Forwards Schedule for Return to Power Operations from 851226 Transient.Schedule Consists of Comprehensive Action List & Milestone Schedule.Commencement of Power Operation Scheduled for 860308
ML20140D589
Person / Time
Site: Rancho Seco
Issue date: 01/24/1986
From: Reinaldo Rodriguez
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Martin J, Miraglia F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V), Office of Nuclear Reactor Regulation
References
RJR-86-37, TAC-60462, NUDOCS 8602030072
Download: ML20140D589 (18)


Text

Y esuu.

SACRAMENTO MUNICIPAL UTILITY DISTRICT G P. O. Box 15830, Sacramento CA 95852-1830.(916) 452-3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CAllFORNIA R1R 86-37 January 24, 1986 JB MARTIN ADMINISTRATOR DIRECTOR OF NUCLEAR REACTOR REGULATION US NUCLEAR REGULATORY COMMISSION ATTENTION FRANK J MIRAGLIA JR DIRECTOR REGION V PhR-B DIVISION OFFICE OF INSPECTION AND ENFORCEMENT US NUCLEAR REGULATORY COMMISSION 1450 MARIA LANE SUTIE 210 WASHINGTON D C 20555 WALNUT CREEK CA 94596

~

DOCKET 50-312 RANCHO SECO NUCLEAR GENERATING STATION UNIT N0 1 SCHEDULE FOR RETURN OF RANCHO SEC0 TO POWER OPERATIONS FROM TRANSIENT OF DECEMBER 26, 1985

Reference:

JB Martin to RJ Rodriguez - Confirmatory Action Letter -

Return of Rancho Seco to Power Operations - December 26, 1985 From the outset of the transient experienced by Rancho Seco on December 26, 1985, the District activated a recovery task force to address the root cause of the trip and actions required for restart of the plant.

With this letter, the District is presenting its schedule for return to power.

During the past month, the District has interfaced with members of your staff (Region V), the NRC Incident Investigation Team (IIT), NRR, INPO, and the B&W Owners Group.

These interactions have identified specific areas that required not only investigations into understanding the root cause of the trip, but also recommended courses of action to reduce the likelihood for this and related events in the future.

As it has done in the past the District has established a recovery plan which results in a comprehensive " Action List".

This list (Attachment I) includes all the related areas pertaining to the trip, equipment under investigation and the District's intended corrective actions. Attachment I presents a summary and a brief description of each of the major issues addressed by the Action List. Attachment II is the milestone schedule for actions preparing for and leading up to return to power operation.

The schedule the District is working towards, is for commencement of power operation on March 8, 1986.

The District is marshalling all its resources to meet this schedule.

Therefore, to assure that there are no impediments from 0602030072 060124 PDR ADOCK 05000312

\\)\\

S PDR DISTRICT HEADQUARTERS O 02o1 S Street. Sacramento CA 95817-1899

.,O n

JB Martin / Frank Miraglia January 24, 1986 the NRC, the District will, upon completion of the various Action List items required for startup, submit these items as closure reports to Region V, NRC.

The District also intends to meet with the Region in early February. During this meeting, the District will provide a progess report on its recovery activities and answer questions of the staff.

We trust that the District's plan to resolve the identified open items, will allow the NRC to concur that Rancho Seco is ready to resume power operation.

]

PN Ak R. J. RODRIGUEZ ASSISTANTGENERALMA}AGER, NUCLEAR Attachments I

2 E 5 LEGEND: SU = St:rtup R: quired MASTER LT = Long Tcrm STATUS DATE 01-24-86 rE PE = Power Escalation DECEMBER 26, 1985 TRANSIENT TIME 1000 5

NA = Not Applicable Page 1 of 15 3

ST = Short Term

- ACTION Li:':

    • Closure.

-t Requ' red to NRC

  • Troubleshoo.

'/Repa'r Guidelines Per GAC 85-1001 Apply DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/

COMMENTS ETC.

1.

