaluating their quality and using that as a feedback mechanism into the evaluation process for how well accreditation is working.

Where we find that the learning objectives are not adequate, we'll use other materials. Where they are adequate, we will use them. We intend to evolve over time to the point where we can construct an NRC exam solely using the facility learning objectives.

We have also opened our examination development training program to INPO and others, providing information to them on how we construct examinations and on the training that we're providing to examiners. There are also activities underway within INP0 to improve development of testing objectives.

Q. 124. How does the Commission intend to implement written examinations based upon the knowledge, skills, and abilities identified in the learning objectives derived from the systematic analysis of licensed operator duties?

A. It's our intent, as expressed in the Statement of Considerations, to reach the point where the training program's learning objectives become the major source for our examination. We want to sample according to a scheme that looks at the most important job performance, knowledge., and abilities, and we have that area documented with our K/A Catalogs. In fact, there's a supplement to the PWR Catalog being published that has th<! same sections as the BWR Catalog.

NUREG-1262 31

In addition, we asked a PWR and BWR panel of subject-matter experts to rate the testing emphasis they thought we should have. That rating forms the basis of NRC's sampling plan, so we will sample the most important job content. What we expect in terms of conditions and standards of performance will be driven by the learning objectives, and that will form the basis of our testing objectives.

The only slight difference between testing and learning objectives has to do with the context in which you judge performance, because one is a time-limited testing situation, and the other might allow a longer training or job perform-ance period.

We don't want our exam to be devoid of contact with your training program. The purpose is to get to the same spot. Of course we reserve the right to look at LERs and other events, and to further' investigate our questions, with your assistance, manuals, license amendments, or other materials, because even if we judge our question in terms of your learning objectives, the material to de-velop the question has to come from something other than the learning objective.

Q. 125. What, if any, utility actions will NRC require to incorporate utility learning objectives into the NRC testing objectives?

A. The better your materials are, the more closely they are keyed to our K/A.

catalog, the easier it is for us to use them. But we're not going to require any actions. In the 90-day letters that go out pr N to the administration of an exam, we're requesting that learning objectives ce submitted, and we're evaluating them, and if they are appropriate for use in our exam, both the written and the operating test, we would employ them to the extent that they are consistent with our sampling plan in the Examiner's Handbook and the K/A Catalogs.

We've been training examiners to look at learning objectives and to use them for testing objectives. To the extent that you can provide material to the examiner where the learning objectives provide a standard of performance and you key the training materials in which the material to develop that question is available, and if you know a K/A in the catalog with an importance rating that's above 2.5, you will have provided the basis for developing a good ques-tion and a good examination.

Our experience is that the learning objectives may have conditions and standards of performance, but the supporting training materials are not there to develop the appropriate questions or they're cast in such a way that it's unclear whether they are related to a K/A associated with job content having a rela-tively high safety significance.

We also did not want to see the " enabling objectives," because these are for trainingpurposesandarenotgroundedinjobperformance. We want objectives that are ' terminal," and have to do with job performance; and the better the material is that you supply, the closer our exam will mirror those objectives.

We've spent a great deal of time looking at how one judges a question based on the learning objective so that the question will elicit the kind of performance or knowledge or response that lets us infer that the person has mastered that particular aspect of the job.

NUREG-1262 32

There's a related issue. We issued Generic Letter 87-01, which announced the availability of the NRC Examination Question Bank, and indicated the mechanisms by which utilities could request the information on what's contained in the bank on their facility or similar facilities. It also indicated a mechanism for you to update questions on the bank, either where we have inaccurate ref-erences or the design of the facility has changed. )

We purged the bank of questions that were more than two years old because some of the older questions did not meet today's quality standards. In some cases, we have only four or five examinations on the bank for a particular utility.

We want to improve that and are interested in your comments and/or questions for the bank. We'll also provide the, bank to you for creating your own ques-tions. To the extent you provide us information that's in a format which is compatible with loading into the bank, we can do that directlyg either through hard copy or electronically. But for security reasons, we can t give you di-rect access to the bank.

Q. 126. If the utility has established some internal guidelines of what they expect of the individual, will you accept those guidelines for the purposes of written examinations?

A. Yes. We would have an issue that we would discuss with the utility, that we would want to revise the guidelines if they did not conform to our testing -

blueprint based on the job-related knowledge and ability statements with high safety significance. 1 Q. 127. Can we submit that in auvance of the written examination, and then come to an agreement somewhere up front?

A. It can be part of the materials that you submit in accordance with the 90-day letter, and we would consider that in developing the exam. l Q. 128. You mentioned a training program for the examiners on writing the learning objectives.- How is that program being instructed; who's teaching that?

A. We started several years back working on writing multiple choice questions, ,

and have been doing one-seek training sessions in all the regions, twice at l headquarters, and once each for contractors. During the one-week training session, examiners converted learning objectives into testing objectives and practiced writing testing objectives.

We've shared that information with INPO and have had INPO staff participate and take the materials back with them, so the information that we're using to develop examinations is available to you through INPO, or even through the staff if you want to request it.

. \

Written Examinations and Operating Tests (Statement of Considerations) '

Q. 129. In the Statement of Considerations, under Part 0, Written Examinations and Operating Tests, it says: " Learning objectives derived from job-task analyses should form the basis for licensing written examinations and operating i

NUREG-1262 33

tests at a facility. Ultimately, the NRC testing objectives will reflect fa-cility licensee-developed learning objectives. In the interim, while programs are being developed and reviewed for accreditation, the NRC has activities .

underway to improve the content validity of NRC examinations and operating i tests." Will NRC commit to solely using the learning objectives for plants that have accredited operator programs?

A. No. The rule states that the learning objectives will be used in part, but that other things, like LERs, etc. , will also be used.

Q. 130. Why are written exaritinations only taken in part from learning objectives?

A. The hope is, eventually, to take the entire written examination from learn- '

ingobjectives. However, at this time, there are many places where the learning objectives are somewhat incomplete or inadequate. So, we utilize LERs and other training materials, such as lesson plans, system descriptions,-

and procedures, to supplement the learning objectives.

Q. 131. When will NRC activities underway to improve the content validity of NRC examinations and operating tests be complete? j j

A. We view this an an ongoing activity. We have a number of initiatives scheduled for completion in this fiscal year, including the revised Handbook (NUREG-1121), passing point workshop, and the supplement to the PWR K/A Cata-log (NUREG-1122) to conform to the BWR K/A Catalog (NUREG-1123).

By the end of this fiscal year, a number of milestones toward meeting that objective will have been met. But this is a continuing process, as we work toward a common understanding of what's necessary for assessing job perfor- {

mance. With the advent of the K/A Catalogs, we've made significant improve- .

ments in basing test content on the operator's performance-based job require- I ments: that is the essence of content validity. We have used a systematic process involving subject matter experts. We have supplemented the PWR Cata- 1 log; it has an April 1987 date and should be in the mail. It now has a theory l and component section similar to that in the BWR Catalog. j 1

In' addition to that, we have been looking at alternate ways to sample the con-tent of the NRC written exam. At present ES-202 and 402 weight all four sec-tions of the exam equally. We've looked at a way of sampling according to the sections in the Catalog. The differences would reflect differences between R0 and SRO positions. We 11 sample more heavily in plant systems for R0s and more heavily in emergencies that have fewer normal and more integrated plant responses for SR0s. The final decision on that will be made based on the recommendation of a Panel made up of industry representatives and NRC contractor personnel that's meeting May 18th through the 22nd.

We will consider the panel's recommendations to us before we make any recommen-dations to change the format of the NRC exam. That sampling plan from our Cata-log and your input on your learning objectives should, in fact, be the essence of a content-valid exam.

NUREG-1262 34 l

l Q. 132. I've heard different people say that all NRC exams are now based on the K/A Catalog. Are all NRC Examiner-Contractors held to that Catalog as a standard?

A. Examinations prepared by Contract Examiners are reviewed in the Region so the standard for the regional Examiner and the Contract Examiner is not dif-ferent. Like regional examiners, the Contractor Examiners are required to write an examination which meets the requirements of the Examiners' standards, which now reference the Catalog and will, in a future revision, also reference the handbook.

We are sensitive to feedback from the exam process. We look at the facility comments generated during the exam review process. We intend to be very re-sponsive to comments that point out any differences between a contract exam I

and one administered by NRC examiners.

  • Q. 133. Is the new rule going to change the format of the exams (e.g., largely essay-type)?

l A. The new rule does not alter the format of the exam. The current Examiner j Standard, ES-202, permits a maximum of 25 percent objective-type questions  ;

(e.g. multiple-choice, true-false), a maximum of 25 percent longer essay-type i questions, and a minimum of 50 percent short-answer questions in Sections 2-4 {

and 6-8 of the exam. Exam Sectior.s 1 and 5 (reactor theory and thermodynamics) can consist of a greater portion of objective-type questions.

We're working on the issue of a generic exam--a prototype, objective exam for theory and component operation.

Q. 134. Have you pilot-tested Form 157 or have you had any practice with it?

A. No. The new Form 157 will be available after May 26. We'll be revising it as necessary, based on our feedback from field use.

Written Examination: Operators (Subpart E, Section 55.41)

Q. 135.

. The items in 55.41(b)(10) and (13) have previously been for senior operator knowledge. What level of knowledge is expected for the reactor operator?

A. Part of 55.41(b)(10), has been for operator knowledge in that it concerns normal, abnormal, and emergency operating procedures for the facility. For the administrative part, the reactor operator would be tested for the depth of knowledge required for his job position in the administrative area because operators get involved with administration at times. And Part (13), " Procedures and Equipment Available for Handling and Dispnsal of Radioactive Materials and Effluents," would also be geared to RO job requirements at your site.

Q. 136. Part 55.41, " Content," does not specifically address that licensed operator candidates need to know Technical Specifications, yet the examiner standard, Section ES-202, discusses the need to know Technical Specifications.

What is the reason for this difference? Is ES-202 correct in its application for Technical Specification knowledge?

NUREG-1262 35

A. Section 55.41(5) addresses the Technical Specifications. We expect opera-tors to use Technical Specifications as appropriate to their job. Reactor opera-tors, as in 55.41(5), are expected te know limiting conditions, particularly those things they should recognize and communicate to the SR0 in a timely manner. '

The same thing goes for the SRO. We don't expect SR0s to be engineers. So required job performance in your systematic evaluation, plus our K/A Catalog, should give you an idea of the level of specificity. We intend to revise the examiner standards to give our examiners better guidance. Right now, it's not l as clear as it could be, but required job performance is the key, and if, for some reason, you feel you use Technical Specifications differently than we can interpret, you should call that to the Region's attention and discuss it long before the exam occurs.

There is clearly a difference between our expectations for R0s and SR0s by virtue of SR0s directing the activities of others. The SRO must know all aspects of, license conoitions. He approves work, work orders, and other things which require 6 knowledge of Technical Specifications beyond the material covered in the operator's written exam.

We don't expect the SR0 to be able to develop a basis for a requirement on his own. We expect him to understand what the requirement is, and be able to carry it out. Thet's the difference that we tried to articulate in these two sections.

An R0 doesn't have to know about approving surveillance, yet surveillance are covered in the Technical Specifications. An R0 does need to know about limits on operation of the plant, as they relate to the list of items under the written examination.

Q. 137. For facilities that have an approved INP0-accredited performance-based training program, what percentage of the written and/or oral exam questions administered by NRC will come from the facilities' objective-based exam bank, or at least from the facilities' training objectives? From Attachment A (to Generic Letter 87-07) it appears that all the exam questions for accredited facilities will come from the facilities training objectives.

A. Eventually, we'd like to use the facilities' learning objectives. But, it's our experience that we have varying degrees of polished objectives. We've also found that even when there is a good objective, where the conditions of performance and the standards of performance are explicit, and the learning and the mastery is all tied to job performance, the supporting materials submitted with the 90-day letter do not allow examiners to develop the kind of question that will elicit the appropriate material to decide whether the candidate has masteredthatobjective. So while the objective may be good, the supporting material isn't suf ficient to develop the right kind of question.

I We're working on this. And we key the content of our exam right now to the VdA Catalog. We do not sample those items that have been found to have a low im-portance to safety. But we have to rely on your analysis to help determine what's important on a plant specific basis.

The better the learning And this is where there's some breakdown at the moment.

objectives in terms of their explicit statement of conditions and standards, the better the supporting material, and the better it's tied to our Catalog, the better the whole system works.

NUREG-1262 36

Butdon'treadintothatthatwewouldbelimitedtothoseobjectives. We would sample, we would tie it to those objectives; but if there isn t an objective in the safety-related system that we think is important, we may create our own test objective and cover it on the exam. l l

We're going to try very hard to ensure that it is safety related, it is opera- I tionally oriented, and it is performance based. Obviously we would want to j have good justification for asking that kind of a question. j Many of you have used the INP0 Job Analysis in your own plant-specific analysis.

And part of the' reason that we tied our analysis at the generic level to the INPO Analysis was so that the system names and numbers, and the resulting material, would be easily keyed at the plant-specific level to the K/A Catalog. i Q. 138. What will the Commission do to ensure that operator exams are both valid and reliable from a psychometrics perspective?

A. Many things. One: We're working on a sampling plan developed by subject-matter experts that will better reflect the job of the operator as opposed to j the four, evenly weighted written exam sections currently in the Examiner's i Standard.

Two: We'll be sampling only those items that received a high importance rating to ensure the exam's content validity.

Three: We have a meeting next month in which we're bringing together another panel of experts first to evaluate our proposed sampling plan and document the -

basis for oist passing point. -

Four: We are conducting continuous, extensive training with our examiners on writing and reviewing questions. l Finally, we are continuing to make improvements on the exam question bank.

Q. 139. The statement of considerations makes the following statement: "Ulti- ,

mately, the NRC test objectives will reflect facility licensee developed learn- i ing objectives..." With an INPO-accredited program already developed from a job-task analysis (JTA),.does our training standard (site-specific learning objectives) supersede the NRC Knowledge and Abilities Catalog? How do we get regional concurrence that they will test to our training standard?

A. It's our intent to use site-specific learning objectives as the basis for ,

our testing objectives. However, if we detect errors of commission or omission i in the site-specific reference material (including learning objectives), we obviously will not shape our exam content to those errors.

Q. 140. Criminal violation only covers persons who willfully violate the Atomic Energy Act or NRC's regulations, and does not apply to situations such as ,

discussions after an examination is administered or when a previously admin-istered examination is used as a practice exam. What is the attitude of the NRC concerning distribution of the facility's examination bank to the examinees?

A. NRC has no specific policy concerning the distribution of the facility's own examination bank to their examinees. While some portion of training may be NUREG-1262 37

given using previously administered examinations as references, this should not be interpreted as NRC endorsement or acceptance of such a practice exclusively.

Written Examination: Senior Operators (Subpart E, Section 55.43)

Q. 141. The Commission Policy Statement on Technical Specifications and im-provements may result in a substantial increase in scope and documentation.

Will any effort be made to limit the knowledge required of senior operators to those elements of the Technical Specification basis that are essential for safe operation?

A. Yes. We have an ongoing program Jooking at the issue of what needs to be examined at the SR0 level, as opposed to the R0 level. And we are working with the people developing these new Tech Specs and intend to make sure that we are producing a performance-based exam.

That's not to say that there won't be son.e additional exam material that comes

~

from the new Technical Specifications. But, again, it will be performance based job relevant, and safety-significant material, and we will provide ample guidance to the examiners, in the examiner standard, as this program develops.

Q. 142. When we were developing standardized Techical Specifications, the re-quirement was that an operator know from memory, and be able to apply "one-hour-or-less," action statements from the Tech Specs. Since standard Tech Specs have come in, there are now well over a hundred one-hour or less action statements from Technical Specifications. Is the policy, or the guidance from the Commission still the same, to commit those to memory, and recognizing that the utilities do not rely on nor require the operators to act from memory in that situation?

A. We are dealing with performance-based knowledge that an operator needs to know. Specifically, if the information is appropriate to the job, if it is in the K/A Catalogs with a high importance rating, he should know that informa-tion. If there is not a specific knowledge or ability associated with it or those that are have a low importance rating, then normally it would not need to be examined. However, there may be procedual steps or other indications that cause him to look into the Technical Specifications. The method you use procedurally in the plant for these indications, through performance-based testing under certain circumstances, such as procedural or event-related pro-blems, would be the method that would be followed by NRC. We don't have any blanket rules that require memorization of everything in Technical Specifica-tions that has to be done in less then an hcur. That is not our policy.

Ensuring that our examinations are operationally oriented and job related is our policy.

Q. 143. Senior operators are required to know the facility operating limitations in the Technical Specifications and their bases. If and when the Westinghouse Owner's Group completes development work and gains acceptance for the Technical Specification MERITS program, this will vastly increase the bases section of the Technical Specification. Will the NRC position change regarding the require-ments to knew the Technical Specification bases if this new program is implemented?

NUREG-1262 38

i j

l 4

A. No. As we implement improvements to Tech Specs, we hope to reduce their size substantially as a result of this program and to do a better job of j describing the why's associated with the limits and the underlying assumptions that relate to them.

We hope that in the long run we will better define the knowledge that a senior operator should have related to the Technical Specifications and their bases.

I don't expect that the volume of the bases to increase to several three-inch notebooks. It should be significantly reduced compared with what's contained in the FSAR. It's going to require a topical report submission and an approval.

by the staff before it can be implemented on a plant-specific basis. We wiH be looking at generic bases, and there will be an opportunity for utilities to comment.

Our intent is not to add superfluous information; it needs to be related to the job.

Q. 144. Section 55.43(b)(3) refers to the facility licensee procedures required to obtain authority for design and operating changes in the facility. What .is t!.e intent of this? Should the SRO understand the process the licensee goes about in obtaining a design change?

A. There may be administrative procedures which would allow, for example, two SR0's on a back shift to change a. procedure, as long as they don't change the intent of the procedure. Or, thera may be other aspects of the 50.59 review proc &ss which an SRO is held accountable for M A g. He may be the shift supervisor, on shift at the time, responsible for those activities. And it's that type of administrative procedure we are addressing. ,

Q. 145. Therefore, are we talking about teaporary alterations, not design )

changes, or permanent license changes?  !

A. He needs to understand what he's approving when he approves the work to be done in the planti We're looking principally at those things which he can ap- 1 prove; deviatation from a procedure, an alternative approach, etc. The 50.59 '

type process, how those changes are controlled, and what it means when he signs off to approve a work package, is likewise important. This process may change the design of the facility, or change the way the facility is operated by a procedure. For clarification, there has been no change in this area from the previous Part 55.

Q. 146. What maintenance. activities are included in 55.43(b)(4)? .

A. Section (b)(4) talks about radiation hazards that may arise t.uring nornul and abnormal situations, including maintenance activities, and various contami- ,

nation conditions. We can't delineate every item that he would have to know.

A common item may, for example, be a radiation work permit (RWP). He may be responsible for signing off, either in concurrence or &pproval, depending on I the facility, on the RWP, so he would be expected to have site-specific know-ledge in that area.

Q. 147. Part 55.43 does not specifically address emergency plan implementation.

This is addressed in Part 55.45. Will the senior operators continue to be asked to classify events, given a specific scenario, into four categories (UE, Alert, SAE, GE) from memory on the written examinations?

NUREG-1262 39

~_ _

A. It m 5 in Section 55.43(b), stipulates that SR0s must be able to address the " assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency conditions." However, neither R0s nor SR0s are required to classify events from memory.

I Operating Tests: Content (Sutpart E, Section 55.45(a))

Q. 148. Is there a definition of plant equipmant that could affect the release of radioactive materials to the environment, per 10 CFR 55.45(a)(8)?

A. We can't tell you every piece of equipment that is testable in that area.

There are many systems and many controls that an individual can operate that could cause a releast; operators are required to understand these systems and controls, which are the responsibility of licensed personnel.

Q. 149. Does 10 CFR 55.45(a)(10) imply that operators must perform exposure shielding calculation 9 A. That depends on how these calculations are made at If you have an on-shift health physicist or, in an emergency,an your facility.

STA, then we would not ask operators to do the shielding calculations. But if the SRO typically checks such calculations, then we may ask the SR0 to check one.

Q. 150. Items 12 and 13 of Section 55.45(a), were reworded to include the phrase "as appropriate." What is the significance of this phrase for the Com-mission to classify this change as " major" in the final Regulation?

A.

The comparison that we'rt making in the Statement of Considerations, Sec-tion IID(2), is between the proposed rule published in November 1984 and the final rule.

and the finalItems rule. 12To and 13 were significantly rewritten between the proposed clarify, we have m Ma sure that for performing as appropriate to the assigned pnition. you're held So R0s areaccountable not expected to pass a test at the SRO level.

Q. 151.

How will you evaluate Item 13 " Teamwork " in the operating test? I'm talking about the operating test itself, when you,have to evaluate one single candidate on how he reacts and interreacts with the team?

A.

You could put some licensed oparators on the team with him, and we would just put an examiner with the individual taking the exam. You could have one of your instructors standing there, as we have done in the past.

Q. 152. How would you evaluate this if we didn't have a simulator?

A.

It is the responsibility of the examiner to structure his operating test scenarios for the Integrated Plant Operations portion of the test that would create situations that would challenge the candidate in competencies G (communication / crew interface) and H (responsibilities / supervision).

this htlonwould require facility a discussiontest.

is a one-on-one format since the operating test without a simu-Obviously

$RO candidate evacuate the control room.For example, a scenario could have an the reactor from the local shutdown panel.He would then be expected to shut down how he would utilize his resources, including diretion, communication, andH report backs. Questions should be phrased as follows: What would you direct HUREG-1262 40

1 I

r i the 80P to do? What reports do you expect to receive from the R0 upon reactor trip? How would you verify a questionable report from the B0P/RO? How do you '

evaluate the licensed operator's use of nonlicensed operators during local operation of an auxiliary feed pump?

Q. 153. Part 55.45(a) contains a new evaluation criterion wh ch requires an applicant to demonstrate the ability to function within the control room team as appropriate to the assigned position and in such a way that the facility li-censee's procedures are adhered to and so that the limitations in its license l and amendments are not violated. Is this criterion intended to be evaluated using the manipulation criteria addressed on the operating namination report contained in ES-302 which requires thpt an applicant: C.) follow procedures, (2) observe and check instrumentation, (3) exhibit dexterity and a feel for console operations? Or, will this evaluation be addressed Cn a future revision I of ES-302?

~

A. This criterion is addressed in the operating test using the existing ES'-302 with the new Form 157. Specifically, the form identifies in competencies G and H (both with and without a simulator) the evaluation of communication / crew interaction and responsibility / supervision.

4 Waiver of Examination and Test Requirements (Subpart E, Section 55.47)

Q. 154. In10CFR55.47,whatisacomparablefasiinyd A. This question addresses the waiver of written examination aid operating test requirements. We would look at each waiver on h ase-by-case basis, and make a determination as to whether or not the facility wm, for licensing,pur-poses, "close enough." k / ,

x 4 l ,

h \

4 i

,; g

.Y '

l i

) '

t il ,

i X i t , c, , a 1 1 t >/ N s

k k

' )

t'j NUREG-1262 41 -

L i f

t i

1

. t 1

SIMULA110N FACILITIES k

u ,

. 1 x I e

) i j

1 4

l J

L i

\i N

p &,,

h,

, ..y L

, . . + '

Written Examinations and Operating Tests: Implementation (Subpart E2 i Section 55.45(b)) '

Q. 155. Will NRC continue to examine operators on plant-referenced simulation facilities following the effective rule date, but prior to the submittal of the simulator certification?

A. Yes. If we're giving exams on your simulator now, we will continue to do so. j Q. 156. Will NRC examine operators on nonplant-referenced simulators for these utilities that have accredited training programs and use a nonplant-referenced simulators between the date that the new rule becomes effective and simulation facility approval by NRC is achieved?

A. We anticipate no change from what we're doing today.

Q. 157. Our facility will not have a plant-referenced simulator available for training until the first quarter of 1990. It is assumed that operating tests will consist entirely of plant walk-throughs until such time as a plant ref-erenced simulator is certified. Is this a correct assumption?

A. Yes, but in the event the utility were to start using that simulator to evaluate candidates prior to the time at which they chose to certify it, we'd have no problem with the examiners using it to conduct operating tests.

Q. 158. Are the provisions of 55.45(b)(2)(1), and 55.45(b)(2)(iii) mutually exclusive? In other words, if the utility plans to meet the provisions of 55.45(b)(2)(iii) by purchasing a simulator during the 46-month period, does the utility need to submit a plan per (b)(2)(i) for the simulator to be used until the plant-referenced simulator is certified?

A. No. If you intend to certify a simulation facility on Form 474, you have 46 months from the effective date of the Rule to do that, and you do not need to submit to us a plan, or an application, prior to that time. If, however, i we do not see any evidence that there are plans in the works for a certified simulation facility, and if we have not seen a plan from you for a noncertified simulation facility, we'll probably get in touch with you to find out what your intentions are.

Q. 159. We currently have a site-specific simulator, and it has been used to administer the simulator portion of the operating tests. Do we have 46 months from the effective date of the rule to submit Form NRC-474, " Simulation Facility Certification"? Will the simulator tests continue to be administered on our concertified simulator before we submit the Form 474 Under what conditions ]

would NRC refuse to administer operating tests on the simulator?

A. Yes, you have 46 months to submit Form 474, and, yes, the simulator will continue to be used for the conduct of exams until you submit that Form 474 or until you reach the four year deadline. NRC would refuse to administer opwat- 1 ing tests if the simulation facility has not been certified by the deadline or I if, after it has been certified, an inspection proves that it is unable to meet ll NUREG-1262 42

l the requirements of conducting an operating exam. And, if certification is pulled, then it needs to be decertified.

Q. 160. For simulators that are not plant specific, when the regulation goes into effect in May, are you going to start giving nonplant-specific simulator exams?

A. No. We do not intend to administer such exams. Those few plants without i plant-referenced simulators will be handled on a case-by-case basis. '

For clarification, once a utility begins to use a simulator to evaluate its i operators, we would retain the option to use it to conduct our operating i tests, even though it may not yet be &pproved or certified. l It's our intent to continue with business as usual from the effective date of the regulation until such time as you either have an accepted and approved simulation facility, or you have certified a simulation facility. Or, of course, the four year deadline arrives.

In other words, if we presently conduct operating exams in a walk-through because you do not have a plant-referenced simulator or you do not have an acceptable simulation facility, we would continue to conduct exams on a walk-through basis. '

But if you do obtain a simulation facility between now and the date that you chose to certify it, if you find the simulation facility. is acceptable for your use in evaluating operators then we will find that same simulation facility acceptable for our use in evaluating operators, even prior to the time it is certified or approved.

One other clarification. It does not matter who owns a simulation facility, I or where it is located--the key is the plant to which it is referenced. And 1 the facility licensee is the one who must certify that simulation facility for use regardless of whether that facility licensee is the owner of that simulation .

facility or not.

Q. 161. Several simulators are still in the manufacturing pipeline, to be de-livered in the next two years, while a few are still just beginning their pro-curement activities. Is this plan required within one year regardless of whether the utility is in the process of procuring a simulator?

A. The plan referred to is required only for those utilities which are not submitting certification on Form 474. If you are procuring a certified simula-tion facility, there is no plan required and there is no application for approval required, regardless of where in the pipeline your procurement is.

If you are not procuring a simulation facility that is to be certified on Form ,

474, then there is a plan required and there is an application for approval. j Then the answer is yes, we would expect that plan submitted to us within one year of the effective date of the regulation, regardless of where you m6y be in the procurement cycle.

Q. 162. Consider the utility undergoing the simulator procurement process right now. There is certainly the realistic possibility that that simulator will j I

NUREG-1262 43 f

not be delivered and declared ready for training until sometime in 1990. At ,

that time it will be approximately two and a half years since design data j freeze.  !

1 In that period it's reasonable to expect that the utility would not be able to {

meet the requirement that the reference plant simulator be current within 12 or l 18 months of the reference plant, which meets those requirements set forth in ANSI 3.5-85, to which you are attesting when you sign the material-false-statement. Does this mean that this utility would have to submit a plan for an alternative within 12 months of May 1987?

A. We would still expect a certification from those utilities on Form 474, rather than the application for approval. You would take exception to meeting some of the requirements of ANS 3.5. These would have to be identified and described, along with a description of when and how they would be resolved.

Q. 163. In other words, they would not be held to the statement that says th~ey are or are not in compliance with ANSI 3.5?

A. That is correct. The facility licensee would address them as exceptions to ANS 3.5.

Q. 164. I didn't see on the proposed Form 474 an area that addresses exceptions.

A. There is such a block on the form. It might not have been on an early version of the form; but on the final version you will see an area near the top which indicates exceptions taken to the standard.

That's not an unusual circumstance just for those who are buying new simulation facilities. Because design modifications are made in the plant, you may at the time of certification have modifications made in the plant that you have not yet put into the simulation facility.

I The process provides for reference plant data and design data for the simula-tion facility, and there can be as much as two years' difference between the time these two conform with one another. If you're not in conformance at the time you certify, if there's some exception, identify that in the exceptions sections and indicate on.what schedule you're going to correct it.

If we disagree with the exceptions, we'll visit you. But if you've done a reasonable jcb of identifying them and we still conclude that we can conduct an operating test, we'll accept that certification.

Q. 165. In Section 55.45, implementation schedule and simulation facility cer-tifications, what is the relationship of the two timetables provided in (b)(2)(iii), which is 46 months, and (b)(3)(iii), which is 60 days?

A. There is no relationship between them. The 46-month requirement in (b)(2)(iii) refers to facility licensees, which includes anyone who has a doc-keted application. The 60-dty requirement in (b)(3)(iii) refers only to what we call facility applicants, which includes only those without docketed appli-cations. So you can ignore that 60-day requirement.

NUREG-1252 44

Q. 166. Do we have a requirement to certify a simulation facility to NRC prior to its being used for an operating exam?

A. No. You have a requirement to certify a simulation facility to NRC no later than four years after the effective date of the regulation. Prior to that four year deadline, it can still be used for conducting operating exams whether it is certified or not.

Q. 167. Due to the extensive use of the simulator for training, there may be times that meeting the 25 percent performance testing requirements within 12 months of the last set of tests is not possible. What is the allowable time table tolerance regarding this situation? For example, is it permissible to perform 50 percent testing in one year and no testing in the next year, as long as 100 percent testing occurs every four years?

A. The regulation provides, in 55.45(b)(4)(vii) and (b)(5)(vi), that perform-ance testing be done at the rate of approximately 25 percent per year on a continuing four year cycle. The goal is to ensure the ongoing testing and up-grading of the simulation facility, and to assure that it is maintained on a consistent basis with the status of the plant. You must present to us, on Form 474, your performance testing schedule. To the extent that it must deviate from 25 percent per year. if it must deviate, you need to let us know just what those deviations are and we will have to evaluate it case-by-case. We're not in a position to give you an allowable table of tolerance for deviations from 25 percent per year, but it's safe to say that performing 50 percent of the tests in one year, and no tests in the next year would not meet the intent of the regulation.

For clarification, we really don't want to see the minutiae of your performance testing schedule, which tests are to be run on which days of which months.

We're looking at an annualized 25 percent per year basis, and that's the block of time in which we would like to see your performance testing scheduled. Any changes that may need to be made to that schedule, you need to tell us about, based on that annual block.

Q. 168. What is the required retention period for simulation facility test procedures, modification documentation, and discrepancy reports?

A. Four years is the re' cord retention period. But at any given time, you may have accumulated and held on to more than four years' worth of data, because you are performing your performance tests at the rate of 25 percent per year.

So if you certify, hypothetically, at time zero and then you submit your first four year report on the four year anniversary of that initial certification, at that time in year four you can discard the results of the performance testing that you had for the initial certification. Then when you submit your next four year report at year eight, you can discard all the performance testing documentation that you used to submit the first four year report.

So it's a four year period, but as you accumulate the tests at 25 percent per year, you're going to be building up a greater retention period until the time comes at your next report to discard it.

NUREG-1262 45

)

.__ ____ - )

Q. 169. Regarding decertification of a plant-referenced simulater: What process will be used to decertify a simulator? Will an NRC examiner be able to decertify a simulator based on his observations of simulator performance during an NRC exam?

A. No. An examiner will not be able to decertify a simulation facility based upon his observations. He will report those observations to NRC, and the staff may use that information to perform an audit or an inspection.

Q. 170. Section 55.45 requires that within one year after its effective date, each facility licensee proposing to use a simulation facility must submit a plan detailing how and when their simulation facility will be developed and submitted for approval. Must a utility that operates dual units at the same plant and that currently obtains a multi-unit operator license from the NRC submit this plan for the unit not being replicated?

A. The availability of current multi-unit licenses would lead us to believe that you do not need to submit an application for approval for the simulation facility for those units. We in all likelihood will accept certifications on ,

Form 474 with the exceptions noted for each unit.

Q. 171. What format requirements, if any, does the Commission wish to see in this application? It appears that a Form 474 will not be used for this purpose.

A. Here is an example of what we'd expect. Let's assume that you have a dual unit control room and that the control rooms are identical with the excep-tion that they're mirror images of each other. Your physical fidelity compari-son in accordance with the standard would identify as an exception the mirror-image layout.

One form 474 would indicate that the mirror-image issue was a difference, but you conclude that's acceptable for an operating test. And you'd reference the ,

certification form for the other unit; that is, you'd identify all the other exceptions that you'may have. So one is tied to the other. That way we get a form that says it's certified for each plant to which it's referenced.

Where you have a simulator now which is on site and which replicates two units, we would expect you to use the certification process.

Q. 172. Several utilities are not planning to obtain plant-referenced simulators.

They prefer to use other simulation devices. Assume that a facility licensee has constructed and is operating a plant referenced simulator that meets the provision of Regulatory Guide 1.149 and ANSI 3.5 and has been certified to the NRC for use for operators and senior operators who operate the reference plant l!

or are candidates for a license at that plant. A second utility wishes to use i the simulator as their simulation device rather than construct and operate a plant referenced simulator. What procedure must the second utility. follow to obtain approval to use that simulator?

A. The answer assumes that the utility who wants to use it is treating it as a noncertified, nonplant-referenced simulator. It does not matter who built the simulator, who owns it, where it's located. The facility licensee who I

NUREG-1262 46 I

I wants to use a particular simulation facility for conducting operating tests is the organization that is required to file a certification or to apply for approval to use it. So in this case, the procedure that the second utility must follow would be to submit a plan within a year, followed by the applica-tion for NRC approval to use that simulation facility, whether they are the owner of it or not.

Q. 173. Has the staff developed guidance and/or criteria regarding the use of a certified plant-referenced simulator by individuals other than those from the referenced plant? .

A. It is possible for any particular simulation facility to be certified as referenced to more than one plant, to'the extent that those plants are similar.

But only the facility licensee who wishes to use a simulation facility for its referenced plant should submit the certification for its use. So if one simu-lation facility is intended to be used by several different licensees for different plants, then we would expect to see several different certification forms coming in, one for each of those facility licensees.

Q. 174. Does this guidance apply to facility licensees that wish to use another facility licensee's plant referenced simulator?

A. Yes, but there are some very practical issues that utilities are going to have to address in the area of configuration control, plant design changes, and getting those plant design changes referenced back into the simulator.

Some of those can be taken care of with software, by having a different data pack, tapes, etc. Others are going to be very difficult to take care of where they relate to control board location or systems that you'd have on the device that are different. Clearly, where two utilities want to use the same simula-tion facility, they are going to have to work out agreements with each other as to how they are going to maintain configuration control such that the same device can be used for the operating test at each utility.

We have not precluded that a facility may certify a simulation facility owned by.someone else to its referenced plant; but the requirements for having an appropriate configuration control system still exist, and you must still follow the ANSI standard. So that if you get into that mode, you may find it diffi-cult over the long term.

Q. 175. Assume that an entity has constructed and is operating a plant-referenced simulator that meets the provisions of Regulatory Guide 1.149 and ANSI /ANS 3.5-1985, and has been certified by NRC for use by operators and senior operators at the reference plant, or who are candidates for license.

A utility wishes to use the above simulator as their simulation device rather l than construct and operate a plant-referenced simulator. What procedure must

~

the utility follow to obtain approval to use the above simulator?

A. Or.ly facility licensees are to certify simulation facilities to NRC or request approval for simulation facilities. If an entity means a facility licensee under 10 CFR Part 50, then that's fine. If it means some other organizational body, then that would not be acceptable for certifying, or l l

NVREG-1262 47

applying for approval of a simulation facility. It does not matter whether that utility owns that simulation facility. It does not matter where that simulation facility is located, but it is the utility who must certify, or apply for approval to use it.

If that simulation facility referred to 15 referenced to a facility licensee's plant, then the process to be followed is certification on Form 474. If it is '

not referenced to the facility licensee's plant, then the proper approach would l be submittal of a plan within a year, followed by application for NRC approval.

Q. 176. Title 10 CFR 55.45(b)(4)(i) states, "In accordance with the plan sub-mitted pursuant to Paragraph (b)(2)(i) or (b)(3)(i) of this section, as appli-cable, sub.11t an application for approval of the simulation facility to the Commission, in accordance with the schedule in Paragraph (b)(2)(ii) or (b)(3)(ii) of this section, as appropriate." What performance tests are required and what standard is used to evaluate whether the tests are satisfactory or not?

A. To the extent applicable even to those simulation facilities that will not be certified, the requirements of ANS 3.5, as endorsed by Reg Guide 1.149, is the standard to be used. The performance tests include the malfunctions identi-fied in Section 3.1.2 of the standard to be done at a rate of approximately 25 percent per year ov a an ongoing four year cycle; the performance tests that are specified in Appendix A of the standard, also at the rate of 25 percent per year; and the operability tests identified ir. Appendix 8 to the standard that are to be done annually.

The criterion for the performance of these tests is that the simulation facil-ity must be capable of being used for the conduct of the operating tests which are identified in Section 55.45(a) of the regulation, and the staff will inspect simulation facilities against that requirement.

Our definition of " plant-referenced simulator" differs from the ANSI standard definition in that we require that a simulation facility be capable of being used with the plant's control room procedures, and we would inspect against the  ;

ability to use those procedures as well.

Q. 177. Sections 55.45(b)(2)(i) and (ii) state that within one year a plan shall be submitted for a simulation facility (other than a plant-referenced simulator),

and within 42 months an application for use of the simulation facility must be ,

submitted. When will the facility licensee know if the plan for the simulation  !

facility is acceptable to the NRC? What criteria will NRC use to determine l acceptability? Can the plan be modified after the first submittal? l 1

A. The minimum acceptance criteria for nonplant-referenced simulators as simulation facilities include the capability for conducting the operating tests identified in Section 55.45(a) and their ability to operate under the use of the control room procedures.

l The nonplant-referenced simulator alone or in combination with other devices must demonstr te acceptability for conducting these operating tests using con-trol room procedures.

NUREG-1262 48

The staff will review the plans for such simulation facilities against the criteria specified in the regulation for the conduct of the operating tests, and to the extent applicable, we will also apply the requirements of ANS 3.5 as endorsed by Regulatory Guide 1.149 even for nonplant-referenced simulators.

The staff intends promptly to inform any facility licensee if the staff's re-view of the plan or the application submitted is not satisfactory for being able to conduct these exams.

We plan to meet with the small group nf facility licensees who have indicated an intention to request staff approval of simulation facilities during the year following the effective date of the regulation and prior to the deadline for their submittal of a plan for application for approval.

Finally, although we expect that our initial meetings with these few facility licensees will result in sufficiently specific guidance that modifications to plans won't be needed after submittal, we don't want to preclude such modifica-tions if the facility licensee judges them to be necessary or desirable.

Q. 178. The preparation of a simulation facility plan will cost money and re-sources. If an submitted simulation facility plan is not acceptable, the NRC should let the utility know it is wasting its time as soon as possible. If a utility submits a plan for an " approved simulation facility" before May 26, 1988 will th6 utility receive an indication of whether or not the NRC will approve the simulation facility? Or, will the NRC approve the simulation facility only after application within the 42-month period stated in the rule?

A. The NRC will review the plan submitted by each facility licensee which proposes to use a simulation facility pursuant to Section 55.45(b)(1)(i). The facility licensee will be provided the results of such review. However, ap-provalofasimulationfacilit)y(inaccordancewithSecticn(b)(4)(ii)) pro- of posed pursuant to paragraph (b (1)(1) will only be considered after receipt an application submitted in accordance with Section 55.45(b)(4).

Q. 179. When a simulation facility evaluation is conducted by the NRC, plant operators may be used to perform the operations using plant procedures. In this case, are the operators performing on a "no risk', basis to their licenses?

If not, will the operators receive credit for an operating test? Could cer-tified instructors be used to demonstrate the simulation facility evaluation test instead of plant licensed operators?

A. During a simulator evaluation, no evaluation will be made of plant opera-tors. If clearly unacceptable performance is identified, the operators and specifics of their performance will be identified to the facility licensee for appropriate action. Qualified simulator instructors would be acceptable for demonstrating simulator performance.

Q. 180. When a malfunction is used during training can we take credit for it as a performance test?

NUREG-1262 49 i

l l

A. If all of the requirements of the Perfomance Test including planning, scheduling and documentation as required on Form 474 are met, credit may~be taken for completion of the Performance Test. 1 Q. 181. Paragraph 55.45(b)(4)(i)(B) states "A description of the components of the simulation facility which are intended to be used for each ptrt of the operating test" must be included as part of a facility's applicai. ion for ap-proval of simulation facilities. Please elaborate. Does " intended" mean "can?"

A. The word " intended" means that the listed component is that which the facility licensee plans to use for the evaluation of a specific one of the 13 items specified in 55.45(a).

Q. 182. Assuming that a utility were to submit a plan to certify a non-reference plant simulator as a simulation facility, what minimum criteria would this facility be required to meet (since operator testing using reference plant procedures would be limited or not possible) and what aspects of the non-reference simulator would disqualify the device from certification as a simula-tion facility?

