Insp Repts 50-329/86-01 & 50-330/86-01 on 861015-16.Major Areas Inspected:Licensee Plans for Facility,Matls Licenses & Insp of Remedial Soils Work Areas.All Work to Leave Soils Remedial Work in Safe Condition Satisfactorily AccomplishedML20215M894 |
Person / Time |
---|
Site: |
Midland |
---|
Issue date: |
10/28/1986 |
---|
From: |
Guldemond W, Landsman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
---|
To: |
|
---|
Shared Package |
---|
ML20215M886 |
List: |
---|
References |
---|
50-329-86-01, 50-329-86-1, 50-330-86-01, 50-330-86-1, NUDOCS 8611030420 |
Download: ML20215M894 (3) |
|
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000329/19860011986-10-28028 October 1986 Insp Repts 50-329/86-01 & 50-330/86-01 on 861015-16.Major Areas Inspected:Licensee Plans for Facility,Matls Licenses & Insp of Remedial Soils Work Areas.All Work to Leave Soils Remedial Work in Safe Condition Satisfactorily Accomplished IR 05000329/20050101985-05-30030 May 1985 Insp Rept 50-456/85-16 on 850329-0510.No Noncompliance or Deviation Noted.Major Areas Inspected:Actions on Previous Insp Items,Preoperational Test Program Implementation & Preoperational Test Procedures Review IR 05000329/19810231982-07-26026 July 1982 IE Insp Repts 50-329/81-23 & 50-330/81-23 on 811201-820630. No Noncompliance Noted.Major Areas Inspected:Exam of Site Conditions & Laydown Areas,Onsite Storage of Matl,Mgt Meetings & Changes in Site Mgt IR 05000329/19820101982-07-22022 July 1982 IE Insp Repts 50-329/82-10 & 50-330/82-10 on 820602-04,30 & 0701.No Noncompliance Noted.Major Areas Inspected:Followup on 10CFR50.55e Items Re Containment Internal Structures Coating Deficiency IR 05000329/19820031982-07-0101 July 1982 IE Insp Repts 50-329/82-03 & 50-330/82-03 on 820412-14, 21-23 & 29.Noncompliance Noted:Failure to Follow Procedures Re Attachment Changes to Drawings & Verification of Design Changes & Inadequate Controls During Excavation IR 05000329/19820121982-06-14014 June 1982 Insp Repts 50-329/82-12 & 50-330/82-12 on 820601-02.No Noncompliance or Deviations Noted.Major Areas Inspected: Preservice Insp Procedures,Work Activities,Nde Personnel Data & Certifications & Previous Insp Findings IR 05000329/19780121978-11-14014 November 1978 IE Inspec Repts 50-329/78-12 & 50-330/78-12 on 781024-27 During Which No Items of Noncompliance Were Noted.Major Areas Inspected incl:10CFR50.55(e) Rept Concerning Settlement of Diesel Generator Foundation & Bldg IR 05000329/19780141978-11-0606 November 1978 IE Inspec Repts 50-329/78-14 & 50-330/78-14 on 780910-29 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Examination of Gen Site Condition & Steam Generator & Reactor Vessel Hold Down Bolting IR 05000329/19780131978-11-0303 November 1978 IE Inspec Repts 50-329/78-13 & 50-330/78-13 on 780724-0908 During Which 2 Items of Noncompliance Were Noted:Welds with Unequal Outside Diameters Were Accepted & Safety Related Control Rod Drive Primary Breakers Were Not Well Protected IR 05000329/19780111978-10-26026 October 1978 IE Inspec Repts 50-329/78-11 & 50-330/78-11 on 780926-28 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Babcock & Wilcox Constr Co Nondestructive Examination Prog Procedures & Personnel Cert IR 05000329/19780101978-10-10010 October 1978 IE Inspec Repts 50-329/78-10 & 50-330/78-10 on 780913-15 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Included:Installation of safety-related Hangers & Restraints IR 05000329/19780091978-09-21021 September 1978 IE Inspec Repts 50-329/78-09 & 50-330/78-09 on 780829-31 During Which 1 Item of Noncompliance Was Noted:Failure to Follow Procedure in Welding Root Pass IR 05000330/19770021977-03-15015 March 1977 Const Insp Rept 50-330/77-02 on 770228-0301.Noncompliance Noted:Failure to Rept Bulge Deficiency Per 10CFR50.55(e)(z). Related Info Encl 1986-10-28