Post Trip Report ( AP.28)

J. Field ST Compiling TR L Grant Simmons Draf t 2/2 Complete 2/15 a)

TAP Team Assistance R. Colombo SU Complete b)

Sequence of Events R. Wichert SU Complete Rev. 3 issued 01-08-86 c)

Aux FW System Initiation G. Paptzun SU Complete Approved 12-29-85.

Response Report d)

Post Trip Shutdown Margin G. Keney SU Complete Always > 2 to 5 percent shutdown.

Approved 12-31-85.

e)

Aux FW Flow to OTSG J. Field SU Closure Rpt.

Analysis Due 1/27 f)** Main Steam Line Analysis J. Field SU 1.

Thermal Calc Due 1/24 By Bechtel 2.

Stress Calc Due 1/27 By Bechtel 3.

Closure Report Due 1/30 Closure Report to cover walkdown g)** Minimum Pressurizer J. Field SU Closure Rpt.

Consider RV Head Bubble.

Level Calculation Due 1/27/86 Official calc being completed.

Awaiting B and W analysis.

G

LEGEED: '

D SU = StArtop Required LT = Long Tcrm STATUS DATE 01-24-06 8

PE = Power Escalation DECEMBER 26, 1985 TRANSIENT TIME 1000

f NA = Not Applicable Page 2 of 15

+

ST = Short Tem

- ACTION LIST -

    • Closure Report Required to NRC
  • Troubleshooting / Repair Guidelines Per GAC 85-1001 Apply DESCRIPTION RESP 0tlSIBILITY SCHEDULE STATUS WR No./NCR/

COMMENTS ETC.

1.

h)

"ICS Reliability Study" R. Dieterich SU Complete Input to RRG study.

f)** Pressurizer Heater J. Field SU Complete NOM 86-39 Troubleshooting plan Operation approved 01-15-86, NOM 86-33.

Heaters are OK.

j)

Control Roca Instruments N. Brock SU Closure Rpt.

Identify which Fail on Loss of Due 1/24/86 ICS Power k)** Investigate report of E. Banaghan SU Complete NOM 86-12 Closure Report approved SM0KE prior to event 01-11-86.

1)** Primary to Secondary J. Field SU Closure Rpt.

Testing to be completed 2/4.

Leak Investigation Due 2/15 m)

Security Interface B. Spencer /D. Ross ST Awaiting Complete actions per GAC Closure 86-016 Actions Due 2/1 1.

Review procedures to involve security in event.

2.

Response to Loss of Badges.

3.

Locked door control policy and procedures.

b LEGEND: SU = Startup R: quired f

LT = Long Term STATUS DATE 01-24-86 f

h PE = Power Escalation DECEMBER 26, 1985 TRANSIENT TIME 1000 NA = Not Applicable Page 3 of 15

,ST = Short Term

- ACTION LIST -

)

    • Closure Report Required to NRC
  • Troubleshooting / Repair Guidelines Per GAC 85-1001 Apply DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/

COMMENTS ETC.

1.

n)

Main Steam Failure Logic N. Brock SU Closure To investigate block valve Rpt. by 1/28 operation.

Concern about IDADS timing of pressure switches.

o)** SPDS vs Strip Charts for J. Field SU A plan due From Human Factors Study.-

OTSG operate level 1/25.'

Closure Rpt.

due 1/30 p)** Determine if transient was J. Field SU Requested by NRC/IIT within USAR Design Basis telecon of 1-17-86.

Due 2-1-86.

2.

Root Cause Analysis

~

a)

Report S. Crunk ST Closure Rpt.

Held up by ICS Due 2/15 troubleshooting b)** Human Factors Review J. Jones ST Complete NOM 86-48 Incorporate into Long Term due 1/22 Human Factors program.

Issued 1-23-86 to NRC.

3.

Determine Cause/ Corrective N. Brock Action for ICS Power failure.

a)

Closed Deleted.

See 3c.

l-a LEGEND:

SU = Startup R quired g

LT = Long Tern STATUS DATE 01-24-86 a

PE = Power Escalation DECEMBER 26, 1985 TRANSIENT TIME 1000 A

NA = Not Applicable Page 4 of 15 3

ST = Short Term

- ACTION LIST -

    • Closure Report Required to NRC
  • Troubleshooting / Repair Guidelines Per GAC 85-1001 Apply DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/

COMMENTS ETC.