A. The minimum criteria for approval of simulation facility are contained in 55.45(b)(4)(ii), which requires that it be suitable for the conduct of operat-ing' tests for the facility licensee's reference plant. (he operating test requires that the 13 items listed in 55.45(a) be able to be adequately eval-uated, and that plant procedures be used. Further details of simulation facil-ity characteristics necessary for NRC certification are contained in Regulatory Guide 1.149 and ANSI /ANS-3.5-1985. A non plant-referenced simulator will, in all likelihood, be developed following a plan and then an application for NRC approval. It would not be certified using NRC Form 474.

Q. 183. For utilities which have not yet received simulation devices from their respective vendors, when will they be required to undergo simulator examina-tions as part of their operating examination? When ready for training? When certified by the utility? When utilized by the facility as an evaluation tool?

Does the above answer change for any facility which currently possesses a simulation device, but asks that it not be used for NRC examinations until such time that it is certified?

A. No simulation facilities will be required to be used in the conduct of operating examinations until May 26, 1991, unless they have been certified to the NRC or approved (after application) by the NRC earlier. However, if a simulation facility is used by the facility licensee as an evaluation tool, the NRC will use it for exams as well. This would hold true despite any request by the utility that it not be used until certified.

Regulatory Guide 1.149 Q. 184. In order for a utility to comply with ANSI /ANS 3.5-1985, it would have to use a full-scope nuclear power plant control room simulator. The standard <

states the following under Section 1, Scope: "Also excluded are part-task or '

limited scope simulators intended for specialized training or familiarization."

NUREG-1262 50 l I

This means that non-full-scope simulators would clearly be excluded from the Standard, and, hence, a simulation facility that does not consist solely of a-full-scope simulator has no guidance or standard which a utility may use to obtain NRC approval. The previous statement leads us to the following conclu-sions: If Reg. Guide 1.149 and ANSI /ANS 3.5-1985 become the only standard for determining the acceptability of a simulation facility, the simulation facility must be a full-scope simulator, is that correct?

A. No. Regulatory Guide 1.149, in regulatory position (c)(2), takes exception to those segments of the Standard that were just cited. The Reg Guide says that simulation facilities, as defined in Section 55.4 of the Regulation (and that includes the plant, and potentially other simulation devices) should meet applicable requirements of the Standard. Also remember that Regulatory Guide 1.149 is only one acceptable means of meeting the requirements of the Regulation, and that facility licensees may propose other approaches to meet-ing the Regulation.

We intend to evaluate those simulation facilities which are other than certified plant-referenced simulators on a case-by-case basis, once we get to the point of dealing only with the applicable portions of the Standard.

Q. 185. If Regulatory Guide 1.149 and ANSI /ANS 3.5-1985 do not represent the only standard for determining the acceptability of a simulation facility, will NRC identify the minimum standards and criteria that are acceptable to them for non-full-scope simulators?

A. Those two documents do describe the only standards. But Regulatory Guide 1.149 is a Guide, it is not a regulation. A facility licensee may propose alternative ways to comply with the regulations in part 55, other than the submittal of the information in Regulatory Guide 1.149.

Q. 186. Does NRC continue to endorse the requirement in ANSI /ANS 3.5-1985 to perform annual operability tests? If so, should this be part of the 25 percent testing, or should it be done annually?

A. Yes. We continue to endorse Appendix B on operability testing, and as the standard requires, this must be done annually. This is not a part of the 25 percent performance testing.

Q. 187. Section C4 of Reg. Guide 1.149 specifies that reference plant modifica-tions be reviewed annually against the simulator and that the simulator update design data be revised as appropriate, and that the first such annual review.

and update should take place within one year following the facility licensee's certification. Does this mean we have until a year after certification to match the simulator update design database to the reference plant or 18 months after simulator operational date, as specified in ANS 3.5, Section 5.2?

A. No. According to Section 5.2 of ANS 3.5, you start with a database which may, for nonoperating plants, be based on predicted data. Eighteen months dfter the simulator is ready for training, your simulator update design data must include available plant data, unless the simulator is on line before the plant, in which case you have 18 months from the date that the plant becomes operational. Ih accordance with the standard, it's whichever is operational later, the plant or the simulator.

NUREG-1262 51

Section C4 of Regulatory Guide 1.149 refers not to the development of this update .

design database, but rather to the annual review of reference plant modifications that are called for in the same Section of the standard, the results of which must be added to the update design database.

The standard says, " Reference plant modifications shall be reviewed at least once per year, and the simulator update design data shall be reviewed as appropriate." Section 5.3 of the standard goes on to say that the simulator shall be modified as required within 12 months. It is this cycle of the annual review of plant modifications, followed within 12 months by simulator modifica-tion.as required, that we expect will begin with your certification on Form 474. j The rest of Section 5.2 addresses when your database must include actual plant data. And the two time schedules are somewhat independent.

You must still base the simulator update design data against the reference plant within 18 months after the simulator is operational. But you must begin yo'ur' cycle of annual plant review of reference plant modifications when you submit the certification.

Q. 188. Section D, " Implementation," of Regulatory Guide 1.149, outlines a procedure to be followed for a facility licensee that wishes to utilize a simu-lation facility at more than one nuclear power plant. Does this

.o facility licensees that wish~to use another facility licensee' guidance s plant- apply referenced simulator?

A. Yes. But the facility must certify that the simulator meets the requirements of ANSI /ANS 3.5-1985, as endorsed by Reg Guide 1.149, for his plant. In review-ing such certifications, we would be particularly concerned about how you handled configuration control. Because you would have the potential for multiple de-sign changes at a facility, we would have to understand how you are going to ensure that the simulation facility tracks the different plants.

Q. 189. What proced.ure must be followed to determine whether a two-unit site will require only~ene plant-referenced simuletor?

A. There is considerable guidance.on this in the " Implementation" section of Regulatory Guide 1.149. .It says that if a facility licensee wishes to use a simulation facility at more than one nuclear power plant, it must demonstrate.

to NRC in its certification, or in it's application, that the differences be-tween the plants are not so significant that they have an impact on the ability of the simulation facility to meet the regulations in 10 CFR Part 55.45(6), and the guidance of ANSI /ANS 3.5-1985.

There are a list of indicators that can be used to demonstrate that there are not such significant differences. One of the key areas that we will look at is whether we issue multiple licenses for your operators of those facilities.

ANSI /ANS 3.5, 1985 Q. 190. ANSI /ANS 3.5-1985 requires that performance tests be conducted in the '

event a design change results in a significant simulator configuration or per-formance variation. What is the NRC's definition of significant? ,

NUREG-1262 52 l

l A. Our operational definition is any change to the simulation facility, its models or software that might cause the results of performance tests to fall outside the acceptable performance criteria set within the standard. The standard does not define "significant," and for an official definition, or an official clarification, you need to seek guidance from ANS itself. It's pos- i sible that this definition will be clarified in the next revision to the  !

standard, but unless and until it is, we will use our operational definition. l Q. 191. Thisquestionconcernsthelistofrequiredmalfunctionsinperformance testing and ANS 3.5-1985. Are those not more ' events" versus " malfunctions"?

Do you understand that this causes confusion on the part of the simulator ven-dors in that if I was to go to a vendor and tell him that I want a reactor trip i malfunction, he's going to wonder what I'm talking about? Do I want power to )

the CRD breairers? Do I want to lose all reactor coolant system flow? How do I )

want to do this to create the abnormal event that ANSI 3.5 is asking me to per- )

form? Is that really referring to a list of abnormal transients? ]

1 A. Yes. )

1 Q. 192. ANSI /ANS 3.5 Section 3.1.1(7) requires that the simulator be capable of l performing startup and power operations with less than full rated reactor cool-ant flow. If the facility licensee is not allowed by Technical Specifications to conduct such operations, is this capability still required?

A. No. If a plant is constrained in any particular area by its Technical Specifications, then the simulation facility need not possess that capability as it applies to routine operations.

Q. 193. The Technical Specifications clearly bind the conditions under which the plant is allowed to operate. Am I correct that the simulator only needs to be bound by the same parameters?

A. No. For normal startup and shutdown practical-factor evolutions, in accordance with your procedures, you med not model those to be outside the bounds of the Technical Specifications. The question came up in the context of "N-minus-1 loop operation"; for instance, continued operation with a recircula-tion pump out of service or continued operation with one reactor coolant pump out of service. You need not model the simulation facility for operation in that mode if you are not permitted normally to start up in that mode. It was with respect to the context for startup.

Clearly, emergency procedures, for example, which go into function restoration guidelines and go beyond design basis accidents are not covered by Tech Specs, but we expect the simulation facility to be able to reasonably model those events. The same holds true when you insert malfunctions. If you turn off power to a panel, you're clearly outside the bounds of the Technical Specifica-tions. You would not be operating with that panel de-energized. So in general, if you are conducting malfunctions, you may be in that mode.

Q. 194. ANSI /ANS 3.5 Section 3.1.1(9) states that measurement of reactivity co-efficients and control rod worth using permanently installed instruments be performed. What is meant by " permanently installed instrumentation?"

I NUREG-1262 53 I

- - - - - - - - - - - - - - - - - - - - - _ - - - - - - - - - - 1

A. The question of the meaning of the term " permanently installed instruments-tion" is.in ANS 3.5, and official definition or clarification really has to 1 come from ANS and not from the Commission. l Our operational definition essentially says that portable or temporary instru-mentation that is brought into the control room for specific modes of operation, such as startup, would not be required as part of the simulation facility.

We intend that you use the normally installed instrumentation available in the control room and not instrumentation associated with special tests.

So if it's part of your normal plant operating procedures and it's instruments-tion you rely on (and we expect that you have instrumentation that falls into l

that category for calculating rod worth for doing startups) that's what we intend you to use. You need not simulate other instrumentation that is outside the scope of your normal procedures. ,

Q. 195. ANSI 3.5 Section 3.1.1(10) states that the simulator be capable of per-forming operator-conducted surveillance testing. Are you only considering the remote shutdown panel?

A. Any surveillance that cannot be performed from the control room need not be modeled. For example, if you're doing a diesel startup from the local panel for the diesel and that's the way you conduct the surveillance, you need not model anything that's done on a routine basis from outside the control room.

Q. 196. Would it be wisa to evaluate, for example, the plant's surveillance pro-cedures and identify which of those we think would be applicable to being done on the simulation facility? In other words, generally the operator from the control room would be doing that evolution. Naturally, all of those valves exist on the control board and so on, and you can legitimately perform that.

Would that be acceptable in meeting the intent of Item 10 in the standard?

A. That would be one way of doing it. But if you look at the performance testing, particularly'when you're getting out of component testing and into system test-ing, and you re evaluating your capability to actually model the system, a way of doing that would be to see if you can model the surveillance procedures on that. -

What you describe is acceptable. You may choose some subset of the surveillance that you can perform on those particular systems to show that those systems are operating within the bounds expected by the plant.

After all, that's where you have a source of data on the' actual performance of.

the system: the records from the surveillance tests that you've conducted on j those systems, particularly where they have specifications for flow or pressure  ;

or some other characteristic which is modeled in the control room.

Q. 197. Plant data, simulator update design data, and simulator design ' data: I )

interpret their relationship this way. Plant data represents the current plant '

configuration including installed and functional modifications. Simulator  ;

update design data, call it Data A, is an accumulation of plant data for a '

fixed time period, such as one year. At the end of the data accumulation, the NUREG-1262 54

simulator update design data is evaluated and appropriate data is incorporated I into the simulator design data by the simulator modification process. We have one year to match the simulator design data to the simulator update design data, Data A. In the meantime, a new accumulation of data into the next simu-lator update design data, Data B, is begun. Is this a correct interpretation?

A. That interpretation is reasonable. The key thing is that you have up to two years according to the standard to incorporate a plant modification into the simulator. You have one year in which to identify the need for a simulator update, based upon the required annual review of plant modifications; and then you have one more year during which you have to get it incorporated into the simulator modification. So we have possibly two years from the time you recog-nize the need from a plant change to opdate the simulator until it must be in the simulator.

Simulation Facility Certification (Including Performance Testing, NRC Form 474, NUREG-1258)

Q. 198. When will the official simulation facility inspections start? Will they start before certification takes place?

A. No. There are two minimum criteria. They will not start before the SFEP guidance has been out for six months, and they will not start until we have received your certification on Form 474, or your application for approval.

Q. 199. What level of simulator capability must be reported and tested if a simulator has considerable simulation capability, much greater than ANSI /ANS 3.5-1985 requirements?

A. We are requiring that the capability of the simulation facility be such that it meets the requirements of 10 CFR 55, and ANS 3.5, as endorsed by Reg Guide 1.149. To the extent that any simulation facility has capabilities '

that exceed those minimum requirements, you need not tell us what they are.

You need not certify them to us, and we will not inspect against them.

Q. 200. In the event we had capabilities beyond ANSI /ANS 3.5-1985 and Part 55 that we did not test and certify, would those capabilities be utilized in examining the operators?,

A. Possibly. For example, let's say that ANSI /ANS 3.5-1985 for a transient  ;

requires a parameter to move in a certain direction so that you don't get spurious alarms, etc. The standard is rather loose with respect to modeling for transients. And if you have something which is closer to an engineering tool, such that you cannot only predict the direction of the parameters, but also have a rather good tolerance on its value as compared to what you would expect from simply meeting the standard, that does not mean that we're not going to examine that particular transient or say that it's outside the scope of our examinations. On the other hand, if you are able to go into the ures of, ,

say, severe accidents, which we don't currently cover in the requirements, we may not be examining in that area. The issue is whether that's appropriate for the control roism crew, or the technical support center, the accident assessment function, and that's the difference.

NUREG-1262 55  !

l i

- - - - - - - - - - - - - - - - - - - - - - - - - - - -- J

l t l l \

Q. 201. That's the real question. When our vintage simulator was purchased, thu limitation on the vendor was to build it to plant design. Sometimes some of the NRC scenarios go beyond design basis, and I can't say whether the simu-lator's performance is correct or incorrect, I have no basis to certify it.

A. We will still be examining on the design basis, because you must do that in order to get into symptom-based procedures and function-restoration guide-lines. And we want to be able to see an operator's ability to use those emergency operating procedures, in particular, j That already puts you beyond tne Chapter 15 design-basis transients and evalua-tions. There is one requirement in ANSI /ANS 3.5-1985, which is endorsed in our Regulatory Guide, and is also contained in our Simulation Facility Evalution Procedure, for some means or mechanism within the simulation facility to notify the simulator operator when the simulation facility has exceeded the capabil-ity of its modeling. And that's one of the things that we would be looking at in our inspections.

Q. 202. In order to get into the emergency operating procedures on most plants, you have to have a variety of different types of failures that are compounded, which go beyond the design scope of the plant as single-failure proof and would be very difficult to run on a simulator. We have found that in using the emer-gency operating procedures (EOP), we can quickly get outside the bounds of simulation. How do you propose that we address that issue on E0Ps?

A. There are two ways: First, the standard indicates _that when you go beyond the bounds of modeling, it should indicate that in some way during the'simula-tion. Second, we conduct examinations that go outside the bounds of your Chap-ter 15 accidents and transients. That's necessary in order to get you. into the function-restoration guidelines.

We intend to see and the regulations require that we understand that an opera-tor can effectively implement those procedures. The tolerr.nces, however, for those procedures are quite large. When you get into casualties, ANS 3.5 essentially requires that the parameter go in the same direction it would go during the actual transient in a plant; that you don't get spurious alarms and that the alarms that are supposed to come in are the ones that you get. It's not time dependent. It's really the ability to look at the parameter and de-cide, based upon that parameter, what procedure you're supposed to be using, and then implement that procedure. We are not looking for a high-fidelity severe-accident simulator in order to be able to exercise the emergency procedures.

Q. 203. This question relates to the definition of " site-specific plant-referenced simulator." What is meant by "it's been designed and uses plant procedures?" With this explanation, could you give me a feeling for whether I have to delete some steps as inapplicable because of non-modeled systems? j Does that need to be highlighted in my performance testing exceptions?  !

A. What we mean by "use of procedures" is simply that the procedures that your l operators use in the control room should be capable of being run on the simula-tion facility without change. You must be able to use controlled copies of the control room procedures, not copies modified in some fashion or by pen-and-ink 1

NUREG-1262 56 i

l

_ - -- - - - - --------J

changes. They actually need to be controlled copies. You can indicate which ,

steps cannot be performed, then you must certify to that. NRC must be able to '

use the facility emergency operating procedures during the conduct of operating tests. A suitable alternative must be provided in the event of non-modeled sys-tems that are involved with the execution of such procedures in the control room.

Depending on the extent and degree of such discrepancies, it is possible to certify with exceptions as opposed to applying for NRC appre 31.

Q. 204. In other words, I can't take exception to any step in the procedure because of non-modeled systems?

A. Let's assume that it is a step in the procedure that's used in the control room, but it directs an activity outside the control room. Say the reactor operator tells the auxiliary operator to do something, and you have not modeled that capability in the simulation facility. That would be not 9plicable.

If it is a step normally conducted from the control room,'it is part of the operating procedures for the control room, and it falls into one of the cate-gories appropriate for the operating test, then you need to model and describe it as a part of your certification of the simulation facility.

If that step need not be used as a part of the operating test, if it's for an ancillary system outside of what we would test en - you may have something as-sociated with fire suppression or some other system, for example, that's not explicitly covered in the items for the operating test -- then that need not be included.

So you have to look at the scope of the operating test in view of the required capabilities of the simulation facility as described in the ANSI standard.

Q. 205. Let's assume that in the absence of a modeled system or a modeled cabinet within the control room area, I believe it would be permissible to use the plant to train on that particular component. In essence, I have an excep-tion on my performance test plan, which would normally require the use of that cabinet. But through on-the-job training in the actual control room, I can give the equivalent of that training that I would have performed on the simula-tor. Have I gone beyond the plant-referenced simulator category and moved into the other category here?, If so, how do I address that?

A. Not necessarily. You need to look at whether that system is, for in-stance, a safety system. If it's not a safety system and it's not otherwise called out in the categories under the operating test, then you need not model that system as a part of the control room. The safe-shutdown panels in some facilities aren't modeled. They are outside the control room. We do not re-quire that you model that in the simulator.

There are radiation monitor panels in the control room and things like that that you may not have modeled in your simulation. We understand that. That should not preclude you from using certification with exception.

~

You need not necessarily go through the application process. It's only when there is some portion of the operating test which does not replicate controls in the control room on the simulation facility that would require you to submit an application for NRC approval.

NUREG-1262 57 L_-_______

Q. 206. Will the operator / examiner feedback form that was discussed be used to determine the status of current simulators?

A. Tne guidance to the Examiners is that the form will be applicable only to simulation facilities that have been certified, or have applied for approval.

However, even today, with the present vintage of simulators, you still are I experiencing feedback reports, although informal, in the exam review process.  !

And that will continue. If the Examiners have a problem in conducting the operating test at your simulator, you can expect some feedback in that regard, even though it won't be the formal process that will occur for certification or approval.

q

. )

Q. 207. So, is it true that if I wait for 46 months to certify, that is an advantage to me?

A. No. It's not an advantage because you will to have provide substan,tial additional information for every application that you submit and we are goi.ng.

review that information and make determinations on individual applications and candidates.

Q. 208. But, yet, you won't inspect us?

A. We won't inspect your simulator, but we're certainly going to be keep close tabs on your applicants. And every time you receive an NRC operating test using your simulator, you can expect feedback through the exam report on the performance of your simulator.

Q. 209. This refers to the accelerated update of the simulation facility that may be required as a result of performance testing. What systems, events, or procedures are we trying to exercise during the simulator exam?

A. The intent was to identify any potential system, operation or scenario that we could not conduct on the simulator exam because of the simulation facility and which we could not readily implement another way during the examination, so that the' exam could potentially be compromised or considered invalid. We would need to see that that system, or procedure or event had been corrected before we could develop an appropriate exam using it. For example, one simula-tor was unable to adequately represent flew coast down on a loss of coolant.

The response was very unusual as compared to what was expected, and on how the procedures were to be used, because there was no coast down. It would not have been appropriate to conduct an examination which involved a loss of flow event in that case. We would not want that situation to exist for the next two years, because we may want to conduct a loss of flow scenario as a part of an exam within that time. So, we would require that that be corrected on a sched-ule that is faster than the normal two year correction schedule provided in the standard.

Q. 210. I think clearly, that's the intent. But I see opening some areas of disagreement in the future. None of us know what the next round of the " topic of the day" is going to be. And we may find that our present machines were not designed to handle whatever that issue is. And, so, when you say any event, that can be troublesome.

i NUREG-1262 58 2

A. We suggest that you look at NUREG-1258 that describes the Simulation Facil-ity Evaluation Procedure (SFEP) and the pilot tests. That should allay some of the apprehension.

Also remember that this system, operation or event is something that you have already certified that your machine is capable of doing. We're referring to something we discovered during the course of our inspection that contradicts something you've told us on your certification.

Q. 211. This question addresses performance tests to be performed on the simu-lator in compliance with 10 CFR 55. What are those set of performance tests, the specific scenarios and malfunctions? Could you clerify that?

A. We're talking about Appendices A and B of ANSI /ANS 3.5-1985, and the list of 25 malfunctions that are contained in Section 3.1.2 of the Standard. There-is a defined list of malfunctions that the simulation facility needs to perform.

Q. 212. Is it just that list that's in 3.5, only?

A. Yes.

Q. 213. Or is it that list, plus the diesel generator that's covered in Regula-tory Guide 1.149?

A. There was a specific list of malfunctions in an earlier draft of Regula-tory Guide 1.149, but it is gone from the final version. The equivalent para-graph that's in the final version endorses the paragraph in the Standard that lists the 25 malfunctions. Recognize, however, that some of those malfunctions are quite broad. We talked about the loss of power. That could mean loss of power to a panel, to a system, to a component, or loss of all power. Small break LOCAs can be initiated from a reactor coolant pump seal, from a steam generator, a tube rupture, a lot of different ways. What we are interested in is a representative sample of those things. You need not do all possible permutations and combinations.

But you are going to have to look at what you are certifying to, that's the reason that you are submitting test abstracts, and you describe what your test-ing program is.

Q. 214. So we will determine which specific scenarios we will run, as long as we cover those areas?

A. That is correct. And you describe that in your abstract, with your certi-fication, and you describe the performance tests that you will conduct in the future to maintain the simulation facility.

Q. 215. Would the Commission find a formal simulator facility review board /

committee (consisting of training management, operations management and senior reactor operators) a suitable forum for making judgments regarding the simula-tor scope requirements versus training value? For example, ANSI /ANS 3.5-1985 states that all accidents analyzed in the facility's FSAR must be included in plant malfunctions in the simulator's scope. It then later states that this is required only when the simulator is determined appropriate for training.

NUREG-1262 59

)

However, in a few cases the accidents provide little, if any, training value to an operator. Can a board, such as that proposed, be considered a legitimate forum for making these decisions?

A. We are concerned with the applicability of your simulation facility for the conduct of operating tests, and not as it applies to your training pro-grams. Generally speaking, when you look at the ANS 3.5 document, you can safely substitute the term " operating tests" wherever the term " training" appears.

Although we recognize that your simulation facility's scope, when applied as part of your training program, may exceed that which is necessary for its applicability to use in operating tests, it doesn't matter to us what process you use internally to identify those differences.

We have tried to indicate clearly the minimum requirements for use of your simu-lation facility to conduct operating tests, and it must meet those minimums'.

These include the evolutions and malfunctions identified in Section 3.1.2, in the performance test appendix, and in the operability test appendix of the standard, using the required operating test requirements in Section 55.45(a) as the criterion.

However you meet those requirements is your decision to make; and as to whether you need to certify or provide additional performance testing data for anything additional, that's also your decision to make.

You will be submitting performance test abstracts with the Form 474 that de-scribe the testing that you're going to perform.

When you look at the list of malfunctions and you see a malfunction that says

" loss of power," that's very broad. Which ones do you choose in developing the test abstract for varicus losses of power?

You should look at the testing that you propose and, if possible, combine some of those malfunctions so that you have a smaller number of performance tests than would otherwise be the case and describe how those tests in your abstracts meet the intent of the standard.

In doing that, we would use those tests in making a judgment as to what the capabilities are. That does not mean that we would limit our examinations, however, to those particular tests or scenarios.

1 Obviously, if you demonstrate that the simulation facility works well for an j event at high power and for some tests at low power, we may be able to mix those just as we do now. You have a substantial amount of control in deciding what testing you want to propose for the performance tests and that list of malfunctions is quite general.

In the case of using the panel, that could be an appropriate vehicle for decid- ,

ing what tests are going to be proposed as performance tests. They could be a

  • subset of all the malfunctions the simulator is capable of performing. You may liter,' illy have hundreds of malfunctions which you can implement.

NUREG-1262 60

I We den't want to see a performance test for each malfunction. We do want to be sure that all of the malfunctions that are listed in the standard can be performed. '

Q. 216. Section 55.45(b)(5)(vi) says a certification report need only include a description of performance testing completed, performance testing planned, and the schedule for conducting 25 percent of performance tests per year for the next four years. Is this sufficient, or must the document conform to ANS 3.5- '

1985 Appendix A?"

A. This question addresses two different issues. The first is the testing that is required, and the second is the reporting. The reporting itself need not be in the format of Appendix A, ANS 3.5, although that's not necessarily a bad idea. But it must cover those items that are called out in the Regulation in Section 55.45(a), specifically a description of the performance tests con-ducted, and the schedule for future performance tests, if that schedule differs from one that was previously submitted with the certification.

The actual testing must include not only the Appendix A performance testing, as called out in the standard, but the specific list of malfunctions that are identified in Section 3.1.2 of the standard, both at the rate of 25 percent per year. Also, the operability testing that's shown in Appendix B of the standard is to be performed annually. So, testing and reporting are separate issues.

Q. 217. When does the Commission project that their guidance for conducting simulation facility audits will be made public?

A. That guidance is available now in draft NUREG-1258, and we will accept your comments on that NUREG until the 26th of May.

Q. 218. Will simulator certification audits be performed by NRC headquarters staff, regional NRC staff, or some combination?

A. In all probability, the simulation facility inspection program will com-bine headquarters and regional staff, starting largely as a headquarters func-tion and over time becoming more region-based as we move into the inspection procedures.

Q. 219. NRC released a final draft of " Handbook for Software Quality Assurance Techniques Applicable to the Nuclear Industry," dated February 1986. This handbook addresses the applicability of 10 CFR 50 Appendix B requirements associated with computer uses in the nuclear industry.

(

It specifies that trainir.g simulators require stringent software quality as-surance. This requirement seems to imply that the simulator's software should l be treated as though it were safety related, with the appropriate programmatic and procedural controls applied. What are the Commission s plans in this area and what relationship, if 'any, will the draft handbook have to simulator certification?

A. The draft handbook to which you refer imposes no requirements on the industry. It is under consideration by the staff, but there is no intent for us to review your software development or quality control procedures as they apply to part 55 and to simulation facility certification.

NUREG-1262 61 l

i You, of course, have to manage your own simulator software program in order to meet the regulations in Part 55 as required to certify that the simulation facility is suitable for conducting operating tests. And we will review the simulation facility's adequacy using the performance testing program, after you submit your Form 474.

We will take a look at the handbook to determine its status, but we think it is safe to consider it not applicable to these regulations.

The best way of determining whether the software is any good or not is to see whether it performs in accordance with the plant's design characteristics. We don't need a very prescriptive software control program protocol that is sub-ject to NRC review and evaluation.

We've described how we intend to inspect the simulation facilities and we have put that into the Simulation Facility Evaluation Procedure. The evaluations will be based upon running things like Licensee Event Report scenarios and seeing how the simulation facility compares with the plant. J<

But if you start modifying the software in one area, you may affect other  !

areas. So you need to understand what impacts such changes will have to the j overall performance tests. If a modification causes a performance test to fall  ;

outside of its acceptance values -- that is, the 2 percent and the 10 percent l

- you need to rerun that test to ensure that the simulation facility.is still j performing in accordance with the design specification. We're looking for a machine that will replicate what we expect to happen in the plant. We're not looking for. developing a software control system which is appropriate to a reactor protection system where you cannot test by operation how effectively the performance of the reactor protection system works. Title 10 CFR 50 Ap- f pendix B requirements would appear to be appropriate in such safety-related  !

applications. That's the difference. l l

Q. 220. This question concerns a sirrulation facility consisting of other than a j plant-referenced simulator, and the performance testing related to such a fa-  !

cility. What performance tests are required and what standard is used to evaluate whether the tests are satisfactory or not?

A. We intend to follow the guidelines in the ANSI standard as applicable to the simulation facility which you have proposed, i Let's say that you want to use another plant's simulation facility for reactor startup and that you can effectively model the controls and indications that would be used for reactor startup. We would expect you to follow the ANSI standard as it related to stnrtup modeling. You may not be able to model it for controls and indications because you don't have that capability on the simulation facility. You would not have to follow ANS 3.5 guidelines in that instance because they are not applicable.

Q. 221. If the standard for performance tests is ANSI /ANS 3.5, as modified by Regulatory Guide 1.149, will it be possible to deviate from the standard in certain areas or must it te adhered to in its entirety?

NUREG-1262 62 t______ __-_____.. ._-

A. We recognize that there will be a number of outstanding discrepancy re-ports on the simulation facility against its reference plant. We expect that, for certified simulation facilities, as well as for those that achieve approval after application, exceptions will have to be taken from the requirements of ANS 3.5. There is a block on Form 474 for certified simulation facilities to address the exceptions that you take at any given time. The same would apply to noncertified simulation facilities where you would address those exceptions in your application.

1 Q. 222. Does a simulation facility certification form, NRC 474, have to be sub-mitted prior to each operating examination?

A. No. Assuming that you maintain the acceptability of the simulation facil-ity, it is a one-time certification.

Q. 223. Will the guidance document be limited to auditing the provisions of ANSI /ANS 3.5-1985?

A. No. It will be limited to auditing certification against the requirements of Section 55.45(a) of the regulation, which delineates the 13 components of the operating test, and ANS 3.5-1585, as endorsed by Regulatory Guide 1.149.

Q. 224. Will the performance testing documentation maintained for NRC review be limited to those items addressed in ANSI 3.5?

A. No. The performance testing and its documentation will use Section 55.45(a) of the regulation as its criterion, and must employ the malfunction testing of Section 3.1.2 of ANS 3.5, as well as the standard's two appendices, and the endorsement by Regulatory Guide 1.149.

To amplify, the operability test identified as Appendix B in the standard is done annually. We have not taken exception to that. Performance testing, which appears in Appendix A, plus the repeat of the malfunction testing, which is described in Section 3 of the standard (that set of testing at approximately a rate of 25 percent per year over four years), will constitute the additional annual testing to be done.

So you have an annual operability test, and then 25 percent of the performance tests that are described in the first appendix, plus 25 percent of the mal-functions that are listed. To the extent the operability test itself dupli-cates a portion of the performance test, that's sufficient. You don't need to do it twice, but that's the scope of the testing we are expecting to be done on an annual basis, and the term annual is used in its common meaning. We are interested in you doing the performance tests regularly over a period of four l years, and not putting them off for the last year.  !

(

Of course, before you submit your certification or your application for ap-  !

proval, you should have completed 100 percent of the operating tests and the performance tests. After that, the 25 percent per year cycle will begin.

Q. 225. It was indicated that when we submit the Form 474, we should have 100 percent of the performance tests completed. Can we count performance tests, specifically malfunction tests, that were performed as part of an acceptable NUREG-1262 63 l

)

1

m.

test procedure, say, three years ago, towards having performed that part of the performance test one time, or do we have to redo it before we submit the form?

A. There is not necessarily any need to redo those performance tests. The concern, if any, is the difference in time from when they were done, and any changes to the plant configuration that would be required by the ANSI standard.

to bring the simulation facility up to date. If there have been no changes that would require you to repart some performance tests to make them in com-pliance with the standard, then those tests should be acceptable.

Q. 226. So if we conducted an a ceptable. test program, and since then have had a program in place to test all the modifications to the software, including -

malfunctions, if appropriate, then we've got a basis for starting, anyway?

A. Yes. We intentionally did not specify a time prior to certification by which you had to have them all completed.

But the situation you have is that once you do certify, then you start perform-ing those same performance tests over again on a 25 percent per year basis over the 4 years to ensure that configuration changes are, indeed, incorporated in the simulation facility. But the rule itself is silent on how long before certification these tests may have been perfc'w d.

There were some changes in the standard between the 1981 version and the 1985 version. You have to show that you have met the 1985 version, and that any design changes or software changes that you have made since then have not affected the validity of those earlier tests. It may be easier to repeat them than to repeat the entire process, but that's up to you.

Q. 227. Is there any intent to include remote shutdown panels in any of the simulation facility requirements?

A. No. However, if these panels are provided as part of the simulation facil-ity, they may be used in the NRC operating test.

Q. 228. What does the Commission consider an adequate schedule to correct per-formance test failures identified in the four year anniversary certification?

A. Although the rule re' quires a report on every four year anniversary of certification, or four year anniversary of application, we intend to have a much closer working relationship with you so that we will know on an ongoing basis about any such performance test failures, and there are several mecha-nisms to do that. One is the 90-day letter prior to examinations, in which uncorrected performance test failures would be identified. Another would be simulation facility fidelity reports from our examiners, and the third would be the results of our periodic audit and inspections of simulation facilities.

The schedule to correct performance test failures is really based upon the seriousness and the magnitude of the failures that are discovered. It may range from purely an NRC recommendation that the failures be corrected, to a recommendation that a failure be corrected within the normal update cycle re-quired by ANS 3.5. The next level would require a correction on an accelerated schedule. The most serious failures require that the facility essentially shutdown until the failures are corrected.

NUREG-1262 64 l

Q. 229. What detail of description is the Commission anticipating in the re-port? Should the report be revised if a schedule for conducting a performance test changes year-to year during the four year period?

A. If your schedule for performance testing changes between the time you submit a certification and any subsequent four year report, you should advise us of that change on the Form 474.

There are three documents for certified simulation facilities that address the level of detail. The rule, specifically the operating test in 55.45(a), lists 13 items that make up the content of the exam; ANS 3.5, which sets out the requirements for the simulation facility's capabilities, as well as the per-formance testing requirements; and Form 474, which indicates that we want performance test abstracts and performance test schedules.

We don't want reams of material on the details of all your performance tests and all the results. If we need additional information in the course of conducting an off-site or an on-site simulation fac.'ity evaluation we will request it from you; we are really looking for summaries and abstracts sub-mitted with that certification form.

Q. 230. Will an NRC certification team be sent to the facility to conduct a simulator performance audit using the new simulator certification criteria?

A. Essentially yes. The NRC staff will conduct the review and the inspection.

It will be a two phase process, an offsite review, followed by an onsite in-spection, if necessary. Only as a result of onsite inspection might certifica-tion be removed, as a last resort. For further clarification, a certification is not removed as a result of an inspection. It's removed as a result of fail-ing performance tests which are required by the regulation. During the inspec-tion we conduct performance tests where we audit the ability of the simulation facility to perform as described in the performance tests that you submitted.

So if the machine does not work during an inspcction, the criterion is still the failure of a substantial number of performance tests, such that you cannot perform a meaningful operating test as described in the regulation.

The conclusion is based upon the requirements for the operating test, not just on failing some fraction.of the performance tests. You have to fail perform-ance tests, but it's got to be a substantial enough number of performance tests that it impacts on the simulation facility's ability to conduct an NRC operating examination. So one performance test failure does not necessarily mean that the simulation facility would be decertified. It has to be a gross enough set of failures that we can't conduct a test.

Q. 231. We presently have two years before a plant modification must be incorpor-ated into our simulator. Can we certify the simulator to the NRC without having incorporated all plant modifications?

A. We always anticipate that even when you certify a simulation facility, there will be exceptions if you haven't been able to bring it up to date with plant modifications. The ANSI standard allows a two year period from the date you identified the need for making modifications until those tre fully incor-porated into the simulation facility. So the answer is yes, you can certify prior to the date you've incorporated the modifications.

NUREG-1262 65

l l

1 Q. 232. Where specifically would that be on Form 474?

A.

There is a block near the top of the form that says "I hereby certify I that the simulation facility meets 10 CFR 55 and ANSI 3.5." ,

It then says: "If there are any exceptions to the certification of item two I above [that is, the ANSI standard], check here and describe on additional pages )

if necessary." l Q. 233. In earlier discussions mention was made about using controlled copies of procedures for simulators. What do you mean by the word control?

A. Controlled copies means those procedures identical to the ones that you use j in the control room of the plant. The copies should be up to date, including references and revisions.

Q. 234. When an examiner conducts an exam on the simulator, a 'e we going t'o be able to take a look at some of the fidelity questions that they have on a simu-1ator prior to them leaving or prior to their exit interview? ]

A. Yes. You'll see details in the Simulation Facility Evaluation Procedure draft (SFEP), but we intend that the process be interactive.

When we first come on site we will sit down and discuss with you the tests we intend to run. You'll be given the opportunity to point out any problems with those tests. And before leaving the site there will be an exit interview where the findings will be discussed and you'll have an opportunity to present your comments about them. It's going to be a very interactive process. We think you'll see that when you look at the SFEP. This is also true of the exams, because examiners will also make comments on simulator fidelity. It has to be an interactive exchange between the examining pecple and the licensee.

Q. 235. Are licensees required to submit exemption requests per the ANSI Star,d-ard or the Regulatory Guide, and they are to be issued per the requirements of 55.45?

A. If any one of the requirements of the operating tests in Section 55.45(a) cannot be met with the simulation facility, you would require an exemption from {

the Regulation. A failure to meet all of the requirements of. the ANSI standard does not require an exemption. It simply requires an identification of what it '

is that you cannot meet. And it must include a conclusion on your part that .

that difference would not preclude the conduct of an operating test as it's described in the Regulation.

That's why the certification on Form 474 is a certification to the Regulation with an identification that you follow the ANSI standard with some exceptions.

We recognize that there will be exceptions. There are exceptions on new licenses on the day they're issued and we issue a number of license conditions.

We don't expect that the number of discrepancy reports on a simulation facility is ever going to get to zero. It's anticipated that there will always be some "

feedback, some necessary correction. The standard itself provides a schedule for incorporating those corrections and revisions.

NUREG-1262 66

v 1

Q. 236. I'm unclear as to how much we have to put into our simulator with re- ,

gard to back panels.

The simulator we have is what's called a main horseshoe. We have 50 to 60 back panels in the simulator which are used during surveillance testing, and re-c5.ntly there have been a lot of bypass switches that we use during our emer-gency plan training. Must we have all those back panels in our simulator or can we substitute the plant for that part of the training? It's a very big main control room, and we [:ut all our back panels in there instead of outside ,

the main control room.

i A. Our intent is not to have you model the entire plant, but if the evolu-tions you are citing are your operating and emergency procedures for the fa-cility, and it's an evolution which is conducted from within t5a control room

~

by the regulation, we would expect that to be modeled or you would have to show us how that could be done without modelling and identify that as an exception.

But br f acilities that have a large number of back panels or other equipment avaihble in the control room, it's not the intent that you mock up all those panels. Generally, they are merged in the main control boards. For example, those that control the reactor, safety systems, electrical line-up, and balance of plant are' the typical ones that we're looking for.

Q. 237. Would it be safe to assume that you have in mind the area that the operating shift typically does not leave during normal operetion of the

, facility?

A. It's those portions of the facility where the individual is defined as being "at the controls," watch is described in Regulatory Guide 1.114. Some ,

facilities mark it off with a red line on the floor or with a fence or whatever.

It's that area where the individual is at the controls as defined in the Regu -

latory Guide that we're interested in simulating. ,

p'

\

s g

i K

{' I y 1,

[

1 NUREG-1262 67

& __ - -_-- - _ _ a

- ~

  • \

l s

I i ,

4 1 l 1

t g >

t ,

-) \

m g

A

. t

/

k 1

s f 5 .

M (

r LICENSLT .

k.  ;,

s Y e i

a s r -,

i h*

I, 4 ,

I j'

f 1 5

, s, i f,

k n

D 4

a

\

+

1 e

\

y, m

't-3 b- ', h.- _,',,

5 m 1,

s c.,

4 M 4 A~ NI 6 f . _ _ _ _ . _ _

i I

4 ,N Special Senior Operator Licenses (Includ,ing Instructor Certification)

'Q. 238. What is the impact of the new rule on instructor qualifications? Are

, the requirements of NUREG-0737 superseded A. The new rule supersedes the requirements for instructor qualifications in ,

NUREG-0737. The responsibility for ensering that instructors are qualified now rests with the accreditation proress. {NPO has established the qualifications for technical instructors, which would he reviewed within accreditation. NRC's role is to monitor the accreditation program to ensure that it maintains the standards that have been endorsed by tM Commission.

Q. 239. Ins?ructors who have been certified or who have held a license pre-viously may instruct stucents in courses needed to prepare applicants for NRC licensing examinations. Are these instructors required to participate in a requaliffcation program?

A. If you have an accredited program or systems approach to training (SAT) program, then that program wjll define the continuing qualification and re-  :

training requirements for insvW.ces. If you do not have an accredited pro- l gram, then the instructors will have to meet the commitments of the approved program as defined under Part 55 and commitments contained in the FSAR. NRC will no longer issue instructor certifications If a licensee is using vendor- ,

certified instructors in a requalification program that has not been completely converted to an SAT program (performance-based), it is conceivable that a 50.59 charge could be made to support such an approach in the interim until such time ,

as the requalification program is converted to an SAT-based program. '

Q. 240. As I understand it, only people tNat hold a license for a facility may instruct license-type material to a hot ifc w e class. Would consultants who {'

were previously licensed and certified by General Electric be able to teach such materia'1?

, A. If your program is accredited, then you determine subject matter expertise and instructor skills in accordance with the accredited program. If your pro-gram is not yet accredited and you were previoui,1y under the commitment in the Denton letter to assure subject matter expertist for instructors -- which was that those instructing integrated plant operations have a level of knowledge comparable to that of a senior reactor operator -- then the process we've allowed in the interim permits you to certify your instructors based upon their successful completion of your senior operator training program.

i We have also allowed that those examined and certified by NRC in the past can I

continue, but they should receive additional training on plant or procedure y

f changes, that portion of the requalification program which is applicable to what they're teaching.