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000329/19860011986-10-28028 October 1986 Insp Repts 50-329/86-01 & 50-330/86-01 on 861015-16.Major Areas Inspected:Licensee Plans for Facility,Matls Licenses & Insp of Remedial Soils Work Areas.All Work to Leave Soils Remedial Work in Safe Condition Satisfactorily Accomplished IR 05000329/20050101985-05-30030 May 1985 Insp Rept 50-456/85-16 on 850329-0510.No Noncompliance or Deviation Noted.Major Areas Inspected:Actions on Previous Insp Items,Preoperational Test Program Implementation & Preoperational Test Procedures Review IR 05000329/19810231982-07-26026 July 1982 IE Insp Repts 50-329/81-23 & 50-330/81-23 on 811201-820630. No Noncompliance Noted.Major Areas Inspected:Exam of Site Conditions & Laydown Areas,Onsite Storage of Matl,Mgt Meetings & Changes in Site Mgt IR 05000329/19820101982-07-22022 July 1982 IE Insp Repts 50-329/82-10 & 50-330/82-10 on 820602-04,30 & 0701.No Noncompliance Noted.Major Areas Inspected:Followup on 10CFR50.55e Items Re Containment Internal Structures Coating Deficiency IR 05000329/19820031982-07-0101 July 1982 IE Insp Repts 50-329/82-03 & 50-330/82-03 on 820412-14, 21-23 & 29.Noncompliance Noted:Failure to Follow Procedures Re Attachment Changes to Drawings & Verification of Design Changes & Inadequate Controls During Excavation IR 05000329/19820121982-06-14014 June 1982 Insp Repts 50-329/82-12 & 50-330/82-12 on 820601-02.No Noncompliance or Deviations Noted.Major Areas Inspected: Preservice Insp Procedures,Work Activities,Nde Personnel Data & Certifications & Previous Insp Findings IR 05000329/19780121978-11-14014 November 1978 IE Inspec Repts 50-329/78-12 & 50-330/78-12 on 781024-27 During Which No Items of Noncompliance Were Noted.Major Areas Inspected incl:10CFR50.55(e) Rept Concerning Settlement of Diesel Generator Foundation & Bldg IR 05000329/19780141978-11-0606 November 1978 IE Inspec Repts 50-329/78-14 & 50-330/78-14 on 780910-29 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Examination of Gen Site Condition & Steam Generator & Reactor Vessel Hold Down Bolting IR 05000329/19780131978-11-0303 November 1978 IE Inspec Repts 50-329/78-13 & 50-330/78-13 on 780724-0908 During Which 2 Items of Noncompliance Were Noted:Welds with Unequal Outside Diameters Were Accepted & Safety Related Control Rod Drive Primary Breakers Were Not Well Protected IR 05000329/19780111978-10-26026 October 1978 IE Inspec Repts 50-329/78-11 & 50-330/78-11 on 780926-28 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Babcock & Wilcox Constr Co Nondestructive Examination Prog Procedures & Personnel Cert IR 05000329/19780101978-10-10010 October 1978 IE Inspec Repts 50-329/78-10 & 50-330/78-10 on 780913-15 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Included:Installation of safety-related Hangers & Restraints IR 05000329/19780091978-09-21021 September 1978 IE Inspec Repts 50-329/78-09 & 50-330/78-09 on 780829-31 During Which 1 Item of Noncompliance Was Noted:Failure to Follow Procedure in Welding Root Pass IR 05000330/19770021977-03-15015 March 1977 Const Insp Rept 50-330/77-02 on 770228-0301.Noncompliance Noted:Failure to Rept Bulge Deficiency Per 10CFR50.55(e)(z). Related Info Encl 1986-10-28