3.

b)*

ICS Power distribution SU Awaiting NRC 3.b.1 and 3.b.2 to NRC for investigation Concurrence removal from Quarantine List.

1.

C Inverter Complete N0!! 86-37 Closure Report 01-16-86.

2.

J Inverter and E and Complete NDH 86-03 F buses c)*

ICS Equipment Investigation SU Closure Closure pending due 2/1 Troubl eshooting 1.

MI 1.

Visual Complete MI complete 1-21-86.

Inspections and Photographs 2.

MI 2.

Insitu Verifi-Awaiting MI complete 1-21-86.

cation of Power Supply Closure Outstanding NCR and MIDR.

Setpoints 3.

MI 3.

Load Carrying Complete MI complete 1-21-86.

Capability of DC Power Supplies 4.

MI 4.

Insitu Verifi-Awaiting MI complete 1-21-86. MIDR cation of Power Supply Closure open pending closure of Monitor Bus Voltage MI.2 MIDR.

Identified Setpoints drifting setpoint.

E LEGEND:

SU = Stcrtup R: quired 5

LT = Lcng Tcrm STATUS DATE 01-24-86 C

PE = Power Escalation DECEMBER 26, 1985 TRANSIENT TIME 1000 MA = Not Applicable Page 5 of 15

~

2 ST = Short Term

- ACTION LIST -

    • Closure Report Required to NRC
  • Troubleshooting / Repair Guidelines Per GAC 85-1001 Apply DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/

COMMENTS ETC.

3.

c) 5.1 MI 5.

Insitu Veriff-Complete 0.12/0.15 sec vice 0.5 set cation of S1 and 52 Work complete 1-21.

Trip Delay 5.2 MI 5.

ICS Repowering Holding Obtained initial data.

Preparing justification to preclude retesting.

Due 1-24.

6.

MI 6.

Bench Test SU Holding MI being prepared.

Need new Power Supply Monitor Power Supply Monitor before testing.

Due 1-25.

7.

MI 7.

Bench Test to Holding for MI being considered for Determine Hand / Auto NRC removal.

Beyond scope of Station Concurrence program.

Due to NRC 1-25.

d)*

Repairs to ICS SU Closure Rpt.

In preparation.

due 2/1 e)

Loss of ICS Procedure 1.

Equipment Input N. Brock SU Due 1/27 Recovery of ICS Power.

ATOG review.

RJR 86-19, Items 5 and 6.

2.

Procedure Development B. Spencer SU Due 2/7 3.

ATOG Review of ICS B. Ford SU Due 2/1 See item 10.a for action..

_ _ _ _ _~

n.

LEGEND: SU = Startup R: quired LT = Long Term STATUS DATE 01-24-86 g

PE = Power Escalation DECEMBER 26, 1985 TRANSIENT TIE 1000 m

NA = Not Applicable Page 6 of 15 5

ST = Short Tem

- ACTION LIST -

    • Closure Report Required to NRC
  • Troubleshooting / Repair Guidelines Per GAC 85-1001 Apply DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/

COMMENTS ETC.

3.

f)

Engineering review of V. Lewis Mods being considered j

proposed ICS Mods:

for implementation i

1.-

BTU Limits V. Lewis ST Closure.

Engineering evaluation in due 1/31 progress.

i 2.

RCS Flow Noise V. Lewis ST Closure Engineering evaluation in due 1/31 progress.

l 3.

WR Recorder Alams V. Lewis SU Closure ECN R-0245 Engineering in progress.

due 2/12 ECNs release 1/27.

l 4.

Modify ADV, TBV V. Lewis SU Closure tCN R-0357 Design Package by 01-27-86.-l to fail closed on due 2/7 Sub B loss of ICS 5.

Provide remote manual V. Lewis SU Closure ECN R-0357 Consider including MFP t

control of AFW due 2/16 Sub A speed and SU FW Valves.

control valves Design Package by 01-27-86.

independent of ICS I

6.

