ML20212L166

From kanterella
Jump to navigation Jump to search
Partial Response to FOIA Request.App G Documents Already Available in Pdr.Documents Listed in App H Re Facilities Encl
ML20212L166
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/22/1987
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Holmes G
MHB TECHNICAL ASSOCIATES
Shared Package
ML20209B373 List:
References
FOIA-86-151 NUDOCS 8701290347
Download: ML20212L166 (5)


Text

.

U.S. NUCLEA'17.E!ULATORY COMMISSION mic soia stoutst nuvataisi f<a%,s.

e F01A-86-151 poeo(,

ht_E ty E f

RESPONSE TO FREEDEM OF l **'

X I "*'

T S

%.eee /

INFORMATION ACT (FOlA) REQUEST JAN g21ll87 e

oxut,mo.ti, sm,

.a.

I.toutStER Mr. Gregory A. Holmes PART 1.-RECORDS RELE ASED OR NOT LOCATED (See checked bones)

No agency records subsect to the request have been located.

No addetonal agency records subsect to the request have been located.

Agency records subsect to the request that are sdentifed m Appendia O

are already evadable for public espection and copying in the NRC Pubhc Document Room, X

1717 H Street, N W., Washington, DC.

Agency records subsect to the request that are identified in Appendan H

a,e be,ng made a,aasbie,o, pubhc.nspect,on and copy,no m ih. NRC pubhc Documeni X

rioom. irti N Sir.et. N W. washmaton. DC. in a foid.F und.t the FOiA numb.c.nd reauesie, nam..

The nonpropnetary version of the proposatts) that you agreed to accept in a telephone conversation with a member of my staff is now being made avalable for pubhc inspecten and coymg at the NRC Pubhc Document Room.1717 H Street. N W, Washington. DC. m a folder under the FOIA number and requester name.

Enclosed e informat.on on how you mas otstam access to and the charges for copvmg records placed m the NRC Public Document Room.1717 H Street. N W. Washington. DC.

Agency records subiect to the request are enclosed Any appbcable charge for copes of the records provided and paynwnt procedu es are noted m the comments secten r

Records sut;,ect to the request have been referred to another Federal agencyhesi for review and direct respor'se to you in view of NRC s response to this request. no further acten a beeng taken on appeal letter dated PART 11 A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain mformaton a the requested records e being withheid from pubhc disclosure pursuant to the FOIA esemptions descnbod m and for the reasons stated a Part 11. sec-tions 8. C. and D Any released portons of the documents for which only part of the record is bemg withheld are being made avadable for pubhc inspection and copyeg e the NRC Pubhc Document Room.1717 H Street. N W Washmaton. DC. in a folder under this FoiA n mber and requester name,

u Comments e

sic 4at meton ow-wa f s aNo g - "giconos-~s 0^

.L

&%s sA

^

1 w

g.4Kr_.r 8701290347 8701'22 PDR FOIA HOLMES86-151 PDR NIC FOIM 464 #enis it w I

F0!A-86-151 Appendix G DATE DESCRIPTION 1.

2/24/82 Unusual Occurrence - PNO-82-09, re valves and associated piping ANO: 8203020570(1page) 2.

3/8/82 Ltr. to the Honorable Nunzio Palladino; Subconsnittee on Energy Conservation and Power Hearing ANO: 8203170416 (5 pages) 3.

4/12/82 Ltr. to Mr. Engelken from R. Reedy; Progress Report #11 on the Quality Assurance Audit and Review portion of the Independent Design Verification Program AN0: 8204220493 (1 page) 4.

4/12/82 Ltr. to Mr. H. R. Denton, et al., from W. Cooper, Teledyne Engineering Services, DCNPP Independent Design Verification Program (IDVP) Initial Phase II Efforts ANO: 8204220307 (4 pages) 5.

4/8/82 Ltr. to Maneatis; Quality Assurance Audit and Review portion of Design Verification Program AN0: 8204200294 (3 pages) 6.

4/13/82 Ltr. to Mr. F. W. Mielke, Jr., from R. DeYoung, Notice of Violation ANO: 8601310080(4pages) 7.

4/16/82 Ltr. to Mr. Richard C. DeYoung from L. Belveal, Notice of Violation Rescinded ANO: 8204220248(3pages) 8.

4/27/82 Order by S. Chilk regarding Newmark's employment status at PG&E AN0: 8204290317(2pages) 9.

4/30/82 Ltr. to Harold Denton from H. Brown; QA Program Covering Bechtel's Scope of Work ANO: 8205040348 (2 pages)

10. 5/11/82 Ltr. to Mr. Roger. F. Reedy from H. Brown; Status of Independent Review of Diablo Canyon project ANO: 8205170187 (1 page)
11. 5/12/82 Ltr. to Mr. Harold Denton from J. Reynolds, 10.CFR 2.206(a)

ANO: 8205210377(11pages) 12.

5/20/82 Motion to Supplement Petition to Enforce and Modify License Condition or Alternatively Motion for Leave to Lodge Documents ANO: 8205240067(8pages) 13.

5/25/82 Ltr. to Mr. Harold Denton from J. Reynolds, 10 CFR 2.206

{

AN0: 8205280324(3pages)

F01A-86-151 Appendix G (continued)

DATE DESCRIPTION 14.

5/25/82 Joint Intervenor's Response in Support of Motion for Order Directing PG&E to Provide Information of Design Errors ANO: 8206040053(4pages) 15.

5/28/82 Ltr. to H. R. Denton et al., from W. Cooper, Temporary Delegation of Project Manager Responsibility and Authority ANO: 8207070494 (1 page) 16.

