ML20212L224

From kanterella
Jump to navigation Jump to search
Notifies That ET Denison Appointed Project Manager of Plant Verification Program Effective Immediately.Author Will Remain Involved in Project as Principal in Charge.Related Info Encl
ML20212L224
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 03/30/1982
From: Cloud R
ROBERT L. CLOUD ASSOCIATES, INC.
To: Harold Denton, Engelken R, Maneatis G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V), Office of Nuclear Reactor Regulation, PACIFIC GAS & ELECTRIC CO.
Shared Package
ML20209B373 List:
References
FOIA-86-151 P-105-4, NUDOCS 8701290379
Download: ML20212L224 (5)


Text

p-

L

.s j

ROBERT L. CLOUD ASSOCIATES, INC.

325 UNIVERSITY AVENUE BERMELEY, CALIFORNIA 94710 (415) 841 9296 P 105-4 March 30, 1982 To Distribution List:

Mr. E. T. Denison is appointed Project Manager of Diablo Canyon Verification Program effective immediately.

I will remain involved in the project as Principal in Charge.

Your rul

)

R.

Clo'd a

8701290379'870122 PDR FOIA HOLMES86-151 PDR l1

s. ;..

_ s.

DISTRIBUTION. LIST:

Mr. Harold R. Denton, Director Mailing Address:

Courier Address:

Office of Nuclear. Reactor Regulation 7920 Norfolk Avenue U. S. Nuclear Regulatory Commission Bethesda,' Maryland 20114 Washington, D. C. 20555 "FOR ADDRESSEE ONLY" (301) 492-7691 (301) 492-7691 Attention:

Hans Schierling (301) 492-8423 "TO BE OPENED BY ADDRESSEE ONLY"

- Mr. R. H. Engelken

~ ' ' ~

R'e~gional Administrator Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 260 Walnut Creek, California 94596 Mr. George Maneatis Senior Vice President Pacific Gas and Electric Company 77 Beale Street San Francisco, California 94106 Mr. Roy Fray Diablo Canyon Verification Program Manager Pacific Gas and Electric Company 215 Market Street San Francisco, California 94106 Mr. R. F. Reedy, President R. F. Reedy, Inc.

236 N. Santa Cruz Avenue Los Gatos, California 95030 Mr. Frank Sestak, Jr.

Chief Pouer Engineer Stone & Webster Engineering Corporation 245 Summer Street Boston, Massachusetts 02107 Dr. W. E. Cooper Teledyne Engineering Services 130 Second Avenue Waltham, Massachusetts 02254 Attention: Document Control l

(

Project 5511

i 1 i

R. F. IEEDY, I.';CuK POIGTED

30 N. Sant Crue.\\.cnne
  • Los Gunes. Catt ro:nta 95oan - (40m.55;.9: 10 April F,

1952

/

~\\

,,te y((,,) J E D ^-

". c. i..

"...n

..+s L

Senirs '/: ce Presider.: for Facel1:

-s Deve'.Opment e

J P A C.'."I n r.. e.4.9 c r - - ; ". I C I

f7 u

- ~..

t-

,s

,(

%,' '"'g._

,b..'.,,,;_'.",, y *,

P.O.

B o >. 7442

  • a r'

1 4

~*s+-

Sa n F r.;3 n e : eco, CA 94120 f

tt

^f

(

f suu.u. -

-m.- - w c.- -

o. *.- ~...

y e'

('

ro; rest, wr

=11 1

p 7

53y;

.s e-

.'.nh7

T.

'. heh*:S:

  • "* I'/='

+

  • ...ed 15.

'. x re s s F..

--yr,

c'.

.:: 1 p

.; e. e,::. a :..

11:

.-v e. p c.-. : a,

c. :.

.g -

{,; c.,

? - :: g:

i

.!:en::o.

. rog ra:..

c. e ; c : - u..;.. ::

)(

._.o..

< o.,

u. 3.- i.

.3 3 r..m

. o

n. p.- 4.

,,, c.....