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000329/19860011986-10-28028 October 1986 Insp Repts 50-329/86-01 & 50-330/86-01 on 861015-16.Major Areas Inspected:Licensee Plans for Facility,Matls Licenses & Insp of Remedial Soils Work Areas.All Work to Leave Soils Remedial Work in Safe Condition Satisfactorily Accomplished IR 05000329/20050101985-05-30030 May 1985 Insp Rept 50-456/85-16 on 850329-0510.No Noncompliance or Deviation Noted.Major Areas Inspected:Actions on Previous Insp Items,Preoperational Test Program Implementation & Preoperational Test Procedures Review IR 05000329/19810231982-07-26026 July 1982 IE Insp Repts 50-329/81-23 & 50-330/81-23 on 811201-820630. No Noncompliance Noted.Major Areas Inspected:Exam of Site Conditions & Laydown Areas,Onsite Storage of Matl,Mgt Meetings & Changes in Site Mgt IR 05000329/19820101982-07-22022 July 1982 IE Insp Repts 50-329/82-10 & 50-330/82-10 on 820602-04,30 & 0701.No Noncompliance Noted.Major Areas Inspected:Followup on 10CFR50.55e Items Re Containment Internal Structures Coating Deficiency IR 05000329/19820031982-07-0101 July 1982 IE Insp Repts 50-329/82-03 & 50-330/82-03 on 820412-14, 21-23 & 29.Noncompliance Noted:Failure to Follow Procedures Re Attachment Changes to Drawings & Verification of Design Changes & Inadequate Controls During Excavation IR 05000329/19820121982-06-14014 June 1982 Insp Repts 50-329/82-12 & 50-330/82-12 on 820601-02.No Noncompliance or Deviations Noted.Major Areas Inspected: Preservice Insp Procedures,Work Activities,Nde Personnel Data & Certifications & Previous Insp Findings IR 05000329/19780121978-11-14014 November 1978 IE Inspec Repts 50-329/78-12 & 50-330/78-12 on 781024-27 During Which No Items of Noncompliance Were Noted.Major Areas Inspected incl:10CFR50.55(e) Rept Concerning Settlement of Diesel Generator Foundation & Bldg IR 05000329/19780141978-11-0606 November 1978 IE Inspec Repts 50-329/78-14 & 50-330/78-14 on 780910-29 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Examination of Gen Site Condition & Steam Generator & Reactor Vessel Hold Down Bolting IR 05000329/19780131978-11-0303 November 1978 IE Inspec Repts 50-329/78-13 & 50-330/78-13 on 780724-0908 During Which 2 Items of Noncompliance Were Noted:Welds with Unequal Outside Diameters Were Accepted & Safety Related Control Rod Drive Primary Breakers Were Not Well Protected IR 05000329/19780111978-10-26026 October 1978 IE Inspec Repts 50-329/78-11 & 50-330/78-11 on 780926-28 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Babcock & Wilcox Constr Co Nondestructive Examination Prog Procedures & Personnel Cert IR 05000329/19780101978-10-10010 October 1978 IE Inspec Repts 50-329/78-10 & 50-330/78-10 on 780913-15 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Included:Installation of safety-related Hangers & Restraints IR 05000329/19780091978-09-21021 September 1978 IE Inspec Repts 50-329/78-09 & 50-330/78-09 on 780829-31 During Which 1 Item of Noncompliance Was Noted:Failure to Follow Procedure in Welding Root Pass IR 05000330/19770021977-03-15015 March 1977 Const Insp Rept 50-330/77-02 on 770228-0301.Noncompliance Noted:Failure to Rept Bulge Deficiency Per 10CFR50.55(e)(z). Related Info Encl 1986-10-28
[Table view] Category:UTILITY