Evaluate multi-channel V. Lewis SU Closure Sub ECN 8 and W study on logic in ICS/NNI power supply due 1/31 progress.

monitors to trip function 7.

Evaluate ICS Trouble V. Lewis SU Closure Annunciator and NNI due 1/31

R LEGEND:

SU = Startup R: quired LT = Long T;rm STATUS DATE 01-24-86 PE = Power Escalation DECEMBER 26, 1985 TRANSIENT TIME 1000 M

NA = Not Applicable Page 7 of 15

^

E ST = Short Term

- ACTION LIST -

    • Closure Report Required to NRC
  • Troubleshooting / Repair Guidelines Per GAC 85-1001 Apply DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/

COMMENTS ETC.

3.

f) 8.

Provide protective V. Lewis SU Closure RJR 86-19, Item 2f.

fusing for AC/DC due 2/6 supplied loads 9.

Investigate Signal V. Lewis SU Investigating Converson/NNI Report Due Interface 2/12 10.

Investigate ICS/NNI V. Lewis SU Investig,ating 15 amp trip, 21 amp Power Supply Load Report Due capability.

current setpoint 2/12 g)

Loss of ICS trouble annunc. C. Linkhart SU Closure RJR 86-19, Item 7.

caused by loss of power due 1/24 to ICS h)

Motor Operated TBV V. Lewis LT Closure RJR 86-19, Item 8.

isolation valves due 1/31 4.

MU Pump (P-236) failure a)*

Repai r/ replace M. Price LT Active NOM 86-42 Troubleshooting Plan released for implementation 1-21-86.

bl* Cause M. Price SU Closed N0tl 86-52 Issued 1-24-86.

LEGEND: SU = Startup R:: quired 3

j LT = Long Tcrim STATUS DATE. 01-24-86 PE = Power Escalation DECEMBER 26, 1985 TRAMSIENT TIMr 1000

~;

NA = Not Applicable Page o of 15

- (

ST = Short Teria

- ACTION LIST -

    • Closure Report Required to NR'C
  • Troubleshooting / Repair Guidelines Per GAC 85-1001 Apply DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/

COMMENTS ETC.

4.

c)

Revise SPs for running J. Field SU Closure w/o MU Pump due 2/15 d)* Effect of SFV-25003 J. Field SU Closure N0tl 86-08 Troubleshooting Action Plan closure awaiting approved 01-10-86.

Run SP runs SP 203.02A and SP 203.05A.

e) 1.

Consider changing V. Lewis ST Reviewing WR 109713 Long Term change, requires suction valve Closure Safety Analysis.

SFV-23508 from due 1/31

" Modulating" to

" Seal - I n. "

2.

Consider Valve V. Lewis ST Closure Interlock M/U Tank discharge interlock due 1/31 valve w/BWST valve per RJR modifications 86-19, Item 2d.

f)

Consider reroute of V. Lewis LT Closure HPI/MU miniflow due 1/31 g)

Reconsider Design Basis R. Dieterich LT Closed N0H 86-51 USAR Design Basis requires SFAS of MU Tank Outlet SFAS closure.

h)

Review of IE Info Notice V. Lewis SU Closure Review for applicability.

85-94, Miniflow on Due 1/31 Safeguards Pumps L

LEGEND:

SU = St:rtup R: quired LT = Long Tcrm STATUS DATE 01-24-86 PE = Power Escalation DECEMBER 26, 1985 TRANSIENT TIME 1000 j

NA = Not Applicable Page 9 of 15-s ST = Short Term

- ACTION LIST -

    • Closure Report Required to NRC
  • Troubleshooting / Repair Guidelinbs Per GAC 85-1001 Apply DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/

C0ftMENTS ETC.

5.

Radiation Monitor R-15001 a)

Repair M. Price SU Complete WR107890 Mechanical Work Complete WR107891 (Replaced Seals) b)

Design evaluation V. Lewis SU Complete NOM 86-38 Closure Report 01-18-86.

6.

RCS Overcooling a) 1.