Now, the practical aspect is that those people who are instructing have to learn that material to a depth greater than that which they instruct, and your program also has mechanisms for evaluating instructor performance.

NUREG-1262 68

i i

i We are trying to move out of the area of specifying training program content or qualifications for instructors. So depending upon your commitment in the pre-sently approved program, you may need to review that in accordance with 50.59. )

HRC will not need to certify it; you may do that under your own program.

Q. 241. How would that apply to vendors such as Westinghouse? We cannot get accredited by INP0. Therefore, if we hold a staff of instructors, are they then going to have to go to the utility and the utility is going to have to either license or certify them?

A. For contractors that are providing instruction for facilities, it is the responsibility of the facility to ensure that the contractors have the appro-priate subject matter expertise and instructor skills to meet the requirements of their accredited program. The staff will not be certifying or approving instructors who are contractors, nor will we be certifying or approving instruc-i tors who are facility employees.

Q. 242. Did I understand correctly that you said that if you're not accredited, that you would have to license instructors?

A. Some facilities in their existing training programs have committed in the FSAR to have either licensed senior reactor operators or individuals who were certified instructors. The old instructor certification, which was comparable to a license (the eligibilty requirements were relaxed), required that the instructor go through the same examination, although he was not authorized to manipulate the controls. We no longer issue such certificates, which would l imply that you would be obligated to have licensed operators conduct your program.

We also indicated that you could perform a 50.59 type of review that would meet the same intent. Having your instructors complete and be examined by the stan-dards of a program comparable to your own senior reactor operator program, such as a vendor certification program, would be sufficient in the interim. When we get to the point where everyone has been accredited, that issue is superseded.

The accreditation process covers instructor qualification and training.

Q. 243. I do not have my programs accredited yet. I hope we will have them done by the end of the year. But I have people who are in a program right now, the same one we've been using all along, and they are being examined by us next week. And the Region is not going to come in and give them an NRC exam. My intention is to certify them as I have done in the past and put them right into a classroom. They will also be in a requalification program. Do I understand that to be a correct procedure? j i

l l

A. Yes. If you are getting ready for accreditation, you probably have com-pleted the self-evaluation report, and are getting ready for a team visit. As preparation for that, you look at how you train and certify instructors. We want that to be a part of.the accreditation process, and not a part of the NRC review.

Q. 244. Can trainees participating in a systems training program for instruc-tor certification manipulate controls on the facility under the appropriate supervision of licensed personnel?

l l

l NUREG-1262 69 l

A. If that training program can lead to a license if carried to completion )

trainers may manipulate controls under appropriate supervision if it occurs in j the proper sequence within the training program. The trainee may also manipu-late controls (under proper supervision) without being involved in a course '

that leads to a license if the systems that are being manipulated do not affect power or reactivity (e.g., feedwater). However if the systems that the trainee 3 will teach, and therefore the controls he would manuipulate, do affect power or  ;

ractivity, then he must be enrolled in a course that leads to a license.

Q. 245. As I understand it, in the accredited utilities, instructors will be considered to be certified to teach licensed operators after they complete the accredited training program. In the case of a utility that doesn't have their operations programs accredited yet, could you outline what the requirements will be?

A. The requirements are basically those which were in existence before the effective date of the Rule, and that is to either have an individual who has completed a training program comparable to that of an SRO, and been examined on it (we used to call that instructor certification), or be a licensed senior operator, who is currently enrolled in a requalification training program. l Because of the fact that we no longer are going to be giving instructor certi-J fications, you then have only the option of using a licensed operator to teach those courses. We are not going to give any further instructor's certifications, that's not permitted under the Rule.

]

For NTOLs and facilities that are in the accreditation process, the Commission's Policy Statement in Training and Qualification of Power Plant Personnel of March 20, 1985 allowed facilities to make the transition from FSAR commitments to accredited programs. Therefore NRC instructor certifications which, as a policy, were discontinued in Mid 1985, relied on facility certification of instructors. We believe this policy will continue and eventually be reflected in Revisions to Section 13.2 of NUREG-0800, the Standard Review Plan.

Q. 246. So, training instructors must be licensed operators?

A. . Yes, until such time as you get accredited, or have some other way of gett-ing subject matter expertise through your accredited program, including in-structor training. We are not going to specify that for an accredited program.

But you may have a program on record today, in which you have committed to the requirements to the Denton letter, which said you were going to do certain things to ensure subject matter expertise in instructors. And that was to either use a licensed senior reactor operator or an individual who has been examined by the NRC to the same level as a senior operator.

We are not going to examine without issuing a license.

Q. 247. Will people who are currently certified by virtue of the fact that they have previously passed a senior reactor operator _ examination somewhere, and thus demonstrated their competency, be considered as certified to teach?

A. Yes. But when they come to us after the effective date of the Rule request-ing to have their certification renewed, that's not going to happen, because there is no longer such certification.

NUREG-1262 70

h Q. 248. So, then, is someone who has passed an SRO exam given by the NRC at some point in the past, considered certified or not?

A. For the purpose of meeting your training program commitment of having an individual who has a knowledge level comparable to that of a senior reactor operator, the answer is yes, provided the individual is maintaining currency in the requalification program, with respect to any changes which would affect his knowledge base. That is consistent with what INP0 is looking at in the instruc-tor training and as identified in Technical Instructor Training and Qualification Guideline, INP0 82-026 at 7.1.

Q. 249. Can you tell us how you expect to treat people under the new rule who are currently SRO instructor certified? What kind of credit are they going to get because they are SR0 instructor certified, if any?

A. The answer is none. Obviously they have completed the same training program and taken the same exam as an SRO, but because of eligibility requirements or' time on shif t or scme other requirement they did not meet the SR0 requirements.

In the past, there have been individuals who successfully converted an instruc-tor's certification to an R0 license.

Additionally, there is the provision for waiver of certain portions of the NRC examination, based on operators having: (1) extensive actual operating experi-ence at a comparable facility within two years, (2) discharged his or her responsibilities competently and safely and is capable of continuing to do so, and (3) learned the operating procedures and is qualified to competently operate the facility designated in the application.

If you want these individuals to become licensed, you will need to submit a complete application, and if applicable, request a waiver under the Regulation.

This application would then be reviewed by the Region as to what portion, if any, of the examination would be waivered.

" Actively Performina the Functions of an Operator or Senior Operator" l Q. 250. What guidance will the Commission provide to the facility licensees and I the staff that Section IIF(2) is Commission policy?

A. Section IIF(2) is part of the Statement of Considerations that summarizes public comments and describes the staff's final actions in response to them.

This Section discusses the definition of " actively performing the functions of an operator or senior operator," which is part of the regulation 3 contained in Sections 55.53(e) and 55.53(f).

  • Q. 251. The regulation for active participation states that "an individual has )

a position on the shift crew that requires the individual to be licensed as de-fined in the facility's Technical Specifications, and that the individual ca-rries out and is responsible for the duties covered in that position." How does this rule accommodate plants with R0 and SR0 licenses on shift that exceed the Technical Specification minimum staffing requirements?

NUREG-1262 71

1 I

I l

A. The rule does not preclude having additional people on shift beyond the I minimum staffing requirements. That is a utility decision. However, in order to take credit for the proficiency of such personnel standing watch above the Technical Specification minimums, as a condition for maintaining a license under 10 CFR 55.53(e), the facility licensee must maintain administrative control over j these designated watchstanders, and must be satisfied that these individuals are i maintaining their proficiency by manipulating the controls of the facility in  !

the case of an operator, or by manipulating the controls and directing the li- {

censed activities of licensed operators, in the case of a senior operator.

So that if you operate a single unit with three reactor operators on shift, two of those individuals are in positions, required by the Technical Specifications.

One is usually the reactor operator and the other is the balance of plant opera-tor. The third person would need to rotate into one of those two positions over the course of a quarter to obtain the requisite number of shifts to maintain his license active, so he would need to sign the logs, on occasion, as the reacto,r operator or the balance of plant operator. So it's clear that you must be in (

the position on shift required by the Technical Specifications, and additional l personnel on shift to perform other duties do not meet the requirement for directing the activities of licensed operators or for manipulating the controls.

There are alternatives built into the regulation to provide ample flexibility in obtaining proficiency for licensed duties, e.g., 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of parallel watch standing. j Q. 252. Our Technical Specifications do not address the individual's responsi-bilities for each position in order to satisfy the active participation re-quirement--it says you have to have an R0 and two SR0s, one SRO as a shift  ;

supervisor and one that's another RO. Can you rotate that SRO position from a j shift foreman position to another senior reactor operator position? It doesn't j say who is required to fill those positions, so the complication is that if we i have a senior control operator who has an SRO license and he's clearly direct-ing the operator's activities, can we give him the responsibility for the day and say the shift foreman no longer has the responsibility, because both of them hold an SR0 1,1c.ense?

A. For the case that you've described, the individual who is on shift directing the activities is the one who's in the position required by the Technical Speci-fications. Whether he is the shift foreman for that shift because that's the title that you use to describe other responsibilities he may have, it is the senior operator in the control room who di'rects how the other two operators manipulate the controls and who is there fulfilling the requirements of the Technical Specifications to be supervising the activities of the licensed operators. That's the position that qualifies for the eight hours on that shift, independent of title. I would hope that your administrative procedures are clear as to who has authority to direct licensed operators so that if the shift foreman is relieved there is another senior operator in the control room carrying out those duties. The Technical Specifications don't refer to shift foreman; they say senior operator directing the activities of other licensed operators.

There is a related question that concerns the extra person on shift who may not be in the licensed role. It is possible for that individual to complete 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of parallel watch standing; that is, he's not in the position required by NUREG-1262 72

l l the Technical Specifications, as long as he is being supervised and his activi-ties are being closely monitored by the person responsible. He could accrue 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of parallel watch standing for that quarter and not be actually in a position required by the Technical Specifications to meet the seven shifts at eight hours each, or the five shifts of twelve hours each.

It would require in that case, that the authorizing representative of the facil-ity certify that he has completed that duty. From a practical standpoint, it's  !

easier to rotate the people through the watch to maintain their proficiency. j The active license status is intended as a way of maintaining the proficiency j of the people who are performing the functions. If you're dual licensed, the i active status requirement can be met by standing watch on only one plant, or on some combination of the plants.

Conditions of Licensees (Subpart F, Section 55.53)

Q. 253. With regards to fuel handlers, in the case where you may refuel once a year, it's probable that the requirement won't be maintained. Subparagraph {

55.53(f)(2) suggests that one shift of supervised duty is required before the j fuel handling foreman with the license can assume his full duties. Is the -

intent that that supervision be performed by another fully qualified SRO who  ;

may not be a fuel handling specialist? l A. That is correct. An active SRO license includes the capability and re-  !

1 sponsibilities associated with monitoring fuel-handling activities.  !

Q. 254. The Operations Manager and Operations Supervisor are required by Tech-nical Specifications to be licensed as Senior Reactor Operators. These in-dividuals do not have a position on the shift crew. They are involved in the day-to-day direction of Licensed Operator activities. Are these positions considered as actively performing Licensed Duties?

A. No, unless they stand the seven 8-hour shifts per quarter, or five 12-hour shifts per quarter. That does not mean that the Ops Manager and the Ops Supervisor cannot keep a license. The requirements to maintain a license are that they continue in requalification.

If the Operations Manager must hold a license, then he must participate in requal, but he need not stand watch on shift in a position where he is directing the activities of the Reactor Operators. A license, whether it's active or not, may meet some Technical Specification requirement.

Q. 255. What if you have an SRO stand a shift assignment as an RO? Does the 3

SRO get credit for standing watch in that position for renewal purposes?  !

A. The SRO is not performing Senior Reactor Operator license duties. Unless he is also standing SRO's duties during that quarter, then his SRO lic6nse i would not be active. Where an SRO is standing an RO wat 9 , his license would i continue to be active insofar as it deals tsith his operad ng or manipulating i the controls as an RO.

In order for him to direct others, he would have to stand a 40-hour parallel shif t in order to be proficient and go back into an SRO's duties. He could, NUREG-1262 73

however, continue to maintain an SR0 license if he's current in requal. If he wants to assume an SR0's capacity, he must go back to a 40-hour shift under instruction as an SRO.

Q. 256. When the operations manager is licensed, should technical advisors or licensed instructors have to become members of a shift crew to maintain an active license?

A. Yes, to maintain an active license, they do. To maintain an inactive license, they don't.

Q. 257. Do personnel seeking to maintain an active !i 9nse have to replace a member of a shift crew to meet the watch requirements of 10 CFR 55.53?

A. Yes, they do.

Q. 258. Although there is only one Technical Specification SRO position on shift (Shift Supervisor), our Technical Specification reflects the 10 CFR 50.54 requirement of a second SR0 on shift. Would standing a watch as a designated second SRO meet the definition of actively performing the function of a Senior Operator?

A. If he is filling an SRO position under the Tech Specs then he would be maintaining his active SR0 license. A number of people have asked, can we have two or three people come in to get their on-shift time? Our position is that those meeting the minimum staffing Technical Specification requirements for whatever operational mode get credit.

For clarification, this question seems to imply that at this facility the Tech Specs do not conform to the Regulation for a single-unit site for having two Senior Operators on shift during operational modes. That's understandable because the Rule itself supersedes the Technical Specification requirement, and is a higher order requirement. That is, you must conform to the Rule even if your Tech Specs permit something less. We would suggest that the next time you have an administrative change to that section of the Technical Specifications, amend it to conform to the Rule.

Q. 259. If the Operations Manager does not hold an active license, what duties may he perform or not perform in that status? For instance, we all have Tech-nical Specifications that require licensed Senior Reactor Operators to approve changes to procedures. Would an inactive license allow him to do those admin-istrative functions?

A. Yes. He can do everything but direct a Reactor Operator in manipulation of controls, or himself manipulate the controls.

Q. 260. All stations have engineering expertise on shift in the form of a shift engineer, who is the STA. ' STAS hold a current SRO license. They direct activities and integrate schedules. Are they not actively performing the func-tions of an SR0 license by those duties, or are they going to have to come back l and perform as a shift supervisor, on shift?

NUREG-1262 74

A. If they are one of the two individuals required by Technical Specifica-tions to staff the shift, then what you just described is acceptable. If one is there as an engineer on shift who happens also to hold an SR0 license, and is only fulfilling the role of an STA, then he is not responsible for directing ,

the activities of licensed operators. There are many cases of extra people on I day shift, who do support functions, such as reviewing tags, procedures, line-ups, records, etc. , and do not require an active license to perform them. It is only when he is responsible for manipulating the controls, or directing the activities of those who manipulate the controls, that an active license is required.

  • Q. 261. Our Technical Specifications require two senior reactor operators and two reactor operators for mode one and two operation. Typically, though, we'll have others assigned to the shift. Is it NRC's intention that only the two people assigned as the balance of plant operator and the reactor operator are receiving credit for being on shift? Or are the others manipulating the con-trols getting credit for being on shift?

A. If utility management has determined that they are necessary for safe oper- l ation, the decision about the number of additional watchstanders is that of the  !

facility licensee. However, in order to take credit for the proficiency of such  !

personnel standing watch above the Technical Specification minimums, as a condi- )

tien for maintaining a license under 10 CFR 55.53(e), the facility licensee must l maintain administrative control over these designated watchstanders, and must be l satisfied that they maintain their proficiency by manipulating the controls, in i the case of an operator, or by manipulating the controls and directing the licensed activities of licensed operators, in the case of a senior operator.

Q. 262. Do candidates upgraded to senior operator lose their active license status per 55.53(e) while standing watch as an extra operator for three months?

A. Yes. If the operator does not maintain the requirements of an R0, he loses his active status. j Q. 263. This question related to actively maintaining a license. Could someone stand 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> in January and then again in June to meet the active license j requirement by calendar quarter.

j A. No. The 40-hour requirement does not pertain to maintaining a license, but is part of the requirement for resuming active status. Maintaining an active license means standing the necessary shift watches.

  • Q. 264. This question concerns active license status at a dual-unit plant.

The shift supervisor is the SRO who normally directs the activities of the operators. We also have an SRO on shift who is over both of the shift super-visors. He does not normally direct the activities of the operators, but he may. Would his supervisory time on shift count as active time?

A. Yes. If you look in the Regulations on staffing for a dual-unit site, you have three SR0s for the two units. If he is in one of those positions, that qualifies him. If he is not in one of those positions, you may still take credit for his proficiency if you monitor administrative control, and are satisfied that he is maintaining that proficiency by manipulating the controls and direct-ing the licensed activities of licensed 0:erators. i I

NUREG-1262 75

j i

i Q. 265. If an operator gets sick in the middle of February, and has been ac-tively on watch in January and February and has this requirement met but is sick for three months before he goes back on the watch, does he have to stand a 40-hour watch? You don't have to demonstrate in the prior three months he has served 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />; isn't it by calendar quarter?

A. Correct. But during the remainder of that quarter he's going to have to complete the required number of shifts to be considered actively performing the functions.

Q. 266. What records will the Commission require to ensure that a licensee has maintained active status per 10 CFR 55.53(e)? What will be the record reten-tion period?

A. It's up to the facility to determirse how it wants to be able to document the active status. Shift turnover logs would be appropriate documentation.

The key is that the documentation be retained and available for review.

There are two answers to the question of record retention. If the record is the control room log, it has its own record retention requirement, which is essentially for the life of the plant. If you are using the control room log to determine whether the guy was signed in, that's adequate.

The certification for his returning to duties is based upon his standing 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of parallel watch. On parallel watch, however, he need not sign the control room log. Under those conditions, the responsible official onsite could create a form which would go into your records onsite and be available '

for audit. That form would have a record retention requirement equal to that person's license; that is, six years.

Q. 267. The proposed rulemaking said nothing about the five 12-hour shifts or seven 8-hour shifts. What is the basis for this, and why weren't we given an opportunity to comment?

A. The previous practice has been for a minimum of one shift, essentially per month, three per quarter. That was deemed by the Commission to not be suffi-cient, as a part of their review and determination of the final Rule, and they increased it to the current requirements in the Rule.

Q. 268. Would it be possible for an operations superintendent to direct activi-ties from off his shift, and if so, then would that individual be required to l maintain an active license by actual shift time for a calendar quarter?

l A. Let me give you what I think is the most practical example: in an emergency, typicallv, the operations superintendent is the individual who goes back and forti. ~etween the Tech Support Center or provides assistance in an emergency. He gives di.rections to whoever it is, the Shift Superintendent or the other SR0s; so he is not directing the manipulation of the controls; he's providing guidance on hu he wants the event to be handled.

Someone else in the decision process is actually deciding whether he agrees or doesn't and directs the activities of the licensed operators in manipulating controls.

NUREG-1262 76

i I

So in that case he is not on shift in the position; he is off shift, responding in accordance with the emergency plan, which is covered by a different portion i of the regulations.

So the operations superintendent need not hold an active license unless you intend him to go on shift as a shift superintendent.

Q. 269. That same logic would apply to day-to-day operations, then, if I under-stand you correctly?

A. There is no day-to-day operations issue. He's there fulfilling the posi-tion that's required by the Tech Specs as the operations superintendent; that is, independent of proficiency in manipulating controls. We would not expect the operations superintendent to go in, for instance, and line up systems or manipulate controls on the board.

He needs to be proficient in order to be consistent with the requirements o'f the regulations, so he would either have to stand 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of parallel duty or maintain proficiency or keep his hands off the controls.

In the process of examining him for requalification, we would examine him both at the R0 and the SRO level. Your continuing training program should ensure that he doesn't lose those manipulative skills because he is not required to maintain an active license.

Q. 270. If our Technical Specification defined the STA position as an SRO on shift, would filling that capacity satisfy the requirements?

A. Yes.

  • Q. 271. Consider a plant in cold shutdown with lowered minimum shift manning requirements. Are the licensed operators assigned to that crew who are in excess of the minimum cold shutdown staffing requirements actively performing licensed duties?

A. Yes. If you have determined that they are necessary for safe operations, I you maintain administrative control over these positions, and if you are satis-fied that they are maintaining their proficiency in accordance with the regulation.

Q. 272. How, and to whom, is certification made under 55.53(f)?

A. This section has to do with returning the individual to an active status.

And I believe we said earlier that no certification has to be made to us. But a certification must be made and available on file for inspection purposes.

Q. 273. It would appear that once a quarter, an individual could spend 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> on shift under the direction of the licensed operators. And the facility could certify that he had done so, and tN t his status in the requal program was cur-rent. And by doing so, he could mhbitain an active license by spending essen-tially 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> a quarter on shift, instead of the 56 to 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> specified in  :

other parts of the Regulations? Is that true?

NUREG-1262 77

A. That is true, although that is not what we intend. The issue is to make it easy for people to maintain a license. And that's a decision that the facility j makes with respect to the commitment of time to the requalification program. >

If the facility wants to commit an additional 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> for parallel watch standing in a control room in addition to the requalification program, so that i he can be active, that's their choice. Our intent was to make the minimum seven I watches at eight hours, or five watches at twelve hours, to maintain the l proficiency of those who are actually directing the activities, or manipulating j the controls. It's a proficiency issue, it's not a license renewal issue. l 1

Q. 274. Are any allowances made in 55.53(f) for off-shift licensed personnel who are involved in daily operation's supervision?

A. No. They are either in active status or they are not. If they are not, their just being a daily operations manager, or an operations superintendent, does not convert them to an active status.

Q. 275. Suppose someone completes 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> on shift under supervision; then his clock starts again for his seven 8-hour periods. If an individual goes through this in the last month of a quarter, does he have to complete those seven 8-hour shifts before that month is up, or does he start during the next calendar quarter?

A. If he's done 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of parallel watch in a quarter, he's active in that quarter. For the next calendar quarter, he would need to stand either seven ,

8-hour watches, er five 12-hour watches. Regaining proficiency allows him to go back into an active status to stand watch. He does not have to do both in the same quarter. That is, he does not have to serve 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> under instruction, plus stand seven 8-hour watches, or five 12-hour shifts in that quarter; it goes to the next one.

Q. 276. Could you clarify what you mean by " parallel watch standing?"

A. It's very similar to "being directly under the supervision of," as we use {

that phrase for a* trainee; that is, the individual that has the watch still has the responsibility.

The person that's in the. parallel situation, even though he's licensed, is not considered proficient. The regulation requires that he not manipulate the controls or direct activities except under the direct supervision of someone who has an active license.

Q. 277. Do those 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> have to be consecutive; i.e., eight hours a day?

A. No. It has to be 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />. You can have four tens or ten fours or any other combination that adds up to 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />; however, they must be in the same calendar quarter.

l NUREG-1262 78

1 l

I The only enplicit guidance in the regulation concerns the seven 8-hour or five 12-hour shifts where a full shift means'from watch relief to watch relief.

Q. 278. Can licensed Senior Operators who are not in active status perform refueling SR0 duties?

A. No. Only active SR0s can supervise refueling activities. If they are not 1 active, they must stand one 8-hour shift under instructions from licensed active }

SR0s to perform active SR0 duties limited to fuel handling. {

Q. 279. What leeway do you give to the facility to know that an operator has -

received a felony conviction? ,

A. Convicted felons typically go to jail, so they're not going to be at work.

Also, all those granted clearance for unrestricted access have background investigations that relate to such things as convictions for felonies. You will have access to the information from that source, too.

Q. 280. But the facility will not necessarily know within 30 days?

A. It is the operator who is required to let us know in 30 days, as a condition of the license.

Q. 281. So, we don't assume any liability for not notifying you within 30 days?

A. If you don't know, and you didn't have a reasonable basis to know, we're not going to hold you liable for that. However, if you get a criminal history check that shows that the person has been convicted of a felony, we expect you to tell us.

Q. 282. If we submit an applicant for a license who has had a felony 15 years ago, is that still reportable. If he had taken a licensing exam and was ready 1 to receive a license, would he have to notify you within 30 days, assuming we did not know that?

A. If the individual knew that he had been convicted of a felony in the past, and he did not report that on the initial application, his application would be considered incomplete. Such an omission could be the basis for revoking his license, since he would have withheld information.

Q. 283. Why is the applicant no longer required to sign the Form 396 certifying that he or she has no felony convictions? i A. Because it is a condition of a license, per Part 55.53(g) that individuals notify us within 30 days of a conviction for a felony. So, should someone get a license who had a prior felony, he would be required to notify us of the prior ,

felony.

]

Q. 284. If we were to let an individual's license go inactive, would it also be I reasonable for us to let his medical requirements lapse?

A. No, you cannot let his medical requirements lapse. He must be medically i examined each two years. That is a condition of his license, whether he main-  !

taint proficiency or not.

I NUREG-1262 79 l

I

Q. 285. Is there is a purpose for that, if he is going to continue inactive?

He is not permitted go on shift, so there seems to be little point to maintain the medical status up to date?

A. The issue is whether he is medically fit to carry out the duties of a li-censed operator if you put him in a situation of watch standing to regain his i proficiency. At that point, he would be permitted to manipulate the controls of the facility, and/or direct activities. The reason we extended the licensing period to six years was to make it coincide with the medical requirement, which comes up in two year cycles.

Q. 286. Are licensees who maintain an inactive license required to participate in a requalification program to the ssme extent as licensees maintaining an active license?

A. Yes. A condition of their license under the new Part 55.53 (h), requires participation in the requalification program.

Q. 287. The problem is that standing the shift foreman's license does not pre-pare this person to go out and handle fuel, and I don't understand how doing one watch under instruction does that, how that can guarantee that he's going to be a safe person in charge of fuel handling?

A. We're talking about an SR0 limited to fuel handling, not an SRO with an unlimited license here. So if a guy has an SR0 license and he's an active SRO, he can be used as an SRO with no other duties but to handle fuel, or be the supervisor in charge of fuel handling,-with no other duties. If he's a senior with a limited license, he's in a different category, because he can't be used as an SRO. So any active SR0 could be a fuel handler senior, but if he is an active fuel handler and then he doesn't handle any fuel for awhile, or for some reason he doesn't use his license, then he has to only stand one watch, or one eight-hour shift with an SRO who is an active SRO, or an SRO with a limited fuel handler, and then he has met that certification again.

The only adjustments we've made in the rule for fuel handlers are that, in order to become active, they only have to stand one parallel shift, which would make it much quicker and easier than the 40 parallel shift, and that the requal program is limited only to those aspects of the plant operation to which their license is limited.

Q. 288. With respect to the requirements for maintaining operating proficiency, can a licensed STA (SR0 License) who is standing the "STA Watch" get credit for SRO proficiency? l A. No. I Q. 289. We had a concern on restoration of an inactive license as a full-scope SRO license, and we wanted'to use that individual for fuel handling during re-fueling. Would that individual as a full-scope license have to go through the 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of concurrent duties, or just eight hours of concurrent duties?

A. It would only take eight hours under parallel watch with a person whose l license is active, whether that's another licensee limited to fuel handling '

only, or it's a senior reactor operator.

NUREG-1262 80

l Q. 290. When will the quarter for shift standing start when the'new rule is implemented?

A. For accountability purposes the first complete calendar quarter after the rule is implemented must meet the seven shift / quarter requirement.

Q. 291. Does completion of 7 days on shift in one position such as shift engi-neer, allow the individual to perform duties in another position on shift for which he is also qualified?

A. If shift engineer is a Tech Spec position required to hold a SR0 license, then performing in the seven-8 hour shifts, per 55.53(e) would permit the licensee to perform duties as either an SR0 or R0.

Q. 292. Do technical advisors or licensed instructors require an active license, f

if they must maintain a license for technical specifications or FSAR?

A. They may need license per the Technical Specifications, FSAR etc. , but it does not have to be " active" per the Re -lation unless the individual is re-quired to assume a postion onshift that the Technical Specification identify as a licensed shift manning requirement.

Q. 293. If an operator gets his license during a calendar quarter, how is he to meet the seven shifts per quarter requirement?

A. For the initial calendar quarter for which a license is issued, he is con-sidered to have met the proficiency requirements by virtue of having passed the exam. Thus, the " actively performing" requirement will commence in the first calendar quarter after he receives the license.

h NUREG-1262 81 I

_ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ . - _ _ _ _ _ _ _ _ ___ ___~

i REQUALIFICATION AND RENEWAL l

l l

4


_____mm

4 Requalification and Renewal (Statement of Considerations)

Q. 294. The regulation says that sometime during that six year period, a can-didate will get a test. That may be the first year through the sixth year, but the next time he is renewed, it may be as much as 11 years apart. Is that correct?

A. No. In the Statement of Considerations, II(H)(4), the last sentence says, "The NRC will administer these requalification written examinations and operating tests on a random basis, so that no operator or senior operator will go longer  ;

than six years without being examined by the NRC once a six year license is )

issued." That's a direction from the Commission to the staff. That's the same i way we handle the clarification of the INP0 status, in the Statement of Consid-erations that goes with the Rule, describing intent. Some operators will receive more than one NRC-administered exam during the term of their license in order j to comply with the Commission's direction to the staff.

Renewal of Licenses (Subpart H, Section 55.57)

Q. 295. At what point will the six year cycle start for present license holders? l A. It will start with the first license issuance after May 26th. We do not intend to amend the present licenses. So on May 25th, someone will get a two- i year license. On May 26th, that individual would receive a six year license. l Q. 296. I have 107 licenses expiring over the next two years for which NRC )

requal exams are not taken. Where do they stand?

A. The renewal of the two year license is governed by the rules under which they were given their original license, so no NRC exam is required.

Q. 297. We've gone from a situation where at the end of the examination con- ,

ducted by NRC, the results were discussed with the utility, to a situation l presently where the results are not discussed until the license certificate is i signed off and the results have been reviewed at the Region. In combining requalification exams administered by NRC with initial license exams admin-istered by NRC, will the examiners, upon an indication that a candidate for .

renewal was a potential failure as a result of the operating portion of the l exam, discuss that information with the utility, or will you allow that person ,

to go back on shift pending the complete review? And how do you expect this to {

affect the turn-around time when we're significantly increasing the number of i exams to be evaluated?  !

l A. We can't predict how it will affect the turn-around time. Hopefully we will have the resources to do it within the existing time frame. From the l point of view of a licensing decision, no decision has been made until the l paper is signed. In other-words, it is only a recommendation until the point that either the license or the failure has been approved by the branch chief, i by the licensing authority. l We're prohibited from discussing predecisional information. That's why we do not give preliminary results either on site or from the regional office.

NUREG-1262 82

i Obviously, if the examiner believes that it's a safety issue if an individual j

-returns to shift, it's incumbent upon him to notify the licensee. We would not leave the site with a safety issue pending. However, when we leave the site, l

we don't always know whether an individual has passed or failed all portions of the examination (written, oral, and simulator).

i Q. 298. What is written evidence of the applicant's experience and how is this  !

supplied? i A. Written evidence will be the same as it is now; as it is reported on rele-vant portions of Form 398.

Q. 299. What is the evidence that the applicant has discharged the license responsibilities competently and safely, and how is this information provided? )

1 A. The utility certifies that the individual has performed in accordance with the terms and conditions of his license, and that he has performed satisfac- 1 torily. It is for you to determine how that performance has been, through ~

whatever mechanisms you want to use; whether it be performance evaluations, or other information that you have in your company files related to that individual. J Q. 300. In reviewing past performance under Section 55.57, you said earlier that an NRC letter or a letter of reprimand might be part of what you'd eval-uate. Does this mean a letter of reprimand specifically from NRC, or one from the site itself?

A. An NRC review would be based upon two things: the certification from the company, and any official enforcement actions taken against the individual that 4 are in his official docket file. It does not include information that has not been formally transmitted to the individual under his license, as it must be a completed action. The fact that an individual is under investigation by the NRC may not result in something going into his file. It only goes into his file when we complete an enforcement action and he receives a letter. It's a formal notification, and there is guidance as to what is permitted in the doc-ket file and what is not. Essentially, anything in the NRC docket file has already been presented to that candidate, whether it be an examination grading report result, or an enforcement action.

Q. 301. If someone never operates the controls, and he gets a license, that license is renewable. Why do we then report the number of hours one operates the facility on a renewal?

A. Although we will renew a license of an individual who has not stood watch, that information may be helpful in making judgments on renewal applications in which the individuals did not fully meet all 55.57(b) requirements to the let-ter. For example, an individual may have been unable to attend every requal class because he was participating in a management course. The number of operational hours for this person may influence our decision regarding his renewal.

Q. 302. When it's time to renew the license of our shift engineers, can their license be renewed in an inactive status, without another examination, if they have maintained all of their requal requirements?

NUREG-1262 83

A. For anyone who holds a license, he must be kept current in the requalifi-cation program; he must be medically fit, and he must have been examined at some time by NRC during the course of that six year license. The requalification examination requirements are applicable independent of active / inactive status.

Q. 303. If a licensee is not maintaining an active license in accordance with 55.53(f) at the time of license expiration, what are the requirements for renewal?

A. If he is not maintaining an active license, he still must meet all of the requirements for renewal in 55.57(b). However, he does not have to be active to get his license renewed. He must be, most importantly, current in the re-qualification program, but he does not have to be active to have his license renewed.

Q. 304. In order to obtain license renewal you must be examined by the NRC at least once during the six year life of the license. What is the extent of this examination: written, operating, both, either?

A. With respect to format, the requalification exam will parallel the initial exam, i.e., it will include both a written and operating test. The content of requalification exams will be based on the facility's learning objectives pro- I vided that these objectives are satisfactory.

Q. 305. Section 55.57 states that license renewal is going to be based on having passed the comprehensive requal exam and operating test administered by the  !

Commission during the term of a six year license. I believe that you have l interpreted that to mean that an exam will be given at least once every six years?

A. Yes, that's what the Commission has stated. The Commission has directed  !

the staff to examine operators at least once each six years, and that's why we l know that some people may have an exam more than once in six years.

Q. 306. What percentage of people will you examine at a time?

At'least 16 percent per year, because we've got to examine 100 percent in six years. In fact, it will be greater than 16 percent because of the randomness involved in ensuring that candidates don't have prior knowledge of when we are coming in to examine.

Q. 307. How far in advance will an individual licensee be notified by the Ccamission of his scheduled examination date?

A. Ten days.

Q. 308. Do you need to take examination to renew a two year license?

A. No. The rule is very specific: You need an examination by the NRC only for the renewal of a six year license.

Q. 309. I have some renewal submittals that will have to be submitted before the May 26th date, but the renewal is not until after. Do I submit them under the existing rules for them to come back as a six year license?

NUREG-1262 84

i A. The Form 398 that you use until May 26, 1987 is the same one that's in effect today. Even though you submit that version of the form, if we issue a license after the 26th, it will be a six year license. Any applications sub-mitted after May 26th should be on the new Form 398 with the new Form 396.

Q. 310. . Will the people presently holding two year licenses have to reapply at the expiration of the two years or will they be automatically extended to the six year cycle?

A. They need to reapply prior to the expiration date of t' heir current license.

Q. 311. Considering that every utility has or will have an accredited retraining program, what is the justification for the random selection, which would in-clude the possibility of having more than one exam in a six year period, versus the possibility of doing an orderly schedule to include only one exam in that same six year period?

A. It is NRC's mandate to ensure that all licensed operators maintain a satisfactory level of proficiency at all times. As such, the required exam is intended to serve as a " spot-check" to verify that that level of proficiency is -

in fact being maintained. Further, we want to ensure that operators can demon-strate this level of competence without special preparation outside of the normal required training program. The Commissioners believe that this is best accomplished by randomly selecting the operators to sit for the required exam.

To the extent possible, we will coordinate the exam schedule with your regular cycles. But if we have reason to believe that there is something wrong with the program, or we have other indications of problems, we will conduct exami-nations at times other than during your requalification cycle.

Q. 312. How can the Commission administer a comprehensive written exam once during the six year cycle if the utility is administering their written exam spread out over a segmented period?

A. As stated above, the Commission's mandate is to ensure a satisfactory level I of operator proficiency at all times. It is the facility licenses's responsi-bility to ensure that their required program, although segmented, maintai.ns this  ;

level of proficiency throughout the training cycle.

]

Q. 313. Who will schedule and track each licensed operator to ensure he has had an NRC exam prior to renewal?

A. That's NRC's responsibility. It will be tracked in the Regions by the docket files on each individual which will contain the last NRC-administered .

requal exam. l Q. 314. How soon can someone be re-examined after failing an NRC exam?

A. We have resources for two visits to a facility per year. If the individual 1 fails and is getting close to the point for renewal, we would evaluate on a  !

case-by-case basis whether our resources permit us to go back and give another l examination before the next regularly scheduled exam. ,

i NUREG-1262 85 j

If he's within, say, six months of renewal, and that's when he's targeted to come up for an exam, that's a pretty good indicator that he's going to be tak-ing an exam at that next cycle before his license renewal.

Q. 315. In the past, if an operator failed the requal exam, he would go into an accelerated requal program normally administered by the utility. Is that going to remain the same, and, once he completes the accelerated requal and the examination by the utility, would that be acceptable as far as meeting the requirement of passing the NRC-administered exam?

A. flo. There are two different questions there. The first deals with the acceptability of the facility's accelerated retraining program to return that individual to licensed duties, and this depends upon the status of your requali-fication program. If your requalification program is deemed satisfactory, then you have the capabilities under your program of dealing with the failure of a requalification examination.

The second concerns satisfying the requirement for a six year reexamination.

The Commission has directed the staff to administer a requalification examina-tion to each licensee during the six year term of the license. If he fails and you have a program that has been deemed satisfactory, you can retrain him and return him to shift duties; however, he must successfully pass an NRC-administered requalification examination before renewal of his license.

Q. 316. Is the appeal process for the requal examination the same as the ini-tial exam? If so, there are two problems. One is the individual's own self-respect if he fails that exam and he feels he should not have. The other pro-blem is that our program is being judged against the results of that requal exam. If there's something that we feel was amiss during the exam, we should have a method of recourse in having that evaluated.

A. The answer is that the appeal process does apply as it relates to the administrative process. You are provided the opportunity to comment on the written examination through the normal process for any written examination.

However, the individual does not have the right to request a hearing because his license has not been,taken away. He still has a license. He can request an administrative review by the Division Director in the Region and a review at NRC Headquarters if there is a potential for the exam results to preclude his license renewal.

If we were to deny the renewal of his license and he was contesting the failure of that exam administratively, he would have the right to a hearing because we had not granted the license renewal. So in that context, he would be eligible to request a hearing on the denial of his application for a license renewal.

Q. 317. Why weren't the utilities allowed to make public comments on 10 CFR 55.57(b)(2)(iv), license renewal requirements?

A. The Commission decided to add Section 55.57(b)(2)(iv) between the time of i the proposed and final rules to allow it to examine licensees during a 6 year license period. This decision was an outgrowth of comments on the proposed rule and is consistent with the Commission's Policy Statement on Training and NUREG-1262 86

l l

Qualifications, and with Section 306 of the Nuclear Waste Policy Act. Part of the reason for that decision is that we indicated in the policy statement on training and qualifications that we would use the requalification examination as a mechanism for judging the validity of the industry-accredited training program process. The Commission is continuing to do that.

We have moved out of the training review and are instead judging the ability of the individual to perform after training. We make that judgment through an examining process. That's the reason for it. The Commission has indicated  !

their policy both through the policy statement, which was publicly noticed and l available, and through a continuation of staff practice.

The Commission tied it to renewal to ensure that there was a clear understand-ing on the part of all operators that this was required, and to eliminate the question of "Why e.e," because in the past, when the staff selected opera-tors for examination, there was always a question of, "How did I get chosen, why not someone else?" In this case, it's clear that it applies to all li-censed operators who hold a six year license.

Q. 318. Will future NRC requalification exams given in conjunction with re-placement tests be modified replacement tests as in the past?

A. NRC requalification examinations are developed to evaluate the adequacy of the facility licensee's requalification program. Where replacement training program and requalification training program objectives overlap, duplication of questions is acceptable.

Q. 319. Since it is six years before any renewals will require the completion of an NRC exam, when will the process of "10-day notice exams" get started?

'A. As of the effective date of the rule.

Q. 320. Does the six year license apply to nonpower reactors? Do their licensed operators require gn NRC exam prior to renewing a license?

A. Operators of nonpower reactors will receive six year licenses upon satisfactory license renewal after their current licenses expire. License renewal will be in accordance with 55.57.

Q. 321. When will the requirement for an applicant to be examined by the NRC prior to renewal be implemented?

A. That requirement will become effective for all six year licenses granted after May 26, 1987. I 1

Q. 322. What will the basis be for " continued need" under 55.57(b)(3)?

A. It is the facility licensee's decision as to whether there is a continced need for an operator. We will not question the judgment of facility management. )

l Q. 323. Can the requirements of 55.57(a)(4),(5), and (6) be certified on the Form 398?

NUREG-1262 87

1 A. Part 55.57(a)(4), assurance that the applicant has satisfactorily completed j the requalification program, and 55.57(a)(5), assurance that the applicant has discharged license responsibilities competently and safely, can both be certified in Form 398. For 55.57(a)(6), certification of medical condition, a Form 396 is needed.

Requali_fication (Subpart H, Section 55.59)

Q.324. What is required for Commission approval of a requalification program?

A. You simply certify to us that you have an accredited program that is based .l on a systems approach to training, and that's sufficient. 'i i

Q. 325. In Generic Letter 87-07, page 24, it states that "The specific cycle will be approved by the NRC as part of each facility's training program." What  ;

does this refer to?  !

A. It covers programs which are not approved through the accreditation process.

Q. 326. On the training program approval, if you have an accredited program and you certify that you're doing an SAT process, that's one method. You also l listed implementation of INP0 Guideline 86-025 as another approach. Can you )

explain this?

A. The accreditation process has a hierarchy of requirements, the top level of l which are called objectives. You must meet the intent of the objective in order '

to be accredited, and those are contained in INPO 85-002. The Commission has reviewed and endorsed the INPO accreditation objectives and criteria as meeting q the SAT or systems approach to training. I believe there are 12 objectives. j Each objective has a number of criteria; meet the criteria and you meet the objective, but the opposite is not always the case. That is, you may not meet 3 one criterion, but you still may meet the intent of the objective through some other mechanism. You go through the criteria and objectives for your self-evaluation.