5/28/82 Ltr. to H. R. Denton from J. Reynolds, Independent Audit of Facility to be conducted prior to licensing AN0: 8206030186(5pages) 17, 6/2/82 Staff response to Governor Brown's request for the Board to order PG&E to provide information on Implications of errors identified in i

Board Notification PN0-5-82-09 and I&E Infonnation Notice 82-11 ANO: 8206040109 (6 pages) 18.

6/7/82 Joint Intervenors's Motion to Reopen the Record Ah0: 8206140054(360pages) 19.

6/30/82 Ltr. to Ms. Kaipo Bailey; Status of the Diablo Canyon Nuclear Power Plant with respect to licensing AN0: 8207160325 (5 pages) 20.

6/30/82 Ltr. to Mr. Denison; IDVP Semimonthly Report Format Ah0: 8207060423 (2 pages)

21. 8/6/82 Transcript - Public Meeting, Diablo Canyon Unit No. 1 Design Verification Program ANO: 8209150116 (176 pages)
22. 8/11/82 Ltr. to Dr. M. Reich from F. Miraglia, Diablo Canyon containment annulus structure AN0: 8208260613 (3 pages)

.I J

F01A-86-151 Appendix H DATE DESCRIPTION 1.

10/9/81 Transcript - Meeting with PG&E to discuss seismic design review, Diablo Canyon Unit 1 (9 pages) 2.

11/3/81 Transcript (beginning with Page 184) - Diablo Canyon Meeting (34 pages) 3.

11/9/81 Frank Miraglia Vu-Graphs (2) PG&E Reverification Program Proposed by the Staff Letter - 50.54f (2 pages) 4.

3/15/82 Memo for Chairman Palladino, Commissioner Gilinsky, Comissioner Bradford, Comissioner Ahearne, and Conmissioner Roberts; Informa-tion item - Submittal by Teledyne Engineering Services (3/8/82)

Regarding the Seismic Verification Program - Phase 1 for Diablo Canyon Unit 1 (Board Notification 82-24) (3 pages) 5.

3/18/82 Ltr. to Georgiou, Esq., Review of Atomic Safety and Licensing Bcara's decision in ALAB-644, 13 NRC 903 (June 16, 1981)

(29 pages) 6.

3/24/b2 Ltr. to P.T. Kuo from Reich, BNL; Seismic Response and Piping System Studies at the NRC (3 pages) 7.

3/24/82 Memo for Chairman Palladino, Comissioner's Gilinsky, Bradford, Ahearne, and Roberts; Information Item - Submittals by R.F. Reedy (3/1/82) and R. L. Cloud (3/15/82) regarding the Design Verifica-tion Program Phase 1 for Diablo Canyon Unit 1 (Board Notification 82-29) (3 pages) 8.

3/30/82 Ltr. from R. Cloud - Verification Program effective immediately (2pages) 9.

4/8/82 Ltr. to Maneatis from R. Reedy; Quality Assurance Audit and ReviewportionofDesignVerificationProgram.(5pages)

10. 4/15/82 Note from F. Miraglia transmitting Teledyne letter dated April 2, 1982 regarding Independent Design Verification Program (4pages)
11. 4/14/82 Ltr. to Mr. R. F. Reedy, et al., from W. Cooper; Procedure for Open Item Reports (1 page)
12. 4/29/82 Ltr. to The Honorable Robert J. Lagomarsino from W. Dircks; Electrical Costs in Santa Barbara (2 pages) e

w F0!A-86-151 Appendix H (Continued)

DATE DESCRIPil0N

13. 4/29/82 Ltr. to The Honorable Tom Beville from J. Ahearne; House Report 96-1093 (2 pages)
14. 4/26/82 Memo for Chairman Palladino, Commissioner Gilinsky, Consissioner Ahearne, and Commissioner Roberts; Information items Regarding the Design Verification Program - Phase 1 for Diablo Canyon, Unit 1 (Board Notification No. 82-42) (4 pages) 15.

5/22/86 Ltr. to Mr. H. H. Brown from W. Cooper; Requested meeting between TES and Governor Brown's Representatives (4 pages) 16, 6/21/82 Ltr. to The honorable Leon E. Panetta from W. Dircks, function of Bechtel Corp. in the Diablo Canyon Project Organization (14 pages)

17. 6/30/82 Ltr. to the Honurable Tom Bevill; Status report in response to the direction given in House Report 96-1093 (2 pages) 18, 7/1/82 Ltr. to Dr. William Cooper; Seismic Response of the Containment Annulus steel structure and a sartple at Diablo Canyon (2 pages) 19.

7/8/82 Ltr. to Joel Reynolds from H. Denton; Diablo Canyon Seismic Verification Program (2 pages) 20.

7/30/82 Ltr. to The Honorable Tom Bevill from N. Palladino House Report 96-1093(2pages)

Ltr. to Phillip(A. Crane from D. Eisenhut, QA Program for Diablo 21, 8/2/82 Canyon Project 3 pages)

22. 8/2/82 Ltr. to Harold Denton from H. Brown, Proposed Independent Design Verification (26pages) 4 l
23. 8/19/82 Ltr. to Dr. W. E. Cooper from D. Eisenhut, Indpendent Design VerificationProgram(36pages) 24.

11/29/82 Ltr. to H. Schierling from J. Cragin w/ attachments, subject:

IDVP Participants - Activity /0wnership of PG&E, Bechtel (13pages) i l

1 w

e-mn-.n

,.--,,,,-----,---n--,,


,.~nwr

,,,--,-----.n..,.

---=---.--a,

--,--m,n g-

-.,