Tech Spec review R. Colombo SU Complete RWC 85-804 Reportable, Cooldown exceeded Tech Spec by 108*F 2.

Overcooling R. Colombo SU Due 1/31 Official caiculation to be Calculation completed b)

Analysis / evaluation 1.

B+W Calculations J. Field SU a.

Preliminary Complete NOM 86-14 No adverse effects on NSS.

Evaluation b.

Core Lift Report Complete NOM 86-14 0 to 21 percent core lift.

No adverse effects.

c.

Fatigue Report Due 1/30 In progress by B and W.

2.

NSAC Calculations J. Field SU Complete NOM 86-13 Determined no adverse

~

effects.

3.

Closure Report J. Field SU Due 1/31

LEGEND:

SU = Startup R quired LT = Long Tcrm STATUS DATE 01-24-86 PE = Power Escalation DECEMBER 26, 1985 TRANSIENT TIME 1000 C

NA = Not Applicable Page 10 of 15 ST = Short Term

- ACTION LIST -

    • Closure Report Required to NRC
  • Troubleshooting / Repair Guidelines Per GAC 85-1001 Apply DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/

COMMENTS ETC.

7.** Health Physics a)

Health Physics Aspects /

F. Kellie SU Complete NOM 86-43 Report issued 1-21-86.

No Radiological Evaluation adverse effects, several recommendations.

b)*

1.

Flooding / Filling of J. Field SU Closure NOM 86-17 Helium leak test of WGS Waste Gas Header /

by 1/31 completed. Action Plan Surge Tank approved 01-13-86.

Work complete.

2.

Waste Gas Compressor M. Price SU Closure WR 107918 Investigation shows Investigation due 1/31 no damage.

c)

Usefulness of RJR-013 V. Lewis ST Closed NOM 86-50 Long term on Living Schedule.

Interi points on H3TMI. g trend 8.

Emergency Plan a)

EP Activation Analysis R. Myers SU Closure Rpt.

Troubleshooting Plan due 1/24 approved 01-14-86.

b)

TSC Fire Sprinkler V. Lewis 50 Closure NCR S-5060 Actuation due 2/6-ECN R-0197 c)

State Auto-notification R. Myers SU Closure Rpt.

System worked properly.

upon SFAS due 1/24

LEGEND: SU = Startup R: quired LT = Long Term STATUS DATE 01-24-86 p

PE = Power Escalation DECEMBER 26, 1985 TRANSIENT NA = Not Applicable

~

TIME 1000 g

Page 11 of 15 ST = Short Tern

- ACTION LIST -

g

    • Closure Report Required to NRC
  • Troubleshooting / Repair Guidelines Per GAC 85-1001 Apply DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/

COMMENTS ETC.

9.

Training a)

Sequence of Events J. Mau SU Due 1/24 BWOG Item 5.

RJR 86-19, Awareness Item 9.

All operators will

~

have recieved training by 1/24.

~

b)

New Procedures and Mods J. Mau SU Due 03/07-86 Identification and scheduling of training.

RJR 86-19, Item 9.

BWOG Item 1.

Review must be documented.

Completion pending procedures by 2/7.

c)

Short Term Training J. Mau ST Event Training I week / shift required.

d)

Simulator Training J. Mau ST RJR 86-19, Item 10.

e)

Comnand and Control J. Mau SU Training simultaneous with Training that of Item 9b.

10. Operational Review a)

Procedure Adequacy B. Ford SU Due 2/1 Includes ATOG Review per item 3.e.3.

b)

Communications B. Ford SU Due 2/1 O

LEGEND: SU = Startup R: quired h

LT = Long T;rn STATUS DATE 01-24-86

. g PE = Power Escalation DECEMBER 26, 1985 TRANSIENT TIME 1000 NA = Not Applicable Page 12 of 15

> $j ST = Short Term

- ACTION LIST -

-4

    • Closure Report Required to NRC
  • Troubleshooting / Repair Guidelines Per GAC 85-1001 Apply DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/

COMMENTS ETC.

10.

c)

Operator Performance B. Ford SU Due 2/1 d) local / Manual Valve B. Ford SU Due 2/1 Operations o)

Effect of Loss of ICS V. Lewis SU

' Closure Rpt.