Subordinate to those are'the guidelines for licensed operator training, for maintenance training, and for other areas. One guideline is for continuing training for licensed operators (INPO 86-025); it gives information about the i content appropriate for a continuing training program. It also describes how you evaluate and feed information from plant operations and performance eval-uations back into the process.

You clearly do not have to cross all the t's and dot all the i's of everything that's in that guideline. That guideline, however, constitutes an acceptable l method of implementing a performance-based, SAT-based continuing training pro-gram that the staff would find acceptable.

The next level below guidelines are good practices. Those are things which INFO has seen facilities do that worked particularly well for a facility, and they have provided guidance on those.

NUREG-1262 88

I l

l We have concluded that if you are accredited you understand what the objectives are, and how criteria are used, and what the process is for developing a systems approach to training. We think that understanding, along with recent INPO training guidelirees provide an adequate basis for you to review your own programs and certify to us that your program is based upon a systems approach to training. l We believe that there are two final parts to that. You need to look at the tasks (

that are relevant to the job, decide which ones are appropriate for training on a continuing basis, based upon such criteria as importance of the task to the j safety function and frequency of performance. Clearly, emergency procedures l

)

would fall into that category. Shift relief and turnover would be outside of that category, such that your continuing training program would not address shift relief and turnover.

If you've operated continuously between outages, you would not necessarily have performed plant startups and shutdowns. In that case, you may want to-fold the startup and shutdown into the continuing training program, and do that on a simulator.

It's that type of flexibility, and reviewing and determining the content of the prograrr. which we feel is the most important attribute of the change to the regulation. It gives you the flexibility to tailor your program to the needs of the job incumbents, and to bring them up to a comparable level with the initial training programs through the INP0 accreditation. That's the process we think should be followed. It doesn't mean that everything has to be done in INPO 8.5-026 with respect to simulator training, or INPO 85-025 with respect to continuing training. Those are guidelines, and you really need to address the issues as to how much of that should be followed or done with INPO, not with the staff. We are not in the position of reviewing and determining what constitutes INPO requirements. We want to move out of that. We will provide our corzents to INPO should we see problem areas for INP0 to address generically with the industry. We do not want to get into the mode of providing guidance to individual utilities on how much of an INPO document needs to be followed before the staff would accept a certification. That's for you and INP0 to work out.

Q. 327. While someone is in an SRO upgrade for (say) ten months, he is not of-ficially in the requalification prograr. How is that going to affect that inactive status?

A. If your upgrade program meets the objectives of your requal program, you can take credit for that. However, if there is a differential there might be some areas that are not covered at all, but are covered in a requalificatica i program. If that individual is no longer current in requalification, to resume active status, he would have to receive the remedial training necessary to make i him current with the requalification program. Simply being in the upgrade program does not, necessarily, compensate for the requalification program. l We hope that that's not an issue that we face very often, because we expect that most candidates who go into an upgrade program would receive a license as a senior operator and remain cognizant of changes, LERs, and significant events.

And upon the date they receive a license, they can manipulate the controls and NUREG-1262 89

direct the activities of others. So, it's only when there's a period between the end of his training and the time he gets a license when you may want to use him as a reactor operator. He may have to stand some parallel watch with the reactor operator before resuming duties. And that's the point when you would have to certify that he had completed the necessary requirements of the reactor requalification program, if there are any aspects that were not covered in the SR0 operating training.

O. 328. Since Section 55.59(b) indicates that the Commission would accept additional training in lieu of a licensee's participation in the requalification program, is it acceptable for a utility to remove certain license holders from the requalification program, yet have them retain their licenses if this addi-tional training was provided to them?

A. No. Section 55.53(h) requires completion of a requalification program as a condition of a license. In general, a licensee who is permanently removed from the requalification program no longer satisfies this condition of their license, and thus has been determined to no longer need a license by the facility licensee under Section 55.55, Expiration. Only under extenuating circumstances (e.g., special temporary assignment, extended illness, removal from shift to enter a degree program, etc.) would the provisions of Section 55.59(b) be invoked. This will be handled on a case-by-case basis.

Q. 329. There is no requirement to modify the Requalification Program documen-tation. We just have to follow the new rule, correct?

A. That is correct. You must follow the new Rule, or your existing program, whichever is more restrictive. But you may perform a 50.59 review to bring your existing program in conformance, and simply submit that. Or, if you need an amendment to the license, you request the amendment, and you would have an administrative change approved to put your program in conformance with the Rule.

Q. 330. Most facilities have an NRC-approved requalification program in the FSAR. For utilities that cannot certify their requalification programs, either because their requalification program has not been approved by INPO, or it has been approved and does not meet the INPO 86-25 requirements for SAT, how will we' implement 10 CFR 55? ,

A. You will continue to follow your approved program of record, as is documented in the FSAR, until you either modify it, bring it up to the INP0 guidelines in 86-25, or take some other action to modify it. That's one way of doing it. You may be able to discuss with INPO other alternatives. But you follow the program of record, as modified by the Rule.

Q. 331. What is the difference between a requalification program 24 months long followed by successiva requalification programs and a continuing training pro-gram administered throughout the term of the individual's license? Does the Commission mean to imply something by use of the word "requalification" versus

" continuing training?" If so, what is the distinction?

A. There is little difference between the two. We expect you on some basis to step back and take a look at the performance of your licensed operators and NUREG-1262 90

i 1

modify your program appropriately to reflect those areas that need continuing training. From that aspect, we chose 24 months, consistent with the previous program, to be a point at which you would take that formal look at your prograin.

There is no distinction except that the law used the term "requalification,"

and that's why we continued with that term.

Q. 332. The requalification program must be conducted for a continuous period not to exceed 24 months. What is the purpose of the 24-month limit?

A. Because it's consistent with defining a fixed-length program. Since the previous period was 24 months, we retained it.

Q. 333. Is there an intent to look at a 24-month period as an isolated section and try to meet certain requirements within a 24-month period?

A. The intent is that at the end that period we want you to do a comprehensive evaluation of the program and decide how you need to modify it for the next cycle. If you want to do it in 12-month or 18-month cycles, that's also accep-table. If you want to tie it to refueling schedules that's also acceptable.

The cycle cannot be longer than 24 months, however.

Q. 334. What is considered a " continuous period" with respect to the conduct of the requalification program?

A. It's 24 months, then you start over again for another 24 months, and then another 24 months, so that ycu'd have three 2 year requal cycles in the six year license period.

Q. 335. Will the program that breaks for, say, a two-month refueling outage be considered a continuous program?

A. By " continuous" we mean that it's the same pro as well as off shift, and it's the program as you' gram for operators ve described on shift it. There may be cases where you want to stop it for a period of time, where you are using segmented training and you want to teach one segment, and in the next segment you, in fact, may have some particular training in the outage that you want to cover prior to the outage.

That's the flexibility you have under the systems approach in defining your needs are and sequencing accordingly.

We want one program for all licensed operators. We don't want one schedule or pregram for people on shift and a different schedule or program for people who are not normal watch standers on shift.

Q. 336. Does NRC want to see a comprehensive evaluation of the program on a biennial basis?

A. Yes, at least on a biennial basis. That's the intent of the biennial qualification examination being comprehensive. Part 55 requires that the evaluation be used in determination of subsequent continuing trair,ing requirements.

NUREG-1262 91

Q. 337. On Page 24 of the supplementary information provided to Generic Letter 87-07 is the following statement: "The frequency of the comprehenshe re-qualification written examination has been changed to a maximum of every two years." Where is this statement to be found in the text of 10 C?P $5?

A. The statement " maximum of two years" with regard to examination frequency can be derived from 10 CFR 55.59(a)(1) under "Requalification Requirements" where it says "Each licensee shall successfully complete the requalification program developed by the facility licensee that has been approved by the Commis'sion and that the program shall be conducted for a continuous period not '

to exceed 24 months in duration." The next paragraph says " pas: a comprehensive requalification examination and an annual operating test." So, by inference, the written examination only has to be administered on a two year basis, where the operating test is required on an annual basis. ,

Q. 338. Does this statement mean that written requalification exans can occur  !

less often than every two years?

A. No. It must be conducted concurrent with the two year program.

Q. 339. If a utility currently has an NRC requal examination scheduled for the first week of June 1987, what will be the impact of this rule on the examina-tion? Will the examination content be covered by the old rule, or will the content be upgraded to the requirements of the new rule? If the examination will be covering the content by the old rule, when can wt expect examinations utilizing the content covered in the new rule?

A. There will be no change for the June exams. Only exe.ms given after July 1st of this year will be under the new rule.

For clarification, there are clearly some changes in the rule that will change  ;

the examination. We don't expect that there will be changes in the content of 1 the exam, based upon a requal program that's already been done under the current Examiner Standard, ES-601, where we are auditing individuals who have two year licenses and auditing the company's program.

Clearly, however, the operating test portion will be docioented on the new Form i 157, and we will be addressing areas that are required by the regulation in constructing the examination. We aren't going to be testing on areas outside of the requal program, or the current licensing program at the facilities, but there will be some change in forms and in the documentation process. The reason for that is that those examinations are already in preparation now, and you can't do 90 days worth of work in the transition period, so we will be continuing to use the materials that were submitted prior to the effective date of the rule to construct the first few exams after the effective date of the rule, but there will be some changes in forms and processing and how it's handled, a Q. 340. Can the written requalification examinatica be given in several sections over a period of time or is the intent to administer one complete examination at one time?

A. If you currently have a requalification program in which you've committed to  !

an annual comprehensive written exam, you have to continue giving that ant.nl NUREG-1262 92 l

]

  • k comprehensive written exam until you have sent in the appropriate documentation m that you have an SAT-based program and that you're moving to a continuous pro-gum that is going to be conducted over a period of 24 months. That's one way 1 of doing it, seading us a letter telling us when you are accredited and that you J nave a reqaJalification program that's SAT-based.

The other alternative is what we have done in the past, which is the 50.54 )

) change, where you would notify us that you're changing your program. LSo if i you're committed to an annual written exam during this transition peH od, you have to continue to meet your commitments until you've notified us that you're chenging.

L Along those lines, with regard to the segmented exams, if you currently have in ,

your program an annual comprehensive examination, then we will expect you to I continue that. ,

If you have an accredited program and the segmented approach to evaluation is an acceptable methodology under that program, we will allow you to implement your program.

But realizing that the NRC examination will be a comprehensive examination, we expect that the progrnm evaluations that you implement will be comprehensive in nature, also. For clarification, weekly quizzes that may be given following a '

week of instruction tallied together to form one exam probably would not meet '

the comprehensive intent of this evaluation process.  ;

Q. 341. Written examinations for requalification will be based on initial li- l cense material. Should the exam not be limited to the scope of the approved i Requalification Program?

)

A. The requalification eyes are intended to be performance-based and opera-tionally oriented. To tha extent that they're made available to us in the submittal following the 90-day letter, we intend to use the facility licensee's learning objectives. that pertain specifically to the continuing training program.

We anticipate that when you have an SAT-based requal training program, it would be modified from time to time, depending on the needs of the job incumbents.

As your needs change, you would modify your program. <

f We anticipate that those learning objectives might be different from time to time. We would, of course, tailor our exams to those learning objectives.

Q. 342. Would it be NRC's goal to document those differences between the initial exams and the requalification exams?

A. We want you to certify.that you've:;ut a requalification program that's based upon a systems approach to training; and you should document those  !

differences.

That's why we say that when you do the initial task analysis, you should identify that subset of tasks which are appropriate for continuing training.

NUREG-1262 93

- _ ____ _ _ - _ _ _ _ _ _ _ - _ _ - _ _ - _ _ _ - _ _ _ _ _ _ _ - - _ _ _ - _ _ . ._. - _ - - A

i, We believe that to the extent you follow the INPO guidelines in 86-025, you will have done that. We believe that that's a fair representation of the typi of material that should be contained in continuing training, aid should be used for the basis of a requalification en mination, c Q. 343. Where do we find the stmdards and criteria for administering the com-prehensive exams for the requals?

A. The standards and criteria are ihntified in Section 55.59, and as far as our implementation, they will be clerified in ES-601.

Q. 34r. You said previously, where ttsre is an annual operating exam and then a comprehensive written exam every two years, that the NRC exam would cct:nt for the operating portion of the examination. Why would that not also be accept-able for the written portion. if individuals were scheduled to have their writ-ten exan during that year? q l

A. We intend for it to be both. If NRC aininisters a written exam, 'that will substitute for the facility written; if NRC administers an operating test, that will substitute for the facility operating test for that year or for that program, whichever is appropriate.

Q. 345. Will section 55.59(a)(2) change the policy of usirq a ?icensed SRO to write / review the written requal examination? If the written examination is given every two years, would he still fulfill the requirements of this section since technically he is not taking the exanlt Similarly, will the SRO e,o writes the performance exam, and is thus exempt from taking the exam for that year, comply with th5s requirement?

A. Section 55.59(a)(2) will not change ths.' policy of using a licensed SRO ts '

write or renew these examinations. Howe 4crl it is the Commission's intent that all licensed operators be enrolled in the requalification program and take the requalification exams; further, an individuuI must take an exam that he did not write or review.

Q. 346. What will be the duration of the grace period for the implementation'of the new 10 CFR 55? ,

A. The rule goes into effect on May 26, 1987. There are grace F.eriods identi-fied within the rule for certain aspects cf the rule, and those are stated in the rule.

These include operating tests on an annual basis. If an individual is licensed on May 26, 1987, and holds a license, he must have had an operating test by  !

May 26, 1988, within one year. For an application which you sutait in the i middle of that period -- after, say, six montns har; expired'-- he may or may j not have had an operating test, because you vou.14 not have been requir&d to '

s complete an operating test for everyone unti' af ter one year. So if it says j you've got to examine annually, then one yea" after the effective date of th1-rule, everyone should have had an operatinc Ltest. Another example is the comprehensive written examination to t'e done at least each 24 mo9ths. After ,

j the rule has been in effect for 24 months, everyone who was liccused on'the i l

3  !

NUREG-1262 S4

7

~

4 q

first day that the rule went into effect shall have.had a comprehensive exami-nation, unless, of course, you are acc.vedited, and then you may use a segmented exam. j Q. 347. It appears that comprehensive requalf fication written exams are required only every two years and operating tests are required once per year. Is this trw?

t  !

A. It is true that the written examination will go to every two years unless ,

your program commit. tents are more stringent. If your current program requires 1 an annual exam and it is not an accredited program, then you will have to notify us if you intend to reduce that commitment. If it's an accredited program, then l you can m de the changes as appropriate.

l Q. 348. Our past requal programs, for those 9cilities which don't have plant-referenced simulators, have not included an.cperating test. They have included some operating evaluations, but not a pure test in the context of the new 1 regulation. Some of the currently licensed operators will be up for renewal immediately, as soon as the new 10 CFR 55 goes into effect. Will there be a transition period during which it would be possible to get a waiver for those '

operators because they will not have had an operatir.g test? We do not have a simulator certified by HRC to conduct an operating test. And, in fact, I'm not ,

even sure if, under the new regulation, we could use our current off-site j simulator to conduct an operating test. So, how do we address renewal of j licenses for the period between now and @ en we get our plant-referenced '

simulator; or will there be some time after which we will have to do an operating test?

A. During the period between the effective date of the Rule and one year M11owing, an individual may not have yet had an annual operating test, and you may put him up for license renewal. After ore year, everyone should have had an operating ter,t. The issue of whether an aperating test is on a simula-tion facility, or conducted as a plant walk through is a different issue.

At least the plant walk-through portion will be remrired. The issue of doing it.on a simulation faci 1 *ty, that would be required by May 26th,1991. Prior

~

to that time, if you have certified or approved simulation facility, you would also do it on the simulator. If you are currently using a simulator, and we

, are conducting examinations on it, we expect you to continue to do so; and within one year of the effecti.'e date of the: rule, start examining catJidates

+

using your current simulator as a part Tf the operating test for the requalifi-cat (on program. Also, you have to make sure that the documentation that you provide fcr that annual operating test, addresses all 13 items in the new Regulation. The Form 157 is the way that we are going to check that. You can use alternate ways, but you must make sure you document all 13 items.

Q. 349. O ding this one year period of transition, do we document, by exception, and ask for a waiver on our requests for renewal? Would that be the appropri-ate say to handle that?

I A. No, thht would not be required by the regulation. ' Gut' we'll specifically address that in the transitior, process, and 4ddress it in the Examiner's Standards, which will be effective on the 26th of May.

NUREG-1262 95

)

1 l

l Q. 350. Must a facility administer annual operating tests to licensed operators before a certified plant referenced simulator is available? ,

A. Yes. Even though it may not be part of your requal program now, you have to start administering an operating exam, and if you don't have a simulator, then you would give an oral exam, a walk-through type like we do on the plant.

This is one aspect of the transition into the new rule where we are not going to look for everyone to have completed an operating test on May 26, 1987; but by May 26, 1988, everybody who's been licensed for that last year shall have j completed an operating test on the facility.

We're using a more common sense approach, so if you submit an application for j renewal for a candidate who has a two year license now, and you submit it in {

four months, that individual may not have had an operating test, as is described j in the rule, because he has not been under that rule for a year. We would still '

renew the license and issue him a six year license.

After everyone has been under the rule for one year, we would not find that he had met the terms and conditions of his license if he had not had an operating test, because the operating test is to be conducted each year.

1 Q. 351. If an SR0 directs the proper action, does that satisfy the ability to l perform the actions necessary?

A. Yes.

I Q. 352. We'vetalkedaboutanannualoperatingexamtobeadministeredbythe utility. What constitutes an " operating exam?

A. If you currently have a simulator on which you or we are conducting exam-inations, then you must include an oral and a simulator examination. It is not performance of practical factors in a training environment. We've had, for instance, the requirement of the Denton letter to perform certain practical factors on an annual basis. People take simulator training and perform the

practical part until successful, whether it takes one, two, or three tries.

We are interested in a structured examination. We are not interested in train-ing on the simulator. The structured examination must meet the requirements of  !

the regulation as it relates to sampling those areas that are specified under the regulation. It is a combination on the simulator, if you have one, and in the plant. If you don't have a simulator, it must be done in the plant.

Q. 353. What constitutes by definition, an annual operating exam? In our NRC-approved requal programs we administer what is called an accident assessment i exam. It's an operational type exam, documented by written examination, which I tests operator knowledge and on how they can operate the plant, implement l procedures, diagnose a situation, a transient, an accident, or whatever. Does l this meet the annual operating exam criteria?

A. Look at what is specified in the Regulation by way of observed behavior for the operating test, and assure yourself that the way you are implementing the exams covers those 13 items for an operating test for requal. The start up 1

NUREG-1262 96

shut down is the only portion that's dropped out. But control board familiarity, those kinds of things are still being assessed. You need to look at your program, and judge whether you have met those 13 items for the operating test for requal.

Q. 354. Must the annual operating exam for requalification be given in one time frame or can that also be broken up into_various pieces throughout the year? It's very difficult to get everybody done in one year by the training staff.

A. For a candidate, it needs to be done at one time, but if what you are asking is that you have 30 people that need to have an operating test, and you want to spread out the 30 tests over the period of a year, the answer is yes.

Can you take an individual and give him a walk-through today and some simulator evaluation tomorrow and then some six months from now add those three pieces up? That would not meet the intent of an annual operating test.

Q. 355. Not even if you broke up the in plant and the simulator between the dif-ferent weeks in requal, and catch them one cycle a week, get a crew in on the simulator and maybe the next time they come up, five weeks from then, get that same crew up on the plant?

A. Although we have explicitly approved such an approach for the written examination where you are using segmented tests, provided you show that the sum of the parts equals the whole in the comprehensive exam, we have not con-cluded that such an approach is acceptable for an operating test. Our posi-tion is that an operating test, to be effective, must be administered at one time, and must cover the 12 items in the rule as a minimum.

Q. 356. Section 55.59(a)(2) implies that the requalification program includes )

observations and evaluations of performance and competency by supervisors or staff members during actual abnormal and emergency procedures at the plant. Is this required?

A. This goes to part 5, evaluation, of the definition of. systematic approach to training. The intent.is that when the casualties are practiced on the simula-tor, performance would be evaluated by staff members as part of that systematic 3 approach to training. It's not intended to have those evaluations done on the actual plant. ]

Q. 357. The criteria for the NRC comprehensive requalification examinations are similar to the standard criteria for an initial examination listed in 55.41 and 55.43. What is the perceived difference between the two exams? 1 A. The requalification exam requires a sampling of criteria. If your requal-ification program is based upon a systems approach to training, you will have reviewed the tasks from the initial program which are appropriate for continuing ,

training. You will have chosen those on some criteria, such as frequency of performance, safety significance or other criteria. That's one way of deter-mining the content of your continuing training program.

Another way is the feedback from performance in the plant: licensee event re-ports, and the like. Another area would include facility design changes and/or .

NUREG-1262 97 j

changes in procedures. Those are the subject areas that we would tend to focus on for a requalification examination.

When you move to learning objectives for your requalification program th"t have conditions and standards, we would use that as the basis for sampling the content of the examination.

3 l

In the meantime, because that's not fully in place yet, we are using such things i as.the K/A catalogs, which identify the importance of job tasks and are based i upon the industry generic job task analysis. We are also using a sampling plan

-- it was referred to as the " examiner handbook" -- where we sample from that catalog to ensure that we get a representative sample of the knowledge, skills )

and abilities -- the skills being done on the simulator--that are appropriate for an NRC examination.

3 We intend the initial examination to be different from the requalification examination. We will look at the two, even though we developed them in paral-lel; and questions which are not appropriate for a job incumbent - questions, for instance, on watch relief and turnover or otner things which he does on ,

a repetitive basis -- would be excluded from the requalification examination. )

We believe that through the informal review process of appeals, and the facility ,

review of the written examinations, there are sufficient safeguards in place during the transition period to ensure that there was a content-valid examina-tion that was indeed related to job performance.

From our review of examination reports from all the regions, the weaknesses concern knowledge of events that have occurred at their own plant, significant events at other similar plants, changes to design, changes to procedures, and selection of those tasks from the initial program which are relevant to training on a continuing basis. We do not help the operators if we simply repeat the initial program for continuing training. That's not the intent.

Q. 358. How are the current guidelines, which allow requalification examination site visits to be extended to every three years based on good SALP ratings or l accreditation, going to interface with 100 percent requalification every six  !

years? .

A. Basically these are two different programs. One is a programmatic evalua-tion looking at the adequacy of the requalification program. The other deals with the Commission-directed re-examination of each licensed operator on a six year hasis. In the next couple of years, though, we don't expect it to change very much. It's going to take some time to build up a pool of six year licenses so that we would be conducting the examinations in accordance with this regulation. So in the near term, those facilities which have better performance and have achieved INP0 accreditation would have a longer period between NRC visits. ,

Q. 359. On the question of randomness, if in year two a candidate passes the exam, and in year four he fails, the rule says he has to pass it once during the six years. Will that stop the renewal of his license?

A. No. If he had passed one exam and failed a second one, but was re-examined by the facility after appropriate remedial training and returned to watch, he NUREG-1262 98

)

l l

would have passed an exam and that would be the basis for the license renewal.

The rule does not say the last examination administered by the NRC. It says an examination during the six year term of the license. And we recognize that some people may have more than one.

Q. 360. What process will be used to schedule the NRC-administered written examination and operating tests during the term of a six year license?

A. It is our intent that this will be a random test, performed on a random basis. We would try not to have double jeopardy, where an individual takes more than one NRC exam during his six year term. But he may. We will have to coordinate with the facility. We would, in our 90-day letter, ask for lists of people who would be eligible to take the NRC exam. This would include all licensed individuals at the site. If there were individuals who had a vacation scheduled during that time, or if there were some personal hardship, we would want to know about it. We want to work with your people's needs as much as we can.

Q. 361. This question addresses the random requalification examination and the pending notification. A lot of emphasis is placed on team work and communi-cations, even though the license is granted to an individual. Admittedly, periodically we may rotate a person within a shift due to illness or vacation, etc., but most of the people, normally three out of the four, usually remain the same. The potentiel exists for administering a simulator examination, potentially to four people that don't work together normally. Have we consi-dered the potential jeopardy there, that we have created an environment con-trary to the way we have been trying to teach the operators, in particular going to the plant-referenced simulators?

A. The examiner standards indicate that when selecting people from shift, you select one crew. That is the mechanism we use. And one crew is approxi-mately 20 percent of those people on shift, unless you have a six-shift I rotation instead of five. And then we look at approximately 20 percent of the  !

operators who are Oct on shift, the day-shift workers. l l

To the extent we can, we would put them into the crews where they normally l work. But when you consider all the other constraints, such as those who  !

have six year licenses, who has two years, what is the time frame for renewal, that will not always be possible. To the extent we can, we want to accommodate your personnel. We would try to coordinate the examination visits with the requalification cycles that you are already using. In fact, in the past we have allowed the facility to identify how they wanted to combine the crews. )

1 We just say these are the guys we are going to see on this schedule, and you l tell us how you want to group them.

But at the same time, there is not going to be a lot of advance notice to the individual as to when he is going to be examined. It will be on the order of ten days. Although there may be some comfort in being examined in the team environment in which training takes place, transfer between teams is' a prac-tical reality with which each operator must be equipped to deal, both in the plant and in the NRC exam.

Q. 362. Will a representative sample group of license holders be tested or will the whole license complement be tested?

NUREG-1262 99

. \

A. In keeping with the Commission directive, it should be a random sample of license holders. All would be subject to exams. We would coordinate that with you if there were severe hardships but that would have to be handled on a case- ,

by-case basis. I l

Q. 363. This concerns the random examinations of licensed operators. How far l in advance will I know who will be examined? When will I be supplied with the 1 list of names, saying that on this day, these people will be examined?

A. You will be notified of the examination 90 days in advance in accordance I with ES-601. Typically, ten working days, prior to i.he examination, we have i notified you of the individuals who have been randomly selected for the requalification program evaluation. l Q. 364. Will NRC notify the facility in time to facilitate preparation of the license holders before taking the requalification exam?

A. We will provide ten days notice. It was explicit direction from the Commission to ensure that examining is done on a random basis for reasons that are associated with evaluating the continuing training program, and evaluating and ensuring that the candidate maintains proficiency and an appropriate knowl-edge level over the duration of his license.

We will coordinate the scheduling of examination visits with y'ur o regular requal )

program schedules and/or your replacement examination schedules to the extent j we can. But our resources are limited. We are budgeted for two visits per  :

year to a fa'cility. And if you have a need for more than two to accommodate some activity, it's likely not to occur without adequate advanced planning.

And we will choose candidates from among those who have not been examined by the NRC before we select someone who already has been so examined. However, some people will be examined twice, so that those who got examined early in their cycle shouldn't make the assumption that they're not going to see the NRC again for the duration of that period.

Q. 365. In the past NRC tested requal every two years and the operators, were drum-head tight, until somebody was randomly selected. Then they relaxed for two or three years, depending upon whether everybody had gotten accredited.

And then the cycle was repeated.

I'm under the impression that neither NUMARC, nor the operators, nor anybody else, had an opportunity to critique these particular two paragraphs prior to having seem them here. It appears to me that as a minimum, NRC is going to have to give a requal test once a year, if I have requested a hot license test once a year.

A. Your aerception is quite accurate. The Statement of Considerations is the vehicle t1at the Commission used to provide directions to the staff on how to implement the Regulation, which has always permitted the staff to administer requalification examinations. The fact that the requalification examination has been made a condition of license renewal is new.

NUREG-1262 100

l l

l There was some concern in the past, of "why me?" "Why not this other guy?"

By putting it in the Regulation, and indicating what the intent is, it becomes clear that everyone will, at some time during that six year license, be examined by NRC in order to have his license renewed.

We are accepting a certification by the facility for two written tests and five operating tests per six years, but the staff will continue to examine in some cases. That is, we will simply choose not to accept the facility's certifica-tion at that time, and we will examine the individual. There may be some cases where an individual will be examined more frequently than once each six years.

Q. 366. If an operator gets his license renewed, and is tested in the first year, my arithmetic says that he can't go but one year beyond his renewal. Then, clearly, the frequency is going to be greater, by definition, than once every s1x years.

A. Correct. That's why we use the word at least once during a six year I license. {

Q. 367. These questions are related to the NRC-administered requal. Would it be possible for an individual to be selected twice during the six year period before all other individual licensees were selected once?

A. We intena to select people who have not been selected before selecting someone a second ties. But that does not preclude this from happening, if we got everybody else. If we've been through all of the people with six year licenses, and we are still sampling, it is possible for an individual to be examined twice.

Q. 368. So, it's random, but the pool from which the random selections are made gets smaller as people are selected?

A. It could get larger, based upon more six year licenses being issued. At some point it will reach equilibrium, where everybody has a six year license.

Q. 369. Is this a testing of the requalification program, or is it testing human beings every six years? I feel'that it may have'been a step backwards in raising the anxiety level of the population of operators who are going to be up tight every year. That's why I don't understand the Statement of Considera-tions, because I'm just concerned about those people.

A. It says that we're going to test so that nobody goes more than six years without being tested, and means that some are going to get examined more than once in six years. It's our view that if a licensed operator is going through an effective, continuing training program, then there shouldn't be any concern with that person getting an NRC exam because our exams are designed to confirm that the individual has maintained a minimum acceptable capability. If he is going through a continuing training program, our expectation is that he is way )

above the minimum that's acceptable.

Q. 370. I feel perfectly comfortable that our operators, and our supervisors on shift can safely operate our units. The vehicle you are using to measure the requalification program is improperly aimed at obtaining those results. If we )

1 3

NUREG-1262 101

focus the requalification program on problem areas, design changes, and events in the industry, it's fairly narrowly focused. But the exam looks at a target area oeyond that, that has not been covered, for memory / recall type things, and it's unrealistic to see the operator be able to pass that, or the senior operator, or anyone else.

But if the exam were focused on what the requal program had focused on, then the focus is on target. You ought to be able to pluck an operator off shift, have him evaluated, and expect that he'll do fine. But when it's not aimed at the same material, very little probability exists of him doing well on the exam.

A. We understand your comment, and we recognize that both groups are trying to move to the point where we are using content-valid examinations to measure performance. We have a ways to go, and we are working on that. And we think you all have ways to go in describing adequately the content of the continuing training program. Eventually, we will get to the point where we have closure-on the scope and content validity of a requalification examination.

Until then, there is going to be anxiety. We believe that with the administra- 1'

.tive review process for examinations, there are adequate safeguards to ensure that improper questions can be challenged, and that the questions are appropri- >

ate to the job. We have provided some tools to do that, and they need to be used. And until we get conservative feedback both ways, and recognize that the objective is to measure that individual's performance, the imperfect tools that we are using now aren't going to get much better.

And that is a challenge to the industry, to really take a hard look at the INP0 guidelines in continuing training programs, and to consider how your program is modifiedtomeetthoseobjectives.

We've had problems with exams in the past, and we probably will in the future.

We have found problems with requal programs in the past, and we'll probably find problems with those programs in the future. But we have not taken action against individuals by way of revoking licenses, or other activities. We do expect that until remediation is provided, those who fail are removed from shift-standing duties until they are brought back up to speed.

And if they feel that the examination is unfair, they can request a review of the examination by the Regional Division Director, and they can subsequently request a review by the Director of DLPQE. We are serious about improving the quality of exams and getting them content validated.

Q. 371. What would happen if, by chance, an individual wasn't selected durino the six year period?

A. The NRC intends to administer a comprehensive written exam and operating )

test to every licensed operator at least once during the six year term of the license. In the unlikely event that an individual did not receive such an exam, we would take immediate steps to initiate one. However, we would have to con-sider that he had made a timely application for renewal, and as a result, his existing license would remain in effect. But we would not issue a new license until we had examined the individual.

NUREG-1262 102 l 1

_ -- -- - t

Q. 372. What occurs when an individual fails the NRC-administered requalifica-tion exam?

A. First, the individual is removed from licensed duties and placed in an ac-celerated training program. Once he has successfully completed all remedial training, he must pass a facility-administered examination to ensure that all weaknesses have been corrected. If that facility's training program received an NRC rating of marginal or unsatisfactory, this examination may be overseen by the NRC, in keeping with the alternate approach to requalification evalua-tions which was recently adopted by NRC.

In addition, it should be noted that in accordance with Section 55.57, all operators must pass an NRC-administered requalification exam during the term of the six year license. Therefore, if this individual failed the NRC-administered requalification examination and has not passed another NRC-administered exam during the term of his current six year license, his license will not be renewed until he has passed such an examination.

Q. 373. Is there any minimum period before a person gets into the :equalifica-tion pool, after getting an initial license?

A. The clock starts the day he gets his six year license. But if we give a requalification program audit, and there are individuals on site with two year licenses in effect, they are also in the pool to be randomly selected for an evaluation of the requalification program, in accordance with Examiner's Standard 601. So, don't assume that only six year people may be chosen.

Q. 374. Part 55.59 states that in lieu of accepting certification by the fa-cility licensee that the licensee has passed written examinations and operating tests administered by the facility licensee, the Commission may administer comprehensive requalification written examinations and an annual operating test. Will this testing take the same form and frequency as the previously established 20 percent testing at 50 percent of the utilities in the Region?

A. Yes. It will have essentially the same form except it will now be about 16 percent of the operators at all facilities in the region every year. For clarification, you can anticipate that the operating test will resemble the one that would be given for an initial candidate, but the written exam would be geared directly to job performance. The written exam is going to have to be operationally oriented.

Q. 375. Will renualification exams be administered to non-approved requalifica-tion programs?

A. As we see it, there are no such programs. You are operating under present NRC approval under old Appendix A, new 55.59(c), the requal program, or you have an INPO-accredited SAT-based requal program. There can't be anything out-side of those.

Q. 376. Prior to the issuance of this rule, people developed their requal pro-gram with two taskmasters: one, the INP0 accreditation process, and the other, the relatively non-task based aspects of Appendix A. Now that the utilities NUREG-1262 103

c have got the flexibility to withdraw or to remove the non-task based part of the old programs, which may take some time, what is the approved program in the interim? Is it the old program?

A. Yes, you must follow the NRC-approved program, which was based previously in Appendix A to Part 55, until such time as you send to us a letter which certifies that you are accredited and that your program has been based upon an SAT approach. We don't believe, however, that that is such a big task. Some of, the material we required in the past falls into the kinds of things that can be used in an SAT-based program.

Whether that set constitutes 80 percent coverage or 70 percent coverage, we're not sure; but the real issue is the flexibility to design your program based upon program evaluation and feedback from on-the-job performance to factor in changes in procedure, changes in design, licensee events, industry events, and if you look at the programs that have been approved by the NRC, those have been required.

In some cases, because of the need to cover so many hours in the classroom, you've had a competition for time available to conduct training, so important items have been covered in the discretionary time left.

So we think that's a major advantage, and it's one that we would encourage you to look at carefully and to implement as quickly as you can.

You have to follow your approved program, but by May 26, 1987, that approved program has to be brought up to at least meet the requirements under the new rule. If you have an Appendix A approved program in place currently, then on May 26th, you can submit a certification that you have SAT program which now meets the requirements of the new rule, but if you do that on May 26th, to upgrade to the SAT program, the program you have in place has to comply. No matter what it is, it has to comply with the new rule on May 26, 1987.

If you do not intend to upgrade to an SAT program, you can continue to follow the format of your old program, but that old program has to meet the require- '

ments of the new rule on May 26, 1987.

Q. 377. What is'the intent of the Commission to approve specific cycles as a part of each facility's training program?

A. Once the programs are certified as SAT programs, it's not our intention to recertify these programs on any particular basis. Item No. 5 brings in the continuing process of change that should reflect the feedback from the perform-ance evaluation of your program. The Commission will not be requesting periodic certification. You certify once and update to indicate when subsequent accredi-tation was achieved.

In the first round of accreditation, you have a specific date that you were accredited. Through that process you have a requirement to submit a report at two years and to be re-accredited at four years. You would simply send in another letter that says, "My programs have been again accredited," and that would be all that's required based upon the Commission's endorsement in the policy statement as it exists today.

NUREG-1262 104

Q. 378. By what means is a utility to certify to the Commission that their requalification program is both accredited and based upon a systems approach to training? The interpretation for implementing a systems approach to training is somewhat different by the NRC and INP0. By what specific standards is our certification for using a systems approach to training based; i. e., the NRC's criteria utilized in conducting pre / post accreditation site evaluation, or using the INP0 85-002 criteria?

A. The two are equivalent; that is, NUREG-1220 is essentially a series of questions related to each of the five elements of a systems approach to training as it's described in the policy statement. In that same policy statement., the Commission has endorsed the INPO accreditation objectives and criteria as being a systems approach to training.

The difference comes about in that INPO has 12 objectives and about 60 subor-dinate criteria. The Commission in the policy statement identified five elements, and the Staff has a number of questions that we use for information-gathering in our reviews. However, we would prefer that you use the INP0 accreditation objectives and criteria and supporting documents; in particular, for your requalification program.

There is clearly a hierarchy of documents within the INPO program. Objectives need to be met. Criteria may or may not be met if you can still meet the ob-jectives. . Guidelines are just that--they are guidelires, an acceptable way of doing business as INPO would review it.

That is very similar to the staff's approach in doing our postaccreditation audits. We have questions that relate to each of the five elements that the Commission has endorsed. Those questions do not imply criteria. They are simply areas where we gather information. So the simple answer to the question is follow INPO.

We have seen several cases where the requalification program was not based upon ,

a systems approach to training; rather, it was based upon a training program docketed with the NRC, that the NRC had approved. It was very prescriptive.

It.was, " Conduct X number of hours of classroom training, perform certain prac-tical factors on the simulator in accordance with the Centon letter," etc.

Because of a reluctance on the part of the utility to change commitments that are required by license condition or regulation, many of those programs were not changed to a systems approach.

Effective May 26th, you can remedy that prior restriction by simply sending a letter to NRC which indicates that you are accredited and that you have developed your requalification program on a systems-approach-to-training basis.

That's the most important aspect of this rule. It gives you the flexibility to control the content of continuing training based upon the needs of the individ-uals who have been trained, and the feedback mechanisms which are described.

Most important is Element 5 of the systems approach to training: program re-vision based upon evaluation of performance on the job. That's where we see the major payoff, and we think that we are giving you the flexibility that you need to fully implement the industry commitments through training and accreditation.

NUREG-1262 105

. R Q. 379. What criteria is the Commission going to use to approve programs de-veloped using a system approach to training?

A. If you are asking the NRC to approve a requalification program that's based on a systems approach to training, we don't look forward to trying to do those kind of reviews. We'd rather see a submittal indicating that you have an INPO-accredited program, which has both initial and requalification training based on an SAT.

If you were to ask NRC to review a training program that was not INPO-accredited, that you claimed was based on a systems approach to training, we would try to use the document that we now have to evaluate that, NUREG-1220.

For clarification, if your program is accredited, and you're not a cold plant licensee, then prior to receiving an operating license we fully expect that you I will use the INP0 accreditation process and the guidelines that have recently- '

been issued by INP0 in their continuing training guidelines for licensed operators to develop your requalification continuing training program.

We will accept a simple statement to the effect that this has been done. We accept as fact that you have been accredited, and therefore that you under- l stand the process of developing' performance-based training. We do not expect )

to review such programs. I don t think INP0 would like us to review programs i against their criteria and to put them into that context. We are trying to, in '

this rulemaking, clearly differentiate between training programs, which are being handled by the industry initiatives through NUMARC and INPO, and licens-ing requirements and the NRC examination. We don't want to mix those two, and would probably have discussions with facilities that propose to do otherwise.

Q. 380. As far as the INP0 document,86-025, is concerned, you just say "as long as you are following the guidelines." Do you expect verbatim compliance with the guidelines, or just general compliance?

A. There is a hierarchy of criteria within the INPO program, starting with objectives. Then you have criteria guidelines. You must meet the intent of theobjective. That's a "shall." When you get down to the criteria, you may not meet all of them verbatim. For some you may have alternate methods.

Guidelines indicates what INP0 believes would be acceptable to meet the intent of the criteria and the objectives.

Your program has mechanisms for reviewing and deciding how you put that process i in place. The fact that you are accredited is evidence to us that you under-stand how to use that process and those guidelines. We don't need to see the details, based upon the fact that you have been through accreditation.

The principal goal for revising the requal programs is to allow feedback from operating problems, particularly licensee events, plant design changes, proce-dure changes, and other aspects of training for which there is a demonstrated need, and not to be constrained to X number of hours in a class, because that's I what's been required in the past. )

4 Q. 381. What if I put in 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> of simulator time, although INP0 says 120, but we're doing okay with 80?

l l

NUREG-1262 106

]

A. That's between you and INP0 and your needs under a program which utilizes the SAT process. We have confidence in the process based on our evaluation of a number of facilities. We may get back into training programs if we see per-formance deficiencies on the job, through an event or through our inspection program.

We have developed guidance, the series of questions in NUREG-1220, as to how we're going to go about evaluating programs. So that you know what you consider to be fair game for us to look at. But we are not in the mode of telling INP0 what to do. That's for the Accrediting Board, INP0, and the facilities to determine.

Q. 382. Will your evaluation of the h. raining program be in accordance with the guidelines in NUREG-1220?

A. Yes. We have had a number of discussions with INP0 on it, and we have been using that for our post-accreditation review.

Q. 383. Will a change to FSAR Chapter 13 (to satisfy new 10 CFR 55 requirements) be considered a decrease in the scope of an approved operator requalification program requiring prior NRC approval, in accordance with 10 CFR 50.54(i)?

i A. No. That issue is addressed in the Statement of Considerations, where it I indicates that this Rule supersedes all other previous requirements. .Even i though the Rule may have caused a decrease in the scope of your requal program it has already been sanctioned by the Commission in its approval of this Rule, provided your program is INP0 accredited. If it's not, then you must follow 50.54(i);--so you must determine if it has decreased in scope.

Q. 384. Applicable portions of Title 10, Chapter 1, Code of Federal Regulations are one of the lecture topics for a requalification program. Can you be more .

specific as to which portions of Title 10 are applicable, or is that up to the j plants to determine?

l 1

A. You just cited the NRC Rules and Regulations, which includes such things as i Tech Specs and amendments to licenses, and things like that. So, there are I many Title 10 issues, including the radiation protection standards in Part 20.