MONTHYEARIR 05000329/19860011986-10-28028 October 1986 Insp Repts 50-329/86-01 & 50-330/86-01 on 861015-16.Major Areas Inspected:Licensee Plans for Facility,Matls Licenses & Insp of Remedial Soils Work Areas.All Work to Leave Soils Remedial Work in Safe Condition Satisfactorily Accomplished IR 05000329/20050101985-05-30030 May 1985 Insp Rept 50-456/85-16 on 850329-0510.No Noncompliance or Deviation Noted.Major Areas Inspected:Actions on Previous Insp Items,Preoperational Test Program Implementation & Preoperational Test Procedures Review IR 05000329/19810231982-07-26026 July 1982 IE Insp Repts 50-329/81-23 & 50-330/81-23 on 811201-820630. No Noncompliance Noted.Major Areas Inspected:Exam of Site Conditions & Laydown Areas,Onsite Storage of Matl,Mgt Meetings & Changes in Site Mgt IR 05000329/19820101982-07-22022 July 1982 IE Insp Repts 50-329/82-10 & 50-330/82-10 on 820602-04,30 & 0701.No Noncompliance Noted.Major Areas Inspected:Followup on 10CFR50.55e Items Re Containment Internal Structures Coating Deficiency IR 05000329/19820031982-07-0101 July 1982 IE Insp Repts 50-329/82-03 & 50-330/82-03 on 820412-14, 21-23 & 29.Noncompliance Noted:Failure to Follow Procedures Re Attachment Changes to Drawings & Verification of Design Changes & Inadequate Controls During Excavation IR 05000329/19820121982-06-14014 June 1982 Insp Repts 50-329/82-12 & 50-330/82-12 on 820601-02.No Noncompliance or Deviations Noted.Major Areas Inspected: Preservice Insp Procedures,Work Activities,Nde Personnel Data & Certifications & Previous Insp Findings IR 05000329/19780121978-11-14014 November 1978 IE Inspec Repts 50-329/78-12 & 50-330/78-12 on 781024-27 During Which No Items of Noncompliance Were Noted.Major Areas Inspected incl:10CFR50.55(e) Rept Concerning Settlement of Diesel Generator Foundation & Bldg IR 05000329/19780141978-11-0606 November 1978 IE Inspec Repts 50-329/78-14 & 50-330/78-14 on 780910-29 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Examination of Gen Site Condition & Steam Generator & Reactor Vessel Hold Down Bolting IR 05000329/19780131978-11-0303 November 1978 IE Inspec Repts 50-329/78-13 & 50-330/78-13 on 780724-0908 During Which 2 Items of Noncompliance Were Noted:Welds with Unequal Outside Diameters Were Accepted & Safety Related Control Rod Drive Primary Breakers Were Not Well Protected IR 05000329/19780111978-10-26026 October 1978 IE Inspec Repts 50-329/78-11 & 50-330/78-11 on 780926-28 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Babcock & Wilcox Constr Co Nondestructive Examination Prog Procedures & Personnel Cert IR 05000329/19780101978-10-10010 October 1978 IE Inspec Repts 50-329/78-10 & 50-330/78-10 on 780913-15 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Included:Installation of safety-related Hangers & Restraints IR 05000329/19780091978-09-21021 September 1978 IE Inspec Repts 50-329/78-09 & 50-330/78-09 on 780829-31 During Which 1 Item of Noncompliance Was Noted:Failure to Follow Procedure in Welding Root Pass IR 05000330/19770021977-03-15015 March 1977 Const Insp Rept 50-330/77-02 on 770228-0301.Noncompliance Noted:Failure to Rept Bulge Deficiency Per 10CFR50.55(e)(z). Related Info Encl 1986-10-28
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000329/19860011986-10-28028 October 1986 Insp Repts 50-329/86-01 & 50-330/86-01 on 861015-16.Major Areas Inspected:Licensee Plans for Facility,Matls Licenses & Insp of Remedial Soils Work Areas.All Work to Leave Soils Remedial Work in Safe Condition Satisfactorily Accomplished PNO-V-86-073, GL Mcchain,In Custody by FBI on Parole Violation,Issued Claims of Evading Security Background Checks for 6 Yrs While Working at Listed Facilities & Knows of Falsified Weld Records.Investigation in