RJR 86-19, Item 4.

during SFAS 1/31 1100 System / Component Response a)*

Aux Steam, PSV-36012A J. Field SU Complete NOM 86-11 R1, Closure Report revised 1-17-86.

b)*

1)

Failure investigation J. Field SU Awaiting NRC WR107855/856 TS Action Plans issued per of Aux FW, FV-20527, Concurrence NDH 86-06/01-10-86.

Repair FV-20528 Action Plan for FV-20527/8 issued 1-21-86 per NOM 86-41.

2)

FWS-063, FWS-064 J. Field SU Engineering FWS-063 had rusted Rpt. Due 1/25 bearings.

Others OK.

c)* Main Steam, PSV-20544 J. Field SU Complete NOM 86-11 R1 Closure Report revised Awaiting NRC 01-17-86 to NRC on 1-21-86.

Concurrence d)

RCP Seal Injection Flow J. Field SU Closed NOM 86-07 No maintenance required.

O

LEGEND: -SU = Startup R:quir:d LT = Long T;rm STATUS DATE 01-24-86

., p PE = Power Escalation DECEMBER 26, 1985 TRANSIENT TIME 1000

i NA = Not Applicable Page 13 of 15 P

ST = Short Tem

- ACTION LIST -

g

    • Closure Report Required to NRC

= Troubleshooting / Repair Guidelines Per GAC 85-1001 Apply DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/

COMMENTS ETC.

11** e)

DHP Lo Oil in Auto Feeder M. Price SU Complete NOM 86-09 No problems found.

Closure Report 01-10-86.

f)* Feedwater Heater Shell J. Field SU A. Plan NOM 86-40 Rework control valve seats.

Reliefs opened Approved 1/20 Closure Report due 1/31.

g)*

SFY-23811 Position J. Field SU Action Plan Z9020 indicated " Closed" Indication Due 1/24 although F9003 continued to Closure indicate flow due 1/30 h)

Review PM program for M. Price SU Closure due manual isolation valves 1/31 12.

Quarantined Equipment List

  • a)

PSV-20544, Main Steam J. Field SU Awaiting NRC NOM 86-11 R1 -

Closure Report awaiting NRC Code Relief Concurrence concu rrence.

Rev. I to NRC 1-21-86.

b)

FV-20527, A-AFW Control J. Field SU Awaiting NRC Hold on repairs pending NRC Valve Concurrence.

will tear down valve Tbleshooting internals and replace hand Complete.

NOM 86-44 Jack.

Engineering Engineering Report to NRC Rpt Complete 1-21-86.

01-20-86.

Repair Action Plan available 01-20-86.

LEGEND:

SU = Startup R: quired 2

LT = Long Tcra STATUS DATE 01-24-86 5

PE = Power Escalation DECEMBER 26, 1985 TRANSIENT TIME 1000 y

NA = Not Applicable Page 14 of 15 F

ST = Short Term

- ACTION LIST -

2

-** Closure Report Required to NRC i

  • Troubleshooting /Repa;r Guidelines Per GAC 85-1001 Apply DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/

COMMENTS ETC.

12. c)

FV-20528, B-AFW Control J. Field SU Awaiting NRC Will rebuild hand jack.

Valve Concurrence.

Tbleshooting Complete.

HOM 86-44 Engineering Report to NRC Engineering 1-21-86.

Rpt Complete 01-20-86.

Repair Action Plan available 01-20-86.

d)

FWS-063, A-AFW Manual J. Field SU Engr. Rpt.

Action Plan approved.

Isolation Valve Due 1/25 mis completed 1-21-86.

e)

FWS-064, B-AFW Manual J. Field SU Engr. Rpt.

Action Plan approved.

Isolation Valve

. Due 1/25 mis completed 1-21-86.

f)

ICS associated Power C. Linkhart SU Awaiting NRC Closure Report completed.

Supplies Concurrence See items 3.b.1/2.

g)

ICS Power Gistribution N. Brock SU Tblshooting Action Plan approved.

