MONTHYEARIR 05000329/20040251985-05-17017 May 1985 Notice of Violation from Insp on 850329-0425 ML20055B0361982-07-0101 July 1982 Notice of Violation from Insp on 820412-14,21-23 & 29 ML20126L8221979-12-0909 December 1979 Notice of Violation from Insp on 781211-790125.Noncompliance Noted Determined to Be Matl False Statement ML20062E2901978-11-0303 November 1978 Notice of Violation from Inspec on 780724-0928 ML20058A1921978-09-21021 September 1978 Notice of Violation from Inspec on 780829-31 1985-05-17
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000329/19860011986-10-28028 October 1986 Insp Repts 50-329/86-01 & 50-330/86-01 on 861015-16.Major Areas Inspected:Licensee Plans for Facility,Matls Licenses & Insp of Remedial Soils Work Areas.All Work to Leave Soils Remedial Work in Safe Condition Satisfactorily Accomplished PNO-V-86-073, GL Mcchain,In Custody by FBI on Parole Violation,Issued Claims of Evading Security Background Checks for 6 Yrs While Working at Listed Facilities & Knows of Falsified Weld Records.Investigation in Progress1986-10-23023 October 1986 PNO-V-86-073:GL Mcchain,In Custody by FBI on Parole Violation,Issued Claims of Evading Security Background Checks for 6 Yrs While Working at Listed Facilities & Knows of Falsified Weld Records.Investigation in Progress PNO-III-86-034, on 860407,util Announced Plans to Convert Facility to Be Fueled by Natural Gas.Const on Facility Halted on 840716 Because of Financial & Rate Uncertainties. Conversion Phase to Be Completed in 19901986-04-0808 April 1986 PNO-III-86-034:on 860407,util Announced Plans to Convert Facility to Be Fueled by Natural Gas.Const on Facility Halted on 840716 Because of Financial & Rate Uncertainties. Conversion Phase to Be Completed in 1990 IR 05000329/20050101985-05-30030 May 1985 Insp Rept 50-456/85-16 on 850329-0510.No Noncompliance or Deviation Noted.Major Areas Inspected:Actions on Previous Insp Items,Preoperational Test Program Implementation & Preoperational Test Procedures Review IR 05000329/20040251985-05-17017 May 1985 Notice of Violation from Insp on 850329-0425 ML20206H8121983-09-14014 September 1983 Rept of Inquiry Q3-83-001 Re Allegation of Improper Welding & Termination of QC Inspector Employment.Inquiry Closed Based Upon Seriousness of Allegation That Kent Terminated Due to Contact W/Bechtel Personnel.Related Documents Encl PNO-III-82-078, on 820809,licensee Issued Stop Work Order for Ongoing Remedial safety-related Soils Work at Site,After NRC Determination That Work Not Approved by Nrr.Procedures Requiring Written Approval of Work Will Be Developed1982-08-12012 August 1982 PNO-III-82-078:on 820809,licensee Issued Stop Work Order for Ongoing Remedial safety-related Soils Work at Site,After NRC Determination That Work Not Approved by Nrr.Procedures Requiring Written Approval of Work Will Be Developed PNO-III-82-071, on 820729,received Part 21 Rept Via Telcon W/Zack Co Re Documentation Discrepancies for Welds Made to HVAC Components at La Salle & Possibly at Clinton & Midland.Welder of Record May Not Be Actual Welder1982-07-30030 July 1982 PNO-III-82-071:on 820729,received Part 21 Rept Via Telcon W/Zack Co Re Documentation Discrepancies for Welds Made to HVAC Components at La Salle & Possibly at Clinton & Midland.Welder of Record May Not Be Actual Welder IR 05000329/19810231982-07-26026 July 1982 IE Insp Repts 50-329/81-23 & 50-330/81-23 on 811201-820630. No Noncompliance Noted.Major Areas Inspected:Exam of Site Conditions & Laydown Areas,Onsite Storage of Matl,Mgt Meetings & Changes in Site Mgt IR 05000329/19820101982-07-22022 July 1982 IE Insp Repts 50-329/82-10 & 50-330/82-10 on 820602-04,30 & 0701.No Noncompliance Noted.Major Areas Inspected:Followup on 10CFR50.55e Items Re Containment Internal Structures Coating Deficiency PNO-III-82-068, on 820503,allegations from Former Employee of HVAC Contractor Received Re False or Incomplete QA Documentation for HVAC Work at Sites.Special Insp of Zack Co & Facilities Initiated1982-07-22022 July 1982 PNO-III-82-068:on 820503,allegations from Former Employee of HVAC Contractor Received Re False or Incomplete QA Documentation for HVAC Work at Sites.Special Insp of Zack Co & Facilities Initiated ML20055B0361982-07-0101 July 1982 Notice of Violation from Insp on 820412-14,21-23 & 29 IR 05000329/19820031982-07-0101 July 1982 IE Insp Repts 50-329/82-03 & 50-330/82-03 on 820412-14, 21-23 & 29.Noncompliance Noted:Failure to Follow Procedures Re Attachment Changes to Drawings & Verification of Design Changes & Inadequate Controls During Excavation IR 05000329/19820121982-06-14014 June 1982 Insp Repts 50-329/82-12 & 50-330/82-12 on 820601-02.No Noncompliance or Deviations Noted.Major Areas Inspected: Preservice Insp Procedures,Work Activities,Nde Personnel Data & Certifications & Previous Insp Findings PNO-III-80-050, on 800315,two Pipe Fitters Attempting to Find Gas Leak,Broke Hose Coupling Containing Gas Pressure of 40 Psi.Gas Denotated by Activation of two-way Radio.Three Men Received Second & Third Degree Burns Over 15% of Body1980-03-17017 March 1980 PNO-III-80-050:on 800315,two Pipe Fitters Attempting to Find Gas Leak,Broke Hose Coupling Containing Gas Pressure of 40 Psi.Gas Denotated by Activation of two-way Radio.Three Men Received Second & Third Degree Burns Over 15% of Body ML20126L8221979-12-0909 