Progress1986-10-23023 October 1986 PNO-V-86-073:GL Mcchain,In Custody by FBI on Parole Violation,Issued Claims of Evading Security Background Checks for 6 Yrs While Working at Listed Facilities & Knows of Falsified Weld Records.Investigation in Progress PNO-III-86-034, on 860407,util Announced Plans to Convert Facility to Be Fueled by Natural Gas.Const on Facility Halted on 840716 Because of Financial & Rate Uncertainties. Conversion Phase to Be Completed in 19901986-04-0808 April 1986 PNO-III-86-034:on 860407,util Announced Plans to Convert Facility to Be Fueled by Natural Gas.Const on Facility Halted on 840716 Because of Financial & Rate Uncertainties. Conversion Phase to Be Completed in 1990 IR 05000329/20050101985-05-30030 May 1985 Insp Rept 50-456/85-16 on 850329-0510.No Noncompliance or Deviation Noted.Major Areas Inspected:Actions on Previous Insp Items,Preoperational Test Program Implementation & Preoperational Test Procedures Review IR 05000329/20040251985-05-17017 May 1985 Notice of Violation from Insp on 850329-0425 ML20206H8121983-09-14014 September 1983 Rept of Inquiry Q3-83-001 Re Allegation of Improper Welding & Termination of QC Inspector Employment.Inquiry Closed Based Upon Seriousness of Allegation That Kent Terminated Due to Contact W/Bechtel Personnel.Related Documents Encl PNO-III-82-078, on 820809,licensee Issued Stop Work Order for Ongoing Remedial safety-related Soils Work at Site,After NRC Determination That Work Not Approved by Nrr.Procedures Requiring Written Approval of Work Will Be Developed1982-08-12012 August 1982 PNO-III-82-078:on 820809,licensee Issued Stop Work Order for Ongoing Remedial safety-related Soils Work at Site,After NRC Determination That Work Not Approved by Nrr.Procedures Requiring Written Approval of Work Will Be Developed PNO-III-82-071, on 820729,received Part 21 Rept Via Telcon W/Zack Co Re Documentation Discrepancies for Welds Made to HVAC Components at La Salle & Possibly at Clinton & Midland.Welder of Record May Not Be Actual Welder1982-07-30030 July 1982 PNO-III-82-071:on 820729,received Part 21 Rept Via Telcon W/Zack Co Re Documentation Discrepancies for Welds Made to HVAC Components at La Salle & Possibly at Clinton & Midland.Welder of Record May Not Be Actual Welder IR 05000329/19810231982-07-26026 July 1982 IE Insp Repts 50-329/81-23 & 50-330/81-23 on 811201-820630. No Noncompliance Noted.Major Areas Inspected:Exam of Site Conditions & Laydown Areas,Onsite Storage of Matl,Mgt Meetings & Changes in Site Mgt IR 05000329/19820101982-07-22022 July 1982 IE Insp Repts 50-329/82-10 & 50-330/82-10 on 820602-04,30 & 0701.No Noncompliance Noted.Major Areas Inspected:Followup on 10CFR50.55e Items Re Containment Internal Structures Coating Deficiency PNO-III-82-068, on 820503,allegations from Former Employee of HVAC Contractor Received Re False or Incomplete QA Documentation for HVAC Work at Sites.Special Insp of Zack Co & Facilities Initiated1982-07-22022 July 1982 PNO-III-82-068:on 820503,allegations from Former Employee of HVAC Contractor Received Re False or Incomplete QA Documentation for HVAC Work at Sites.Special Insp of Zack Co & Facilities Initiated ML20055B0361982-07-0101 July 1982 Notice of Violation from Insp on 820412-14,21-23 & 29 IR 05000329/19820031982-07-0101 July 1982 IE Insp Repts 50-329/82-03 & 50-330/82-03 on 820412-14, 21-23 & 29.Noncompliance Noted:Failure to Follow Procedures Re Attachment Changes to Drawings & Verification of Design Changes & Inadequate Controls During Excavation