In Progress 13.

Procedure Changes Tracking J. Field SU Draft List Steve Luke, develop list of Due 1-27 all related procedure changes.

LEGEND:

SU = Startup R. quired 1 2 LT = Long T;rm STATUS DATE 01-24-86 5

PE = Power Escalation DECEMBER 26, 1985 TRANSIENT TIME 1000 k

NA = Not Applicable Page 15 of 15 F

ST = Short Term

- ACTION LIST -

2

    • Closure Report Required to NRC
  • Troubleshooting / Repair Guidelines Per GAC 85-1001 Apply DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/

C0f1MENTS ETC.

14.

Carryover items f rom October 2, 1985 Event Action List:

1.

Item II: Root Cause S. Crunk ST Pending NA Closure Required Final Report Due 2.

Item VIb: Check common N. Brock LT Overdue NA To be completed 12-15-85.

failure possibility on Due controller linkages.

3.

Item Villi: Correct /

11. Price LT Overdue CCL 85-0856 To be completed 01-01-86.

upgrade documentation on Due turbin? trip block.

4.

Item VIllm:

Design V. Lewis LT Overdue NA To be revised by Living improvements to reduce Due 1-31 Schedule by 01-31-86.

MSR Relief Valve leakage 5.

Item Xb: Perform ICS N. Brock PE Needs Closure NA To be completed 12-01-85.

tuning at power Due 6.

Iten XIIIj:

S. Crunk LT Pending NA Need Final Report P-319 Bearing Failure Due Root Cause Report 7.

Item XIVb:

S Crunk LT Pending CCL 85-0862 To be completed 12-15-85 Loss of Aux. Steam Event Due Root Cause Report l

8.

Item XVIb:

D. Comstock LT Due 3-1-86 NA Procedure Adequacy Lessons Learned l

(

a

.= *,,

ATTACilMENT II 3

g

,l-l0

"' g s

at m.

hh T

'h"'I ooger.

t. t 91tii.

,rs o

a

$U 6 8y 2

~~~~'8~

yy fa f~

)

!g.;nn 3sa.

t d.

s.

r 1

g!!$!E'O$!se$

E k i l!!4 3)j d g 0,3;e i

I!

mase0 5 1 S

i 4,

1 rx f0000e-0!g=sven si 9 r

tx

-l i s

i t

m as yh5"f gp kis

,y5$2hg}$'

3

_ '_:t i O 3!pj!)s!

9afW i

S JV" 6J 'Q sg**f3 3

9B ei d6 l

t

,!,hhag,3nsrises,g;[<l

    • 0%

I31.

a g-[ d-d-Q

, g-y-t 3 l.. h. f, - ;j' w 3., f

,af 1

y r,

v Y ;

.l7-l.8t9 sa e

.a 5

5 s

eedte;gy8 ig-fa g

a-4 g

av 00,qqegg sgegg'

}

gr c,

a 9*YY. A s., a f

.5 d

g

[

[

n#

a$

d 8

~

l4 I

r, g

1,.

e. a 3 Fe g.: as et s

i

~

k A / s a i :.I s. B C g e

'j d

3 g )'

  • e"! f> d 1 i I f gg a! 8 w =l f ): g; 5

s 3:

{

it!

a 6

e

--g, y-e o e

d Sll a. :

fi 0i oi [ $ G E $ s, ii n

!)

o 93 h

..:;a t

,Ju 4 f,

), sg g 92 e a h

h7.'

Qi Qg 4; y h )

!)

j [b r,.

s s :

s 56 A s i

'a v E _

s _ 'g.g _. ) _ M _ c _. g _ i G. $. e d

.t e

e

'-gjt, !

/ ?

iii ly

,ij A < a S :s zp.

$3 d N

s 3

A I a a j S

Oi 0i fi '3*,

.1 6 f s 4 2 3

a

}'

g.:

'J d h 3 t

g 3Y

.)

5 $

g l-

.4 1

8 3 Y.

w m{f.

,t

.I.

t,L a

& a g

g A

e

.j h, 3

a 11 L'

a Y

k

__