The subject matter of those lectures should be determined by the plants to satisfy the training needs of their operators.

Q. 385. Paragraph (c)(3)(i) of Part 55.59 requires certain manipulations to be performed annually. This list of manipulations dif fers from the list in the Harold Denton letter of March 28, 1980. Our requalification pregram is based l on the Denton letter. How long do we have to modify our requalification program to be in compliance with the new 55.59 requirements?"

1 A. The rule supersedes and should include the requirements of the Harold 4 Denton letter of March 28, 1980. If there are commitments in your program that go beyond those identified within the March 28, 1980, letter, then you will have to entertain an amendment to your Tech Specs to bring your program to that minimum level specified within the rule. Otherwise, we expect you to have a program that is modified and in compliance with rule by May 26, 1987.

NUREG-1262 107

Q. 386. Section 55.59(c)(3)(v) states: "A simulator may be used in meeting the requirements of paragraphs (c)(3)(i) and (3)(ii) of this section, if it repro-duces the general operating characteristics of the facility involved and the arrangement of the instrumentation and the controls of the simJlator is similar to that of the facility involved." Fort Calhoun will continue to use the Combustion Engineering (CE) simulator in Windsor until the plant-referenced ,

simulator is available for training. Is the CE simulator approved for meeting the applicable requirements until such time as a referenced simulator is avail-able? The same question applies to the discussion in Section 55.59(c)(4)(iv).

A. Yes, until May 26, 1991. This is now a part of your requalification pro-  ;

gram and will continue to be a part of your requalification program until you either have a certified or an approved simulation facility.

Q. 387. Does NRC agree with the utility interpretation that they may use the nonplant-referenced simulator as the preferred device when it comes to the .

requalification training program's on-the-job training control manipulations?

A. The word " preferred," we would think of as " equal." There is a nuance for j the control manipulations -- the on-the-job training in items (a) through (f). {

In the Rule, under on-the job training, it says, "A simulator may be used in meeting the requirements of paragraps (c)(3)(1), and (c)(3)(ii) of this section, Ji if it reproduces the general operating characteristics of the facility involved, {

and the arrangement of the instrumentation and controls of the simulator is I similar to that of the facility involved."

This difference permits the use of the nonplant-referenced simulator for start up, shut down, and other things which are not related to casualty control, even after you have certified or received approval of your simulation facility. It specifies that you must use the certified or approved simulation facility for ,

the operating test, and for Subparagraphs (g) through (aa) of the Section, which are the casualties.

So, you may use a simulator other than an acceptable simulation facility for control manipulations for requals. But you must use the acceptable simulation facility for casualties after May 26, 1991, or after you have been certified of received approval. It. provides you some flexibility during periods when your simulation facility may not be available for routine control manipulations.

Q. 388. May a utility use a certified simulation facility for requalification training programs, such as on-the-job training in control manipulations, or must some control manipulation.s be performed using the plant controls?

A. If you look at the list, it just says you can't do casualties on plant controls. Items A through F in 55.59 are eligible to be performed either on the plant or with an approved or certified simulator.

These relate to start-ups and shutdowns and changes of power of more than 10 percent, manipulations which you can perform on the facility without putting it in danger. It is your option. You may either do those on the plant or on the simulator.

For the remaining items that are required annually or for the operating test, those must be done on a simulation facility. They may not be done on the plant.

NUREG-1262 108

Q. 389. With respect to licensed operator / senior operator requalification train-ing, is it appropriate that utilities assume they can take credit for the required annual and biennial plant control manipulations completed on a simulation facility (nonplant referenced) if their programs have been approved by the National Nuclear Accrediting Board?

A. Yes.

Q. 390. Can a utility whose training programs have not been accredited by the National Nuclear Accrediting Board and which does not have a plant referenced simulator take credit for plant control manipulations that are performed on a nonplant referenced simulator? '

A. If that's what your approved program is now, then there will be no change to that approved program until you get your own simulator, or until May 26, 1991 at which time the regulation requires that the training portion be done on a certified or approved simulation facility. There's an exception, in Section 3, "On-the-Job Training," that you may substitute your accredited pro-gram for those requirements. So if you are able to talk INP0 into accepting a simulation facility other than a plant-referenced simulator, that's between you and INP0, but for the purposes of the staff's review, we would expect you to use the simulator after it has been certified if you do that before the May 26, 1991, with one minor exception, which has to do with the first six on-the-job items listed under 55.59(c)(3). In that case, you need not have a certified simulation facility or an approved facility. The words permit you to use another simulation device. Section 55.59(c)(3)(v) permits the use of a simu-lator which' reproduces the general operating characteristics of the facility involved, if the arrangement of instrumentation and controls of the simulator are similar to those of the facility involved. It only requires the fidelity of a piant referenced simulator for the casualties.

Q. 391. Must all six manipulations listed in Paragraph (55.59)(c)(3)(i) be performed biennially, or just one of the six?

A. Items A through L must be performed annually. All the rest are performed ,

biennially. All of the first six items must be performed, either on the plant or the simulator. The rest are casualties, that must be performed on a simulator.

Q. 392. Is it correct that Section 55.59 has now added fuel manipulations to the required items to be done annually? They are more than what's in the Harold Denton letter. We have renewals coming up during tb . summer of 1987, and the training program has been ongoing for the last ye6 There may be some I manipulations that, in fact, have not been accomplished on t.ne simulator on an annual basis by July of 1987 that 55.59 now says should have been done on an ,

annual basis. j A. There are two parts to this answer. First, the requirements in Sec-tion 55.59(c)(3), with the exeption of the sequence, are identical to those in the Denton letter; no fuel manipulations are required. Second, although the new requirement exists, the annual manipulations don't have to be completed for everybody until the regulation has been in effect for one year.

I NUREG-1262 109 i

9 i

I Q. 393. In 55.59, "0N-THE-JOB-TRAINING," loss of electrical power is one of the manipulations that needs to be performed. Is that loss of off-site power or 3 degraded power sources, such as the loss of half of your emergency bus or is it i a total blackout?

]

A. It may be both. That is, it could be a. total loss of electrical power, or it could be loss of power, particularly involving buses or. consoles. i Q. 394. If we want to run those scenarios, either one would meet that?

A. That is correct. But remember that, according to that Section, you may not do casualties on the plant. The break-out in the Regulation specifies that everything below a loss of coolant event is an accident. The malfunctions  !

and faults are done on a simulator. But the permissive part.is for the other manipulations, the control manipulations, that may be done on the plant or on a simulator.

Q. 395. Must plant control manipulations during the requalification period be i documented on Form 3987 A. The documentation hasn't changed for that particular. item of the'398 Form.

You still have to certify that the control manipulations were done. Only where there would be exceptions to the guidance in Regulatory Guide 1.8 would there need to be some amplifying comments made. For-example, if you did five similar manipulations, evaluated them and concluded they were acceptable, you might want to point that out in the comments section on the Form 398..

Q. 396. If a license holder fails the written requalification exam or operating test administered by the Commission during the six year license term and sub-sequently participates in the approved accelerated requalification program per Section 55.59(c)(4)(v), will certification of successful participation in this program be acceptable for renewal, or will a second NRC-administered exam during the six year term be required?

A. A second NRC examination will be requirud. That individual can go back i on shift after failing the NRC requal exam, after participating in upgrade '

training and passing the. facility's own evaluation. However, the terms of the Regulation are that for renewal he must pass an NRC-administered exam.-

Q. 397. Must licensed Operator training records be retained for the life of the plant?

A. Those that deal with the six year license, per se, only need to be kept for six years. However, some facilities have committed to record retention require-ments in their Technical Specifications which are more restrictive than this regulation. In order to get the relief that the regulation permits, you must' submit an administrative change request to amend your Technical Specifications to make the record retention requirements equal to six years or the_ term of the individual's license. -

I This Rule supersedes all previous requirements for Operator licensing and training, unless you currently have a more restrictive requirement. In that case, there are two vehicles you can use. One is an amendment to the license, l

NUREG-1262 110

if a formal amendment is necessary. The other is a 50.59 review, which you can do administratively and then notify us that it has been comp eted when you indicate your other changes at the end of the year. In any event, you must conform to the requirements of the regulation, particularly those that are more restrictive than your current program.

Two examples immediately come to mind. Most people today have an annual written examination. The Rule would permit you to go to a two year examination. The change to go to a two year exam can be processed under 50.59 and it does not constitute a reduction in scope if the change is for the purpose of conforming to the regulation.

That is, the Commission, in the process of reviewing the regulation, concluded that there were compensatory measures for changing from a one year written exam to a two year written exam. In this case the compensatory measure is the annual operating test. So it does not fall into a reduction of scope and it does not require prior NRC approval unless it happens to be involved in an amendment to the license or the Tech Specs.

Q. 398. This is a question about documentation of exams given at the Plant.

Under the requal program, it says that we must keep the student's answers for the period of the license. Does this mean that we must keep those exams as quality records and keep them for the lifetime of the plant, or are you saying that we keep it for the term of the license?

A. It's for the term of the operator's license. And in this case, for example, his records would include six operating test examination forms, and three com-prehensive written examinations in his individual file, until such time as his license is renewed, and then you start over again. Now, if you use a segmented examination in lieu of a comprehensive exam for each requal program, and you have more than three written exams, then that's a function of how you structure your program. You keep them only for the term of that individual license.

Q. 399. So, are fou saying for any operator exams that we administer, once we are past the renewal stage, we could destroy those as long as we have quality records to back up the fact that he had the exam -- in other words, the grades, and so forth? .

A. The fact that he was in a requalification program before, and you certified that, yes, you could put them in other quality records.

Q. 400. On initial operator exams, are we required to keep the exam itself, or can we just keep a summary that goes in the operator's history file -- a sum-mary of his grades, and things like this? We currently keep the master exams and a copy of the answer key, but are we required to keep the individual student exams and his answers?

A. Our requirement is that the actual exam, or copies of the actual exam, be maintained for the duration of the current license. When you get that license renewed, you may eliminate that material from the files and start over.

Q. 401. So are you saying once an operator gets a license, we could do that on the initial files, too?

r NUREG-1262 111

. 1 i

A. That is correct. The requirement demonstrates that you've met the require-ment of the Regulation to conduct operating tests and comprehensive written 1 examinations during the term of that particular license.

Q. 402. How are microfilm records authenticated to meet 55.59(c)(5)(ii)?

A. They are authenticated by an authorized representative of the facility.

Q. 403. Ceuld you comment on the use of video tape as far as exam documentation.

You mentioned keeping a deck log where you would recover strip charts. Would you give us some comment on the use of video tape?

A. We do not intend to use video tape or the equivalent of instant replay during an examination. The records that we are looking for are the same records that 4 would be used for a post-trip review, essentially the same documentation. To the $

extent that the simulator has the ability to retain the scenario, and you can-down load that to a computer tape, you could retain and use that tape.

Q. 404. I'd just like to make one comment on that. That's fine, I think, if the scenario includes a trip. If you're starting in mode four with a scenario, it's more difficult to recover those kind of parameters that you would need to recreate the scenario.

A. The problem with a TV tape is that it is incomplete. You may not. hear discussions between the candidate and the Examiner because of how microphones are placed. We generally stand back, but at times we are at the Operator's elbow.

We have been asked on numerous occasions whether the facility would be allowed to video tape for either record purposes or training purposes. We consider it intrusive, both on the candidate and the Examiner, and incomplete.

Q. 405. Most of the manipulations that are listed in the Regulation are not l applicable to test and research reactors. Are we still operating under the ten j manipulations in a two year period, as we have been in the past?

A. If that was in your approved requalification program, it would remain i approved. {

Q. 406. Is it possible for requalification examinations administered by the NRC to be " split", such that the written and operational exams are given during I different site visits?

A. This is Regional prerogative, on a case-by-case basis, with advance notice to licensee.

Q. 407. A licensed RO is enrolled in the facility's SR0 upgrade training pro-gram. NRC chooses this individual, randomly, to participate in their requal program evaluation examination. He fails the NRC administered exam, yet he is passing or has passed all portions of the upgrade program to this point.

Does he have to be withdrawn frca upgrade program, go through accelerated requal for R0 requal exam failure, and be reexamined, or can he just drop R0 qualification and pursue an SR0 license?

NUREG-1262 112

l A. A licensed operator must meet the requirements of the facility's requali-fication program which generally requires accelerated training and/or reexami-nation. His status in other facility managed training programs is the preroga-tive of facility management. If the facility elects to " drop R0 qualification" for the individual under 10 CFR 55.5(a) the individual could make application for an SRO license under 10 CFR 55.31. However, the individual would not be an SRO upgrade candidate as that status assumes a active R0 license.

Q. 408. Will written exams administered by NRC for requalification be totally objective, totally subjective, or some combination?

A. They will be a combination of both. Some examination questions are writ-ten with the intent of meeting the definition of an objective question. An objective question is defined as one in which: (1) there is only one correct I answer; and (2) all qualified graders would agree on the amount of credit al-lowed for any given candidate's answer. j Q. 409. Will persons holding a two year license be included in NRC requal exams during the transition?

A. Persons with valid licenses may be included in NRC exams. However, re-newals will be under 55.57 which requires the facility licensee to indicate a need for renewal of the license.

Q. 410. Please clarify paragraph 55.59(c)(4)(iii). What is being asked for?

A. The regulation requires a formalized, documented system for evaluating the performance and competency of licensed operators and senior operators. The system must include observation of on-the-job performance and evaluation,.of the operators performance and competency through the use of an operating test.

The operating test must include evaluation of actions taken during actual or simulated events which require the use of abnormal and emergency procedures.

Q. 411. Concerning paragraph 55.59(c)(3)(iv), what does "on a regularly scheduled basis" mean?

A. The facility licensee must establish a review schedule that will provide reasonable assurance that each licensed operator and senior operator is know-ledgeable of all abnormal and emergency procedures. At a minimum, the schedule must require the review of all abnormal and emergency procedures at least once every two years.

Q. 412. Where preplanned lectures are part of the requal program, is it neces-sary that the licensees participate in all of these lectures, notwithstanding successful completion of the written examinations following these lectures, in order to be able to say that the licensee has met the requal program require-ments on the NRC-398 application?

A. Under revised 55.59 no provisions for exemption of lectures is provided.

If currently approved programs contain exemption provisions for licensed in-structors the programs should continue until the programs are accredited.

I 1

NUREG-1262 113

  • /

INP0 guideline 82-026 contains exemption provisions for instructors who teach specific subjects; however, they must attend lectures in subjects they do not l teach. l Q. 413. Paragraph 55.59(b) implies that the NRC is notified when an in.dividual fails a comprehensive written examination or operating test. Is this a requirement?

j A. The NRC does not expect to be notified if a licensed operator or senior operator fails an examination. Requalification programs have provisions for accelerated training. We expect facility management will provide the necessary retraining and reexaminations before returning to active license status an i operator or senior operator who has failed a requalification examination. l 1

Q. 414. How will non compliance with accreditated requalification training pro-grams (i.e. extended illness, jury duty, etc.) be requalified?

A. Operators will be required to make-up missed portions of the requalifica-tion program and to submit evidence to the Commission of successful completion of the training.

Q. 415. We have a program where we have licensed maintenance people as senior reactor operators limited to fuel handling. To what extent will this new rule apply to us, since in the comments preceding the rule there's mention that this is not being covered, that it's going to be covered as it is currently being done.

For the past 14 years, as long as we've had SR0s limited to fuel handling, we have not been required to give operating exams. Our annual requalification exam is a written exam only.

A. For a license which is conditioned to fuel handling only, the testing and requalification program should be appropriate to the license as it's condi-tiened. The licensee is not permitted to operate the facility. You would therefore not be required to give him an operating test, as described in the regulation.

I 1

NUREG-1262 114

4 I

o CONFORMING AMENDMENTS TO 10 CFR PART 50

_ - - _ _ _ _ _ _ _ - _ _ . _. 3

l i

\

Q. 416. The new 10 CFR 50.54(i-1) requires us to notify you of any change in the scope of our program. Since we are not defining for you what our program is now, what is it that you are looking for?

A. Let's say that you are using an NRC-approved program today, and you make a modification to that program to conform to the Regulation. Say you go from an annual written examination to a comprehensive examination each two years. You may do that pursuant to 50.59, and simply amend your FSAR at the next update.

Or, preferably, you would be accredited, have completed your review of your requalification program, and confirmed it as a systems approach to training.

Both methods may be done pursuant to 50.59. They do not require amendments to licenses. It is only when you have conmitted to something tnat's a part of the licensing document. For instance, some facilities have the Denton letter incor-porated in their Technical Specifications, associated with staffing on shift.

You need to look at your commitments on a case-specific basis for your utility.

Our intent is that you be able to do most of those under 50.59. They would not require review and approval by the staff in advance of your implementing the change.

Q. 417. Previously Part 50.54(i) referred to a decrease in scope, frequency, or duration. Now all you are saying is scope. Is that correct?

A. Yes. The reason for that is that the Rule specifies that you shall have a duration of no longer than two years, and it must be followed. The program that you use through INP0 describes content.

Q. 418. What about frequency of the parts?

A. That's covered by the systems approach to training, where you look at the task that is performed, and you decide what it is. And that's why we excluded the classroom, OJT, and examination portion of requalification given that you certify that your program is done in accordance with the systems approach to training. For clarification, although you may be giving segmented exams in your requalification program, you should be aware that if NRC conducts a re-qualification exam at your facility, it will be a comprehensive written exam and will include an operating test.

Q. 419. The systems approach to training in itself is subjected to revisions to the training program. Some of these changes may be considered, at least by the utility, as a reduction in scope. The statement in 50.54 is still there,  !

where it says that Commission approval is required for a reduction in scope in a training program. How do we meet 50.54 and still comply with 55.59? s A. The key words are "except as specifically authorized by the Commission." k The Commission itself, in the Policy Statement on Training and Qualification of {

Nuclear Power Plant Personnel, on March 20, 1985, particularly Element 5, indi- l cates that it expects the program to be evaluated and revised as necessary, l based upon job performance needs. j We recognize that if you only added and never subtracted, you would eventually get to the point where you're putting all the time into training and never l

NUREG-1262 115

_ - - - - - - - - - - - - - - - - _ - - - - - - - J

i doing anything on the job. We expect the evaluation to be reasonable based upon what you're doing. If you want to substitute something that's more impor-tant, the fact that you've dropped something does not constitute a reduction in scope for a systens approach to training.

We believe that's a major improvement in the whole training process. You are not locked into doing something for the next six, seven, or eight years because you committed to it in 1980. You now review it and, if it's meaningful, you perform it - you control that evaluation process.

Q. 420. With respect to that area of 50.54 changes, which basically states that we will have a requalification program and that we cannot lessen the scope, what documents would be looked at as base documents to see whether we did or did not reduct: the scope?

A. We will look at your approved requalification training program.

Q. 421. In the 50.74 requirement, you have set up some direction as to sending all correspondence for Part 55 to the Region. However, because this is a Part 50 requirement, should we be sending that to the document control desk in ac-cordance with Part 50.4, which became effective in January of 1987? All cor-despondence required under Part 50 was supposed to go to the document control desk, with a copy to the Regional Administrator. Please clarify.

A. Communications under each part of the regulation have to conform to the communications requirements of that part.

Q. 422. Is the licensee definition under 50.74 the same as the licensee defi-nition in 10 CFR 55?

A. Yes.

Q. 423. If a licensee is out of conformance with the INPO-accredited training 1 program, is that reportable pursuant to 10 CFR 50.72 and 50.73?

A. It's not reportable to NRC, but you may need to report it to INPO, along with what you're doing to get back into conformance. It may be reportable to NRC if you have certified that someone is a graduate of an accredited program and that he has completed the program, then you find that you have not implemented the program adequately. In that instance, you may have a reporting requirement to NRC.

1 1

l NUREG-1262 116

Appendix B 10 CFR Parts 50 and 55 Operators' Licenses and Conforming Amendments

R l

l 1

\

OPERATOR LICENSING EXAMINER STANDARDS (NUREG-1021) l l

~-~___

I l

Q. 424. What weight does NUREG-1021 carry?

A. The purpose of the Examiner Standards, NUREG-1021, is to ensure uniformit and consistency among the regions in the conduct of the examination process. y It provides direction to the regions on how we expect them to conduct the operator licensing function. We audit the regions against that Standard. It '

does not impose new requirements. That is, the requirements that are addressed )

in the Examiner Standards flow from other documents, whether it be a l Regulatory Guide, or Regulation, or other guideline.

That's why many of the changes to Examiner Standards described result from the change to the Rule, the more authoritative document. The standard contains policy on how to carry out the Rule. ' \

Q. 425. It was mentioned that the license examiners would be filling out a *

\

simulation facility fidelity feedback report. Could we request that those re-ports be included in our copy of the examination packages when they are re -

turned to us?

A. They will be. That has been incorporated into Rev. 4 to the Examiner Stan-derds. The simulation facility fidelity feedback report is contained in Emf-ner Standard ES-104 " Procedures for Postexamination Activities," as section C(3),

which requires that a Simulation Facility Fidelity report be prepared for each examination including simulator evaluations of candidates. The Standard also requires this report to be part of the Examination Report sent to the facility.

Q. 426. Will the Simulation Facility Fidelity Feedback Report be used do deter-mine the status of current simulators?

A. The guidance to the examiners is that this information will be applicable -

only to simulation facilities that have been certified or have applied for (

approval. However, even today, with the present vintage of simulators, you still receive informal feedback reports in the exam review process. And that 'd

will continue. If the Examiners have a problem conducting the operating, test s s

at your simulator, you can expect some feedback, although it won't be as formal (i as would occur after certification or approval.

~

Q. 427. It was stated earlier that once Form 474 is submitted, the simulation facility is certified in accordance with ANSI /ANS 3.5, and that there are three different mechanisms that may trigger the process of further evaluation:

(1) questions regarding the Form 474 submittal, (2) random visits to the facility for evaluation, and (3) the post-examination activities associated with the examination at the facility.

Would the procedures for the simulation facility evaluation feedback due by May

-- specifically, ES-104 -- be specific as to the standards and criteria and mechanisms by which the examiners will make a post-examination evaluation of a facility that would then trigger the evaluation procedure?

A. No. The mechanism is intended to be essentially a simple comment sheet i that might contain a comment to the effect that "During Scenario X, the'simula-tion facility failed to perform as expected. There was no flow coast down associated with reactor coolant pumps on a loss of power." , i NUREG-1262 117

(

This type of co m ent would be collected and evaluated. Someone would then determine whether it raised a question its our mind that would be the basis for going back and locking at the simulation facility.

It's not significantly different from comments on the simulator in the examina-tion report -- the inspection report that's issued following an exam. If there are a number of random failures, that's the kind of information we're collecting.

There is no acceptance criterfa threshold. It's the examiner's judgment. If he felt there was a problem, we're giving him a vehicle to write it down and communicate it back so that knowledgeable people can look at it and decide

, whether that would trigger an inspection or evaluation.

Q. 428. TypicaMy after that type of evaluation, there's not going to be a sig-nificant amount of data by which someone away from the facility, someone who was not there at the time of the examination, could make a very objective or accurate determination as to whether there is a problem with the simulation facility or not; and I understand that there are a significant number of freezes.

If, during an overpressure incident, pressure continues to rise to 3,500 pounds, then obviously there's a problem with the simulation facility, but other ex-amples may not be so clear-cut. Therefore, there's a potential for NRC followup where, perhaps it was not war.* anted because of an evaluation made by someone who was not there when the event occurred.

A. That's why we're getting the feedback from the examiner who was there at tar: time it occurred. The facility will also receive a copy of the writeup with the inspection report, and I'm sure it wil: he a subject in the exit briefing with the chief examiner at the end of the' exam week.

We think there are adequate mechanisms in place to alert the facility as to what the potential concern is, but most importantly, we want to get feedback on how well the simulation facility is working during an examination based upon an examiner's observation of that simulation facility.

Further, we have been increasingly requesting that facilities record data during simulator exams tn the greatest extent possible so that information is available for review on a more ob;ective scale.

Q. 429. We are required to complete training and experience blocks on Form 398 because we don't yet have an acceptable simulation facility, even though we have an INPO-accredited program. Will we still be evaluated in accordance with current ES-109 requirements?

A. Yes.

Q. 430. Under eligibility, you previously cited Examiner's Standard 109. In the future an accredited program with an acceptable simulation facility may be substituted for eligibility. Examiner Standard 109 says two years of power plant experience is required. Does that requirement remain?

A. A facility with an INPO-accredited training program that utilizes a certi-fied or. approved simulation facility need not meet other experience requirements.

NUREG-1262 118

I Revision 4 to the examiner standards revise # ES 109 to conform with the Regulation.

Q. 431. Examiner Standard 109 lists the eligibility requirements for licensed operators and senior licensed operator applicants. One of these requirements is that each individual spend three months on shift as an extra man uncier the supervision of a licensed or senior licensed operator. Is this requiremuit still in effect? Where does this requirement come from, given that it is not.

addressed in 10 CFR 55, and the new revision super:eder previws requirements?

A. Although not a requirement, this is consistent'with .our past practice, and j it's consistent with Reg Guide 1.8, which endorses ANSI 3.1-1981. ' It will bc continued in ES-109. Facility licensees can ask for a waiver, and their re- ]

l quests will be considered.

Q. 432. Examiner Standard 109 says that training conducted as part of a licente program cannot count for experience. But ANSI /ANS 3.1-1981, which is what the Commissioners have told us to use, allows related technical training.to count for experience. Is ES-109 in compliance with 3.1?

A. The training time that doesn't count as experience refers to the training l required by the approved license program in which the individual is partici-pating. Related technical training refers to training ne may have received in another position, such as auxiliary operator. This time may be counted, up to '

a certain percentage.

Q. 433. There was an article in Nuclear News, January 1987, pago 42, that says the average pass rate for the industry on requalification exams administered by the NRC is 78 percent nationwide. Examiner Standard 601 says that in order for a requalification program to be evaluated as satisfactory, 80 percent or moie have to pass. This indicates that the industry, natic?-wide, has less than 3 satisfactory requal program. Do you agree?

A. No, because the statistics that Nuclear News used are somewhat question-able. Last year we evaluated 17 facilities, anc'5 of them fell in the marginal or unsatisfactory category btG::se they had substantially higher failure rates.

So, a few are causing the net t nal statistics to be different. It was similar the year before, when we. had five facilities that were in the marginal or un-satisfactory category.

The program evaluation is based upon whether 80 percent or more pass. It's not based upon the average scores of the candi6 tes taking the exam. In other  ;

words, if you examine 10 candidates, and 2 fail, you have 80 percent passing and we determine that program is satisfactwy. The average score on that exam l.

may be 78 per cent because the 2 people th t failed scored in the 60s, while everybody else scored above 80. l I

Q. 434. Assume that NRC comes in to give the utility requalification exams, '

and the scores are between 60 and 80 percern and are rated marginal. After the utility modifies their program, reexamines tnose failures, and comes out with a satisfactory grade, does NRC change that from a marginal to acceptable program? q l

A. The marginal rating would be based on the examination given, :n accordance '

with ES-601. We evaluated the program and identified individuals with weak-nesses. They require remedial training, which b given. Their training will 3 NUREG-1262 119 +

i l

U

A,

, 7 dh 4 k.

E

?.

not cause us to revise our eva'luation. Two yetes hence, when we come back and and you will doevaluated be ancther ssevalutiord hopefully

!dtisfactory. The original80 evaluation percent will andpass at that conclus time}on stands until we:come back and re-evaluate, either by inspection or re-examination.

Q. 435. b'tEattrue,evenifourprogramwasmodifiedtocoverthoseweak-nessestpat;y6 undiscovered?

A. Yes. Your program may, indeed, no longer be marginal.

But until we come back and independently evaluate, that remains our conclusion of record.

Q. 436. So, the only way we can get that changed, is for.you to come back to give another exam, is that true? -

A. Yes, we come back and ins our inspection at that time. pect that area, and reach a conclusion based on Q. 437. Can we ask for such a re-evaluation?

A. Sure.

Q. 438. Wnat limits on materials requested from the facility licensee exist, if any?

' A' . We wW be, reasonable, but there are no limits. Typically, we'go through.

the list inith the facility, and indicate what items we need. We are not going to ask for the whole library or every print on tha'ftcility. However, we may need more material at times than you issue to the student to learn the plant, because we have to get familiar with different plants that have slight differ-ences from one type vendor to another. So, we may need more in-depth material.

i Q. 439. We receive a copy of the written e>an'after it has been administered, and as part of the documentation, we are prcvided with the learning objectives of the source documents from which these questions were derived. For simulator examinations, could,we be provided #ith that same documentation, since we go to the effort to devel'op scenarios thWare based on industry events, LERs, and' learning objectives that we've derived from our prcgram 40 that when you design yoursimulatorexams,theywouldalsobebaseduponthesegameprecepts?

A. We currently fill out Attachments 3 and 5 to Examirer's Standard 302, which delineatestheobjectivesthattheexameventsaretryinitoaccomplish. Those have been provided to all the individuals who have failed the examination. For i individuals who passed, we have provided only Attachment 3, the delineation of  :

the overall exercise itself, malfunction by malfunction, or over-ride by over-ride. We have not been providing Attachment 5 to individuals who pass. If you i request, we can provide you a copy of Attachment 5, which'contains our objec- l tives for that examination.

Q. 440. dth regard to IE'Information Notice (IEIN) No. %-101 " Applicability of 10 CFR 21 to Consulting Firms Providing Training," is training material that is found deficient reportable under 10 CFR 21?

i 1 u i D

i NUREG-1262 120 .

3 7

A. The answer is yes under certain conditions. IEIN85-101 provides guidance I to licensees and consultants concerning applicability of 10 CFR 21 to certain training activities provided by consultants. Further information regarding reporting requirements can be found in NUREG-0302 Rev. 1, " Remarks Presented I (Questions / Answers Discussed at Public Regional Meetings to Discuss Regulations (10 CFR Part 21) for Reporting of Defects and Noncompliance." 1 I

Q. 441. Would the review of the exam to make our comments within the five J working days also apply to the simulator exam? )

I A. The comment procedure has been limited to the written examination by the Examiner's Standards. You can comment, obviously, on our simulator exam, and we are more than willing to listen to what you have to say. But we have not ,

j been going through a formal comment procedure for the simulator exam. One of  !

the reasons is that the simulator examination is on going during the course of the week. And the written examination is given typically in the first day. l I

And, usually, by the end of the week, you provide us with your written exam' I comments, and that expedites the grading process.

Our present practice does not solicit written comments on the simulator exam for grading purposes. Normally the dialogue established with the simulator operators (training staff) is adequate to resolve any weaknesses in the simu-lator scenarios prior to their execution. Otherwise, written comments are accepted during an appeal process for an individual candidate.

l NUREG-1262 121 {

I

NRC Staff Reports NUREG-0094 NRC Operator Licensing Guide, July 1974.

NUREG-0302 Remarks Presented (Questions and Answers Discussed) at Public Regional Meetings to Discuss Regulations (10 CFR Part 21) for Reporting of Defects and Noncompliance, Rev. 1, October 1977.

, NUREG-0660 NRC Action Plan Developed as a Result of the TMI-2 Accident, May 1980.

NUREG-0737 Clarification of THI Action Plan Requirements, November 1980.

NUREG-0800 Standard Review Plan for the Review of Safety Evaluation Reports for Nuclear Power Plants. LWR edition.

NUREG-1021 Operator Licensing Examiner Standards, Rev. 3, September 1986.

NUREG-1122 Knowledge and Abilities Catalog for Nuclear Power Plant Operators-Pressurized Water Reactors (PWR), July 1985.

NUREG-1123 Knowledge and Abilities Catalog for Nuclear Power Plant Operators-Boiling Water Reactors (BWR), September 1986.

NUREG-1220 Training Review Criteria and Procedures, July 1986.

NUREG-1258 Evaluation Procedure for Simulation Facilities Certified Under 10 CFR 55 (Draft), March 1987.

)

Regulatory Guides Regulatory Guide 1.8, Rev. 2. Qualification and Training of Personnel for Nuclear Power Plants, April 1987.

Regulatory Guide 1.70. Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants, November 1978.

Regulatory Guide 1.114 Guidance on Being Operator at the Controls of a Nuclear i Power Plant, November 1976.

Regulatory Guide 1.134, Rev. 2. Medical Evaluation of Licensed Personnel for I Nuclear Power Plants, April 1987. l Regulatory Guide 1.149, Rev. 1. Nuclear Power Plant Simulation Facilities for Use in Operator Licensing Examination.

NUREG-1262 122

American National Standards i

ANSI /ANS N18.1-1971. Selection and Training of Nuclear Fower Plant Personnel. l l ANSI /ANS 3.1-1981. Selection, Qualification and Licensing of Personnel for  !

Nuclear Power Plants. j 1

ANSI /ANS 3.4-1983. Medical Certification and Monitoring of Personnel Requiring. ]

Operator Licenses for Nuclear Power Plants.

ANSI /ANS 3.5-1985. Nuclear Power Plant Simulations for Use in Operator Training.  ;

ANSI /ANS 15.4-1977. Selection and Training of Personnel for Research Reactors.

l Institute of Nuclear Power Operations (INPO) Publications I

, INP0 85-002, Rev 1. The Accreditation of Training in the Nuclear Power Industry, 1 l September 1985. '

INPO 82-026. Technical Instructor Training and Qualifications.

INPO 86-025. Guidelines for Continuing Training, October 1986.

l INP0 86-026. Guidelines for Simulator Training, October 1986.

Generic Letters G.L.83-12A Issuance of NRC Form 398-Applicability for Nonpower Reactors, July 11, 1983.

G.L. 87-01 Public Availability of the NRC Operator Licensing Examination Question Bank, January 8, 1987.

G.L. 87-07 Information Transmittal of Final Rulemaking for Revision to l Operator Licensing -- 10 CFR 55 and Conforming Amendments, j March 9,.1987.

Information and Federal Register Notices IEIN 85-101 Applicability of 10 CFR 21 to Consulting Firms Providing Train-ing, December 31, 1985.

Federal Register Notice 50 FR 11147, Policy Statement on Training and Qualifi-cation of Nuclear Power Plant Personnel, March 20, 1985.

1 Federal Register Notice 50 FR 43621, Policy Statement on Engineering Expertise j on Shift, October 28, 1985.

NUREG-1262 123

i Correspondence H. R. Denton, NRC, Letter to All Power Reactor Applicants and Licensees.

Subject:

Qualifications of Reactor Operators. March 28, 1980.

j j

Inspection Procedure IP 41701 Licensed Operator Training, May 29, 1985. -

i

(

1 i

NUREG-1262 124-

9 #

E l

l i

1 I

l 4

l

.1 l

REFERENCES 4

a 1

.__-- w

l 1

l 1

Appendix A Generic Letter 87-07 l l

1 1

i i

i

/

sstetua l

  1. g UNITED STATES

[ g NUCLEAR REGULATORY COMMISSION

l WASHINGTON, D. C. 20555

...../

AIAR 1 g igy TO ALL FACILITY LICENSEES

SUBJECT:

INFORMATION TRANSMITTAL OF FINAL RULEMAKING j FOR REVISIONS TO OPERATOR LICENSING -  !

10 CFR 55 AND CONFORMING AMENDMENTS l (Generic Letter No. 87-07) .

l To provide information about the final revisions to 10 CFR 55, " Operators' Licenses," and their implementation, the Comission is holding a series of public meetings. These meetings will be held as follows:

A. April 9, 1987 for Region II Richard B. Russell Federal-Building i

Strom Auditorium, Lower Level 75 Spring Street, SW i Atlanta, Georgia  !

Point of

Contact:

Mr. Kenneth E. Brockman US Nuclear Regulatory Comission, Region II 101 Marietta Street, Suite 3100 Atlanta, GA 30323 (404)331-5594

8. April 14, 1987 for Regions IV and V Stouffer Concourse Hotel 3801 Quebec Street Denver, Colorado (Across from Stapleton Airport)

Points of

Contact:

Mr. Ralph Cooley US Nuclear Regulatory Comission, Region IV Parkway Central Plaza Building 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 (817)860-8147 Mr. Phillip Morrill .

US Nuclear Regulatory Comission, Region Y 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596 (415) 943-3740 C. April 16,1987 for Region III l Ramada Hotel O' Hare J 6600 N. Mannheim Road (corner of Higgins)

Rosemont, Illinois (One mile from O' Hare Airport) ]

1 Phone: (312) 827-5131 1 Point of

Contact:

Mr. Thomas Burdick US Nuclear Regulatory Comission, Region III 799 Roosevelt Road Glen Ellyn, IL 60137 (312)790-5566 8703190207 l A-1

.._.__.m _ _ __ _ __ _ _ _ . _ _ _ ___.____ _ _ _ _

4 D. April 20, 1987 for Region ! l Hilton Hotel Valley Forge  ;

251 West DeKalb Pike i King of Prussia, Pennsylvania j Phone: (215)337-1200 , , j Point of

Contact:

Mr. Noel F. Dudley US Nuclear Regulatory Comission, Region I

. 631 Park Avenue 19406 King)of Prussia, PA (215 337-5211 Enclosed with this htter is a double-spaced copy of the regulations and supporting information for your review prior to the public meeting. You are encouraged to forward questions to the appropriate point-of-contact, one week prior to the date of the meeting which you plan to attend. The staff intends to answer these questions and others during the meetings and will consolidate all questions and answers into a NUREG report after the meeting.

In preparation for these meetings, all licensees should pay special attention to the requirements of Sections 55.31(a) and 55.59(c) regarding both initial and requalification training and the option of substituting an accredited training program for initial and requalification training programs previously approved by NRC. This option may be implemented upon writtan notification to the NRC and does not require any staff review. However, because of conflicts between previous 10CFR55 Appendix A requirements and a systems approach to ,

requalification training, it is necessary to certify that the substitute training program is both accredited and based upon a systems approach to training. The superseded training program description contained in the FSAR-need not be revised until the next update required by 50.71(e).

Sincerely,

%ughA w - -%

/arold R. Denton, Director -

ffice of Nuclear Reactor Regulation

Enclosure:

As stated l

4 l

A-2

-9

i 8 .

Federal Register / Vol. 52. No. 57 / Wednesday. March 25, 1967 / Rules and Regulations 9453 known brucellosis in cattle for the not a "mejor rule" Based on information respect to this interim rule are period of12 months precedmg compiled by the Department, we have impracticable and contrary to the public clarification as Class Free. De Class C determined that this rule will have an interest. and good cause is found for classification is for States or areas with effect on the econo.ny of less than 3100 making this interim rule effective less the highest rete of brucellosis, with million; will not cause a major increue than 30 days after the publication of this Class A and Clus B in between. In oosts or prices for consumers. d x:ument in the Federal Register. l Restrictions on the movement of cattle individual industrio. Federal. Sta te, or Comments are being sol cited for 80 are more stringent for movements from local swemment agencies, or deys after publication of this document.

Class A States or areas compared with geographic regions; and will not cause a and a final document discussing movements from Free States or areas, significant adverse effect on comments received and any end are more stringent for movementa competition. employment investment, amendments required will be published from Class B States or areas compared productivity, innovation. or on the in the Federal Register as soon as with movements from Class A States or ability of United States based possible.

areas, and so on. enterprises to compete with foreign. 1.lat of Subjects in 9 CFR Part 75 The basic standards for the different baseu enterprises in domestic or export markets. Animal diseases. Brucellosis. Cattle, claulfications of States or areas concern maintenance of:(1) Acattle For this action, the Office of Hoga. Quarantine. Transportation.

I herd infection rate, based on the number Management and Budget has walved its cf herds found to have brucellosis review process required by Executive PART 76-8RUCEL.I.OSIS reactors not to exceed a stated level Order 12291. Accordingly. 9 CFR Port 78 is during 12 consecutive months; (2) a rate Cattle moved interstate are moved for amended sa fouows:

ofinfectior in the cattle population. slaughter, for use as breeding stock. or citation fw Pan 78 1 e autho based on the percentage of brucellosis for feeding. Changing the status of continues to rea as, follows:

reactors found in Market Cattle Alabama reduces certain testing and Identification (MCl)-testing at other requirements on the interstate Autbority: 21 U.S C.111-114a-1.1143 115.