IR 05000329/19820121982-06-14014 June 1982 Insp Repts 50-329/82-12 & 50-330/82-12 on 820601-02.No Noncompliance or Deviations Noted.Major Areas Inspected: Preservice Insp Procedures,Work Activities,Nde Personnel Data & Certifications & Previous Insp Findings PNO-III-80-050, on 800315,two Pipe Fitters Attempting to Find Gas Leak,Broke Hose Coupling Containing Gas Pressure of 40 Psi.Gas Denotated by Activation of two-way Radio.Three Men Received Second & Third Degree Burns Over 15% of Body1980-03-17017 March 1980 PNO-III-80-050:on 800315,two Pipe Fitters Attempting to Find Gas Leak,Broke Hose Coupling Containing Gas Pressure of 40 Psi.Gas Denotated by Activation of two-way Radio.Three Men Received Second & Third Degree Burns Over 15% of Body ML20126L8221979-12-0909 December 1979 Notice of Violation from Insp on 781211-790125.Noncompliance Noted Determined to Be Matl False Statement IR 05000329/19780121978-11-14014 November 1978 IE Inspec Repts 50-329/78-12 & 50-330/78-12 on 781024-27 During Which No Items of Noncompliance Were Noted.Major Areas Inspected incl:10CFR50.55(e) Rept Concerning Settlement of Diesel Generator Foundation & Bldg IR 05000329/19780141978-11-0606 November 1978 IE Inspec Repts 50-329/78-14 & 50-330/78-14 on 780910-29 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Examination of Gen Site Condition & Steam Generator & Reactor Vessel Hold Down Bolting ML20062E2901978-11-0303 November 1978 Notice of Violation from Inspec on 780724-0928 IR 05000329/19780131978-11-0303 November 1978 IE Inspec Repts 50-329/78-13 & 50-330/78-13 on 780724-0908 During Which 2 Items of Noncompliance Were Noted:Welds with Unequal Outside Diameters Were Accepted & Safety Related Control Rod Drive Primary Breakers Were Not Well Protected IR 05000329/19780111978-10-26026 October 1978 IE Inspec Repts 50-329/78-11 & 50-330/78-11 on 780926-28 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Babcock & Wilcox Constr Co Nondestructive Examination Prog Procedures & Personnel Cert IR 05000329/19780101978-10-10010 October 1978 IE Inspec Repts 50-329/78-10 & 50-330/78-10 on 780913-15 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Included:Installation of safety-related Hangers & Restraints IR 05000329/19780091978-09-21021 September 1978 IE Inspec Repts 50-329/78-09 & 50-330/78-09 on 780829-31 During Which 1 Item of Noncompliance Was Noted:Failure to Follow Procedure in Welding Root Pass ML20058A1921978-09-21021 September 1978 Notice of Violation from Inspec on 780829-31 ML20249A6301978-06-23023 June 1978 PNS-78-028:on 890624,anti-nuclear Demonstration Scheduled During Wk of 780624-25,at Listed facilities.Anti-nuclear Group from Kansas City Plans to Conduct Rally & Picnic at State Recreation Area in Vicinity of Wolf Creek Const Site ML20151X6941977-10-0707 October 1977 PNO-77-177:on 771007,Dow Chemical Co Accidentally Released Chlorine Gas Causing Evacuation of Neighboring Townships Population.Situation Returned to Normal by Midafternoon IR 05000330/19770021977-03-15015 March 1977 Const Insp Rept 50-330/77-02 on 770228-0301.Noncompliance Noted:Failure to Rept Bulge Deficiency Per 10CFR50.55(e)(z). Related Info Encl ML20249B8301976-07-29029 July 1976 PNO-76-133:Consumers Power Co Informed Region III That Errors Were Discovered in Placing Reinforcing Steel Bars at Three Locations in Auxiliary Building at Midland Construction Site.Inspector at Site to Review Problem 1986-04-08
[Table view] |
Inspection Report - Midland - 1986001 |
---|
|
|
Text
. - - -
.
