Submits Followup Actions & Details of Allegation RI-85-A-0103 as Discussed at Allegation Panel 851002 Meeting Re 850301 Incident W/Unit 3 Offgas Sys.Resident Inspector to Recontact Alleger & Provide Insp Rept 85-31
ML20234F481
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/04/1985
From: Gallo R, Shropshire A, Starostecki R
NRC
To:
NRC
Shared Package
ML20234F407 List:
References
FOIA-87-228 NUDOCS 8707080238
Download: ML20234F481 (2)


Text

T ALLEGATION PANEL DECISIONS Priority: Low An allegation panel met on 10/2/85 regarding RI-85-A-0103 which was received by the OAC on 10/2/85. . .

1 Those in attendance were: R. Starostecki Panel Chairman i S. Collins Branch Chief l R. Gallo Action Office Contact T. Johnson Sr. Resident, Peach Bottom {

j B. Letts OI:RI Investigator l A. Shropshire Office Allegation Coordinator FOLLOW-UP ACTIONS. j

1) Resident to recontact the alleger on 10/3/85 and provide a copy of Inspection Report 85-31 to the individual. Question the individual to learn exactly what PECO managers told him and if anyone witnessed their discussion.
2) AOC to contact J. Ko tan and advise him that his assistance may be required to explain to the alleger that no overexposure occurred.
3) Reconvene panel (ECD 10 /85).

A. Shropshire, OAC 6PdbN R. Gallo, AOC /pg/gf n

R. Starostecki l(c-Panel Chairman I

1 cc: l J. Allan J. Gutierrez R. Christopher, 01:RI D. Caphton

}=o1M-b'7-A20 Allegation File 4/, fc sc a k 5/Af 8707000238 070701 PDR FOIA PDR RUDINTOB7-age

a ALLEGAT10N DESCRIPT10N Peach Bottom 2 & 3 50-277 & 50-278 (Site or Licersee) (Docket No.) l l

Allegation RI-85-A-0103 was received on 10/2/85 at 0700 by J. Williams.

Characterization of the 1 concern: .

Concerned aboat fired for talking to the NRC about exposures received from 3/1/85 incident with Unit 3 offgas system.

Confidentiality: No Name: George Fields i Employer: Bartlett Nuclear Address: I Position: H. P. Technician Phone: j J

Type of Regulated Activity: Reactor (

Functional Area (s): Onsite Health & Safety j 3

DETAILS: (Timeframe of Allegation: March 1, 1985)

The alleger believes he is being fired because PECo thinks he talked to NRC about an incident that occurred on March 1, B85. The alleger stated the j reason PECo gave for firing the alleger was for taking too much sick leave ]

(alleger has taken.16 days since first of year). Five days were taken due to 1 an automobile accident and the alleger had sick leave approved two weeks before j having wisdom teeth pulled (information volunteered by alleger). Another j person is being fired at the same time for the same reason and four new H.P.'s i are being hired. The alleger's last scheduled work day is 10/4. The alleger j stated that other.H.P.'s attendance records are much worse and are still working.

The alleger is still concerned about exposures received during the 3/1/85 event. The alleger's exposure concerns appear not to have been adequately discussed with the alleger (NRC IR 85-31 covers incident and a copy will be given to the alleger on 10/3/85).

The alleger said that about 2 weeks ago, Allen Hilsmeier and Jack Winzenreid spoke to the alleger about going to the NRC. The alleger was told not to go to the NRC with the concerns.  ;

(The worker is on the midnight to 7:00 shift; resident told the alleger he '

would be in contact at 7:00 on 10/3).

1 i

i