117.1so.121.123-126.1Mb.1Mf; 7 CFR 2.17 stockyards and slaughtering movement of these cattle. However.

cattle from certified brucellosis free 2.31. end art.2(d).

establishments-not to exceed a stated level;(3) a surveillarice system that herde moving interstate are not affected i 7s.41 I h eneedl requires testing of dairy herda. by these changes in status.We have 2. Section 78.41. paragraph (b) participation of all slaughtering determined that the changes in amended by adding Alabama,, is setablishmenta in the MCI program, bruce!!osis status made by this immediately before ,,Ansona .

identificanon sad monitoring of herda at document will not affect market patterne 3. Secuan 7&41, parag sph (c)is high risk of infection. includmg herda and will not have a significant economic amended by removing " Alabama .

adjacent to infected herds and herda impact on those persons affected by this document. Done in Washington. DC. this 20th day of from which infected animate have been Under these circumetsaces, the March. teer.

sold or received: and (4) minimum procedural standards for administering Administrator of the Animal and Plant B.G lehneen.

the pr0 gram. Health inspection Service has Deputy Administrator. Veterinary Servicee. 1 Prior to the effective date of this determined that this action will not have Animoland Mant HechA Inspection Service. ,

document. Alabama was classified as a a significant economic impact on a (FR Doc. Er-4421 Filed >2+.87; s.45 am) I Class B State because of the herd substantial number of small entities. suse ones m u e.e i infection rete and the MCI reactor Executive Order 12373 ii ii i -

prevalence rete. However, a review of the brucellosis program establishes that This program / activity is listed in the NUCLEAR REGULATORY Alabama should be changed to Class A Catalog of Federal Domestic Assistance COMMISSION status, under No.10.025 and is subject to the in order to attain and maintain Class , provisions of Executive Order 12372. 10 CFR Parts 30 and 5F A status, a State or stea must (1) not which requires intergovernmental exceed a cattle herd infection rate, due consultation with State and local Opwators' Uconwes and Conforming to field strain Brucello obortus of 0.28 officials. (See 7 CFR Part 3015. Subpart Amendments percent cr 2.5 herde per 1.000 based on V.)

the number of reactors found within the ,__ __

Acesey: Nuclear Regulatory State or area during any 12 consecutive -------3 Commission.

months, except in States with 10.000 or Dr. John K. Atwell. Deputy actiost Final rule.

fewer herds:(2) maintain a 12 Administrator of the Animal and Plant consecutive months MCI reactor Health Inspection Servios for Veterinary suussaav:The Nuclear Regulatory prevalence rate not to exceed one Services, has determined that an Commission is amendmg its regulations reactor per 1.000 cattle tested (0.10 emergency situatica exista, which to (1) clarify the regulations for issuing percent); and (3) have an approved warrants publication of this interim rule licenses to operators and senior individual herd plan in effect within 15 without prior opportunity for public operators:(2) revise the requirements days oflocating the source herd or comment.immediate action is and scope of written examinations and recipient herd. Alabame now meets the warranted in order to delete operating tests for operators and senior criteria for classification as Class A. unnecessary restrictions on the operators. including a requirement for a interstate movement of certain cattle simulation facility; (3) codify procedures Executive Order 12291 and R'8"let"I from Alabama, for administenng requahfication Flexibility Act Further, pursuant to administrative examinations: and (4) desenbe the form We are issuing this rule in procedure provisions in 5 U.S.C. 533. it is and content for operator license conformance with Executive Order found upon good cause that prior notice applications.The rule is necessary to 12291, and we have determined that it is and other public procedures with meet NRC responsibihties under Section D-1

4 9454 Federal Register / Vol. 52. No. 57 / Wednesday. March 25, 1987 / Rules and Regulat;ons 306 of the Nuclear Waste Policy Act of Branch. Office of Nuclear Reactor " Medical Re'quirements." A 90-day 1982. Regulation. U.S. Nuclear Regulatory comment period expired on February 25.

catts: Effective Date: May 26.1987, Commission. Washington. DC 20555. 1985. Comments were received from 88 Public meeting dotest April 9,14.16 and Telephone: 301-492-4868. respondents. An additional 47 20.1987. Pon PURTHER mPORt4AT10N CONTACT: respondents commented on the three aoonesses: Public meeting locations: Chief. Operator Ucensing Branch. Office associated regulatory guides also issued Public meetings will be held to discuss of Nuclear Reactor Regulation. U.S. for public comment. Reports that contain )

implementation of the requirements of Nuclear Regulatory Commission. a detailed analysis of these comments this rule.The meetings will be held as Washington, DC 20555. Telephone: (301) and their resolution are available as follows: 492-4866. indicated under "Aconssess:".

A. April 9.1967 for Region IL Richard ' sueet.sassbrfA8sY pep 0aseAT100s: %ese proposed revisions to 10 CFR B. Rusull Federal Building. Strom Part 65 were to improve the operator Auditorium.1,0wer I,evel. 75 Spring 1. BdM licensing process and to achieve the Street. SW. Atlanta. Georgia. Section 107 of the Atomic Energy Act following objectives:

Point of

Contact:

Mr. Kenneth E. of 1954. as amended (42 U.S.C. 2137),

Brockman. U.S. Nuclear Regulatory requires the Nuclear Regulatory (1) Improve the safety of nuclear Commission. Region II.101 Marietta Commission to prescribe uniform Power plant operations by improving gc Street. Suite 3100. Altanta. CA 30323, conditions for licensing individuals as oPerstor licensing process and (404) 331-5594. OPeretors of production and utilization examination content.

B. April 14.1987 for Regions IV and V. facilities and to determine the (2) Provide the NRC with an improved Stouffer Concourse Hotel. 3801 Quebec qualifications of these individuals and to basis for administering operator Street. Denver. Colorado (Across from issue licenses to such individuals. The licensing examinations and conducting 1 Stapleton Airport), regulations implementing these operating tests. and  !

Points of

Contact:

Mr. Ralph Colley, requirements are set out in Part 55 of (3) Respond to the specific direction U.S. Nuclear Regulatory Commission. Title 10. Chapter 1. of the Code of given by Congress in Section 308.

Region IV Parkway Central Plaza Federal Re lations.To assist licensees Nuclear Weste Policy Act of 1982. Pub.

Building. 611 Ryan Plaza Drive. Suite and others, e Commission also has L 97-425. to promulgate regulations and 1000. Arlington. TX 76011. (817) 800- issued regulatory guides and generic guidance in the area of examinations.

8147. letters that provide guidance on Mr. Phillip Momll. U.S. Nuclear On Much 20.1986, he Connimion acceptable methods of meeting these Regulatory Commission. Region V.1450 regulatory requirements. published a Final Policy Statement on Msria Lane Suite 210. Walnut Creek. The Commission has become Training and Qualification og N,, gear CA 94598. [415) 943-3740. Increasingly aware of the need to update Pown Plant PemnaeH5NH47) est

.C. April 16.1987 for Region !!L lts operator licensing lations and ducribw the Commission's curmat Ramada Hotel O' Hare,0000 N. related regulato es.These Policy regarding training of operetors. be Mannheim Road (corner of Higgins), revisions are toel the addition to this policy statement, the Rosemont. Illinois (One mile from extent to which simulators e uld be Commission is publishing the new rules O' Hare Airport). Phone:(312)827 4131. used in licens examinations and to described in this noticar, these rules Point of

Contact:

Mr.Domas Brdick, reflect upgrad requirements for supercede all current regulations for U.S. Nuclear Regulatory Commission, licensed operetot selection, tra and Operator licenses.Thoes facility Region III.799 Roosevelt Road Glen requalification programs resulting a licensees that have made a commitmew Ellyn. IL 80137. (312) 790-5586. the accident at TMI-2. Although the . that is less than that required by these D. April 20,1987 for Rtston 1. Hilton Commission has been actively engaged new rules must conform to the new rula$

Hotel Valley Forge. 251 West DeKalb ' in investigating these matters, the automatically.Those facility licensees Pike. King of Prussis. Pennsylvania, schedule for completing these activities that have made a commitment different Phone:(215) 337-1200. wu furthw accelerated by the from or more than that required by tbne

  • Point of

Contact:

Mr. Noel F. Dudley, enactment of January 7.19es, of the new rules for license a===d= ants and U.S. Nuclear Regulatory Commission. Nuclear Waste Policy Act of 1982. Pub, technical speciScation changes, may Region L 631 Park Avenue. King of L 97425. Section 30s of that act (42 apply to the t'a==iaala= es that they Prussia. PA 19406. (215) 337-62n. U.S.C.10226. 96 Stat. 2301 at 2262-2203) can ocaform to &ese new rule.Othe Background information for the rule directs the NRC to establish (1) ~ changes abould be madein accordance

. includes a copy of the regulatory simulator training requirements for wie 10 CFR g&ge.

analysis, the supporting statement for applicants for operator licenses and for the Office of Mana ment and Budget operator requalification Produc6an fmGid" Y (3) ladededinPart Sg am not ufemacedin  !

,I clearanceof the rmation couection requirements governing NR I requirements. Regulatory Guides. ANSI / administration of requalification to svisions since &,am am no o ANS standards. NUREG eeries examinations, and (3) requirements for opwetem a 6_ --___.facGides J

  • documents, other documents discussed o ting tests at civilian nuclear power curma licensed by the Commission.

in this notice. and reports that contain a p nt simulators. Al&o considweden has ben detailed analysis of the public On November as.1984, the ginn to smaller sies and scope of comments received during the public Commission published proposed test and research reactors the comment period and their resolution amendments to 10 CFR Part 55. mquirements in this nottee apply to all ,

may be examined at the NRC Public " Operators' Licenses" in the Fedwal utilization facilities licensed under to Document Room.1717 H Street NW., Register (49 FR 46428). These CFR Part 50. including test and research Washington, DC. amendments proposed granting. In part, reactors. Consequently, except where A single copy of the reports a petition for rulemaking (PRM-85-1) specific wording has been used to note concerning public commente may be that was filed by KMC Inc. PRM-55-1 is different requirements, these rules apply

, obtained from Chief. Operator Licensing discussed more fully under Section II.8, to test and research reactors.

O s.t B-2

Federal Register / Vol. 52. No. 57 / Wednesday. March 25, 1987 / Rules and Regulations M55 II. Summary of Public Comments and requested clanfication about the Plants." 8 The intent is to prevent the Final Actions limitauon of the conditions under which manipulation of the controls by an The proposed amendments to improve the plant could be used. operator whose medecal condition and the operator licensing process have been It is not the intent of NRC to permit or general health would cause operational mod fled in response to the commente encourage the initiation of transients on errors endangenng public health and received. A summary of the public the plant when and if the plant is used safety. The medical requirements rely comments and, where appropriate, e as a simulation facihty.The use of the on examination of the applicant or description of the changes that resulted plant is envisioned as a possible operator by a licensed physician who from them follows. approach that a facility licensee might evaluates the medical conditon of the (A) GenemlComments-(1) Ceneml propose to use in conjunction with operator, based on the criteria of ANS!/

purpose of these omendments. Several another simulation device or devices, in ANS 34-1963 that is endorsed by commenters provided general support lieu of a plant referenced simulator.nis Regulatory Guide 1.134. " Medical for the proposed rule. Other commenters approech might be suitable, for example. Evaluation of Licensed Personnel for suggested changes to clanfy the purpose for older planta without access to plant. Nuclear Power Plants," and makes and examptions sections. These sections referenced simu% tors, where recommendations to the facility's were reworded as a result of the manipulations of the plant. to the extent management.ne facility's management evaluation of these comments. In consistent with plant conditions. might is responsible for certifying the particular, the purpose of the rule be used to demonstrate familiarity with suitability of the applicant for a license.

Indicates that terms and conditions of the plant for which the cand;date would ne NRC has the responsibility for operators' licenses and renewal are making an assessment of the applicant b' IIC"8d covered. Exemption for trainees at a for a license. including the applicant's facility is clanfied to indicate that a Several commenters suggested t trainee is only exempted while the definition of " reference plant , hat fitness. Neither the facility not medical the NRC staff will make medical participating in an NRC-approved should not be specific to a plant and its judgments. When a conditional license training program to quahiy for an unit. The word " unit" has been deleted is requested. the NRC will use a operator license. In addition, employees from this definition, although it remains quahfied medical expert to review the involved in fuel handling are exempt if the NRC's intent that a reference plant medical evidence submitted by the they are supervised by a licensed senior refer to a specific docket number. For facil ty to make a determination. For operator. those situations in which a multi-unit minor conditions such as the need to ,

(2) Definitions. Many commenters plant is composed of units from the wear corrective lenses or a hearing aid.

were concerned with the specific sarne vendor and vintage. it is likely that the Form NRC 396 is modified to definitions in the rule. A number of only one simulation facihty would be simplify the process for obtaining a commenters addressed the definitions of required. For others. Regulatory Guide medically conditioned license.

" simulation facility" and " Plant- 1.149 provides specific guidance for Mo*eover, while the biennial medical referenced simulator." and requested those facility licensees that want to examination required under 155.21 is clarification of the NRC's intent for the consider the use of one simulation intended to detect alcoholism or drug use of such des ices in the partial facility for use at more than one nuclear dependency or both, no reference is  ;

conduct of opersting tests. Several power plant.This guidance is based made in the rule to alcohol or drug commenters believed that only plant- {

upon existing NRC policy on the problems.These issues are covered in a i referenced simulators would be granting of multiunit operator's licenses. Policy Statement on Fitness for Duty of j permitted. . (B) Afedicof requirements-(1) Nuclear Power P! ant Personnel (51 FR  :

The deft Criteria for medico / requirements. Most 27921). published on August 4.1966. by simulator is,nition of a " plant.

mtended to mean a referenced commenters agreed with the revisions to the Commission. in addition, the license '

simulator that meets all of the the medical certification process, which renewal period is changed to 6 years to requirements of ANSl/ANS 3.5-1965. as would require, for the usual case. a brief be compatible with the biennial medical endorsed by Regulatory Guide 1.149. examination requirements.

certification by the facility licensee on Nuclear Power Plant Simulation . Form NRC-396. as revised. Some In July 1983. KMC, Inc., petitioned the  !

Commission (pRM-55-1)"to simplify the c mmenters questioned the relationship atio s se on

  • f these requirements to drug and procedure for the review of the medical i Regu! story Guides. of this Supplementary information). alcohol problems and programs. Other status of appl,icants for operator- .

The definition of a " simulation c mmnitus wee confused about who . . . licenses. KMC stated that the I would have responsibility for current procedures require that a facility"is intended to provide for flexibility in the conduct of the simulator determining the rnedical condition of an detailed medical history and results of  ;

(non-plant-walkthrough) portion of the opuator or applicant for an operator's the applicant s medical examination by license. Some comments were made a licensed physician be sent to the operating test. The intent is to permit.

under circumstances specified in 10 CFR about the specific language in the Commission.The petitioner requested 55.45(b). the use of the plant itself, and/ medical requirements regarding that the Commission amend its of a plant-referenced simulator. and/or disqualifying conditions and regulations to permit designated medical commenters requested changes or examiners, as defined in ANSI N54%

some other type of simulation device 1976. ,' Medical Certification and such as a part-task or basic-principles clarification. Many commenters noted simulator, for the conduct of the the need to adjust the medical Monitoring of personnel Requiring simulator portion of the operating test. requirements to the renewal cycle. c s o uc a u A number of commenters expressed The medical requirements reflect the

{rstor, l

concern that a plant, when used as a industr'y standard articulated in ANSI / .

simulator, could not safely perform the full range of functions that a simulator ANS 3.4-1983. " Medical Certification and Monitoring of Personnel Requinng g j""

S y" *[  !

so,,3 g ,n,,,,,, 4,,,,, t,, c,, n,, p ,6. ginoo,,

could perform, and some commenters Operating Licenses for Nuclear Power aosa B-3

. .. . . . . . . , w , G .' ~ ~ ' ' ' '~ ~' - ' ~

25. 1987 / Rules and Regulations _

Federal Register / Vol. 52. No. 57 / Wednesday March 9456 issue a document that specifically licensee to urtify () U .here is a need dehneates what an operator is been examined (i: sing the guidance for the applicant b > = form assigned responsible for on NRC examinations conmned m ANS! N546-1976 as duties. Severr! om eters were and operating tests.

endorsed by Regulatory Guide 1.134) concerned thu J6 Seed" was not Systematic analysis of job and that the apphcant's general health clearly defmed ' n *quirements are and physical condition is not such as performance requirements is an intended to simpi; b e the facility accepted methodology for deriving may cause operational errors. Under the licensee's managet. y .. internallylicensing review examination content.The job-petitioner's request the use of the the need for the license before the task analyses are being performed as current NRC Form 396 would be application is made. Another concern ofpart of the performance based programs discontinued for utihty operators and many commenters was the relationship that are being implemented by facility detailed medical records would be betweer. industry accredited training licensees as part of the industry retained by the licensee's designated medical examiner. Subpart C to Part 55 programs and the details regarding supported accreditation program.The responds to the KMC. Inc. petition. NRC training and experience learning objectives neededderived from these to apply grants its request, in part. by chmmating to the NRC on Form lob task analyses NRC-398. In should form the basis addition, some commenters were for licensing written examinations and the requirement to submit. in usual cases, medicalinformation for an concerned with the definition of the operating tests at a facility. Ultimately.

phrase " learned to operate." This phrase the NRC testing objectives will reflect l ,

applicant for an operator's license directly to the NRC. Instead, as has been deleted from i $5.31 and f acility licensee-developed learning I replaced by wording which indicates objectives. In the intenm. while these I described above, a certification to NRC about compliance with the health that if a candidate successfully programs are being developed and I completes the training and experience reviewed for accreditation, the NRC has requirements in 155.33ta)(1) would be activities underway to improve the made by the facility licensee. requirements to belicensed as an operator, the NRC will conduct the content validity of NRC examinations (21 Notificotwn ofincopocitation because o/disabihty or d/ ness. Some appropriate examination and operating and operating tests.

confusion was noted by several test. Section 55.31(a)(5) has been added (2) Specific wording of categories.

to specify the minimum number of Many commenters made specific commenters regardmg the process to f notify the Commission when an operator control manipulations towording recommendations for the be conducted l was incapacitated because of disability by an applicant. Details regarding other categorieslisted under content of the  ;

training and qualification will not be written examinations and operating test. j or illness.The final rule is changed to required to be supplied on Form NRC These suggestions were reviewed by reflect more clearly the Commission s intent. That is, if, durma the term of the 398.if these requirements are contained subject-matter experts and changes in an NRC spproved training program were made to clarify or improve the license, an operator s medical condition changes and does not meet the that ea muIa fa it content categories. No major changes

,ece , C und r i 55 45(b). resulted except to two categories under requirements set forthin ANSI /ANS .

Subject to continued Commi,ssion g ggg 3.4-1983, notification of the Commission endorsement of the industry s categories (12) and (13) were reworded by the facility licensee is required. At , g,g_,*

the same time,if the examining accreditation process under the Final physician indicates that the condition Policy Statement on Training and 1121 Demonstrate the knowledge and ability can be accommodated as noted in 15.1 Quabfication of Nuclear Power Plant *8

,,, ',P,P,*g,,'

h'g'yy,d

, , y,'f,"g[ith '

of the ANS!/ANS 3.4-1983, a conditional Personnel (50 FR11147; March 20,1985). y the safe operation of the facihty, license may be requested by an a facility licensee's training program authorized representative of the facility would be approved by being accredited (13) Demonstrate the opplicant,: abihty to licensee. Form NRC 390 must be used by the NationalNuclear Accrediting fu"Ction within th' C08tI ** '*** ** h a and sup rting medical avidence must appropriate to the assigned pontion. in suc

. Board. way that the facihty beensee's pmcMuros are be supp ed.However,the facility (D) Written examinations and adhered to and that the limitations in its licensee does not have to wait for operating tests---(1) Content. Most bcense and amendments are not violated.

i permission from the Commisalon before commenters recommended that the returning an operator to licensed duties, principal means of determining the (3) Wolvers. Several commenters if the operator has been examined by a knowledge, skilla, and abilities to be suggested that examinations and tests physician,who,using ANSI /ANS 3.4- be automatically walved under specific included in operator licensing written

?983 as a basis.has recommended to the examinations and operating tests snould circumstr.nces. As the agency f

, facility's management that the operator be the learning objectives derived from responsible for public health and safety I with regard to nuclear facilities, the cao return. a systematic enalysis of the job (3) Test andresearch reactors. Many performanos requirements.These Commission cannot waive its test and research reactor operators were commenters recommended that these independent assessment of operators.

concerned that the requirements in the learning objectives form the basis and Walvere are based on operators rule changed the medical requirements, previously passing all or part of a scope of examinations and tests and licensing examination. Details regarding for them.The rule changes only the that other sources of information the should requirements for test and research processing of waivers are addressed only be used until thelearning In NUREG-1021. Operator Licensing reactor facility licensees. It does not objectives are evallable for a facility.

change the status quo for reactor Conversely, some cornmenters Examiner Standards."

  • l operators, for whom ANSI /ANS-15.4- questioned as premature the 1977(N 380). " Selection and Training of endorsement by NRC of a systematic
  • Nt:Rr.c..enes dodments are available far public mpecuan and wpyias for a tes in the Personnel for Research Reactors." analysis from which to draw the content commis .on s Public Documentc=aw soom at 171 requirements continue. for licensing examinations and tests.

(C) Applications. Applications for an One commenter recommended that NRC operator hcense require the facibty

  1. B-4

I l

Federal Register / Vol. 52. No. 57 / Wednesday, March 25. 1987 / Rules and Regulations H57 periodic " subsequent" application has event that simulator design changes i (4) Integrity ondexamirations and result in significant simulator l tests. Although many commenters been eliminated. in support of its ,

certification or its apphcation, as configuration or performance variations. l supported the addition of I 55 49, in addition, the standard is silent on j "lategrity of Examinations and Tests." appropriate each facility licensee will be required to conduct periodic the subject of periodic testing of I they felt that the penalties in i 55 71 j were excessive.Other commenters were performance tests on its simulation malfunctions. The NRC endorsement of 1

afraid that any action might be f acility, and maintain records pertaining the standard in the R.C. takes exception to the conduct of these tests and the to the deletion of periodic performance interpreted as cheating and that the role of facility licensees in enforcement was results obtained. testing. The regulations will require unclear. The NRC always has it is the Commission't intent that performance testing to be conducted those facility licensees that submit a throughout the life of a simulation prosecutorial discretion not to take certification for a simulation facility facility, on a four year cycle, at the rate enforcement action in unclear cases.

The Isnguage in 155.71 on criminal may immediately begin use of the of approximately 25 percent per year, violations only covers peeona who certified simulation facility for the The protection of public health and

" willfully violate" the Atomic Energy conduct of operating tests at the safety requires that licensed operators Act or the NRC's regulations and does reference plant. not only be proficient in general not apply to situations such as . (2) Performance testing. Many operations but be able to safely copa discussions after an exammation is comments addressed the requirement with plant transients and malfunctions.

administered or when a previously Thus a reactor operator license for the conduct of a series of candidate's response to malfunctions administered examination is used as a performance tests,in which an practice exammation. extensive range of tests would be dunng an operating test is an importa'nt factor in the examiner's assessment of (E) Simulation facilities-(t) conducted over a 4. year cycle. 25 Application process. Many commenters that candidate's performance. It is also percent per year.The industry standard were concerned with what they termed which was in effect at the time of the necessary to avoid misleading or the burdensome procedure requiring proposed rulemaki . ANSI /ANS 3.5- negative training, which could result '

f 1981. required c m ete simulator from the use of a simulation facility r ulat c$tY. performance testing every four years.

which does not correctly portray plant a Erova to u e and R.C.1.149 endorsed that response to malfunctions. Therefore the rtif ca on by the facili Y e see to requirement. In addition. the R.C. ability of a simulation facility to spmfied that all malfunctions which a faithfully portray plant malfunctions as u ry : a d ds h uld uff e.w$e simulation facihty was capable of well as general, operability is to be to performing should be tested to the verified by penodic performance testing.

combined audit the simulation with facility the NRC's an abilit[extent review that such malfunctions could be Such testing provides assurance that the the supporting documentation. used in the conduct of operating testa, simulation facility remains acceptable The Commission has amended the The majonty of commenters felt that the over time and continues to meet the final rule to reflect the position taken in burden of conducting these tests would Commission s regulations. A definition these comments. Any facility licensee demand an excessive amount of time on of performance testing has been added that proposes to use a simulation facility the part of the simulation facility as well to i 55.4. and the requirements for that meets the definition of a plant- as the facility licensee's staff. Numerous performance testing have been clarified referenced simulator (essentially a in the applicable paragraphs of suggestions were made proposing lists simulator that meets the requirements of of perfmance tests thought to be l 55.45(b), as they apply to all ANS-3.5.1985. Nuclear Power plant simulation facilities, whether certified or appropriate, suggesting alternative Simulators for Use in Operator approved.

formulas for the cycle of performance Training." as modified by Regulatory testing. or offenng suggestions that the (3) Schedule. A number of comments Guide 1.149) will be required only to rule merely endorse a new version of the included cr.ticism of the time schedules certify this'to the Commission. and to specified as being unreasonably short maintain records pertaining to . industry standard which was in preparation at the time. for submitting a simulation facility plan l performance testing results for A new version of the standard, and for having a simulation facility in ,

Commitsion review or audit. Any full compliance with the regulation. j identified as ANSI /ANS 3.5-1985, was facility licensee that proposes to use a The regulation has been changed to l simulation facility that is other than a published after the expiration of the j public :omment period. In response to allow 1 year (versus 120 days) for a plan referenced simulator will be the comments received and to the newly facility licensee to submit a plan l required to submit a plan detailing hcw detailing its approach to the simulation i the requirements of i 55.45 will be met issued industry standard R.C.1.149 has '

been changed to endorse the new facility requirement; and to allow 4 >

on the alternative device or devices. years (versus 3) for its simulation j followed by an application for NRC standard. with exceptions, and to  ;

include in its endorsement the specific, f acility to be in full compliance with the '

approval for use of the simulation regulation. Those facility licensees that limited list of malfunction performance facility. However. in response to the certify the use of a plant referenced numerous comments received, this tests contained in the standard.

However, although the new standard simulator will not have to submit a plan.

application process has been greatly (4) Penaltyfor unavailability of continues to require the conduct of simphfied and the requirement for a simulation focility. Several comments simulator performance tests. it has deleted the requirement that these tests expressed concern that the penalty was '

$'reet NW Washmston. DC These documents may be conducted on a four year cycle for too harsh for the unavailabihty of a be Purchased irom the U.S Govamment Prmtms the life of the simulator. Instead it has simulation facility acceptable to the omeo (GPO) by witme Et%rneo or by wnnng the cPO.P O Bon ros:. Washmron DC acu- substituted an annual operability test. Commission.

  • ' ' * *" and now required that performance tests It is the Commission's intent that Nhn)caYinformI oMcIYsYp'. rimy'i of every facility licensee have available a commera. s:ss Port Ro>. sto.4 sprmst.eid. v A be conducted only upon completion of initial simulator construction and in the simulation facihty that meets the
let .

B-5

9450 Federal Register / Vol. 52 No. 57 / Wednesday. March 25. 1987 / Rules and Regulations senior operator licenses from the final months orlonger.Therefore the Commissian's requirements within a rule. This action is in recognition of the following requirements have been reasonable period of time afler the industry accreditation of training added effective date of the rule. and that. once wsilable, the simulation facility be programs, which includes instructor if an operator hu not performed licensed mt.intained and upgraded, as needed. to training, qualification and evaluation. duties on a minimum of seven 6-hout shifts or and is in keeping with the intent of the fh e 12. hour shifts per quarter. before contir ue its acceptabihty for the resumption of activities authonzed by a conduct of operating tests.The Commission Policy Statement on Training and Qualifications of Nuclear license issued under these regulations. an Commission recognizes that unique authonzed representative of the facility circumstances may arise on a plant. Power Plant Personnel. Industry efforts heensee shall cerufy that the qualifications specific basis that cause some deviation in implementing instructor training. and status of the hcensee are current and from the time requirements established quahfication and evaluation programs '

  • lid *^d th*l th' lic'""' h*' CO*PI d
  • in the rule and that, from time.to time, a will be monitored as described by the previously certified or approved Policy Statement. Moreover, senior */,"[",*gi, gN,'[,',$fth"j ""d

simulation f acility may become operator licenses limited to fuel operator, as appropnate. and in the position temporanly unacceptable for the handling will continue to be issued as to which the individuallicensee will be they are currenfly. However. since assigned. f'or licenses limited to fuel conduct of operating tests. It is the handling. one supervised shift is sufficient.

Commission's intent to address any such industry accreditation includes Instructor evaluation, current NRC Certification shall be maintained at the situations on a case.by. case basis. facildy.

(5) Lock ofguidance for assessment. Instructor certification will not contmue A number of comments expressed at facilities with industry accreditation. De revision in the wording of the rule concern that the guidance to be used by A great number of commenters had was made so that it is no longer.

the Commission in its assessment of specific suggestions regarding the ecessary to include the wording simulation facihty adequacy was not yet requirements for special senior nactively and extensively engaged" available. It is the Commission's intent operators. These comments are no. . under requalification. A licensee can

' hat no simulation facility audits will be longer applicable since the Commission now maintain licensed status by conducted until this guidance has been has deleted these licenses from the final successfully completing the facility fully developed and made publicly rule. licensee's NRC. approved requalification asailable for a minimum of 6 months. (2) " Actis cly performing the functions program and passing the requalification t6) Applicability tofuture facility of on operator or sensor operator, examinations and operating tests.

b,censees. Several commenters Although only one commenter H questioned whether the Commission's specifically questioned the definition of. perfor ance7ft a pen of not regulations regarding simulation " actively performing the (functionsj of. participating on shift, the conditions of a facihties were intended to apply to a great many commenters questioned license in i 55.53(f) must be met. In this future facihty licensees. this phrase in regard to R.G.1.8. manner a licensee without current it is the Commission s intent that Personnel Qualifications and Tram. m.g b** led 8f h beihtY **"Id not be for Nuclear Power Plants." as it was these regulations apply to future facility licensees as well as current facility hcensees.

published for public comment in conjunction with the proposed rule.

'[* I

,,, g requirements for actively performing (7) Test and research reactor From the comments made in response to the functi,ons of an operator or senior operators. Several test and researeb the regulatory guide and other operator' would be met with a mmimum reactor operators were concerned that comments made regarding the prov.ision of four hours per calendar quarter.

the requirements in the rule changed the in the rule under "Requabrication Similarly, under i 55.53(f), a minimum of licensing process for them. As stated which required that an operator or six hours parallel work would be above, the rule does not change the senior operator be " actively and required to return to active status.

status quo for this category of operator. extensively engaged" as an operator or ne definition of" simulation facility"in senior operator,it is clear that many (3) Notification of the Comminion.

Sorr.e commenters noted that the I 55.4 allows the plant to be used to commenters were confused about the Commission had no need to know about meet the requirements of 6 55.45(b).In degree of participation in plant the criminal conviction of a licensee.

addition, specific wording in 155.45(b) operations that is required as a However. l 55.53(g) is intended to cover permits test and research reactor facility condition to maintain an operator's or criminal behavior. NRC is interested in ,

Licensees to be exempted from senior operator's license.To prevent

. further confusion, the rule has been felonious criminal convictions of a r submitting a pirn for the use of a licensee.The NRC considers that there simulation facility that is other than a modified in i 55.4. " Definitions," to

. may be a relationship between

  • plant. referenced simulator. provide the following definition: c nviction for a felony and job 5 (F) Licensesyt) Specialsenior Actively performing the functions of an performance.

operatorlicenses. Many commenters operator or senior operator" means that an (C) Expiration. Currently, licenses q individual has a position on the shift crew questioned the lasuance of special expire after two years.To lessen the senior licenses. Sever 61 argued that that requires the todMdual to be licensed as defined in the facility's technical paperwork burdens of facility licenseen I. current instructor certification specifications, and that the IndMdual carries and the NRC. a five year expiration was requirements were sufficient, others out and is responsible for the duties covered proposed. Many comrnenters suggested j indicated that industry-accredited that the proposed five year expiration l

' by that posimm.

programs include instructor evaluation, and renewal of !icenses be adjusted to  !

and others cited the Commission's in addition, several commenters were concemed that the requirements were meet the bienn;al medical examination j Policy Statement on Training and requirements.ne renewal cycle has l unclear regarding the return to " active" Qualifications of Nuclear Power Plant status following a period during which a been changed and licenses will now Personnel as conflicting with these expire after 6 years.

licensee has not been " actively

, licenses. (H) Requalification and renewo/-(t)

The Commission has daleted the performing the functions of an operator or senior operstor" for a period of 4 Requalification progrom and provision for the issuance of special f' B-6

Federal Register / Vol. 52. No. 57 / Wednesday. March 25, 1987 / Rules and Regulations 9459 examination content. A great many successfully maintaining the proficiency licensed will be a much more effective )

commenters were unclear about the and knowledge of licensed personnel. training tool than one which is not. )

relationship of the NRC requahfication To this end. the rule requires in 155.57 The Commission decided, however. (

4 requirements and performance. based that each applicant for renewal of a six- that because there might be special training programs. Moreover. many year license pass an NRC administered circumstances in some cases which commenters urged more flexibility in the comprehensive requalification written would weigh against requiring that a ,

rcqualification cycle and more clarity in examination and operating test at least particular utility purchase a simulator (

the program content requirements. once during each six year license.The the Commission would not make it a I Although the requirement for NRC NRC will administer these requirement.This kind of case specific approval of requalification programs requalification written examinations special circumstances is precisely what will remain, the list of content areas and operating tests on a random basis our exemption procedures are intended under ll55.41,55 43 and 55.45 will be so that no operator or senior operator to handle. lf a licensee had appropriate I referenced in i 55.59 to clarify the issue will go longer thal six years without justification. the Commission could of examination and operating test being examined by thp NRC once a six- always consider whether to grant an content. In addition. I 55.59(c) content year license is issued. exemption to the regulation. Instead. the requirements (formerly Appendix A to (I) Afodification andrevocation of Commission chose to water down the 10 CFR Part 55) can be met with a licenses. Sorse comments were received regulation and require less.

performance. based program for a about the Commission's authority to fecility as approved by the NRC. In its Separate Mews oNommisalooer modify and revoke licenses.The Bemdial Final Policy Statement on Training and Commission has the authonty to modify.

Quahfication of Nuclear Power Plant suspend or revoke a license under the I fully support the Commission's Personnel. the Commission endorsed Atomic Energy Act.Moreover, inherent broad objective that operators be industry-accredited programs as in the Commission's authority to modify, reexamined on a regular basis. But I performance based.The frequency of suspend. or revoke a license is its ability believe the final rule is too inflexible for the comprehensive requalification to place a licensed operator or senior good regulatory and administrative written examination has been changed operator under probation. if warranted. practice. NRC may indeed need to to a maximum of every 2 years and of (J) Editorial. Many commenters had examine operators every six years: in e u 0 ng tes o ' n n. substantive editorial changes to some cases, perhaps more often. But if a fy n t o exc

{

24aon s p, g n jd c st suggest. These comments were reviewed licensee satisfactorily demonstrates its by an NRC technical editor and ability to conduct high quality.

incorporated as appropriate, performance based examinations in I d accordance with I 55.57(b)(2){iii). such (K) Conforming omendments. A part o och fa y a tr n ng to ra .

conforming amendment.10 CFR 50J4, license,e performance may well justify (2) " Actively ond extensively extension or relaxation of this requires the facility licensee to notify engaged." As explained above many requirement. This approach would,ha,ve the Commission of a change in operator commenters were concerned with the been consistent with the Commission s i implementation of the provision for status.This amendment complements I $5.53(g). Policy of rewarding good licensee j

" actively and extensively engaged as an Performance and focusing attention and operator or senior operator

  • as it related (L) Revision to 10 CFR 50.54 cad 10 CTR 50.34/b//B/. Revisions have been resources on deficient performers. The to renewal. This provision is deleted in Commission thus could have provided the final rule. This action complements made to 10 CFR 50.34(b)(8) and 50.54 to reflect the changes made to to CFR Part incentive to beensees and flexibility to the additions 155.53 (e) and (f) to the NRC examiner staff, and should

" Conditions of Licenses." 55.

(3) Test andresearch reactors- I'"

" 8" ' 7 ' ""

  • Several commenters were concerned Se$

As 1stinarate vlews of Commissioner most urgeolly needed.

that the requalification requirements for operators at this class of reactor were . This rule is a good idea, but it does I also continue to believe that the time changed.The requirements in not go far enough. The Commission has come (given the decreased cost and i 55.59(c)(7) continue the requirements should have required all ticensees to increased sophistication of the of former Appendix A to 10 CFR Part 55 obtain plant referenced simulators. technology) for all but a few small for test and research reactors. No change Thm an two nasons for this. First.1 powerplants to be required to have plant in requirements is intended. believe that section 306 of the Nuclear reference simulators for operator (4) NRC administration of Waste Policy Act of1982 (Pub. L 97- training. While there may be some requalification examinations. Some 425) requires it. Second. plant teferenced special cases that would qualify for commenters questioned the NRC simulators are an excellent way for exemption from such a requirement on administration of requalification reactor operators to practice control the basis of geography and/or plant . j examinations.The Commission believes manipulations for the plant and to similarity. licensees could in those that an NRC administered examination actually see how the plant would circumstances apply for and receive an for license renewal provides a ssurance respond.This is especially important in exempticn. 1 erstor can training the operators to deal with that operate an the operator controlsor in seniora sa ofe and emergency or other situations when the E#'8"I7 ^^*I F 'I' competent manner and that a senior plant is not in its normal state. it is a The regulatory analysis describes the operator can direct the activities of much more effective teaching tool for values (benefits) and impacts (costs) of other licensed operators in a safe and the operators to actually manipulate implementing the proposed regulations competent manner. The Commission controls and watch the " plant" respond and guidance for operator licensing. The i also believes that NRC administered than to have them merely memorize accuracy of these estimates in the examinations provide assurance that emergency procedures. Further a regulatory analysis is limited by the lack facility licensee administered simulator which is referenced to the of extensive data on human requalification programs are plant on which the operator will be performance improvement associated B-7

9460 Federal Register / Vol 52. No. 57 / Wednesday. March 25. 1987 / Rules and Regulations _

with an improved licensing process. by the Office of Management and Subpart S-Esemptions Where possib!e. quantitative measures Budget approval number 3150-0018. 55.11 Spectre exemptions.

were qualitatively compared to related M 13 C

  • ral m mphons.

Vit!. Regulatory Flexibility Certification mformation from other sources for Subpert C-esosool Requirements verification.The full text of the As required by the Regulatory regulatory anal) sis on these Flexibihty Act of 1980. 5 U.S C. 805(b). ssa Wdical mminsuon.

amendments is available for inspection the Commission hereby certifies that $ fncIp c$ tion because of disability or in the NRC Public Document Room.1717 this rule will not have a significant innen.

H Street NW Washington. DC. Single economic impact on a substantial 55.27 Documentation.

copies of the analysis may be obtained number of small entities. The from Chief. Operator 1.icensing Branch. conforming amendment to 10 CFR Part """

  • A"**"'"'

telephone: (301) 492-4868. 50 and the revision of to CFR Part 65 55 31 How to apply.

affect primarily the companies that own 55.33 Disposinon of an initial application.

IV.Backfit Analysis " 38 *P'N'""**

and operate light. water nuclear power The Commission has determined that reactors and the vendors of those Subpart g-WNiten Esaminemens and these rules are in response to section reactors. They also affect individuals Operaung Teste 306 of the Nuclear Waste Policy Act of licensed as operators at these 5s 41 wntten examination:Operatore.

1982 and, therefore, are exempt from the companies. Neither the companies that ss 43 Wrteten examination: Senior operators.

backfit rule 10 CFR 50.109 (50 FR 38097). own and operate reactors nor these ss 45 operatine tests.

Individuals fall within the scope of the n47 Weivet of examinadon and test V. Regulatory Guides "9"3""**

  • definition of "small entity" set forth in Three regulatory guides were 55 491ntegnty M e'xaminaues and tus section SC1(b) of the Regulatory published in draft form for public Flexibility Act.NRC's Size Standards subpart F-Woonoce cornment in conjunction with the edopted December 9.1965 (50 FR 50241). 55.51 tesuance of licenset proposed rule.These guides were or the Small Business Size Standards set nsa condiuone oflicenses.

intended to provide guidance on out in regulations issued by the Small nse Expirstloa.

acceptable methods ofimplementing the Business Administretionin 13 CFR Part n57 Raewel oflicenses, revisions to the regulations. As a result 121. ESS Requahncehon.

of public comment and additional staff SubpeN N and Rwooeten of review. these three guides are bemg Ust of Subjects Woonees issued in final form 10 CTR Port 50 nel Modification er d revocation ofIlceases.

Evalu t on of 's f Antitrust. Cla ssified information. Fire Subpert N-4nforooment Nuclear Poiver Plants.- prevention. Incorporation by reference, nr1 violeuona.

Integommental mlaHont Nuclear Authority: Sees. tor.1e1.1s2. es Stat. see.

(2) R.C.1.149. Revision 2. " Nuclear Power Plant Simulation Facilities for power plants and reactors. Penalty, sea es3 u emended. sec. 234. ss Stat. 444. es Use in Operator License Examinations." Radiation protection. Reactor siting amended (42 U.S.C 2137 saet assa aass);

criteria. Reportirig and recordkeeping esce. not as asented. aus, es Seat taea as and Tre ning of Pe If N ar "9 **"* ** # "'

Po"" Plane" 10CFR Arrt35 8'*one E41. nes. nos and use also leeued under sec. ass. Pub. L 91-438, se Stat.

Copies of these guides may be Manpower training programs, Nuclear 22s2 (42 U.S.C totas). seenom samt anno purchased from the Government Printm.g tesued under sect in ter. es Stat. pas les Office at the current GPO price. power plants and reactors. Penalty.

Reporting and recordkeeping U.S C 2:as.2as71 Information on current GPO prices may For the purposes of sec. 223. et Stat. est, se be obtained by contacting the re9uirements*

amended (42 U.S.C. 2273) Il 5s.3. ssJ1. Ete Superintendent of Documents. U.S. Fw the masons set out in the and ss.s3 are leeued under sec.1sti, as Stat.

Government Prinung Office. Post Office preamble and under the authority of the eso, es amended (42 U.S.C. 3:01(1)): and Box 37082. Washington, DC 200197082. Atomic Energy Act of 1954, as amended, il nas, nas and ss.ss(f) are leeued under telephone (202) 276-2000 or (202) 27b the Energy Reorganization Act of 1974, sec. lete, es seat. eso. es amended (4s U. esc 2171- as amended. the Nuclear Weste Polley saatto)).

Act of 1982, and 5 U.S.C. 553, the NRC is VI. Environmental Impact: Categorical adopting the following amendments to W A h Pro h Exclusion to CPR Part 58 and 10 CFR Part 50. g 33.1 - pu, pees.

The NRC has determined that this 1.10 CFR Part 55 is revised to read as The regulations in this part:

regulation is the type of action desenbed I U***: (a) Establish procedures and criteria

} in categorical exclusion to CFR for the laeuence of licenses to operators

. St.22(cK1). Therefore, neither an PART 55-OPERATORS' UCENSES and senior operators of utilization environmental impact statement nor an facilities licensed pursuant to the environmental assessment has been P# A Atomic Energy Act of 1964, as amended, prepared for this regulation. sw. or section 202 of the Energy 55.1 Purpose Reorganization Act of 1974, as amended.

Vit. Paperwork Reduction Act $s.2 Scope.

Statement and Part 50 of this chapter.

ss.: ucenu acquirements.