December 1979 Notice of Violation from Insp on 781211-790125.Noncompliance Noted Determined to Be Matl False Statement IR 05000329/19780121978-11-14014 November 1978 IE Inspec Repts 50-329/78-12 & 50-330/78-12 on 781024-27 During Which No Items of Noncompliance Were Noted.Major Areas Inspected incl:10CFR50.55(e) Rept Concerning Settlement of Diesel Generator Foundation & Bldg IR 05000329/19780141978-11-0606 November 1978 IE Inspec Repts 50-329/78-14 & 50-330/78-14 on 780910-29 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Examination of Gen Site Condition & Steam Generator & Reactor Vessel Hold Down Bolting IR 05000329/19780131978-11-0303 November 1978 IE Inspec Repts 50-329/78-13 & 50-330/78-13 on 780724-0908 During Which 2 Items of Noncompliance Were Noted:Welds with Unequal Outside Diameters Were Accepted & Safety Related Control Rod Drive Primary Breakers Were Not Well Protected ML20062E2901978-11-0303 November 1978 Notice of Violation from Inspec on 780724-0928 IR 05000329/19780111978-10-26026 October 1978 IE Inspec Repts 50-329/78-11 & 50-330/78-11 on 780926-28 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Babcock & Wilcox Constr Co Nondestructive Examination Prog Procedures & Personnel Cert IR 05000329/19780101978-10-10010 October 1978 IE Inspec Repts 50-329/78-10 & 50-330/78-10 on 780913-15 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Included:Installation of safety-related Hangers & Restraints IR 05000329/19780091978-09-21021 September 1978 IE Inspec Repts 50-329/78-09 & 50-330/78-09 on 780829-31 During Which 1 Item of Noncompliance Was Noted:Failure to Follow Procedure in Welding Root Pass ML20058A1921978-09-21021 September 1978 Notice of Violation from Inspec on 780829-31 ML20249A6301978-06-23023 June 1978 PNS-78-028:on 890624,anti-nuclear Demonstration Scheduled During Wk of 780624-25,at Listed facilities.Anti-nuclear Group from Kansas City Plans to Conduct Rally & Picnic at State Recreation Area in Vicinity of Wolf Creek Const Site ML20151X6941977-10-0707 October 1977 PNO-77-177:on 771007,Dow Chemical Co Accidentally Released Chlorine Gas Causing Evacuation of Neighboring Townships Population.Situation Returned to Normal by Midafternoon IR 05000330/19770021977-03-15015 March 1977 Const Insp Rept 50-330/77-02 on 770228-0301.Noncompliance Noted:Failure to Rept Bulge Deficiency Per 10CFR50.55(e)(z). Related Info Encl ML20249B8301976-07-29029 July 1976 PNO-76-133:Consumers Power Co Informed Region III That Errors Were Discovered in Placing Reinforcing Steel Bars at Three Locations in Auxiliary Building at Midland Construction Site.Inspector at Site to Review Problem 1986-04-08
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
Appendix NOTICE OF VIOLATION.
Consumers Power Company Docket No. 50-329 Docket No. 50-330 -
As a result of the routine safety inspection conducted on April 12-14 and 21-23, 1982, and in accordance with the NRC Enforcement Policy, 47 FR 9987 (March 9, 1982), the following violation was identified:
10 CFR 50, Appendix B, Criterion V, states in part that, " Activities affecting quality shall be prescribed by documented instructions...and shall be accomplished in accordance with these instructions... instructions, procedures, or drawings shall include appropriate quantitative or qualita-tive acceptance criteria for determining that important activities have been satisfactorily accomplished."
CPCo Quality Assurance Program Policy No. 5, states in part that, "organi-zations... prepare and maintain procedures as necessary to provide instruc-tions. . .for a consistent method of performing recurring engineering, con-etruction and Quality Assurance activities...these documents provide quali-tative and quantitative acceptance criteria for determining that important activities have been satisfactorily accomplished."
Contrary to the above, the inspector determined the following three examples of noncompliance:
- a. CPCo's QA Procedure No. 6-1 requires that the number of attachment changes to a drawing be limited to four. Thereafter, any change results in its incorporation into the drawing. Bechtel Drawing C-1315 has nine outstanding FCR's and Drawing C-1316 has five out-
! standing FCR's,
- b. Specification C-211 does not have the degree of controls necessary for the protection to be used during excavation. This resulted in the BWST #3 valve pit being undermined during the removal of an
- electrical duct bank, t
- c. CPCo's QA Procedure No. 3 requires that verification of design be i performed by individuals other than those who performed the original design. Mergentine's Field Procedures 52 and 55 were marked up in ink to show changes made. There was no evidence as to when or by whom the changes were made. This resulted in inadequate assurance i that the changes were reviewed and approved prior to implementation of the procedure.
This is a Severity Level IV violation (Supplement II).
l 8207200286 820702 gDRADOCK 05000329 PDR
Appendix 2 Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written state-ment or explanation in reply, including for each item of noncompliance:
(1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further noncompliance; and (3) the date when full com-pliance will be achieved. Consideration may be given to extending your response time for good cause shown.
& tv Dated'~