(

Verv *.;;; you:..v g m l [g

./

,-. /./. s/-

t

/

s

- /

s..-

r 4

..,,f' y;.:,. ;- '...

..y' l/

.,G s. /

-,^

.t s-. L y.,.. -

  • s j

!.. Fj

/

F.F K : n c cc; H.

R.

Denton W.

E.

Cooper h.

'. Clouc h.

Fray F.

S <- s t a k..i r.

i....., ?

a..

......<.....-..i..

. > 1 l1 n).

_) J._)

R. F. REEDY, INCORPORATED

3G N. Nantu Crue.bcunc Los Guto., Callfurnia 'J50!iu * (40MI ;ini-ill IO April 8, 1982 Mr.

G.

A.

Maneatis J.

Senior Vice President for Facilities Development IdhY b 'pgb PACIFIC GAS AND ELECTRIC P.O.

Box 7442 San Francisco, CA 94120

Subject:

Semimonthly Report Progress Report #11 Dear 'tr.

"aneatis:

Attached is our Progress Report #11 on the Quality Assurance Audit and Review portion of the Independent Design Verification Program.

The Report covers the period from March 24, 1982 to April 7, 1982.

Verv +"uly you s ce F.

dy, P. E o

R.

REEDY, INC.

RFK:na g

\\

, y R.

L.

Cloud stak, J r.

k

~

L4$

qfnb

sf" e A-)

R. F. REEDY, INCORPORXTED 236 N. Sunta Cniz.kesiine Lim Gutos, California 950:50 * (40N :154-9I10 April 3,

1982 Mr.

G.

A.

Maneatis Senior Vice President for Facilities Development PACIFIC GAS AND ELECTRIC P.O.

Box 7442 San Francisco, CA 94120

Subject:

Semimonthly Report Progress Report #11

Dear Mr. Maneatis:

Attached is our Progress Report #11 on the Quality Assurance Audit and Review portion of the Independent Design Verification Program.

The Report covers the period from March 24, 1982 to April 7, 1982.

Ver uly you s oe eedy, P. E R.

REEDY, INC.

RPR:na cc:

H.

R.

Denton W.

E.

Cooper R.

L.

Cloud R.

Pray F.

Sestak, J r.

a it..g r l' thoh. l' l!. - I.ngle. s rhig i nusuliang

PitOGltESS ItEPOltT OF SEISMIC SAFETY-RELATED CONTRACTS PRIOR TO JUNE 1978 DIABLO CANYON NUCLEAR POWElt PLANT PitOG RESS REPORT #11 WUltK PEltIUD FitOM MAllCil 24, 1982 to APitIL 7, L98

l Report of work performed with regard to quality Assurance Audits and lleviews by l

R.

F.

REEL)Y, INC.

l l

I l

l O l ! A N n /A hrs n nC))

l TJ M Wdo'-w w 1

......,.......i.i

-i..e,.......<............

s r

"I' PROGRESS REPORT # 11 This report covers our ac tivit'ies through April 7 1982 with regard to our Independent Quality Assurance Audits and Reviews of the Diablo Canyon Unit 1 Plant.

The Phase I QA Programs for PG&E and the six major design subcontractors noted in previous reports have been completed.

The design chain is to be reviewed to determine whether or not any other design subcontrac-tors should be included in the Phase I effort.

In addition the following activities have occurred:

(1)

We attended a Phase I Program aview meeting with the NRC staff on March 25, 1982 in Bethesda, MD.

(2)

On March 26,

1982, we met with TELEDYNE ENGINEERING SERVICES, R.

L. CLOUD ASSOCIATES, and STONE WEBSTER in the WESTINGHOUSE offices in Bethesda.

The purpose of the meeting was to discuss the continuation of the Phase I

Program under the Program Management of TES.

Also interfaces and methods of operation were discussed.

(3)

On April 1, 1982 we met with the NRC staff in Bethesda to discuss the Phase'I QA Audit and Review Reports.

The purpose of the meeting was to discuss the approach, the criteria used and the meaning of the results of the QA Audits and Reviews.

I i

l n..., i

u.... i i

-i..e...............~.i.....

!