55 4 Dantuus. (b) Provide for the terms and This final rule amends informauon

conditions upon which the Commission I collection requirements that are subject fs Yo"is willissue or modify these licenses and to the Paperwork Reduction Act of 1980 n7 Addidonal requimmenta. (c) Provide for the terms and  !

. (44 U.S C. 3501 et seq.).These ss e informauon collection requimments: conditions to maintain and renew these  ;

, paperwork requirements were approved Oh48 approval. licenses. l B-8

f f*ederal Reglater / Vol. 52. No. 57 / Wednesday. March 25. 1987 / Rules and Regulations 9461 lSL2 soaps. demonstrates expected plant response for operators and senior operators of  !

The regulations in this part apply to-- to operstor input, and to normal, nuclear reactors licensed under 10 CFR (a) Any individual who manipulates the transient, and accident conditions to Part 50 and located in these regions.

controle of any utilization facility which the simulator has been designed (2) Any application for a license or licensed pursuant to Part 50 of this to respond. license renewal filed under the i cha pter, and " Reference plant" means the specific regulations in this part involving a (b) Any individual designated by a nuclear power plant from which a nuclear reactor licensed under 10 CFR .

facility licensee to be responsible for simulation facility's control room Part 50 and any related inquiry.

directing any licensed setivity of a configuration, system control communication, information. or report licensed operator. arrangement, and design data are must be submitted by mail or in person I ss.3 umanas rowtrements. "Nor operator" means any to the Regional Administrator.The A person must be authorized by a individuallicensed under this part to Regional Adm,inistrator or the license issued by the Commission to Administrator s designee will transmit manipulate the controls of a facility and perform the function of an operator or a to direct the licensed activities of to the Grectw omuclear Reactor serdor operator as defined in this part. licensed operators. Regulation any matter that is not within

" Simulation facility" means one or the scope of the Regional iSL4 Dennmons. more of the following com onents. alone Administrator's delegated authority.

As used in this part: or in combination, used fo the partial (i)If the riuclear reactor is located in "Act"means the Atomic Energy Act conduct of operating tests for operators, Region 1. submission must be made to of1954. including any amendments to senior operators, and candidates: the Regional Administrator.RegionI. i the Act. (1) The plant. U.S. Nuclear Regulatory Commission.

" Actively performing the functions of (2) A plant-referenced simulator. 631 Park Avenue. King of Prussia, an operator or senior operator" means (31 Another simulation device. Pennsylvania 19406, that an individual has a position on the " Systems approach to training" means (ii)If the nuclear reactor is located in shift crew that requires the individual to a training program that includes the Region 11. submission must be made to be licensed as defined in the facility's following five elements:

technical specifications. and that the the Regional Administrator. Region !!.

(1) Systematic analysis of the jobs to U S. Nuclear Regulatory Commission.

Individual carries out and is responsible be performed. 151 Marietta Street' Suite 2900. Atlanta, for the duties covered by that position. (2) Learning objectives derived from

" Commission" means the Nucfear the analysis which describe desired mg a 30m Regulatory Commission or its duly performance after training. (iii)If the nuclear reactor is located in authorized representatives. (3) Training design and Region UI. submission must be made to

" Controls" when used with respect to implementation based on the learning the Regional Admuustrator. Region !!!.

a nuclear reactor means apparatus and objectives. U.S. Nuclear Regulatory Commission, mechanisms the manipulation of which (4) Evaluation of trainee mastery of 799 Roosevelt Road Glen Ellyn. Illinois directly affects the reactivity or power the objectives during training. 60137.

level of the reactor. (5) Evaluat!on and revision of the liv)If the nuclear reactor is located in Tacility" means any utilization training based on the performance of Regioc IV, submission must be made to facility as defined in Part 50 of this trained personnelin the job setting. the Regional Administrator. Region IV.

chapter. In cases for which a license is " United States." when used in a U.S. Nuclear Regulatory Commission. '

lesued for operation of two or more geographical sense. includes Puerto Rico 611 Ryan Plaza Dnve Suite 1000, facilities " facility" means all facilities and all territories and possessions of the Arlington. Texas 76011.

identified in the license. United States.

Tacilitylicensee means an applicant (v)If the nuclear reactor is located in Re ion V. submission must be made to '

for, Licensee means an individualor holder of a (a) Except aslicense provided for a facility.

under a . I 55.5 commun6 the Regional cations,Region V.

Administrator.

U.S. Nuclear Regulatory Commission.

licensed operator or senior operator, regional licensing program identified in

" Operator" means any individual paragraph (b) of this section, an 1450 Maria Lane Suite 210. Walnut licensed under this part to manipulate a applicant or licensee or facility licensee Creek. California 94596' controlof a facility. shall submit any comtnunication or i 58.8 Interpretat6ana. I

" Performance testing" means testing report concerning the regulations in this i conducted to verify a simulation part end shall submit any application Except as specifically authorized by facility's performance as compared to filed under these regulations to the the Commission in writing, no actual or predicted reference plant Commission as follows: Interpretation of the meaning of the {

performance. (1) By mail addressed to--Director of regulations in this part by any officer or ,

" Physician" means an individual Nuclear Reactor Regulation. U.S. employee of the Commission other than i licensed by a State or territory of the . Nuclear Regulatory Commission, a written interpretation by the General United States, the District of Columbia Washington DC 20555, or Counsel will be recognized to be binding or the Commonwealth of Puerto Rico to (2) By delivery in person to the upon the Commission.

dispense drugs in the practice of Commission offices at--(i)1717 H Street g $g,y w w ,, ,,ni ,,

medicine. NW.. Washington. DC or (ii) 7920

" Plant-referenced simulator" means a Norfolk Avenue.Bethesda.Msryland. The Commission may, by rule, simulator modeling the systems of the (b)(1)The Director of Nuclear Reactor regulation. or order. impose upon any reference plant with which the operator Regulation has delegated to the Regional licensee such requirements. in addition interfaces in the control room. includmg Administrators of Regions 1. II !!! IV, to those established in the regulations in {

operating consoles, and which permits and V authority and responsibility this part, as it deems appropriate or use of the reference plant's procedures. pursuant to the regulations in this part necessary to protect health and to A plant referenced simulator for the issuance and renewal of licenses minimite danger to hfe or property.

{

B-9

9462 Federal Register / Vol. 52, No. 57 / Wednesday. Wrch 25. 1987 / Rules and Regulations i 55.8 information conection Subpart C-Medical Requirements Ucensee," available from Publication requirements: OWB approval Services Section. Document (a) The Nuclear Regulatory I 55.21 Mescal examination. Management Branc.h. Division of Commission has submitted the An applicant for a license shall have a TechnicalInformation and Document informatwn collection requirements medical examination by a physician. A Control. U.S. Nuclear Regulatory contained m this part to the Office of licensee shall have a medical Commission. Washington. DC 20555; Management and Budget (OMB) for examination by a physician every two (2) File an original and two copies of approval as required by the paperwork years.The physician shall determine Form NRC-398, together with the that the applicant or licensee meets the information required in paragraphs Reduction Act of 1980 (44 U.S C. 3501 et seq-). OMB has approved the requirements of i 55.33(a)(1). (a)(3). (4),(5) and (6) of this section, with information collection requirements the appropriate Regional Administrator; I 55.23 Certtncation. (3) Submit a written request from an contained in this part under control To certify the medical fitness of the authorized representative of the facility number 3150-0018 appl carit, an authorized repruntatin licensee by which the applicant will be b Th d info t

' 8 da rt a ion op dtinIt p ppea n 55 a n t et e to

) 55.59. Ucensee." available from Publication (4) Provide evidence that the a licant (c) This part contairs information Services Section. Document collection requirements in addition to Management Branch. Division of has successfully completed the facilit!as those approved under the control licensee's requirements to be license Technicallnformation and Document *I ' ' d of h'

'namber specified in paragraph (s) of this Control. U.S. Nuclear Regulatcry

  • [g$"I  ;[,n ?s" f r s opuat section. These mformation collection Commission. Washington, DC 20555.

requirements and the control numbers or a seni r perator to perform assigned (a) Form NRC-396 must certify that a u ons d r under which they are approved are as follows.

physician has conducted the medical ',s e ,e ,h examination of the applicant as required evidence on Form NRC-398.This ls t (11 In il 55.23,55.25,55 27,55.31. Form m I 55.21.

NRC-396 is approved under control (b) When the certification requests a certification must include details of the number 315M024 applicant's qualifications, and details on conditionallicense based on medical counes of instruction administered by (2) In il 55.31,55.35. 55.47. and 55.57 evidence, the medical evidence must be the facility licensee, and describe the Form NRC-398 is approved under submitted on NRC Form 396 to the nature of the training received at the control number 315M090 Commission and the Conunission then facility, and the startup and shutdown (3) In i 55.45. Form NRC-474 is makes a determination in secordance experience received. In lieu of these soproved under control number 3150- with i 55.33. details, the Commission may accept 0138- I 55.25 incapacitation because of certification that the applicant has eseamey or sneen, successfully completed e Commission-If. during the term of the license, the approved training program that is based I ss.1 specme esempuone. licensee develops a physical or mental on a systems approach to training and De Commission may, upon condition that causes the licensee to fall that uses a simulation facility application by an interested person, or 80. meet the requirements of I 55.21 of acceptable to the Commission under upon its own initiative, grant such this part the facility licensee shall notify I 55.45(b) of this part:

esemptions from the requirements of the the Commission within 30 days of (5) provide evidence that the regulations in this part as it determines learning of the diagnosis. For conditions applicant, as a trainee. has successfully are authorized by law and will not for which a conditionallicense (as manipulated the controls of the facility endanger life or property and are describing in i 55.33(b) of this part)is for which a license is sought. At a otherwise in the public interest. requested, the facility licensee shall mir.imum, five significant centrol provide medical certification on Form manipulations must be performed which I St.13 Generalesemptions. .

NRC 398 to the Commission (as affect reactivity or power level. For a The regulations in this part do not described in i 56.23 of this part). facility that has not completed initia e up

  • '~~

uire a license for an individual I 54.37 m ne facilitylicensee shalldocument 7 *i i$',t Safety Analysis Report es amended and (a) Under the direction and in the and me.ntain the results of medical approved by the Commisalon, the presence of a licensed operator or senior qualifications data, test results and accept evidence of operstor. manipulates the controls of-(1) A research or training reactor as each operator's or senior operator's Commission satisfactory per saa'formance of simul medical history for the current license control manipulations as part of a

'l l;

part of the individual's training as a student or period and provide the documentation to the Commission upon request.The Commisalon-approv6d training program by a trainee on a simulation facility (2) A facility as a part of the facility licensee shall retain this acceptable to the Commission under - i individual's training in a facility documentation while an individual I 55.45(b) of this part. For a facility l licensee's training program as approved performs the functions of an operator or which ha, (i) completed preoperational by the Commission to qualify for an senior operator. testing as describe' in its Final Safety operatorlicense under this part. Subpad D--Appucatione Analysis Report, as amended and 1 (b) Under the direction and in the approved by the Commission, and fil) is presence of a licensed senior operator. I 54.31 How to apply, in er. extended shutdown which manipulates the controls of a facility to (a) The applicant shall: precludes manipulation of the control of j load or unload the fuelinto, out of or . (1) Complete Form NRC-398. the facility in the control room.the I within the reactor vessel. " Personal Qualification Statement- Commission may process the a

k B- 10 Y .

. . l l

Federal Register / Vol. 52. No. 57 / Wednesday. March 25. 1987 / Rules and Regulations 9463 application and may administer the under i 55.33(s)(1) of this part. the (b)The written examination for an wntten examination and operating test Commissioi may approve the operator for a facility willinclude a required by ll 55.41 or 55.43 and 55 45 application and include conditions in representative sample from among the of this part but may not issue the the license to accommodate the medical following 14 items, to the extent license until the required evidence of defect. The Commission will consider applicable to the facility. l control manipulations is supplied. For the recommendations and supporting (1) Fundamentals of reactor theory, licensed operators applying for a senior evidence of the facility licensee and of including fission process, neutron operator license certification that the the examining physician (provided on multiplication, source effects, control operator has successfully operated the Form NRC-396)in arriving at its rod effects, criticality indications, controla of the facility as a licensed decision. reactivity coefficients, and poison operator shall be accepted; and effecta.

(6) Provide certification by the facility I 55J5

  • 1;;":etions. (2) General design features of the licensae of medical condition and (a) An applicant whose application for core, including core structure, fuel general health on Form NRC-396, to a license has been denied because of elements, control rode, core comply with ll 55.21. 55.23 and failure to pass the written examination instruments tion, and coolant flow.

55.33(a)(1). or operating test, or both, may file 6 new (3) Mechanical components and (b) The Commission may at any tirne application two months after the date of design features of the reactor primary after the application has been filed, and denial. The application must be before the license has expired. require submitted on Form NRC-398 and includs system.

(4) Secondary coolant and auxiliary futher information under oath or a statement signed by an authorized systems that affect the facility.

affirmation in order to enable it to representative of the facility licensee by determine whether to grant or deny the whom the applicant will be employed (5) Facility operating characteristics i application or whether to revoke, durms steady state and transient i that states m detail the extent of the $

modify. or suspend the license. applicant s additional training since the conditions including coolant chemistry.

(c) An applicant whose application causes and effects of temperature.

denial and certifies that the applicant is has been denied because of a medical pressure and reactivity changes, effects ready for re-examination. An applicant condition or general health may submit may filed a third application six months of load changes, and operstmg a further medicai report at any time as a after the date of denial of the second I mitations and reasons for these 1 operating characteristics.

sup lement to the application.

( ) Each application and statenient application. and may file further (6) Design. componenta, and functions

)

successive applications two years after must contain complete and securate tne date of denial of each prior of reactivity conaol mechanisms and disclosure as to all matters required to application. The applicant shall submit licant shall sign e &:.h successive application on Forrn Des n co nponents, and. functions be statements disclosed.ne required apby paragraphs (a)(1)

NRC-398 and, include a statement of U * '7 ' ' ' I"d'"8 and (2) of this section. rdditional tratrung. n ne i e[l cks.

failure modes and automatic and I"3 8*'****"d*"'"**' manual features.

  • ""****"' ei er e ri n exar a lon or (8) Components. capacity, and (a) Requirements for the opprovalof operating test and failed the other may on initialopplication. De Commission request in a new application on Form I""C'*"' "I '*"8'"CY ',I'and NRG-398 to be excused from re, (9) Shielding, isolation will approve an initial application for a c ntainment design features. m, eluding hcense pursuant to the regulations in examination on the portions of the {

examination or test which the applicant access HmHations.

this part. if it finds that- (1@ Adnu,mstrative, normal.

(1) Hechh. The applicants medical has passed. ne Commission may in ita discretion grant the request,if lit abnormal, and emergency operating condition and general health will not g adversely affect the performance of determines that sufficient justification is procedures for the facility. .

. presented. (11) Purpose and operation of  !

assigned operator job duties or cause radiation monitoring systems including operational errors endangering public Subpart E-Written Examinations and alarms and survey equipment.

health and safety.ne Commission will )

Operating Tests (12) Radiological safety principles and j base its finding upon the certification by procedures.

the facility licensee as detailed in IW1 Wrmn examinanom opwators. i (13) Procedures and equipment i l 55.21 (a) Content. The written examination available for handling and disposal of i (2) Written examination and for an operator will contain a radioactive materials and effluents.

operating test The applicant has passed representative selection of questions on (14) Principles of heat transfer the requisite written examination and the knowledge, skills, and abilities l thermodynamics and fluid mechanics.

operating test in accordance with needed to perform licensed operator il 55.41 and 55.45 or 55 43 and 55.45. duties. The knowledge. skills, and f $5.43 Wrttten examinsees Senior These examinations and tests determine abilities will be identified. In part, from opwstors.

whether the applicant for an operator's learning objectives derived from a (a) Content. De written examination license has teamed to operate a facility systematic analysis of licensed operator for a senior operator will contain a competently and safely. and duties performed by each facility representative selection of questions on additionally.in the case of a senior licensee and contained in its training the knowledge. skills, and abilities operator, whether the applicant has program and from information in the needed to perform licensed senior 3 learned to direct the licensed activities Final Safety Analysis Report. system operator duties. The knowledge, skills. , j oflicensed operators competently and destnption manuals and operating and abilities will be identified,in part. I safely. procedures. facility license and license from learning objectives derived from a j (b) Conditionollicense. If an amendments. Licensee Etent Reports, systematic analysis oflicensed senior -

applicant's general medical condition and other matenals requested from the operator duties performed by each does not meet the minimum standards facility licensee by the Commission. facility licensee and contained in its B-11 i

i 1 1

_ _ _ _ _ _ _ _ _ _ _ - - . _ _ - _ - - _ _ _ _ _ _ - - - - - - - - - _ - - - _ - - - - - - - - - - - _ - - - - - - -J

t.

9464 Federal RGstsier / Vol. 52. No. 57 / Wednesday. March 25, 1987 / Rules and Restulations training program and from information (2) Manipulate the console controls as (i) A simulation facility which the in the Fmal Safety Analysis Report, required to operate the facility between Commission has approved for use ufler s> tem description manuals and shutdown and designated power levels. application has been made by the operating procedures. facility license (3) Identify annunciators and facility licensee, or and license amendments. Licensee condition indicating signals and perform (ii) A simulation facility consisting Es ent Reports, and other materials appropriate remedial actions where solely of a plant. referenced simultator requested from the facility licensee by appropriate. which has been certified to the the Commission. (4) Identify the instrumentation Commission by the facility licensee. ,

(b) The written examination for a systems and the significance of facility (2) Schedule forfacility //censees. (i) i seninr operator for a facility willinclude instrument readings. Within one year after the effective date a representative sample from among the (5) Observe and safely control the of this part, each facility Itcenses which following seven items and the 14 items operating behavior characteristics of the proposes to use a simulation facility specified in i 55.41 of this part, to the facility, pursuant to paragraph (b)(1)(i) of this extent applicable to the facility: (6) Perform control manipulations section, except test and research (1) Conditions and limitations in the required to obtain desired operating reactors, shall submit a plan by which facility license. results duri,ng normal abnormal, and its simulation facility will be developed (2) Facility operating limitations in the emergency situations. and by which an application will be technical specifications and their bases. (7) Safely operate the facility's head submitted for its use.

(3) Facility gicensee procedures removal eystems. including primary (ii)Those facility licensees which required to obtain suthority for design coolant, emergency coolant, and decay propose to conform with paragraph and operating changes m the facility, heat removal systems. and identify the (b)(1)(i) of this section, not later than 42 relations of the proper operation of months after the effective date of this (4) Radiation hazards that may arise during normal and abnormal situations. these systems to the operation of the rule. shall submit an application for use facility, of this simulation facihty to the neluding maintenance activit,ies and (8) Safely operate the facility's Commission,in accordance with various contamination conditions.

auxiliary and emergency systems, paragraph (b)(4XI) of this section.

(5) Assessment of facility condit. ions including operation of those controls (iii) nose facilitylicensees which and selection of appropriate procedures associated with plant equipment that propose to conform with paragraph -

during normal, abnormal. and could affect reactivity or the release of (b)(1Xii) of this section. not later than 46 emergency situations, radioactive materials to the months after the effective date of this -

(6) Procedures and limitations environment. .

rule, shall submit a certification for use involved in initial core loading. (9) Demonstrate or describe the use of this simulation facility to the alterations in core configuration, control and function of the facility's radiation Commission on Form NRC-474.

rod programming. and determination of monitoring systems, inicuding fixed " Simulation Facility Certification."

s arious internal and external effects on radistion monitors and alarms, portable available from Publication Services core reactivity. survey instruments, and personnel Section. Document Management Branch.

(7) Fuel handling facilities and monitoring equipment. Division of Technical Information and procedures. (10) Demonstrate knowledge of Document Control. U.S. Nuclear .

I ssAs @ersens testa, significant radiation hasards, including Regulatory Commission. Washington.

permissible levels in excess of those DC 20555,in accordance with paragraph -

(a) Content. De operating tests authorised, and ability to perform other (bX5XI) of this section.

administered to applicants for operator procedures to reduce excessive levels of (iv) ne simulation facility portion of and senior operator licenses in radiation and to guard against personnel the operating test will not be accordance with paragraph (b)(1) of this exposure, administered on other than a certified or section are generally similar in scope. (11) Demonstrate knowledge of the an approved simulation facility after The content will be identified in part. emergency plan for the facility. May 26.1991.

from learning objectives derived from a including, as appropriate, the operator's (3) Schedule /brfacility appliconds. (il systematic analysis of licensed operator or senior operator's responsibility to For facility licensee applications after or senior operator duties performed by decide whether the plan should be the effective date of this rule, except ter' each facility licensee and contained in executed and the duties under the plan and research reactors, the a licant its training program and from ossigned. shallsubmit a plan which tifice information in the Final Safety Analysis (12) Demonstrate the knowledge and whether its simulation facility will Report. system description manuals and ability as appropriate to the assigned conform with paragraph (bM1MI)ce operating procedures, facility license position to assume the responsibilities (bM1Mii) of this section at the time of and license amendments. Licensee associated with the safe operation of the application.

Event Reports, and other meteelais facility. (ii) Thoes applicants which propose to requested from the facility licensee by (13) Demonstrate the applicant's conform with paragraph (bM1XI) of this the Commission. De operating test, to ability to function within the control section, not later than 130 days before the extent applicable, requires the room team as appropriate to the the date when the applicant proposes epplicaat to denionstrate an .

assigned position, la such a way that the that the Commission conduct operating I understanding of and the ability to facility licensee's procedures are tests, shall submit an application fee use .I perform the actions necessary to adhered to and that the limitations in its ofits simulation facility to the NRC. In accomplish a representative sample license and amendments are not accordance with paragraph (b)(4)(i) of frcm among the following 13 items. violated. this section.

(1) Perform pre-startup procedures for (b) Implementation-41) (iii) Those applicants which propose the facility, including operating of those Administration. The operating test will to conform with paragraph (b)(1)(li) of controls associated with plant be administered in a plant walkthrough this section, not later than 80 days equipment that could affect resetivity. and in either-- before the date when the applicant t

S.

4 B-12 IS

1 Federal Register / Vol. 52. No. 57 / Wednesday. March 25, 1987 / Rules and Regulations 9465 proposes that NRC conduct operating including results of completed performance tests,if different. to be [

tests shall submit a certification for use performance testing as required for condocted on the simulation facility ofits simulation facility to the approval. during the subsequent four year period.

Commission on Form NRC-474. in (vii) Any application or report and a schedule for the conduct of accordance with paragraph (b)(5)(i) of submitted pursuant to paragraphs approximately 25 percent of the this section. (b)(4)(i),(b)(4)(iii) and (b)(4)(vi) of this performance tests per year for the (4) Applicofion for ond opprovolof section must include a description of the subsequent four years.

simulation facihtiet. Those facility performance testing completed for the licensees which propose,in accordance simulauon facility, and must include a 155.ar walver of examination and test with paragraph (b)(1)(1) of this section, description of performance tests. if M""'**"

to use a simulation facility that is other different, to be conducted on the (a) On application, the Commission than solely a plant-referenced almulator simulation facility during the subsequent may waive any or all of the as defined in i 55.4 shall- four year period, and a schedule for the requirements for a written examination (1)In accordance with the plan conduct of approximately 25 percent of and operating test. if it finds that the submitted pursuant to paragraph the performance testa applicant-(b)(2)(1) or (b)(3)(1) of this section, as subsequent four years.per year for the(1) Has had extensive actual operating  !

applicable submit an application for (5) Certification ofsimulation experience at a comparable facility, as approval of the simulation facility to the facilities-Those facility licensees l determined by the Commission, within l Commission. in accordance with the which propose,in accordance with two years before the date of application:

schedule in paragraph (b)(2)(ii) or j paragraph (b)(1)(ii) of this section. to use (2) Has discharged his or her i (b)(3)(ll) of this section as appropriate. a simulation facility consisting solely of responsibilities competently and safely This application must include: a plant. referenced simulator as defhed and is capable of continuing to do so; (A) A statement that the simulation in i 55 4. shall- and facility meets the plan submitted to the (i) Submit a certification to the (3) Has learned the operating i

Commission pursuant to paragraph Commission that the simula'hn facility procedures for and is qualified to (b)(2)(i) or (b)(3)(l) of this section, as meets the Commission's reguhdons. The operate competently and safely the applicable; facility licensee shall provide this facility designated in the application.

(B) A desenption of the components of certification on Form NRC-474 in (b) The Commission may accept as the simulation facility which are accordance with the schedule in proof of the applicant's past intended to be used for each part of the paragraph (b)(2)(iii) or (b)(3)(lii) of this operating test; and performance a certification of an section as applicable, authorized representative of the facility (C) A description of the performance (ii) Submit, every four years on the tests as part of the application, and the licensee or of a holder of an j anniversary of the certification, a report authorization by which the applicant results of such tests. to the Commission which identifies any

, 1 (ii) The Commission will approve a was previously employed. The uncorrected performance test failures.

simulation facility if it finds that the certification must contain a description and submit a schedule for correction of of the applicant's operating experience.

simulation facility and its proposed see such performance test failures. lf any.

are suitable for the conduct of operating Including an approximate number of (iii) Retain the results of the hours the applicant operated the tests for the facility licensee's reference performance test conducted until four plant. in acccrdance with paragraph (a) years after the submittal of certification controls of the facility, the duties of this section. performed, and the extent of the under paragraph (b)(5)(i). each report applicant's responsibility.

(iii) Submit, every four years on the pursuant to paragraph (b)(5)(ii), or anniversary of the application, a report (c) The Commission may accept as decertification under paragraph (b)(5)(v) ,

to the Commission which identifies any of this section. as applicable. proof of the applicant's current j i uncorrected performance test failures. (iv)If the Commission determines, qualifications a certification of an and submit a schedule for correction of based upon the results of performance authorized representative of the facility these performance test failures,if any. testing, that a certified simulation licensee or of a holder of an  !

[iv) Retain the results of the facility does not meet the reqwements authorization where the applicant's )

performance test conducted until four of this part. the simulation facility may " C" #11 b' "Ulized' years after the submittal of the I not be used to conduct operating tests, j 55.49 Integrtty of examinations and j application under paragraph (b)(4)(i). (v)If the Commission determines, tests.

Gach report pursuant to paragraph pursuant to paragraph (b)(5)(iv) of this (b)(4)(lill. or any reapplication under Applicants. licensees. and facility section. that a certified simulation licensees shall not engsstr m any paragraph (b)(4)(iv) of this section, as facility does not meet the requirements appropriate. activity that compromises the integrity i of this part the facility licensee may of any application. test, or examination (v)If the Commission determines, submit a decertification to the based upon the results of performance required by this part. I Commission on Form NRC-474. This '

testing, that an approved simuistion decertification must include a Subpart F-Ucenses facility does not meet the requirements description of corrective actions taken, of this part the simulation facility may including results of completed I $5.51 iswance oncenses.

not be used to conduct operating tests. perfortrance testing as required for Operator ondsenior operator (vi)If the Commission determmes, decertification. l

/icenses. If the Commission determines ,

pursuant to paragraph (bl(4)(v) of this (vi) Any certification report, or that an applicant for an operator license section, that an approved simulation l decertification submitted pursuant to or a senior operator license meets the l facility does not meet the requirements paragraph (b)(5)(i). (b)(5)(ii) or (b)(5)(v) requirements of the A:t and its of this part, the facility licensee may of this section must include a regulations. it willissue a hcense in the again submit an application for description of performance testing form and containing any conditions and approval.This application must include completed for the simulation facility, limitations it considers appropriate and l e description of correctis e actions taken, and must include a description of the n ecessa ry.

1 B-13 i

_ _ __ _ _ _ _ - _ _ _ _ _ - _ _ _ _ - _ _ _ _ - - . J

9466 Federal Register / Vol. 52. No. 57 / Wednesday, March 25, 1987 / Rules and Regulations 155.53 Conditions of Econses. I 55.55 Expusuon. (i)!s capable of continuing to Each license contains and la subject to (a) Each operator license and senior competently and safely assume licensed the following conditions whether stated operator license expires six years after duties:

in the license or not; the date of issuance. upon termination (ii) Has successfully completed a la) Neither the license nor any nght of employment with the facility licensee, requalification program that has been under the license may be assigned or or upon determination by the facility approved by the Commission as licensee that the licensed individual no required by I 55.59: and otherwise transferred.

(iii) Has passed the requalification (b) The license is limited to the facility longer needs to maintain a license.

for which it is issued. (b)If a licensee files an application for examinations and annual operating tests ,

renewal or an upgrade of an existing as required by I 55.59.  !

(c) The license is limited to those (iv) Has passed a comprehens!ve controls of the facility specified in the license on Form NRC-398 at least 30 days before the expiration of the requalification written examination and license. operating test administered by the (d) The license la subject to, and the existing license. it does not expire until disposition of the application for Commission during the term of a six-licessee shall observe. all applicable year license.

rules, regulations, and orders of the renewal or for an upgraded license has been finally determined by the (3) nere is a continued need for a Commission. licensee to operate or for a senior (e)If a licensee has not been actively Commission. Filing by mail or telegram will be deemed to be complete at the operator to direct operators at the performing the functions of an operator time the application is deposited in the facility designated in the application.

or senior operator, the licensee may not (4) De past performance of the resume activities authorized by a license mail or with a telegraph company.

I

  • o s a a$i g s kd e tied by arag apb(f) f his Commiss!o ion willinclude in its section.To maintain active status, the (a) The applicant for renewal of a license shall~ evaluatjon information such as notices licensee shall actisely perform the of violations or letters of reprimand in functions of an operator or senior (1) Complete and sign Form NRC. 398 and include the number of the license the IIcensee e docket.

operator on a minimum of seven 8-hour or five 12. hour shifts per calendar for which renewalis sought. 155.5e Requasencettort quarter. For test and research reactors. (2) File an original and two copias of (aWg4 codon ngm'amants.

the licensee shall actively perform the Form NRC-398 with the appropriate Regional Administrator specified in Es icensee all-functions of an operator or senior operator for a minhnum of four hours i 55.5(b). &4 dh per caler:dar quarter. (3) Provide written evidence of the {g  ; jfens e thas n (f)If paragraph (e)of this sectionis applicant's experience under the approved by the Commisalon.nle not met, before resumption of functions existing licenae and the approximate p shallbe *d 'ed f authorized by a license issued under this number of hours that the licensee has c ou @ dnM M part. an authorized representative of the operated the facility. ph in durh facility licensee shall certify the (4) Provide a statement by an (2) Pass a comprehensive following: authorized representative of the facility requalification written eu-ation and (1) That the qualifications and status licensee that during the effective term of

  • of the licensee are current and valid; the current license the applicant has ""ggj"d" *[3,N ,,,$,3,, ,ggg and satisfactorily completed the sample the items specified in ll 56.41 (2) nat the licensee ha: completed a requalification program for the facility and 55.43 of this part. to the extent minimum of 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of shift fonctions for which OPnator or senior operator appucable to b facility, b Mcm under the direction of an opfrator or licenu renewalis sou,ght. and any limitation of the limase under senior operator as appropriate and m (5) Provide evidence that the appilcant 15a.53(c) of this part.

the position.to which the individual will hu discharged the license (U) The operating test willioquire the be assigned. De 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> must have responalbilities competently and safely, operator or senior operator to included a complete tour o!the plant- De Commission may accept as demonstrate an understanding of and and all required shift turnover evidence of the applicant's having met the ability to perform the actions procedures. For senior operators limited this requirement a certificate of an ne ' to a lish a to fuel handling under paragraph (c) of authorized representative r+f the facility c rehenele pie dans this section. one shift must have been licensee or holder of an authorization by specified la I 86.48(a) (2) through (13) completed. For test and research which the licensee has been employed. inclualve to the extent applicabia to the reactors. a minimam of six hours aunt (6) Provide certification by the facility r,ctngy, have been completed. licensee of medical condition and (1H]In has of b t'risuunitaaise (g) Tne licensee shall notify the general health on Form NRC-396, to accepting a certification by the facil!!y Commission withia 30 days about a comply with ll 55.21,55.23 and 55.27.  !!censee that the licensee has passed r

a conviction for a felony. (b) The license will be renewed if the written examination and opeteting

. (h) The licensee shall complete a Commission finds that- testa administered by the facility requalification program as described by (1)The medical condition and the licensee within its Commission,-

I $5.59. general health of the licensee continue approved program developed by using a (1)ne licensee shall heve a blennial to be such as not to cane operational systema approach to training undee medical examination. errors that endanger public health and paragraph (c) of this section. the (J) ne licensee shall comply with any esfety.ne Commission will base this Comrnisalon may administer a other conditions that the Commission finding upon the certification by the comprehensive requalificat6on written may impose to protect health or to facility licensee as described in i 55.23. examination and an annual operating minimize danger to life or propes1y. (2) The licensee- test.

4.

'B- 14 r

l

Federal Register / Vol. 52. No. 57 / Wednesday March 25, 1987 / Rules and Regulations 9467 (b) Additiono/ trommg !! the performed annually; all other items must (V) Turbine or generator trip.

requirements of paragraphs (a)(1) and be performed on a two. year cycle. (W) Malfunction of an automatic (2) of this section are not met, the However, the requalification programs control system that affects reactivity.

Commission may require the licensee to must contain a comrnitment that each (X) Malfunction of reactor coolant complete additional training and to individual shall perform or participate in pressure / volume control system.

submit evidence to the Commission of a combination of reactivity control (Y) Reactor trip.

successful completion of this training manipulations based on the availability (Z) Main steam line break (inside or before returning to licensed duties. of plant equipment and systems. Those outside containment).

(c) Requohfication program control manipulations which are not (AA) A nuclearinstrumentation requirements. A facility licensee shall performed at the plant may be failure.

have a requalification prograrn reviewed performed on a simulator.The use of the (ii) Each licensed operator and senior and approved by the Commission.The Technical Specifications should be operator has demonstrated satisfactory requalification program must meet the maximized during the simulator control understanding of the operation of the requirements of paragraphs (c)(1) manipulations. Senior operator licensees apparatus and mechanisms associated through (7) of this section. In lieu of are credited with these activities if they with the control manipulations in paragraphs (c) (2). (3). and (4) of this direct control manipulations as they are paragraph (c)(3)(i)of this section and section, the Commission may approve a performed. knows the operating procedures in each program developed by using a systems (A) Plant or reactor startups to include area for which the operator or senior approach to training. a range that reactivity feedback from operator is licensed.

(1) Schedule. The requalification nuclear heat addition is noticeable and (iii) Each licensed opeistor and senior program must be conducted for a heatup rate is established. operator is cognizant of facility design continuous penod not to exceed two (B) Plant shutdown. changes, procedure changes. and facility .

years, and upon conclusion must be (C) Manual control of steam license changes.

promptly followed. purevant to a generators or feedwater or both during (iv) Each licensed operator and senior l

i continuous schedule, by successive startup and shutdown. operator reviews the contents of all l requahfication programs. (D) Boration or dilution dunng power abnormal and emergency procedures on (2) Lectures. The requalification operation. a regularly scheduled basis.

program must include preplanned (E) Significant (>10 percent) power (v) A simulator may be used in changes m manual rod control or {

lectures on a regular and continuing meeting the requirements of peregraphs basis throughout the hcense pened in recirculation flow.

(F) Reactor power change of10 (c) (3)( ) and (3)(ii) of this section. if it those areas where operator and senior . reproduces the general operating operator written examinations and percent or greater where load change is characteristics of the facility involved facility operating expenence indicate perfo"rned with load limit control or and the arrangement of the that emphasis in scope and depth of where flux. temperature or speed instrumentation and controls of the coverage is needed in the following controlis on manual (for HTCR).  : mulator is similar to that of the facility subjects: (C) Loss of coolant. including- involved. lf the simulator or simulation (i) Theory and principles of operation. (1) Significant pWR steam generator device is used to administer operating (ii) General and specific plant leaks tests for a facility as provided in 5 55 45 ,

operating characteristics. (2) Inside and outside primary (b)(1). the device approved to meet the [

(ill) Plant instrumentation and control g con rg, sinme"j smil beluding luhm requirements of 155 45(b)(1) must be systems. ,n used for credit to be given for meeting (iv) Plant protection systems. determination 3 the requirements of paragraphs (c)(3)(i) '

(v) Engmeered safety systems. 9) a v. rated reactor coolant response '

(G through AA) of this section.

(vi) Normal. abnormal, and emergency I' (4) Ero/uotion. The requalification operating procedures. (H) Lose of instrument air (if program must include-(vii) Radiation control and safety. simulated plant specific). (i) Comprehensive requalification (viii) Technical specifications. (I) Loss of electncal power (or written examinations and annual (ix) Applicable portions of Title 10. degraded power sources).

operating tests which determine areas in }'

Chapter 1. Code of federal (J) Loss of core coolant flow / natural which rettsining is needed to upgrade

  1. ~ licensed operator and senior operator l (3) On-the-job unining. ne K) of feedwater (normal and knowledge.

requalification program must include on. '[,*Yj'f service

,o water. lf required (ii) Written examinations which the-lob training so that- determine licensed operators and senior (1) Each licensed operator of a go,,,ge[,

utilization facility manipulates the plant (M)[ sso' f shutdown cooling. Operators' knowledge of subjects covered in the requalification program (NJ Loss of component cooling system controls and each licensed senior or cooling to an individual component. and provide a basis for evaluating their operator either manipulates the controls knowledge of abnormal and emergency (C) Loss of normal feedwater or or directs the activities of individuals normal feedwater system failure. procedures.

during plant control manipulations (P) Loss of condenser vacuum. (iii) Systematic observation and during the term of the licensed (Q) Loss of protective system channel. evaluation of the performance and j operator's or senior operator's license. (R) Misposmoned control rod or rods competency of licensed operatcts and i For reactor operators and senior (or rod drops). senior operators by supervisors and/or I operators. these manipulations must (S) Inability to drive control rods. training staff members. meluding corssist of the following control (T) Conditions requiring use of evuluation of actions taken or to be manipulations and plant evolutions if emergency boration or standby liquid taken during actual or simulated they are applicable to the plant design. control system. abnormal and emergency procedures.

Items desenbed in paragraphs (c)(3)(i) (U) Fuel claddmg failure or high liv) Simulation of emergency or (A) through (L) of this section must be activity in reactor coolant or offgas, abnormal conditions that may be

?

I.

t B-15 .

t

l 9468 Federal Register / Vol. 52. No. 57 / Wednesday. March 25, 1987 / Rules and Regulations I accomplished by using the control panel from this record retention requirement. violation of any provision of:

of the facihty involved or by using a (6) Ahernative training progmms. The (1)The Atomic Energy Act of1954, as i simulator. Where the control panel of requirements of this section may be met arnended:

the facility is used for simulation. the by requali fication programs conducted (2) Title II of the Energy .

actions taken or to be taken for the by persons other than the facility Reorganization Act of 1974, as amended:

emergency or abnormal condition shal1 licensee if the requalification programs or (

be discussed: actual manipulation of the are similar to the program desenbed in (3) Any regu!stion or order issued I plant controls is not required. If a paragraphs (c)(1) through (5) of this under these Acts.

simulator is used in meeting the section and the alternative program has (b) A court order may be obtained for requirements of paragraph (c)(4)(iii) of been approved by the Commission. the payment of a etvil penalty imposed this section. it shall accurately under wetion 234 of the Aomic Energy reproduce the operating characteristics (7) Applicability to research and test reactorfacihties. To accommodate Act for violation of:

of the facility involved and the (1) Sections 53.57,62.63.81.82. W .

arrangement of the instrumentation and spec alized modes of operation and differences in control, equipment, and W W. E or 109 d me Atomic controls of the simulator shall closely Energy Act:

parallel that of the facility involved, operator skills and knowledge, the requalificatioh program for each (2) Section 206 of the Energy After the provisions of f 55.45(b) have been implemented at a facility the licensed operator and senior operator of Reorganization Act of 1974:

a research reactor or test reactor facility (3) Any rule, regula tion, or order certified or approved simu,lation facility issued under these Acts:

must be used to comply with this must conform geners!!y but need not be identical to the requahfication program (4) Any tenn, condition orlimitation (v) sions for each licensed outlined in parsgraphs (c) (1) through (6) of any license issued under these Acts; operator and senior operator to of this section.Sigmficant deviations of from the requirements of paragraphs (c) (5) y g ,

participate In en acceieraied (1) through (6) of this section will be license may be revoked under section 9 '

permitted only if supported by written 1 I

[etfo an evs u t ons con ucted stification and approved by the A e s7n w o will u ly violates pursuant to paragra he (c)(4)(i) through

[iv) of this section c early indicated the ommission.

or any regulation issued under the Act.

($ Records.The requalification Subpart G-ModMcation and I"* 8 "

program docurnentation must include Revocation of Ucenses

,y gu d. p 1 conviction, may be punished by fine or I) e c ity licensee shall maintain i 56.s1 tsodmcat6on and revococon of imprisonment, or both, as provided by records documenting the participation of "**"***' I* "'

each licensed operator and senior (a) The terms and conditions of all operator in the requalification program. licenses are subject to amendment. PART 50-COMESTIC UCENSING OF The records must contain copies of revision, or modification by resson of PRODUCTION AND UTIUZATION written examinations administered. the rules, regulations. or orders issued in FACluTIES answers given by the licensee, and the accordance with the Act or any results of evaluations and amendments thereto. 2.The authort citation for Part 50 documentation of operating tests and of "" * * *, g,g" (b) Any license may be revoked.

any additional training administered in suspended. or modified, in whole or in Authortry: Sees.103.104.101.182. tes, test areae in which an operstor or senior part: 1ao. as Stot. saa, es7. osa, ess un saa, s58. es li "" # ** *'"** " "

faci tY censerecords h 11 re e or senior untilthethe operater,i[these application or in any statement of fact required under section 182 of the 22so. 22s2h seca. 201,302 aos, as sut.1242.

operator o license is renewed. tan 1248. as amended (42 UAC 6641. 5642.

Act. 66e6), unlus utherwin noted.

