ML20214L542

From kanterella
Jump to navigation Jump to search

Confirmatory Action Ltr Re Facility Return to Power Operations.Understands Util Will Conduct Root Cause Analysis of 851226 Reactor Trip & Provide Briefing of Assessment & Justification to Resume Power Operations
ML20214L542
Person / Time
Site: Rancho Seco
Issue date: 12/26/1985
From: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Reinaldo Rodriguez
SACRAMENTO MUNICIPAL UTILITY DISTRICT
References
CAL, TAC-60462, NUDOCS 8705300003
Download: ML20214L542 (1)


Text

_ _ _ _ _ __

kQ'[s k-h

~

\\' R b>D M.4 %

INET B STAT M 8

80UCLEAM MEGULATORY C000MISS80N s

ammon v usoenaam ums.auns ne sinunn eneem.cas.wosseia eenes DEC 2G EB5 Docket flo. 50-312 License Ilu. OpR-54 CONFIIDIATORY ACTI(Ni LETTDt Sacramento flunicipal Utility District p.0. Box 15830 Sacramento. California 95813 Attention: Mr. R. J. llodriguez 5ebject: Return of Rancho Seco to power Operations Gentiamen:

It is my understanding, as a result of our conversation on Decader 26.*1985 that prior to return of Rancho Seco to power operations you will con &ct a root cause analysis of the reactor trip which occurred on Decem6er 26.1985.

In addition. and prior to return to power. you will provide the IELC a briefing of your assessment of the root cause and your justification as to Ay the Rancho Seco facility is ready to resume power operations.

If my understanding concerning your proposed actions. as summartred above.

is not correct, you should promptly notify this office in writing.

Stacerely.

7$2n

  1. O m

ger J. L. Martin

(

Regional Administrator oc:

L. G. Schwieger. 5 MUD G. Coward. 5 MUD 5 tate of CA 0700300003 051226 rLH

/,0006 GL0003??

s PDR

-d