.
U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-329/86001(DRP);50-330/86001(DRP)
Docket No. 50-329; 50-330 License No. CPPR-81; CPPR-82 Licensee: Consumers Power Company 1945 West Parnall Road Jackson, MI 49201 Facility Name: Midland Plant, Units 1 and 2 ,
Inspection At: Midland Plant Site, Midland, MI Inspection Conducted: October 15-16, 1986 Inspector: R. B. Landsman N , VM /O'28'b Approved By: W. G. Guldemond, Chief' /'O' dC E'0C=
Reactor Projects Branch 2 Inspection Summary Inspection on October 15-16, 1986 (Report No. 50-329/86001(DRP); 50-330/86001(DRP))
Areas Inspected Discussion of the licensee's future plans for the Midland facility, materials licenses, and an inspection of the remedial soils work area Results: During the meeting with the licensee, the licensee's staff discussed the conversion plans for the Midland facility. All of the work necessary to leave the soils remedial work in a safe condition during the Midland plant construction suspension had been satisfactorily accomplished.
.
8611030420 861028 PDR ADOCK 05000329 O PDR
, - - - - . _ _ _ _ .- _
.
4 DETAILS Person Contacted Consumers Fouer Company (CPCo)
J. A. Mooney, Executive Manager B. H. Peck, Site Manager W. R. Bird, Licensing Supervisor R. F. Green, Environmental Department J. A. Hay, Forester W. F. Sabo, Facilities Operations R. H. Wieland, Facilities Operations -
All attended the exit meeting on October 16, 1986. Future Plans for the Midland Facility Mr. Mooney gave an overview of the licensee's plans to convert the facility into a gas-fired combined-cycle plant which would also supply steam to Dow Chemica . Materials Fission Chamber Licenses The Midland Units 1 and 2 fission chambers had been stored in site warehouse No. They were shipped to the Palisades Nuclear Plant for storage on August 29, 1986. The inspector reviewed CPCo Source Inventory and Leak Test Records made prior to shipment and the Radioactive Material Snipment Records made during shipment and determined that the radiological limits were below regulatory requirements. The transfer was made in accordance with NRC rules and regulations. The results of a radiation and contamination survey (made in the warehouse storage area) confirmed that no residual contamination remains. The licensee plans to request termination of their licenses SNM-1904 and SNM-1905 in the near futur . Licensee Action on Soils Shutdown Activities The inspectors toured the remedial soils work areas to determine if the work activities listed in CPCo letters dated July 26, 1984, and August 28, 1984, had been properly accomplished. These activities were considered necessary tasks to halt the remedial soils work in progress and leave the work in a safe condition during the Midland plant work suspensio The inspectors verified that the only remaining task was accomplishe That task was to place a dike across the emergency heat sink in front of the Service Water Pump Structure in order to keep lake rain water from entering the intake bay Since the shutdown, over two years ago, the auxiliary building has under gone virtually no movement except for the seasonal variations with temperature. This indicates that the partially completed underpinning
-_
.'
.
and lay up grouting has left the building in a safe and stable conditio It can cause no danger to the public if left as i The licensee indicated that if at a later time, the lake is to be re-established and re-filled for the gas conversion, something will be done to the partially completed underpinning to alleviate the possibility of soil washouts under the building, thus possibly making the building unstabl . Exit Interview The inspectors met with licensee representatives (denoted in Paragraph 1) at the conclusion of the inspection and summarized the scope and findings of the inspection activities. The licensee acknowledged these findings. The inspector also discussed the likely informational content of the inspection report with regard to documents or processes reviewed by the inspector during the inspection. The licensee did not identify any such documents or processes as proprietar