(ii) Each reord required by this pan S*cten 27 slao lamd under pub.1. 96-must be legible throughout the retention (2) Because of conditions revealed by the application or statement of fact ce 801. sec.10,92 Stat. 2951 (42 USC 5081).

penod specified by each Commiulon Secoons 50.58. 50.91 and met also seemed regulation.The record asy be the any mpwt. md inspecun w &

mans that wwld warrant the under Pub. L 97-418. 96 Stat. 3071. 2073 (42 original or a reproduced copy or a UAC 21:s. 22ael. Secoon so.rs also isoned Commission to refuse to grant a license anda sec.122. es Stat. sas (42 UAC 21 sal.

microform Is authenticated bmicroform on an rovided wiginalthat the copy or application. 5. coons mao.m also ise ed under uc. ,

authorized personnel and thN the (3) For willful violation of, or failure to in es Stat, en as amended (42 U.S.C tus). l microform is capable of prodocing a observe any of the terms and conditions sectiers MS-mto2 also immed under me.

clear copy throughout the required of the Act, or the license, or of any rule. 186. 88 Stat. 958 (42 USC 2238).

regulation, or order of the Commission. the o te as retention period. ,

(iii)If there is a conflict between the Of and (c), 30 n 5044. 50.44. 9044, and So.sn(s)

Commission's regulations in this part. (4) For any conduct determined by the m inued neder sec. seth, es stat. sea, as and any license condition, or other Commission to be a hazard to safe amended (42 UAC 22m(b)k il 80 tO(b) and written Commission approval or operation of the facility. (c) e.nd 6044 m twaed under uc.1811. se authorization pertaining to the retention stat. 940. as amended (42 UAC 22c111lk and period for the aame t) of record the Subpart H--Enforcement il msstel. 506 m70 art, m72. nra. I retention period speci d for these and 50.78 are issued under sec, teto, at Stat.

l records by the regulations in this part i 65.71 Vlotettons. 950, as amended (42 UAC 22mtol).

apply unless the Commission, pursuant (a) An injunction or other court order 3. In i 5c.34, paragraph (b)(8) La -

to i 55.11. grants a specific exemption may be obtained prohibiting any revised as follows:

l B-16 l 1

l l

_____----------__---__J

. . I Federal Register / Vol. 52. No. 57 / Wednesday. March 25. tw / Rule {and Regulations 9469 l i

iso.Sa contents of appocauons;techn6 cal DEPARTMENT OF TRANSPORTATION interestad persons an opportunity to paruc5au de ma%%

. . . Federal Avtstion Administration rmendment. Due consideration has ben 14 CFR Part 33 given to the comments received.

(b) * * *

(s) A desenption and plans for The Air Transport Association (ATAi j I g y,, ,g,4, $,,, 3,.

uf America. representing operators of implementation of an operator gge,y requalification program.The operator Boeing Model 747 and 757 airp'. anes ,

Airworthiness D6rectives; Soeing stated that the proposed rule requiring l requahlication program must as a minimum. meet the requirements for Model 747 and 757 Series Airplanea inspection of all 767 and 757 airp;snes la j not justified for those operators Whose those programs contained in 155.59 of AGENCY; Federal Aviation Part 55 of this chepter. rec rds list the serial numbers and Administration (TAA). DOT. appbcable aircraft of the subiest AcTiOsc Fir.al rule. reservoirs installed. ne ATA. therefore.

4. In i 50.54 paragraphs (i) and (6-1) requested that pare raph A.of the suuMARY: Dis amendment adopts a cr2 revised to read as follows. proposed rule be de eted and that the new airworthiness dir'e ctive (AD), affectivity be revised to read " Boeing I 50.54 Candmons of teensea, applicsble to Boeing Models 747 and 757 Applies to all Model 747 and 757 series

. . . . . series airplanes. which requires a rplanes equipped with emergency (i) Except as provided in l 55.13 of inspection of the passenger door power reservoirs listed in H.R. Textron j emergency power usens fu integrHy brea Bulletin No. 80330>52-05." The this chapter, the licensee may not permit of the pnssun nM rupture R FAA agrees that it is unnecessary to the manipulation of the controls of any repair. if necessary, and replacement og facihty by anyone who is not a licensed inspect the airplanes if records are i defective dask retainers.nis available to determine the serial sperator or senior operator as provided amndment is prompted by numrous in Part 55 of this chapter ' " numbers of the reservoirs installed and

' n n is oce (1-1) Within three months after to e ature seha se he AD ha ,b issuance of an operating license, the This condition. If not corrected, would g a l licensee shall have in effect en operator render the emergency power reservoir [,' g," ,," ",g j requahfication program which must as a incapable of providing power to assist in applicable service bulletin. i minimum, meet the requirements of opening the door quickly when required The ATA also commented that the i 5L59(c) of this chapter. for emergency evacuation. .. NOTE"in the proposed rule which Notwithstanding the provisions of caTts: Effective May 1.1987. advises readers that the affected ' i l 50.59, the licensee may not, except as AcoRessts:The applicable Boeing reservo(rs may be installed on other j specifically authortred by the service information may be obtained airplanes should be deleted because. if Commission decrease the scope of an from the Boeing Commercial Airplane adopted, will create confusion in the approved operator requalification Company. P.O. Box 3707. Se attle, field since the affectivity of the program. Washington 96124; the applicable H.R. proposed rule is clearly only against i

  • * * *
  • Textron service information may be Boeing aircraft.ne FAA concvn that
5. Immediately following i 50.73, obtained from H.R. Textron. 252su West the affectivity is only Boeing aircraft and '

"1.icensee Event Report System." a new Rye Canyon Road. Valencia. Califorma specifically Mo6els 747 and 757;  !

l 50.74 is added as a conforming 91355. This information may be however, the " NOTE" should not be examined at the FAA. Northwest deleted because, while some Boeing 747 l amendment to reed as follows: j Mountain Region.17900 Pacific Highway and 757 aircraft may have been i l 50.74 NotlAcet6en of change in operator South. Sea ttle. Washington. or the delivered without defectiva reservoirs. a j or senior operator statua. Seattle Aircraft Certification Office, defective reservoir could have been l Each licensee shall notify the 9010 East Marginal Way South. Seattle, installed in the field since delive*y. The Washingon 98168. note has been revised to reflect " Boeing J Commission in accordance with ( 50 4 Model 747 and 757 series airplanes.

within 30 days of the following in regard FOR FURTHER 486FORMATIOed COef7ACT:

to a licensed operator or senior Mr.Pliny Brestel. Airframe Branch. The ATA also requested that the i ANM-120S: telephone (206) 431-1931. Initial compliance period in paragraph j cpentor:

Mailing address FAA. Northwest A. of the proposed rule be changed from -

(a) Permanent reassignment from the Mountain Region.17900 Pacific Highway a0 to 90 days to afford those opc ators.

S uth. C-68966. Seattle, Washington whc may not have tscords listmg senal e i ed e ne d for a 1 ce d o erator 98168. numbers of renrvoirs. additional time to er senior operator under i 55.31(a)(3) of complete tM Ileft inspection to sWPPLEasEDfTARY ItePORMAftOsc A this chapter, proposal to amend Part 39 of the Federal determineLtthe.y are affected by the I (b) Termination of any operator or I Aviation Regulations to include an rule.Ths ATA stated that.in some senior operator. airworthiness directive which requires instances (likely 50%). the installed j (c) Disability or illness as descrided in inspection of the passenger door reservoirs would require removal to t )

l 55.25 of this chapter. emergency power reservoir on Boeing read the serial number. Further. some t

]

Dated at Washington. DC. this 2mh day of Models 747 and 757 series airplanes for operators check the reservoirs every '

Integrity of the pressure relief rupture four days and. therefore need tirne ie wrch tes7.

disk, repair. if necessary, and change time. maintenance program to 4 For the Nuclear Regulatory Commiscon.

replacement of defective disk retainers. comply with the daily check requiru.mt I lohn C. Hoyle, was pubbshed in the Federal Register on of paragraph B.The FAA does not .

Achng Secretary forrhe Commasson- Der. ember 24.1986 (51 FR 46687). The concur with an extension of the imtids j

[FR Doc. s7-647s Filed 346-8". 6 45 mm! comment period for the NPRM. which comphance penod from 80 to 90 days in awma come nemas ended February 18.1987, afforded that air safety and pubtle interest B-17 i

l

_ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ a

, . 7 ,. , 3  !

i <

1 i

/ ,

(

6 l- '

r k' ) l

!( '

t l'

/

f l 4 i

Appendix C Regu% tory Guide 1.134 Medical Evaluation of Lice'nsed Personnel for Nuclear Power Plants

,e i

f 5

6

}

(

w _

m .

t V s C- T.

' 2' , Revision 2*

" Apeil 1987 U.S. NUCLEAR REGULATORY; COMMISSION

< W@, s REGULATORY GUIDF_

  • ese. OFFICE OF NUCLEAR REGULATORY RP. SEARCH REGULATORY GUIDE 1 34 (Task OL d015)

MEDICAL EVALUATION OF LICEniSED PER00;#4EL FOR NUCLEAR POWER PLANTS o i

A. INTRODUCTION The AoWory Corrrittee on Reactor Safeguards has been conMted concerning this guide and has concurred in Sections 55.31,"How To Apply," and 55.57, " Renewal the ephtory position.

of Licenses," of 10 CFR Part 55, " Operators' Licenses," 1' require that each initial or renewal application foc an Any information collection activities mentioned in this operatur or senior operator license contain a merNeal rtgulatory guide are contained as requirements in 10 CFR examination settification following the form prescribed Part 55, which provides the regulatory basis for this guide.

l in Subpart C of Part 55. " Medical Requirements." See- The inforrnation collection requirements in 10 CFR Pan 5 5 tions 55.33, " Disposition of trutial Application," and have t cen cleared under OMB Clearance No. 3150-001 B.

55.57 state that the initial or renewel applicatiorts for < j these licenses will be approved if, among other things. B. DISCUSSION J the applicant has no medical or general health condition that might cause operations' *s endangering p211e Section 55 23. " Certification." of Subpart C, " Medical health and safety. Paragraph (., s. Q 55.53, " Conditions Requirements," of 10 CFR Part"5 requires that a physician of Licenses," requires that an examination be conducted examine the applicant in acardany eth NRC's reeuistory every 2 years, guidance and determine that the examinee's medical condi-tion and genera!lde21th meet the requirements for granting Section 55.25, " Incapacitation Because of Disability or renewing an operator beense. The physician must send a or illness," deals with an operator or senior operator full medical examinatan repost to the fecility licensee,

{ who becomes incapacitated because of a mental or : which M then transmit a completes ?crm 396 to the physical condition that might cause impatred judgment ' . NRC. D.e vitent of these requirements u so have the facility or motor coordination.

1

'.icensee certify the health of its <>paton. Howwer, the faci.lia licensee is expected to maus.rt tbcre ree.tds that Section 55.27, " Documentation," requires that the may be reviewed t.y the NRC. Therch, R 55.27 requires I facility licensee document and maintain the medical quali- the facility licensee to docume$ arf Maritun the full i ficatiort, data, current test results, and each opentor's ' medical examinatiM report,incivf%tht resu'ls of methcal I medical history and provide these to the NRC upon its 4 qualifications datitest results, Wd eschopentor's medical request history. fn addi'. ion, Q 55.2 requirihtie fteility hcensee to retant de most recent medicalinfont4tka as a result of This guide desenbes a method acceptable to the NRC the biennia! physica.1 examination and r t nvioe that informa-staff for providing the information needed by the staff tion to tic NRC on request. The cv Af.cr. tion form would j for its evaluation of the medical qualifications of applicants be sent by'tNe facility licensee to the NRC.

for initial or renewal operator or senior operator licenses <

for nuclear power plants and for providing notification to ' .7 There ry two instances in which rtificn* triformatien I

the NRC of an incapacitating disability or illness. must be sent to the NRC. One is when a condattor.a!licerhe

, based on medical evidence is requested under the provisir nt,  ;

l haragr:A MM W secod WW h h a kenM ,

'The substantial number of chanses in this revision has mods it Ejndividual Na become mentally 0; physically rafble to (

impractical to indicate the changes with lines in the margin. ,

m3 ,

/ '

/> j'

.1

w. N -wen

[

USNRC R20Ut.ATORY GulOES { 7he guldet, orie is*A1 Ire the fotlowing ten Drost11vlsions? ' j Regulatory Culdes are issued to describe and make available tc the [

pud 64c methods acceptacle to the NRC staff of 4 implementing L power Wasctors / 6. Products

7. Transportal 6on specific parts of the Commission's regulations, to delineate tech- ~ L Researcn and Test Readcrs a. Occupational HearW -

niOues used Dy the staff in evaluating speciflc problems or postu- . J. Fuels and Materiets FactutJes

9. Antitrust ane Fine C.N Reaew lated accioents or to provide guidance to apoltcants. RegulatJrV 4. Env6tonmental and $lting Gu6 des are sol suDstatutes for regulations, and compilance ,sth 3. Maternets and AaM Arotect60n 10. Generaa them as not recuared. Methods and solutions different from those set "

out in the guides will be accept 4 Die if they provide a Dasis for ins Copies of issue"o guides may De purchased from the Go'vernnvant fladings reoutsite to the issuance or Cont 6 nuance of a permit or

(. license Dy the Commession.

This guide was issued after consideration of comments received from Printing Off 6ce at the current W pr6ce. Information on current GPO prices may be obtained Og contact 6ng the Superinteecent of O(.cuments. U.S. Government Printing Office, post of16ce som the pubesc. Comments and suggestions for improvements in unese 3 7082, Washington, DC 20013 7oa2. toiephone (202)2rS.2o60 or .

vuodes are encouraged at all times, and guides will De revis,d. as (202)275 2171. i appropriate. to accommodate comments and to reflect new enforma- '

" * * " issued guides may also be pvrhaand from the Mr. mon 44 Techn6 cal written comments may be submitted to the Rules and procedure? Infaser.at6on Serv 6ce on a stk.dene ower basis cutails on t his "tranch, ORR ADM, U4. Nuclear Regulatory Commission,' serv 6ce may be obtained by wi$lny NTi% 52 s Rort Royal Road, Wash 6ngton, Od 20S$5. Springfload. V A 22161.

r~-

h

  • i '

,' f' '

C- 2 .

perform job duties. In this case, the facility licanste Nothing in ANSI /ANS 3.41983 or this guide should mu>t notify the NRC within 30 days after learning that be !cunstmed to mean that such matters as an indi-l <he 6s grmsis has been made. The facil2ty licensee must vidual's reading habits, political or religious beliefs, or attitudes on social, economic, or political issues should t forward to the NRC Form 396 and medical records

. L destnbing the disabihty. This related information is be investigated or judged.

1 1 \ required by s 5547 to be documented and maintained Af by the facihty.

s

< C. REGULATORY PQSITION V American National Standard developed by the ,

The tecnicirer9s contained in ANSI /ANS-3.41983, N .M hinerican Nuclear Society, ANS!/ANS 3.41983, " Medical "Medicti ' Ce:tiiccion and Monitoring of Personnel Certification arid Monitoring of Personnel Requiring Requinng Drer;*ar Licenses for Nuclear Power Plants,"3

~

Operr. tor ucenses for Nuclear Power Plants,"! prescribes provide a inethod acceptable to the NRC staff for

. , <nittimum ! acquirements necessary to determine that the determinirs the medical qualifications of applicants for

^ medical condition and general health of nuclear reactor initial or ienewal operator or senior operator licenses. )

l o ts. tors wiu not causiordrational errors. The criteria ^

presented in this stands d provide an examining physician D. IMPLEMENTATION a basis for terermining whether a potentially disqualify-ii ing abnormi.; health condit2on exi.sts. Establishing mini- The purpose of this section is to provide information mum heal'.rt require vr!ts should aid in more uniform to applicants and licensees about the staff's plans for 1

medW es aluations. Ifciwever, it is necessary to recognize using this repalatory guide.

that, 'aithougP f it ir the physician's responsibility to ident2fn and yevaluatti any potentially disqualifying .Except in those cases in which the licensee proposes mniical cw.h6ns, NRC makes the final determination an acceptable alternative method for complying . with of 'he afplicatt's medical fitness. specified portions of the Commission's regulations, the

?> 'T methods described in the guide will be used in evaluat.

' ,/ _

ing the part of an application for initial or renewal opera-8 copies iaar t,e obtairohom the American Nuw $odety, tor or senior operator licenses on NRC Form 396 "Certifi-ss5 Forth Kensingtos. Avenue, La Grange Park, thinVs 6os"s. cate of Medical Examination by Facility Licensee."

t l s, .

4 , Ji r

!c J

. 1 t

s y 1 t i s

4 i ,,j

'L 1

' 1 ,

4 p ,

i r

,3

!.134 2 t

.] .

5 'A ' - -. - ____________._____._____a

C- 3 l

1 VALUE/lMPACT ANALYSIS A separate value/ impact analysis has not been pre. Room at that time. Tha analysis is also appropriate ]

pared for ttus regulatory guide. A value/ impact analysis to Revision 2 of Regulatory Guide 1.134. A copy of was included in the regulatory analysis for the amend- the regulatory analysa is available for inspection and ments to 10 CFR Part 55 published on March 25, 1987, copying for a fee at the NRC Public Document Room, a copy of which was placed in the Public Document 1717 H S6teet NW., Washington, DC.

i I

(

i l

j

(

ei).s. G.P.o.19e.1B1-682 60e56 1.134-3

l Appendix D Regulatory Guide 1.149 Nuclear Power Plant Simulation Facilities for Use in Operator License Examinations l

1

D-1 Revision 1'

[* " U.S. NUCLEAR REGULATORY COMMISSION AP'il 1887

( GU DE

%.o) REGULATORY o o. OFFICE OF NUCLEAR REGULATORY RESEARCH i

REGULATORY GUIDE 1,149 l (Task OL 402 5)

NUCLEAR POWER PLANT SIMULATION FACILITIES FOR USE IN OPERATOR LICENSE EXAMINATIONS A. INTRODUCTION ,

B. DISCUSSION Paragraph 55.45(a) of 10 CFR Part 55. " Operators' Although ensuring that individuals who receive opera-1icenses," requires that an applicant for an operator or tot or senior operator licenses possess the knowledge, senior operator license demonstrate both an understand- skills, and abilities necessary to operate the facility in a ing of and the ability to perform certain essential job safe manner is the responsibility of facility licensees, the tasks. Paragraph 55.45(b) specifies that these operating Nuclear Regulatory Commission must perform an inde-tests will be administered, in part, either in a simulation pendent audit of this process through its operator facility consisting solely of a plant referenced simulator licensing examinations. Section 55.45, " Operating Tests,"

that has been certified to the Commission by the of 10 CFR Part 55 requires the candidate for a license facility licensee or in a simulation facility approved by to demonstrate (1) an understanding of and the ability ,

the Commission after application has been made by the to perform the actions necessary during normal, abnor- I facility licensee.1 mal, and emergency situations; (2) the operation of systems that affect heat remov.al cr reactivity changes; This regulatory guide describes a method acceptable and (3) behaviors that show the individual's ability to to the NRC staff for complying with those portions of function within the control room team in such a way the Commission's regulations regarding (1) certification that the facility licensee's procedures are adhered to and of a simulation facility consisting solely of a plant- that the limitations in its license and amendments are referenced sunulator and (2) application for prior ap- not violated.

proval of a simulation facility.

The use of a plant-referenced simulator for testing The Advisory Committee on Reactor Safeguards has enables the examiner to evaluate a candidate's perfor-been consulted concerning this guide and has concurred mance in an environment closely correlated with condi-in the regulatory position. tions in the specific plant for which that candidate has applied for a license. With major facility differences Any information couection activities mentioned in minimized between the testing and operating environ-this regulatory guide are contained as requirements in ments, examiners have been able to make pass-fail those sections of 10 CFR Part 55 that provide the judgments with confidence.

regulatory basis for this guide. The information collec- ,

tion requirements in 10 CFR Part 55 have been cleared Although the increased use of plant-referenced simu- '

under Clearance No. 3150 0018 and No. 3150 0138. lators has provided to examiners the capability for i

'The substantial number of chanses in this revision has made it better discrimination between success and failure in a impractical to indicate the changes with lines in the margin. Candidate than could be achieved with. non-piant-8 A simula ton facitley is denned in iss.a as one or more of the

'" N" * * ** "

l following components, sione ar la combination, uned for the pertial of several factors that could suggest the use of alterna-conduct of operatins tests for perstars, senior operstors and candi- tive systems or devices for conducting the non-gas g g t,(ii)ap t<eferenced sim tot,( ) another USNRC REGULATORY GUIDES The pulces are issued in the following ten broad civtseons:

Regulatory Guides are issued to oescribe and make available to the DubilC thethods acceptable to the NRC staff of imp 6ementing s. Power Reactors 6. Products u d by the staf n va ua 1 i c p* ole or t u and ter als a 11 t es upat n saith .

u des n s bf' t es rr ato s, en o plance fl Ma er al an i to t6on ld. Gen I

!"*i" ini"

  • e'lM*hrfe"a'as"f#."f"ti"e','"','?"e' fCJ"&in's '

l

( ==rbi=.- - -- -" - m ,wf = u=t w = ,ruru m =

Mle' 5 "'uYNEaI"!O.N,'Yel3 "3'3e95! d I ' * ****

  • priat to a ommodate comments and to reflect new informa.

gopr f issued guices may also be purchased from the National Technical j Written comments may be submitted to the Rules and Procedures enformat6on Servece on a stancing oroer basis. Details on this Branch, ORR A O M, U.S. Nuclear Regulatory Commession, service may be obtained by writing NTis, s2as Rort Royal Road, Washington, Dt. 20sss- Springfleid. V A 22161.

D- 2 include the cost and lead time associated with procure- to ensure the continued acceptability of the simulation ment or upgrading of a plant referenced simulator. More- facility. These malfunctions, if applicable to the facihty, over, rapidly changmg technology in the simulation indus- should be tested in their entirety not less than every try is resulting in previously unavailable options that four years, approximately 25% per year. When con.

could lead a facility licensee to seek alternative ways to ducted in addition to the tests required by Section 5 A meet the requirements of Q55 45. ANSI /ANS 3.51985, and when subjected to the performance critena for

" Nuclear Power Plant Simulators for Use in Operator transient operations spectfied in Section 4.2, " Transient Training"2 (the standard), in conjunction with this Operation," these malfunction tests provide an accept-regulatory guide, provides guidance in these areas. able means of demonstrating the performance and operabihty of the simulation facility.

C. REGULATORY POSITION

6. Appendix A to the standard, "Gaide for Document-Requirements are set forth in ANSI /ANS-3.51985 for ing Simulator Performance," and Appendix B to the specifying muumum performance and configuration cri- standard, " Simulator Operability Tests," should be con-teria for a simulator, for comparing a simulator to its sidered integral parts of the standard.

reference plant, and for upgrading simulators to reflect changes to reference plant response or control room D. IMPLEMENTATION configuration. These requirements provide a method acceptable to the NRC staff for a facility licensee (1) to The purpose of this section is to provide information certify a simulation facility consisting solely of a plant- to facility licensees about the NRC staff's plans for usmg referenced simulator or (2) to obtain approval of a this ry;ulatory guide.

simulation facility for use in portions of reactor opera-tor and senior operator license examinations subject to in accordance with the requirements in $55.45 of the followmg: 10 CFR Part $5 the simulation facihty portion of the operating test will not be administered on other than an

1. The references to operator training in Section 1, approved or a certified sanulation facility after: ,

" Scope," of the standard should be taken to apply to operating tests for operators, senior operators, and candidates. 1. The facility licensee has submitted a certification in accordance with paragraph 55.45(b)(5Xi), or

2. Simulation facilities as defined in $55.4 of 10 CFR Part 55, to the extent that the facility licensee applies 2. The staff has approved an application submitted for approval under the requirements of paragraph 55.45(b), by the facility licensee in accordance with paragraph should meet the applicable requirements of the standard. 55.45(bX4), or
3. The standard identifies in Section 1.1, " Background," 3. May 28,1991, whichever occurs sooner.

other documents to be included as part of the standard.

The applicability of one of these documents, ANSl/ Until that time, the NRC will continue to grve exami-AN S-3.1,2 should be determined by refernns to Revi- nations for a facility licensee's reference plant in accord-sion 2 to Regulatory Guide 1.8, " Qualification and ance with Generic Letter 8218, " Reactor Operator and Training of Personnel for Nuclear Power Plants." Senior Reactor Operator Requalification Examinations,"3

4. Section 5.2, " Simulator Update Design Dats," re-quires that reference plant modifications be reviewed Licensees and applicants may propose means other annually against the simulator and that the simulator than those specified in Section C of this guide for meeting update design data be revised as appropriate. This applicable regulations. Except in those cases in which a should be taken to mean that the first such annual facility licensee submits a certification for its simulation review and update should take place within one year facility or proposes an acceptable alternative method for fo!!owing the facility licensee's certification as specified complying with specified portions of the Commission's in paragraph 55.45(bX$Xi) or within 18 months fo!!ow- regulations, the NRC will use the method described in ,

ing the submittal of the application for approval as this guide in the evaluation of the application for I specified in paragraph 55.45(bX4Xi). approval submitted by the facility licensee for its simula-tion facility. The guidance provided in Section C has

5. Section 5.4, " Simulator Testing," requires the con- been approved for use by the staff in the evaluation of duct of specific tests to establish simulator performance all submittals as an acceptable means of complying with and verify its operability. In addition to these proce- the Commission's regulations specified in Section A.

dures, applicable malfunctions, identified in Section 3.1.2, " Plant Malfunctions," should be penodically tested if a facility licensee wuhes to utilize a simulation facility for more than one nuclear power plant, it must I AvaEsble for copyins for a fee or inspection at the NRC 2 Cop 6es may be cotained from the American Nuclear Society.

sss North Kensmgton Avenue,La Grange Park,1L 6os2s. Public Document Room,1787 H Street NW., Washington, DC.

, 1.149 2 l

N D-3 i

demonstrate to the NRC in its certification or in its 2. Technical specifications; application that the differences between the plants are not so significant that they have an impact on the ability of the sunulation facility to meet the require- 3. Procedures, primarily abnormal and emergency ments and guidance of AN51/ANS-3.51985 as qualified operating procedures; in this regulatory guide fo.: each of the plants. This demonstration should include an analysis and summary of the differences between each plant and the simula- 4. Control room design and instrument / control loca-tion facility, including: tion; and

1. Facility design and systems relevant to control room personnel; 5. Operational characteristics.

l i

1 l

l 1

1 1

1

(

. ... c.r.o.1,e2 181-6ea.6eose 1 1.149-3

D-4 VALUE/ IMPACT ANALYSIS A separate value/ impact analysis has r.ot been pre. Room at that time. This analysis is also appropriate to pared for this regulatory guide. A value/ impact analysis Revision 1 of Regulatory Guide 1.149. A copy of the was. included in the regulatory analysis for the amend- regulatory analysis is available for inspection and copy-ments to 10 CFR Part 55 published on March 25,1987, ing for a fee at the NRC Public Document Room, a copy of wiuch was placed in the Public Document 1717 H Street NW., Washington, DC.

i k

I I

UNITED STATES . . . , ,

miaes e au ***

NUCLEAR REGULATORY COMMISSION WASHINGTON. 0.C. 20566 ..M. e.

namn es em OFFICIAL SUSINESS PENALTY FOR PmrvATE USE. 4300 1

1.149-4

Appendix E Regulatory Guide 1.8 Qualification and Training of Personnel for Nuclear Power Plants l l

1 I

1 I

)

i

i E- 1 Revisi:n 2*

U.S. NUCLEAR REGULATORY COMMISSION April 1981

[ "  % ,g ,

c!'/1 s e .e.o REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH

)

l REGULATORY GUIDE 1.8 (Task OL 403-5)

QUALIFICATION AND TRAINING OF PERSONNEL FOR NUCLEAR POWER PLANTS A. INTRODUCTION training of nuclear power plant personnel. This standard was approved by the American National Standards Paragraph 50.34(b)(6)(i) of 10 CFR Tart 50," Domestic Institute (ANS?) Committee N18, Design Criteria for i Licensing f Production and Utilization Facilities," requires Nuclear Power Plants, and designated ANSI N18.11971, that an application for a license to operate a nuclear " Selection and Training of Nuclear Power Platt Person- j power plant include information concerning organizational nel." Regulatory Guide 1.8, " Personnel Selection and structure, personnel qualifications, and related rsatters. Trairung," endorsing ANSI N18.1-1971, was issued in ,

Subpart D, " Applications," of 10 CFR Part 55," Operators' March 1971, and Revision I was issued in September 1 icenses," requires that operator license applications 1975. A revision of ANSI N18.11971 was subsequently include mformation concerning an individual's education approved by the ANS! Board of Standards Review and and experience and related matters. This regulatory guide designated ANS!/ANS-3.1 1978, " Selection and Training describes a method acceptable to the NRC staff for of Nuclear Power Plant Personnel."

complying with those portions of the Commission's regulations with regard to the training and qualifications A first proposed Revision 2 to Regulatory Guide 1.8 of nuclear power plant personnel. Personnel of test, endorsing ANSI /ANS 3.1 1978 was issued for public trammg, research, and mobile reactors are not covered comment m February 1979. As a result of experience by this regulatory guide. gained from the accident at Three Mile Island Unit 2 (TMI 2), additional public comments in the area of The Advisory Committee on Reactor Safeguards has personnel qualifications were requested on proposed

( been consulted concerning this guide and has concurred Revision 2 to Regulatory Guide 1.8 in May 1979. All in the regulatory position. of the comments from both requests were forwarded to the ANS-3 Subcommittee for its use during the develop-Any information collection activities mentioned in ment of a revision to ANSI /ANS-3.1 1978. Subsequent-this regulatory guide are contained as requirements in ly, Draft Standard ANS 3.1, dated December 6,1979, 10 CFR Parts 50 and 55, which provide the regulatory incorporating the upgraded requirements was issued. In basis for this guide. The information collection require- September 1980, public comments were requested on a ments in 10 CFR Part 50 have been approved under second preposed Revision 2 to Regulatory Guide 1.8 OMB Clearance No. 3150-011, those in 10 CFR Part that endorsed Draft Standard ANS 3.1. The public 55, under OMB Clearance No, 3150 0018. comments received were held in abeyance pending Commission action on proposed rules on operator B. DISCUSSION quahfications and licensing in SECY 8184, "Qualifica-tion of Reactor Operators," February 2, 1981, and Subcommittee ANS-3, Reactor Operathns, American SECY 81-84 A, " Discussion of Revisions to Reactor Nuclear Society Standards Committee, developed a Operator Qualifications,"3 June 15,1981. The Commis-standard containing criteria for the qualification and sion did not approve either of these proposals and directed the staff to continue to study the issue.

The substantial number of ch I Co y for a fee in the impractical to indicate the chanaes Mes in inthis innes therevision margin. has made it NRC Pubbles are available Document Room,1717 foe inspection H Street t or eo[s.inhashington, DC-USNRC REGULATORY GulOES The yJ6 des are issued in the following ten broad divisions:

Regulatory Guides are issued to oescribe and make evallaDie to the publ6c methods ecceptaDie to the N RC staff of implementing s. Power Reactors 6. Products u d Dv the staf n u i ic o p u sand ter als a 4 ties Ccupat n Health 3' des **M*"& Lif407'#,'"!Oa'tfon.*fdoD e!#,,0%"eM t 5"an',i"/"l"J'WhJ!Lon' id. O'W' """ ""*"' "'"

!"*i" u'i,e'ZMMie"?fe'enf#r,"in"'v";'a'.

""' Li"C=

( &"e",!"!!,' tut n'*an.'""*"" *' **""""'"" *' ' """" '

2!!?,,W'?"di r,!!*'umt%'ct'aie%'g*ma'&*

nc'"u=1 b?N((5$aN5baYi@l'.N,'u' [oflif,'*3E". e'$'s i E ""

por riat ccommodate comments and to reflect new 6nforme.

{,'a'"T.,*{R3","g 51"*%!!!. lie',u "iTry*"co m'ia"# f,' " i,'5[fIu*b Ebia5"lai

E-2 i

Dunns 1981, Draft Standard ANS 3.1 was updated to 10 CFR Part 50) and the requirement to have a snift factor in additional lessons learned from the .TMI 2 technical advisor (STA) available to the shift (NUREG-accident and changing regulatory requirements. The 0737, l. A. l .1 ). One option in the Policy Statement, standard was approved by the American Nuclear Society's which is preferred by the Commission, allows combining Nuclear Power Plant Standards Committee (NUPPSCO) the functions of the STA with one of the required senior and the ANSI Board of Standards Review and was operators as long as spee.fsc training and education reissued as ANS!!ANS-3.11981, " Selection, Qualification requirements are met. The other option allows for con-and Training of Personnel for Nuclear Power Plants."2 A tinuation of an approved independent STA program.

third proposed Revision 2 of Regulatory Guide 1.8 was Regulatory Position C.I.j reflects the guidance provided developed to endorse ANS!/ANS 3.11981 with certain in this Policy Statement, additions and exceptions and was issued for public com-ment in January 1985. As a result of the public com- C. REGULATORY POSITION ments and Commission actions concerning training and qualifications, this Revision 2 of Regulatory Guide 1.8 1. Positions in ANSI /ANS 3.11981 that Are Endorsed now endorses Sections 4.3.1.1, " Shift Supervisor," 4.3.12, by this Regulatory Guide

" Senior Operator," 4.5.1.2, "Iicensed Operators," 4.4.8,

" Shift Technical Advisor," and 4.4.4, " Radiation Protec- For the positions listed in ANSI /ANS-3.1 1981, tion," of ANSI /ANS-3.1 1981. Endorsement for all other " Selection, Qualification and Training of Personnel for positions will remain with ANSI N18.11971, " Selection Nuclear Power Plants," as shift supervisor, senior opera-and Training of Nuclear Power Plant Personnel." The tor, licensed operator, and shift technical advisor, the bases for the additions and exceptions to ANSI /ANS 3.1 requirements contained in the standard provide an 1981 are contained in NUREG-0737, "Clanfication of approach acceptable to the NRC staff for complying with TMI Action Plan Requirements,"3 which includes the the quahfications and training requirements of 10 CFR March 28,1980 letter to all power reactor applicants Parts 50 and 55 subject to the guidance regarding the and licensees regarding qualification of reactor operators, STA function provided in the Commission's " Policy and NUREG-0094, " Guide for the Licensing of Facility Statement on Engineering Expertise on Shaft" and the Operators. Including Senior Operators,"3 and the Commis- clarifications, additions, and exceptions in paragraphs a sion's " Policy Statement on Engineenns Expertise on through k below. For radiation protection supervisory Shift" (50 FR 43621). The regulatory position related personnel. Section 4.4.4 of the standard contains an to the radiation protection manager is revised from what f approach acceptable for the position of radiation protec-was included in Revision 1 of Regulatory Guide 1.8 (1975). tion manager (RPM) subject to the following: l The industry has adopted the requisite quahfications in ANS!/ANS 3.1 1981, anc' the current change endorses a. In lieu of the description in Section 5.1 of ANSI /

that industry position. ANS 3.1 1981, cold license examinations should be defined as those that are administered before the urut has com-On March 20,1985, the Commission issued a " Policy pleted preoperational testing and initial operations as Statement on Training and Qualification of Nuclear described in its Final Safety Analysis Report as amended Power Plant Personnel" (50 FR 11147) that recos- and approved by the Commission. Hot examinations are nizes industry commitment to accredit training pro- those administered after this condition is attained, grams. In the pol (cy statement, the NRC endorsed the training accreditation 7- gram managed by the Institute b. Hot license applicants must meet the training of Nuclear Power Oe. ims (INPN, because it encom- elements in Sections 4.3.1.1.c, 4.3.1.2.c, and 4.5.1.2.c of passes the elements 4 performanta-cased training and the standard and the expenence elements in Sections will provide the basis to ensure that personnel have 4.3.1.1.b, 4.3.1.2.b, and 4.5.1.2.b of the standard. Cold qualifications commensurate with the performance re- license applicants are subject to the training elements quirements of their jobs. The Commission has decided identified above, but they are exempt from the expe-to withhold action on promulgating new training and rience elements.

qualifications regulations during an evaluation period.

During that period, NRC will continue to evaluate the c. Paragraph 2 of Section 4.3.1.1.a of ANSI /ANS 3.1 results of the accreditation program to determine if the 1981 is not applicable. An individual who meets the voluntary industry efforts ensure qualifications that meet Commission's " Policy Statement on Engineering Expertise or exceed the minimum standards included in this guide. on Shift" is required on all shifts to provide engineering expertise (see Regulatory Position C.ld).

The Commission's " Policy Statement on Engineering Expertise on Shift" issued on October 28,1985 (50 FR d. The minimum educational requirement for shift 43621) provides two options for meeting nuclear power supervisors, Section 4.3.1.1.a. and for senior operators, plant staffing requirements (paragraph 50.54(m)(2)(1) of Section 4.3.1.2.a. is a high school diploma or equivalent.

2 Copies may be obtained from the American Nucseer Society, c. An applicant for a senior operator (50) license ,

sss North Kensineton Avenue,LaGrange Park.11. 60525. should have 4 years of responsible power plant exper-3C ience. Responsible power plant experience for an SO is Post ges emay sosbe obtained 370 from the Government 2,washineton,Dc 200:3 70a2Printing ofnce, defined as having actively performed as a designated 1.8-2

E-3 control room operator (fossil or nuclear) or as a power STA has not actively performed, the STA should receive plant staff engmeer involved in the day to-day activities training sufficient to ensure that the STA is cognirant of of the facility during or after the final year of construc- facility and procedure changes that occurred during the tion. A maximum of 2 years of responsib!c power plant absence, expenence may be fulfilled by academic or related tech-nical training on a one for one time basis. Two years should Combining the functions of a senior operator and the be nuclear power plant expenence. At least 6 months of STA is acceptable if the provisions of the Commission's the nuclear power plant experience should be at the " Policy Statement on Engmeering Expertise on Shift" plant for which an applicant seeks a license. In addition, are met. In addition to the requirements specified a applicants for an SO position not holding a bachelor's Section 4.4.8.c of ANSI /ANS-3.1-1981, the STA should '

degree in engineering or equivalent should have held an have specific training in the response to and analysis of operator's license and should have been actively involved plant transients and accidents and training in tne rela-in the performance of licensed duties for at least 1 year. tionship of accident conditions to offsite consequences

f. In addition to the requirements stated in Section l 5.2.1.2.1 of ANSI /ANS-3.1 1981, classroom instruction k. The radiation protection manager should have the for all license applicants should include training in the quahfications described in Section 4.4.4 of ANSI /ANS-use of installed plant systems for the control and mitiga- 3.1 1981 with the clarification that 3 of the 4 years of tion of an accident in which the core is severely damaged. experience in applied radiation protection, should be professionallevel experience.
g. In addition to the requirements in Section 5.2.1.3.1 of ANSl/ANS-3.1 1981, each applicant for an operator or 2. Positions in ANSI /ANS N18.11971 that Are Endorsed senior operator hcense should serve 3 months as an extra by this Regulatory Guide person on shift in training for that position. These 3 months as an extra person on shift in training should For positions listed in the standard other than those include all phases of day to-day operations under the under Regulatory Position I above the requirements con-supervision of licensed personnel- tained in ANSI N18.11971, " Selection and Training of Nuclear Power Plant Personnel," provide an approach
h. Control room operating experience for hot license acceptable to the NRC staff for complying with the quali-applicants, described in Section 5.2.1.3.1 of ANSI /ANS- fications and training requirements of 10 CFR Parts 50 3.11981, should include manipulation of controls of the and 55.

( facility during a minimum of five reactivity changes. Every effort should be made to have a diversity of reactivity D. IMPLEMENTATION changes for each applicant. Startups, shutdowns,large load changes, and changes in rod programming are some exam- The purpose of this section is to provide information ples and could be accomplished by manually using such to applicants and licensees regarding the NRC staff's systems as rod control, chemical shim control, or recircu- plans for using tha regulatory guide.

lation flow.

Applicants and licensees may propose means other

i. All cold license applicants should participate in than those specified in Section C of this guide for meet-practical work assignments as described in Section 5.2.1.4 ing applicable regulations.

of ANSI /ANS 3.11981 for a minimum of 6 months.

J. In addition to the responsibilities described in Sec- Except in those cases in which the applicant or licensee tion 4.4.8 of ANSI /ANS-3.1 1981, the STA should assume proposes an acceptable alternative means of complying an active role in shift activities. For example, the STA with the Commission's regulations specified in Section A, should review plant logs, participate in shift turnover, the guidance provided in Section C has been approved and maintain awareness of plant configuration and status. for use by the staff after March 31, 1988, in the evalua.

The educational requirements for the STA specified in tion of the qualifications and training requirements for Section 4.4.8.a of ANSI /ANS 3.11981 are not appli- (1) nuclear power plant personnel as described in appli-cable. An independent STA snould have a bachelor's cations for an operating license (2) applicants for opera-degree or equivalent in a scientific or engineering discipline. tor and senior opetator licenses, and (3) replacement personnel in those positions in operating nuclear power

Actively performing STA functions" means perform- plants whose training programs have not yet been accred-ing at least three shifts per quarter as the STA. If an ited by an accreditation program endorsed by the NRC.

  • U.s. c.P.O.19e7.181-662:60057 1.83 C______________.__ _ _ . _ _ _ _ _ _ . _ _ _

E-4 VALUE/ IMPACT ANALYSIS A separate value/ impact analysis has not been prepared that time. This analysis is also appropriate to Revision 2 for ttus regulatory guide A value/ impact analysis was of Regulatory Guide 1.8. A copy of the regulatory anal-included in the regulatory analysis for the amendments to ysis as available for inspection and copying for a fee at 10 CFR Part 55 published on March 25,1987, a copy ' the NRC Public Document Room,1717 H Street NW.,

of which was placed in the Pubhc Document Room at Washington, DC.

s.s '

.s .

l

~ .

UNITED STATES neete m man NUCLEAR REGULATORY COMMISSION *' 'jgmas mo WASHINGTON, D.C. 20666 was o c.

nourr = w 0FFCIAL BUSINESS PENALTY FOR PRIVATE USE. 6300 1.8-4


__--.____m_ _ _ - - _ _ _ . _ _ _